Post on 18-Jun-2018
transcript
GOVERNMENT OF ANDHRA PRADESH
ABSTRACT
H.M.W.S. & S.B – Protection of catchment Areas of Himayatsagar and Osmansagar Lakes –
Recommendations of the Committee Constituted by the H.M.W.S. & S.B – Amendment to
G.O.Ms.No.192, M.A., Dt.31.3.1994 – Orders – Issued.
MUNICIPAL ADMINISTRATION AND URBAN DEVELOPMENT (II) DEPARTMENT
G.O.Ms.No.111, M.A. Dated the 8th
March, 1996.
Read the following:-
1. G.O.Ms.No.192, M.A, dated 31.3.1994.
2. From the Vice Chairman, HUDA, letter No.3811/P8/94, dated 6.6.94.
3. From the Director, Town and Country Planning, Hyderabad letter
Roc.No.11914/94/P1, dated 9.8.94.
4. From Managing Director, H.M.W.S. & S. Board, letter No.1220/CE/T1-S1/92/2030;
dated 3.1.95 and 21.4.95.
5. Govt. D.O. Lr.No.31222/11/95-1, M.A, Dt. 25.10.95 and 4.11.1995
6. From the ManagingDirector, H.M.W.S & .Board, Hyderabad, D.O.Lr.No.MDP/
HMWS&SB/ 95-1637, dated 26.12.1995.
-------
ORDER:
1. In the G.O., 1st read above, orders were issued prohibiting various developments within 10
km radius of Himayatsagar and Osmansagar lake areas which are main sources of drinking
water supply as per the recommendation of the Expert Committee constituted by Hyderabad
Metropolitan Water Supply and Sewerage Board to suggest ways and means to monitor the
quality of water in these reservoirs.
2. In the D.O. Letter 6th
read above, the Managing Director, Hyderabad Metropolitan Water
Supply and Sewerage Board has furnished second interim report of the committee prepared
after detailed discussions and field visit to Osmansagar pipelines, making certain
recommendations for the protection of the lakes.
3. Government after careful examination of the recommendations of the Committee, have
decided to issue the following orders in modification of the earlier orders issued in
G.O.Ms.No.192, M.A., dated 31.3.1994.
(i) To prohibit polluting industries, major hotels, residential colonies or other establishments
that generate pollution, in the catchment of the lakes upto 10 kms from full tank level of
the lakes as per list in Annexure –I.
However, residential developments in residential use zone may be permitted. The
following measures shall be taken to protect water flowing into the lakes.
(a) 60% of the total area shall be kept as open space and roads in all layouts in the
villages of catchment area.
(b) The land use of about 90% of the area is classified as recreational and conservation
use in the Master Plan. The Hyderabad Urban Development Authority should take
action for the classification of this 90% of the area as agriculture which is inclusive
of horticulture and floriculture.
(c) To restrict the F.S.I to 1:0.5 in the catchment area. This measure will ensure that
90% of the area remains under agriculture as is the practice now and ensure
protection of the lakes.
(d) To monitor periodically the level of difference pesticides, fertilizer residues carried
into the lakes. The Hyderabad Metropolitan Water Supply and Sewerage Board
shall conduct such studies through J.N.T.U/ Central University or any other
reputed agency at regular intervals and review the results once in 6 months.
(e) To prohibit polluting industries within 10 kms radius (i.e. both on upstream and
down stream side of the lakes) to prevent acidification of lakes due to air pollution.
(f) There shall be total prohibition of location of industries in the prohibited zone.
(g) Andhra Pradesh Pollution Control Board shall make further study of the existing
industries in the upstream and down stream of the lakes and take action under their
Act.
(ii) For the protection of raw water channel from Osmansagar to Asifnagar no layout or
building permission should be granted by Municipal Corporation of Hyderabad /
Hyderabad Urban Development Authority / Director of Town and Country Planning up
to a maximum of 100 ft from the conduit site boundary. While approving the layouts
along the conduit, a minimum of 9 mtrs wide road plus green belt to a maximum width
of 100ft should be insisted to act as buffer on either side of conduit and the green belt
shall be accounted as part of mandatory open space to be left the layout. Drainage pipe
lines must be laid parallel to the conduit and no sewerage/sullage water discharged shall
be allowed from the layouts towards the conduit.
