GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
RAILWAY BOARD
No. 2011/RSF/649/2/RP-II/RWF New Delhi, dt. 15.07.11
The Chief Mechanical Engineer, Rail Wheel Factory, Bangalore – 560 064. The Controller of Stores, All India Railways & P/Units.
Sub:- Minutes of the Quarterly WTA Meeting for the planning of items for the period II/2011-12 (July - September, 2011).
Minutes of quarterly WTA meeting for the period II/2011-12 (July - September, 2011)
held with the representatives of RWF and Zonal Railways/PUs in Rail Bhawan, New Delhi on 07.07.11 has been uploaded on India Railway’s website www.indianrailways.gov.in. To access the Minutes kindly click on “Railway Board Directorates” under “About Indian Railways” Tab. Then click on “Stores”. Then click on “Conferences / Meetings” to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter III/2011-
12 (October - December, 2011) should reach this office latest by 15.09.11 positively. The exact date and venue of the meeting would be advised later on.
(Hindi version will follow.) Encl.:- As above.
( Sanjeev Misra ) Director, Railway Stores (F)
Railway Board.
Copy of the Minutes of the meeting together with allocation statement is forwarded for information and necessary action please.
1. The Chief Mechanical Engineers, All India Railways and Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata – 700 028. 4. M/s Bharat Earth Movers Ltd., “BEML SOUDHA”, 23/1, 4th Main, S.R. Nagar,
Bangalore-560 027. 5. M/s Titagarh Wagons Ltd.,113, Park Street, Kolkata – 700 016. 6. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office
Complex, Lodhi Road, New Delhi-110 003. 7. Adv.(RS), AM(ME), EDRS(C ), EDRS(P), EDME(Chg.), EDME (Tr.), EDEE(RS),
DME(PU), DME(P)-1, DEE/G, DRS(W), DRS(M), DF(S)-1 and RS(WTA) Branches of Railway Board.
8. CWM, Eastern Railway, Kancharapara. 9. The Controller of stores, Metro Railway, Kolkata.
RWF MINUTES Minutes of Quarterly WTA meeting held with representatives of RWF on 7.7.2011 in Rail Bhawan, New Delhi for planning the requirement of WTA items for the 2nd Quarter (July-September, 2011).
General
• COSs of all Indian Railways and Production Units, CME and COS of RWF,
GM(SAIL/DSP) and other officials from Railway Board and Railways were welcomed to
the WTA meeting.
• RWF was complimented for the production & supply of over 18500 wheelsets. RWF was
requested to enhance its production capacity to meet additional requirement of wheelsets
/ wheels and axles.
• Against a targeted supply of 17000 wheels per quarter, M/s SAIL has supplied only
12000 wheels. On axle front also performance of SAIL is below the target. SAIL was
advised to ensure supply as per their commitment and also to makeup for shortfall (in
first quarter) in 2nd quarter of 2011-12.
BG Coaching Wheels
• CR, E.CoR, NER, SR, SCR, SWR and WR have projected the demands of BG coaching
wheels on higher side as compared to their EAC. They have demanded almost 50% of
their annual requirement during this quarter. These Railways were requested to review
and reassess their requirement of BG coaching wheels.
MG Coaching Wheels
• NE, NF & NWR have expressed urgency of MG coaching wheels as these wheels
though allotted were not dispatched by RWF in past . CME/RWF was requested to
manufacture urgent requirement of MG coaching wheels. On this CME/RWF stated that
RWF could manufacture only 36000 loose wheels during this quarter as wheel shop is
being shut down for annual maintenance from 16/08/2011. Due to this shut down RWF
will not be in a position to manufacture and supply more than 36000 loose wheels.
• AM/PU directed RWF to manufacture 1500 MG coaching wheels in one lot (considering
the need for optimizing production) during this quarter in addition to 18,000 wheelsets or
36000 loose wheels. 1500 MG coaching Wheels will be sufficient to meet the
requirement of Railways for next 2-3 years.
- 2-
LHB Wheels
• EDRS(P) informed that 1800-2000 LHB wheels are being offered for inspection in 3rd
week of July and are expected to be available by Aug /Sept.2011. RCF, NR, ER and WR
were advised to note the same and ensure optimum utilization of LHB wheels and
wheelsets available with them. AM(PU) directed RCF and NR to give feedback on the
utilization of LHB wheels which became partly defective during wheelset pressing.
EDRS(P) requested M/s SAIL/DSP to explore the possibility of taking up manufacture of
LHB Wheel as requirement of LHB Wheels is increasing on the Railways. Necessary
details (specification, drawings etc.) will be furnished. M/s SAIL was advised to give a
feedback on this issue by next WTA meeting.
Address by AM(PU)
• AM/PU stated that Railways were advised to de-axle the released wheelsets from
condemned stock. No feed back in this regard has been received. He advised all the
Railways to ensure de-axling of the released wheelsets from condemned coaches and
wagons to meet their maintenance requirement for axles. No released Wheelsets should
be sent to RWF as scrap.
