Good Morning

CASTLEWOOD Rotary

August 6, 2019

Castlewood Dam

Built in 11 months by 85 guys

Cost $350,000

2,000 acre feet.

1.7 billion gallons of water.

Lake Louisa

Along Speer Boulevard

Larimer Street

Why did it fail?

August 3, 1933

1:20 a.m.

Where are the deep cuts?

1933

2008

Thanks

It’s Always A Great Day In the Park.

P.S. The original name of the canyon was

Wildcat Canyon circa 1902.