(iii) Orders issued in G.O.Ms.No.50, M.A., dated 18.1.1989 shall be effectively implemented
by concerned Departments i.e., (1) Zilla Parishad Ranga Reddy, Mahabubnagar and
Medak districts. (2) Panchayat Raj Department (3) Irrigation Department (4) Social
Welfare Department are directed not to takeup any building works / check dams / lift
irrigation works / storage reservoirs across vagus flowing in the catchment areas.
(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)
C. ARJUN RAO
Principal Secretary to Government
To
The Managing Director, Hyderabad Metro Water Supply & Sewerage Board, Hyderabad.
The A.P. Pollution Control Board, Hyderabad.
The Vice-Chairman, Hyderabad Urban Development Authority, Hyderabad.
The Director of Town and Country Planning, Hyderabad.
The Panchayat Raj and Rural Development Dept.
The Industries and Commerce Department
The Energy, Science and Technology Department
The Collector, Mahabubnagar / Rangareddy / Medak / Hyderabad district.
Copy to:
Secretary to C. M.
P.S. to M (MA) / C.S.
A/W Section, MA & UD Department.
// forwarded by order//
Sd/-
SECTION OFFICER
ANNEXURE –I
VILLAGES FALLING WITHIN 10 KMs CATCHMENT AREA OF
OSMANSAGAR AND HIMAYATSAGAR.
Sl.No. Name of the Village Sl .in the Mandal Name of the Mandal
(1) (2) (3) (4)
1. Aziznagar 8 Moinabad
2. Yenkatpally 9 “
3. Mumtazguda 10 “
4. Sajjanpalli 13 “
5. Surgangal 19 “
6. Naebnagar 20 “
7. Bangallaguda 2 “
8. Nagireddiguda 22 “
9. Bakaramjagir 23 “
10. Andapur 24 “
11. Dargatdrula 25 “
12. Venkatpuram 26 “
13. Malkaram 3 Shamshabad
14. Kolbawatidoddi 4 “
15. Sultanpalli 5 “
16. Yacharam 6 “
17. Rayangudda 7 “
18. Chowdariguda 10 “
19. Markhudda 11 “
20. Amapelli 12 “
21. Harrigudda 13 “
22. Kotwalguda 14 “
23. Shamshabad 20 “
24. Kishanguda 21 “
25. Ottapalli 22 “
26. Tondapalli 23 “
27. Devatabowli 24 “
28. Talkatta 14/2 “
29. Etbarpalli 15 “
30. Makanpally 16 “
31. Kattireddypally 17 “
32. Yenkamadi 18 “
33. Ramangipur 1 “
34. Kevatriguda 2 “
35. Mangipur 8 “
36. Jukal 9 “
37. Gandigudda 24 “
38. Peddashapur 26 “
39. Madanpally 27 “
40. Palmakula 28 “
Sl.No. Name of the Village Sl. in the Mandal Name of the Mandal
(1) (2) (3) (4)
41. Gangiraiguda 31 Shamshabad
42. Cherlaguda 32 “
43. Hameedullanagar 33 “
44. Osettiguda 34 “
45. Gowlapallykand 35 “
46. Rashidguda 36 “
47. Syedguda 37 “
48. Gollapallekalan 38 “
49. Bahadurguda 39 “
50. Golkondakhur 40 “
51. Shakerpur 41 “
52. Sangiguda 42 “
53. Golkondakalan 43 “
54. Sollipet 8 Shabad
55. Maddur 9 “
56. Gudur 5 Kothur
57. Himayat Nagar 7 Moinabad
58. Chikkoor 6 “
59. Chanda Nagar 5 “
60. Medipally 1 “
61. Chinna Mangalaram 2 “
62. Mothukupally 3 “
63. Reddypally 4 “
64. Pedda Mangalaram 11 “
65. Khanpur 2 Rajendranagar
66. Gunugurthy 3 “
67. Vatti Nagulapally 1 ”
68. Janwada 9 Shankerpally
69. Dhatampally 8 Shamshabad
70. Maharajpet 10 “
71. Gopularam 11 “
72. Poddutur 12 “
73. Chinna Shapur 12 “
74. Tol Matta 14 “
75. Yenkapally 12 Chevella
76. Yerlapally 13 “
77. Kanmeta 14 “
78. Gollapally 15 “
79. Raviapally 16 “
80. Mudimyal 17 “
81. Mumera 18 Rajendranagar
82. Malakpur 34 “
83. Tankutur 13 Shankarpally
84. Bulkapur 5 “
SECTION OFFICER
$\iPL
Proces,No.LCV421312007
Sub:- Alienation - Alienation of Government / Assigned lands in Rakamcharla (V), PudwMandal, Ranga Reddy District Sy.No.243 to 248, Extent Ac.28-06 in favour of APIIC forlaying approach road - Sanction of ex-glatia amount - Olders - Issued.