• RWF was also advised to process TTCI clearance etc for the development of LHB wheels
as requirement of these wheels will increase. He also desired that RDSO should urgently
give trial scheme of LHB Wheels. AM(PU) directed RCF and NR to give feedback on
the utilization of LHB wheels which became partly defective during wheelset pressing.
• In view of increased requirement of WTA items for Production and Maintenance of
wagons, coaches, the production of wheels and wheelsets for BLC wagons (not owned by
IR) will not be taken up in this quarter.
Address by Adv(RS)
• Adv/RS has stated that consumption of wheelsets during the last quarter has increased
due to increase in wagon production The inventory of wheelsets available with wagon
builders has come down and it is apprehended that short supply may affect wagon
production in near future. As the requirement is more than supply, capacity of RWF
should be utilized for maximizing production of WTA items required for BOX’N wagons
- 3 -
and BG Coaches and Loco axles. Other WTA items can be sourced from DSP or through
purchase.
• Adv/RS also stated that in the last quarter number of global tenders for axles & wheelsets
have been processed. Procurement in these cases needs to be finalized on priority basis
and it is to be ensured that technical scrutiny etc. is done on top priority. Status of these
cases will be put up to AM/PU for review. In order to supplement supply of BOX-N
Wheels sets, procurement of 10000 nos wheelsets & 5000 nos BOX-N Axles have been
processed. This is in addition to the procurement of following items :-
1. Axles for WDG 4 locos
1986
2. Axles for LHB coaches
3350
3. BG coaching axles 6000
4. WAG7 & WDG3A Loco axles
1772
• Adv/RS expressed expressed his displeasure regarding non-supply of axles ordered by
RWF on M/s Amstead & directed COS/RWF to take penal action for firm’s failure to
supply.
Address by GM(Mills)/SAIL/DSP
• GM(Mills)/SAIL/DSP has stated that during inspections of wheels rejection due to batch
criteria is very high. Batch criteria of rejection of wheels was introduced by RDSO long
ago when inspection facilities at DSP were not adequate. Now every wheel produced at
SAIL/DSP under goes Dimensional checking, Ultrasonic Testing and Magnetic Particle
test . Thus batch criteria of rejection at this stage is unnecessary. This criteria is
hampering production of wheelsets at SAIL/DSP & also reducing supply of wheels to IR.
They requested to advise RDSO to review the rejection criteria during inspection. It was
decided that RDSO will examine this issue in light of present inspection methods adopted
at SAIL/DSP.
- 4 - The position regarding supplies made by RWF during the previous quarter i.e. April -
June, 2011 was discussed. The same is tabulated as under:-
SUPPLIES DURING APRIL - JUNE, 2011
No. Item Quantity Planned (April - June, 2011)
Actual Supplies (April - June, 2011)
Variation (+) excess (-) shortfall
Total Supplies from April – June, 2011
A LOOSE WHEELS (i) BOX ‘N’ Wheels
W/WL-4764/R 7050 4743 -2307 4743
(ii) MG Chg. Wheels MG/T-0-1-004 (W/WL-770/R) (WAP-W-031)
150 122 -28 122
(iii) BG Chg. Wheels W/WL-1660/R
11700 11040 -660 11040
(iv) BG Loco Wheels W/WL-4984/R
0 0 0 0
(v) MG Loco Wheels W/WL-4955/R
0 0 0 0
(vi) 840 mm dia wheels for CONCOR
650 603 -47 603
(vii) EMU/DMU Wheels to Drg. No. K-4004
0 0 0 0
(vii) Wheels for BVZC Wagons to Drg. No. W/WL-4747
0 0 0 0
TOTAL WHEELS 19550 16508 -3042 16508 B LOOSE AXLES (i) Nos. 7089 5821 -1268 5821 (ii) Equated Box ‘N’ Units 8143 6586 -1557 6586 C WHEELSETS (i) 16T BG Chg. Wheelsets 300 191 -109 191 (ii) Wheelsets for BVZI 0 0 0 (iii) BOX ‘N’ W/sets include
Wagon Builders & BLC Wagons
18500 18566 66 18566
(iv) EMU W/sets for Trailer Coaches
0 0 0
TOTALWHEELSETS 18800 18757 -43 18757 The detailed supply position (Railway wise/Consignee wise) is given in the enclosed
Annexure-I. The item-wise planning for July - September, 2011 is shown in Annexure - II.
ANNEXURE - I Position regarding quantities planned vis a - vis actual supplies made by RWF/Bangalore during the Ist Quarter (April - June, 2011).
S.NOS. DRAWING &
DESCRIPTION RLY./CONSIGNEE QTY.
