Godrej Plant 13 Annexe – Facts Sheet

Energy Savings

36 %

Water Savings

86 %Waste Recycled

100 %

IGBC – EB Facts

GODREJ PLANT – 13 ANNEXE, Mumbai

PLATINUM 90/100

Site & Facility Management 16/18

Water Efficiency 26/26

Energy Efficiency 24/30

Health & Comfort 12/14

Innovation in Design 12/12

*Attempted and Achieved 90 Points

Building Profile

Green Certification:

PLATINUM Rating under IGBC – EB

PLANT 13 ANNEXE

BUILDING

VIKHROLI EAST,

MUMBAI

Built 2008

Built up Area 24,443 Sq Mt

Air- Conditioned Area 16,050 Sq Mt

Building Usage – Floor Wise

Basement Floor Utilities & Parking

Ground Floor Kitchen and Canteen

First Floor Cafeteria & Office

Second Floor Office

Third Floor Conference Rooms

Fourth Floor Auditorium and Banquet

Challenges

Collaboration

Diverse Usage of Building

Canteen

Office

Training

Varying Occupancy Profile

Benchmarking

Site & Facility Management

Building Envelope : Daylight at Various Level and Locations

Daylight Tunnel At the Entrance At Various Level

High SRI Paint at Terrace

Landscape Terrace Garden

Green Policy

Energy Audit

PM Schedule

(Contd..)

Reduce Heat Island EffectStrategic Initatives

Eco-Friendly Commute : The location of Vikhroli facilitates easy access to the Godrej

campus by Public transportation such as Bus and Railway

Eco-Friendly Landscaping : 76 % of Total Landscape Area is with Native/ Adaptive

Species

Bus Stand Railway Station Auto-Rickshaw Shuttle Bus

At Entrance Near Canteen At Cafeteria

Water Efficiency

Low Flow and Water Efficient Fixtures : 86 % Savings achieved

Fixture Type Baseline Installed

Flush Fixture 6 LPF 6 / 3 LPF Dual Flush

Urinals 4 LPF 2 LPF

Faucet 8 LPM 2.5 LPM @3 Bar

Rain Water harvesting

Low flow fixture Dual flush

Rain Water Harvesting Capacity : 83% of Total Rainfall on Site

IGBC EB Requirement :

(RWH)

25 % - 50 %

IGBC EB Requirement :

(Water Efficient)

20 % - 40 %

Treatment and Reuse of Waste Water – 100 %

Description Value (in KL)

Total Waste Water Generated per

Day

133

Total Central STP Capacity per Day 750

Accountability

Central STP at Godrej and Boyce, Vikhroli

Energy Efficiency

Details Consumption in kWh

Total Energy consumption as per ECBC 3,364,834

Actual Energy Consumption 2,151,284

Savings per Annum ( ECBC – Actual) 1,213,550

Energy Savings in Percentage 36 %

Energy performance of Building: 36 % Savings achieved

IGBC EB Requirement :

(Energy Efficiency)

20 % - 40 %

Energy Performance Index: PL-13 Annexe

For Warm and Humid Climate

EPI < 100 5 Star

BEE Star Labelling :

(Energy Efficiency)

Application is in

Progress

Details Values in kWh

Actual Energy Consumption 2,151,284

Estimated Renewable Energy

Generation

2,02,915

Energy Savings in Percentage 9.4 %

On-Site Renewable Energy Generation: 9.4 % Generation Estimated

IGBC EB Requirement :

(On-Site Renewable)

2.5 % - 7.5 %

Energy Metering to Monitor and Enhance Energy Performance

Metering Panel

NOTE: 120 KW Solar PV

Break-up of Energy Consumption : Sub Metering

Energy Efficiency : Strategies

• Building Envelope :

� Ample Daylight

� Sufficient Parking

� Trees and Shading

� Landscape and Terrace Garden

• Building Management Systems and Automation:

• Operation and Maintenance :

Building Management System Fire Alarm System Occupancy and

Daylight SensorsHigh COP Chiller

Health and Comfort

Facilities for Differently Abled People

Washrooms Braille & Audio SystemPreferred Parking

Ramp at Building Entrance

Facilities for Occupant’s Well-being : HUBBLE

Poster & Card Making

Mahatma Gandhi Jayanti

Christmas Day Celebration

International Women’s day Mission on Mars

Diwali Celebration

Facilities for Occupant’s Well-being : HUBBLE – Events Organised

Inn vation

Typewriter Sculpture @ Hubble: last stock of Godrej’s

Type Writers

� Investment : 14 Lacs INR

� Savings: 04 Lacs INR

� Payback : 3.5 Years

Key-Initiatives :

Dish-Wash Machine (Water)

Water Savings :

15,000 Lit/day

Heat Pump (Energy)

� Investment : 25 Lacs INR

� Savings : 08 Lacs INR

� Payback : 03 Years

Waste Management : Organic Waste Compost

Collection and Segregation of Kitchen Waste

Organic Waste Vermi Compost – Manure Generation

Description (MT) FY 14 FY 15

Organic Waste 940 1130

Compost Generation 280 400

Innovation: Awareness and Education

An Art Work made out of used paper by the school students displayed in the building

Posters on Food Wastage, Water Saving and Safety

Thank You