Refi 1. Zonal Manager, APIIC, Jeedimetla, Hyderabad LI.No.20IJDM/APIIC /RKC/20"|0-17 , Dt:06.03.2012.
Copy to the Tahsildar, Pudur Mandal, R.R.District.
Copoy to the Zonal Manager, APIIC, Jeedimetla Zone, Hyderabad-56.
gZopy to the Managing Director, APIIC, Parisram Bhavan, 6rh Floor, 5-9-58/8, Fathemaidan Road,Hyderabad 500004.
ECTOR & DPRESENTT SMT A.VANI PRASAD. t.A.S.
RANGA REDDY
aPilcLTrrrllvaRD sEcrti
l4AR 7"'
ORDERS:
The Zonal Manager, APIIC Ltd., Jeedimetia Zone, Hyderabad in
submitted the proposals for alienation of the Covernment land in Sy.No.243 extent Ac.3-OSgl€,,2r'A/z
extent Ac.5-00gts, 24511 extent Ac.5-00gts, 24611 extent_Ac.5-03gts, 247 /1exte\t Ac.439gts and 249/I
extent Ac.4-39gts (total extent Ac.28-06gts) situated in Rakarncherla Village of pudur Mandal infavour of APIIC Ltd for laying 100 feet wide approach road to the Governrnent land allotted to Apllcin Sy.No.5/1, of Rakamcheda Village. When the matter was referred the Sub-Collector, Vikarabad
submitted the proposals for fixation of Market Value for payment of ex-gratia in terms of
G,O.Ms.No,1307 Rev (Asn.l) Dept. Dt23.12.1993, in the reference 3.,r cited. The Sub-Collecto!,
Vikarabad has recommended to consider the prcvious mte of Rs.1,95,000/- per acle (excluding 30%
solatiuEr for oavment of ex-graria to the assignees of the land h Sy.No.243, 244/2, 245/1, 24b/ l,247 /"1 a^d 248/ 1 situated in Rakamcherla Villaqe of pudur Mandal.
Accordingly, sanction is hereby accorded for payment of ex-gratia to the assignees of the
Govemment land in Sy.No.243, 244/2, 245/1, 246/"t, 247/1 a d,24a/t situated in'Rakamcherla
Village, Pudur Mandal at the rate of Rs.1,95,000/- (Rupees One LaqNinty Five Thousand) only per
acle (excluding 30% solatium) as recommended by the Sub-Collector, VrlaFbad Division.
The Sub-Collector, Vikarabad is requested to take mmediate achon for resumption of the
lands after payment of ex-gratia to the arssrgnees.
sd/-colLECTO&
RANGA REDDY DISTRICT./ / Aftested/ /
4t#"o'(Reddy District.
ToThe Sub-Collector,Vikambad Division.
\b
Ranga
v
442.60
69.79
19.09
47.81
60.0
6
44.16
178.4
1
70.1
3
60.7
5
107.99
94.08
114.44
133.22
131.3
3
146.61
146.2
1
250.70
535.57
704.
82
TELEPHONE EXCHANGE
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
0
18.3 MTS. WIDE ROAD
E X I S T I N G R O A D
PR
OP
OS
ED
1
8.3
M
TS
. W
IDE
R
OA
DP
RO
PO
SE
D
1
8.3
M
TS
.
WID
E
R
OA
D
C. F. C. ACS.0.68
PROPOSED LAYOUT PLAN FOR
INDUSTRIAL PARK AT
RAKAM CHERLA (V) IN SURVEY
NO.5/1, OF PUDUR MANDAL,
RANGAREDDY-DIST.
P L
O
T
S
P L
O
T
S
P L O T
P L
O
T
P L
O
T
S
31.8
632.78
48.10
52.86
52.4
9
50.6
9
51.13
112.34
57.2
1
wide road
UM
EN
TA
L T
O
CHIEF GEN. MANAGER/E
ASST.MANAGER/T
A.P.I.I.C.LTD.,HYDERABAD
ENGINEER-IN-CHIEF
MANAGER/E
DY.GENERAL MANAGER APIIC LTD.HYD.
442.60
47.81
44.16
178.4
1
70.1
3
60.7
5
107.99
94.08
114.44
133.22
131.3
3
146.61
146.2
1
250.70
535.57
704.
82
AREA 0.82 AC
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
075
.00
75.0
075
.00
112.
50
PROPOSED 18.3 M WIDE ROAD
PR
OP
OS
ED
1
8.3
M
TS
. W
IDE
R
OA
DP
RO
PO
SE
D
18.3
M
TS
. W
IDE
R
OA
D
PR
OP
OS
ED
1
8.3
M
TS
. W
IDE
R
OA
DP
RO
PO
SE
D
1
8.3
M
TS
.
WID
E
R
OA
D
ACS.8.93
COMMERCIAL
ACS1.21. C. F. C. ACS.0.68
C. F. C.ACS.1.52
P L
O
T
S
P L
O
T
S
P L
O
T
S
P L
O
T
S
P L O T S
P L O T
P L
O
T
75 X
135.0
0 M
TS
.75 X
135.0
0 M
TS
.
112.5
X 1
75.5
3 M
TS
112.5
X 1
21.6
4 M
TS
31.8
632.78
48.10
52.86
52.4
9
50.6
9
51.13
112.34
57.2
1
wide road
UM
EN
TA
L T
O
ASST.MANAGER/T
MANAGER/E
DY.GENERAL MANAGER/E
APIIC LTD.HYD.
APIIC LTD.HYD.
LAND USE ANALYSIS:-
LAYOUT BOUNDARY
EXISTING ROADS
PROPOSED ROADS
TOTAL LAYOUT AREA ACS.122.18 100.00%
PLOTTED AREA ACS.090.55 074.12%
ROADS AREA ACS.011.29 009.24%
OPEN SPACE AREA ACS.012.28 010.05 %
ADMN., & CFC AREA ACS.004.00 003.27 %
COMMERCIAL AREA ACS.001.21 000.99 %
ELEC.SUB.STATION ACS.002.85 002.33 %
135.00 135.00
135.00 135.00
135.00 135.00
135.00 135.00
135.00
135.00 135.00
135.00 135.00
135.00 135.00
135.00 135.00
135.00 135.00
154.31
188.48
175.53
120.
95
137.01
88.46
45.9
5
75.02
53.0
1
38.94105.03
56.6
5136.97
118.
7211
2.50
112.
5011
2.50
112.
50
82.9
6
102.
9629
9.17
ADMN.BLDG
ACS.1.45
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
24
25
26
23
29
28
27
TOTAL NO. OF PLOTS :
TOTAL; ROAD LENGTH 2699.61MTS./ 2.70 KMS.
32 nos.
OPEN SPACE
59.73
112.
50
31.95
121.64
121.64
121.64
253.20
324.75
78.0
4
PROPOSED
18.3
M. R
O A
D
V C & M D
10.0
0 m
w
ide
b
uff
er zo
ne
10.0
0 m
w
ide
b
uffer
z
one
10.0
0 m
w
ide
b
uff
er
zon
e
10.00 m
wide
buffe
r z
one
10.0
0 m
w
ide
b
uff
er zo
ne
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.0
0 m
w
ide
b
uff
er
zon
e
10.0
0 m
w
ide
b
uff
er
zon
e10.00 m wide buffer zone
10.0
0 m
w
ide
b
uff
er
zon
e
N
80.7
2
106.0197.39
3031
59.7
1
PROPOSED 18.3 M WIDE ROAD
EXISTING BT 60.00 F WIDE ROAD
E X I S T I N G R O A D
TO
PA
RIG
I
TO
M
AN
NE
GU
DA
EX
IST
ING
100'-
0"
(
30.0
M)
W I
D E
HIG
HW
AY
R O
A D
ST
AT
E
OPEN SPACE
ACS.3.35
71.27
77.1241.61 28.52
67.67
118.
40
82.6
9
66.7
2
53.9
8
46.8
4
120.00 100.38
167.54
254.08
ACS.2.85
ELEC.SUB.STATION
22
32
LAND TOBE ACQ
UIRED AND BOUNDARIES TO
BE FIXED
ACRES : 28.06
C. F. C. ACS.0.35
PROPO
SED 30.00 MTS. W
IDE APPROACH
ROAD
SCALE 1:1000
68.83
177.46
65.48
112.
50
Sd/- 17/12/2012
442.60
47.81
44.16
178.41
70.13
60.7
5
107.99
94.08
114.44
133.22
131.33
146.61
146.
21
250.70
535.57
704.8
2
AREA 0.82 AC
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75.00
75
.0
07
5.0
07
5.0
07
5.0
0
75
.0
0
75.00
75
.0
07
5.0
0
11
2.5
0
PROPOSED 18.3 M WIDE ROAD
PRO
POSE
D
1
8.3
MT
S.
WID
E
RO
AD
PRO
POSE
D
1
8.3
MT
S.
WID
E
R
OA
D
PRO
POSE
D
1
8.3
MT
S.
WID
E
R
OA
DPR
OPO
SED
18.
3 M
TS.
W
IDE
RO
AD
ACS.8.93COMMERCIAL
ACS1.21. C. F. C. ACS.0.68
C. F. C.ACS.1.52
P L
O
T
S
P L
O
T
S
P L
O
T
S
P L
O
T
S
P L O T S
P L O T
P L
O
T
75 X
135
.00
MT
S.75
X 1
35.0
0 M
TS.
112.
5 X
175
.53
MT
S11
2.5
X 1
21.6
4 M
TS
31
.8
6
32.78
4
8
.1
0
5
2
.
8
6
5
2
.
4
9
5
0
.
6
9
5
1
.1
3
1
1
2
.3
4
5
7
.2
1
w
id
e
r
o
a
d
UMENTAL TO
ASST.MANAGER/T
MANAGER/E
DY.GENERAL MANAGER/E
APIIC LTD.HYD.
APIIC LTD.HYD.
LAND USE ANALYSIS:-
LAYOUT BOUNDARY
EXISTING ROADS
PROPOSED ROADS
TOTAL LAYOUT AREA ACS.122.18 100.00%
PLOTTED AREA ACS.090.55 074.12%
ROADS AREA ACS.011.29 009.24%
OPEN SPACE AREA ACS.012.28 010.05 %
ADMN., & CFC AREA ACS.004.00 003.27 %
COMMERCIAL AREA ACS.001.21 000.99 %
ELEC.SUB.STATION ACS.002.85 002.33 %
135.00 135.00
135.00 135.00
135.00 135.00
135.00 135.00
135.00
135.00 135.00
135.00 135.00
135.00 135.00
135.00 135.00
135.00 135.00
154.31
188.48
175.53
12
0.9
5
1
3
7
.0
1
8
8
.4
6
45
.9
5
75.02
53
.0
1
3
8
.
9
4
1
0
5
.0
3
56
.6
5
1
3
6
.9
7
11
8.7
2
11
2.5
0
11
2.5
01
12
.5
0
11
2.5
0
8
2
.
9
6
10
2.9
6
29
9.1
7
ADMN.BLDG
ACS.1.45
1
2
3
4
5
6
7
8
910
11
12
13
14
15
16
17
18
19
20
21
24
25
26
23
29
28
27
TOTAL NO. OF PLOTS :
TOTAL; ROAD LENGTH 2699.61MTS./ 2.70 KMS.
32 nos.
OPEN SPACE
5
9
.7
3
11
2.5
0
31
.9
5
121.64
121.64
121.64
25
3.2
0
3
2
4
.
7
5
7
8
.
0
4
PROPOSED
18.3
M. R
O A
D
V C & M D
10.0
0 m
w
ide
b
uffe
r
zone
10.00
m
wide b
uffer
zone
10.00
m
wide
b
uffe
r z
one
10.00 m wide
buffer z
one
10.0
0 m
w
ide
b
uffe
r
zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00 m wide buffer zone
10.00
m
wide
buf
fer
zone
10.00
m
wide
buf
fer
zone
10.00 m wide buffer zone
10.00
m
wide
b
uffe
r z
one
N8
0
.
7
2
1
0
6
.0
1
9
7
.3
9
30 31
5
9
.
7
1
PROPOSED 18.3 M WIDE ROAD
E
X
I
S
T
I
N
G
B
T
6
0
.
0
0
F
W
I
D
E
R
O
A
D
TO P
ARIG
I
TO M
AN
NEG
UD
A
EXIS
TING
1
00'-0
"
(30.
0M)
W I
D E
HIG
HW
AY
R O
A D
STA
TE
OPEN SPACE
ACS.3.357
1
.
2
7
7
7
.
1
2
4
1
.
6
1
2
8
.5
2
6
7
.
6
7
1
1
8
.
4
0
8
2
.
6
9
6
6
.
7
2
5
3
.
9
8
4
6
.
8
4
120.00100.38
16
7.5
4
254.08
ACS.2.85
ELEC.SUB.STATION
22
32
C. F. C. ACS.0.35
SCALE 1:1000
6
8
.
8
3
177.46
65.48
11
2.5
0
Sd/- 17/12/2012
342.16
1
2
0
.3
2
STROM WATER TRENCH
RECHARGEABLE PIT
MANHOLE
LEGEND
SCALE 1:1000
STROM WATER & RAIN WATER PLAN
HECS(P)LtdAPPROVED/DATE
ENGINEEING CHECKED/DATE
DRAFTING CHECKED/DATEDESIGNED
NAME DATE
CHECKED
CR
CEO
REV
0DWG No: DD - HECS - APIIC - SRW - 005
DRAWN JAA 29.04.12
M/S. ANDHRA PRADESH INDUSTRIAL
CONSULTANT:
HUBERT ENVIRO CARE SYSTEMS P LTD,CHENNAI-600 083.
STORM WATER WITH RECHARGEABLE PIT LINKAGE PLAN SHOWING THE DETAILED RAIN WATER &
INFRASTRUCTURE CORPORATION (APIIC)
INDUSTRIAL PARK, RAKAMCHERLA
29.04.12
29.04.12
PUDUR MANDAL, RANGAREDDY DIST.
DESILTING CHAMBER
RAIN WATER LINEDESILITING CHAMBER
RECHARGEABLE PIT
1.0m x 0.8m
1.2m-Dia & 3m-Depth01
02
03
DESCRIPTION SIZESl.No:
03
11
NO OF UNITS
STORM WATER MANHOLE 0.6m x 0.6m16
442.60
47.81
44.16
178.41
70.13
60.7
5
107.99
94.08
114.44
133.22
131.33
146.61
146.
21
250.70
535.57
704.8
2
AREA 0.82 AC
75.00
75.00
75.00
75.00
75
.0
0
75
.0
07
5.0
07
5.0
0
75.00
75.00
75
.0
0
75.00
75.00
75.00
75.00
75.00
11
2.5
0
4
8
.1
0
5
2
.
8
6
5
2
.
4
95
0
.
6
9
5
1
.1
3
1
1
2
.3
4
5
7
.2
1
w
id
e
r
o
a
d
UMENTAL TO
135.00135.00
135.00 135.00
135.00 135.00
135.00
135.00
135.00
135.00
135.00
135.00
135.00
135.00
135.00
135.00
135.00
154.31
164.93
12
0.9
5
75.02
3
8
.
9
4
1
0
5
.0
3
1
3
6
.9
7
11
2.5
0
11
2.5
01
12
.5
0
11
2.5
0
5
9
.7
3
11
2.5
0
121.64
121.64
121.64
25
3.2
0
3
2
4
.
7
5
8
0
.
7
2
5
9
.
7
1
E
X
I
S
T
I
N
G
B
T
6
0
.
0
0
F
W
I
D
E
R
O
A
D
TO P
ARIG
I
TO M
AN
NEG
UD
A
EXIS
TIN
G
100
'-0"
(3
0.0M
)W
I D
EH
IGH
WA
Y R
O A
DST
AT
E
7
1
.
2
7
7
7
.
1
2
4
1
.6
1
2
8
.5
2
6
7
.
6
7
1
1
8
.
4
0
8
2
.
6
9
6
6
.
7
2
5
3
.
9
8
120.00 76.21
16
7.5
4
254.08
ACS.2.49
ELEC.SUB.STATION
177.46
65.48
11
2.5
0
1108
1207
06 13
1405
04 15
1603
02 17
1801
25
24
23
22
21
20
30
32
22
7.9
8
4
0
.3
4
188.77
PROP
OSED
18.3
MTS
. WID
E R
OAD
135.00
135.00
53
.0
1
31
26
11
6.1
5
1
6
3
.
4
5
9
9
.
3
4
6
9
.
8
5
141.4
9
1
1
1
.1
4
1
2
5
.7
0
1
0
1
.
8
3
C. F. C.ACS.1.52
C. F. C. ACS.0.68
ADMN.BLDG
ACS.1.45
OPEN SPACE
ACS.3.35
ACS.8.93
OPEN SPACE
COMMERCIAL ACS 0.94.
C
. F. C
.
ACS.
0.35
0910
19
27
28
29
46
.4
8
46
.6
9
11
0.1
2
10
1.1
8
75.00
TO RAIN WATER
HARVESTING TANK
REV REV BY DATE DESCRIPTION EDIT
01 JAA 29.07.13