PLANNED (JANUARY - MARCH,11)
QTY. SUPPLIED (JANUARY - MARCH,11)
VARIATION (+) EXCESS (-) SHORTFALL
WHEELS ER/HLR/LLH/JMP 700 547 -153NR/JUDW 500 609 109NCR/JHS 2000 212 -1788NFR/NBQ 100 101 1NWR/AII 200 248 48SR/CW/PER 600 524 -76SCR/RYPS 1600 1152 -448SECR/RWSS 500 498 -2SWR/UBL 100 100 0WR/DHD 750 752 2
1 Wheel disc. BOX 'N' Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)
Total 7050 4743 -2307
CR/MTN/PR 700 750 50ER/LLH 700 696 -4ER/JMP 200 72 -128Eco.R/MCS 200 210 10NR/AMV 200 212 12NR/ASR 700 708 8NER/GKP 300 241 -59NFR/NBQ 100 109 9NWR/AII/JU 700 760 60SR/LW/PER 100 92 -8SCR/TPTY 800 484 -316SER/KGP 500 248 -252SWR/UBL 600 1085 485SWR/UBL 400 0 -400WR/PL 1800 1871 71WCR/BPL 300 133 -167ICF 2000 1852 -148RCF 1400 1517 117
2 BG Chg. Wheels to Drg. No.W/WL-1660/R
Total 11700 11040 -660
NER/IZN 50 42 -8NFR/NBQ 50 50 0NWR/BKN 50 30 -20
3 MG Coaching Wheels to RDSO's Drg. No.CG-K 6099 (WAP-W-031) 150 122 -28
NR/JUDW 350 357 7NCR/JHS 200 173 -27WR/DHD 100 73 -27
4 840 dia wheel for CONCOR for BLC wagon
Total 650 603 -47
TOTAL WHEELS 19550 16508 -3042 AXLES
NR/CB 20 20 0WR/DHD 10 10 0
1 BG DSL Loco Axles to Drg. No. W/WL-4973/R (WAP/SK/MA-245)
Total 30 30 0
DMW 120 119 -12 Axle for WDG-2 A
(Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt 'b' part No.11231622
Total 120 119 -1
CLW 40 40 0
SER/KGP 10 9 -1
3 Axle rough turned for WAP-4 loco to Drg. No.03/2/11/55 Alt. 1 Total 50 49 -1
DLW 60 43 -174 Axle rough for WDS-
6 to Drg. No. TPL-2585 Total 60 43 -17
DMW 80 80 05 Axle driving rough
turned for WDM-2C & WDM-3A Locos to Drg. No.D/WL-5058/R Alt. NIL
Total 80 80 0
CLW 150 38 -112
CR/BSL 30 23 -7
6 Axles for WAG-9 & WAP-7 (Rough machined) to CLW's Drg. No.1209-01-011-002
Total 180 61 -119
CRBSL 10 0 -107 Axle (3-phase) for
WAP-5 loco to CLW's Drg. No. 1210-01-311-025
CLW 13 13 0
Total 23 13 -10
ER/JMP 20 0 -20
SWR/AP 12 0 -12
8 Axle rough machined for WDG-2, WDG-3A, WDM-3D Locos to Drg. No. TPL-6292
Total 32 0 -32
SER/KGP 10 10 0CLW 180 180 0
9 Axle rough machined for WDG-2 & WAG-7 to DRg. BHEL 120 68 -52
No.06/2/11/2 Total 310 258 -52
SR/GOC 60 53 -7
SCR/BZA 25 20 -5
10 Axle rough for WDP-2 & WDM-2 to Drg. No. TPL-6687
Total 85 73 -12
NFR/NBQ 10 4 -6
SWR/AP 10 10 0
11 Axle rough for WDP-4 locos to Drg. No.WDG-4/PS/22 GM Pt. No.40088369 Total 20 14 -6
SCR/GY 6 0 -6
SWR/UBL 15 0 -15
12 Axle rough GM Loco to EMD Pt.No.40077315 (Geared) & DLW Part No.17230019 Total 21 0 -21
DLW 18 14 -413 Axle forWDG-5
locos to DLW's part No.17230330 Total 18 14 -4
NR/GZB 50 55 5WR/DHD 18 25 7
14 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516
Total 68 80 12
TOTAL AXLES (1) TO (14) IN NOS.
1097 834 -263
TOTAL AXLES IN EQUATED NOS. (X by 1.9)=
2084 1585 -499.7
NR/GZB 10 0 -1015 BG EMU MTR Coach Axles to Drg. No. DC/EMU-M-0-1-005
Total 10 0 -10
ER/HLR 6 6 016 Axle for AC Motor
Coach to Drg. No.EMU/MC-1-025 Total 6 6 0
ICF 200 58 -142
Titagarh/KPA 24 0 -24
BEML 36 0 -36
17 EMU Motor Coach Axles to Drg. No.AC/DC-EMU/B-02-002 Alt. A/2 item 1 (WAP's Drg. No. WAP-A-087) Total 260 58 -202
RCF 42 0 -42
CR/MTN 15 9 -618 Axle for MEMU/DMC
to Drg. No.EMU/M-0-1-025 Alt. 'a'
Total 57 9 -48
TOTAL EMU
AXLES IN NOS. 333 73 -260
TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=
400 88 -312
ICF 500 789 289Titagarh/KPA 48 48 0BEML/MYSS 72 64 -8
19 EMU Axles for Trailor Coaches to Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157 Total 620 901 281
SR/CW/PER 15 0 -1520 BG EMU Axles to Drg. No. W/WL-4784/R Total 15 0 -15
MR/Kolkata 10 0 -1021 Axle rough turned
for Trailer Coach for Kolkata Metro to Drg. No.MRB-0-1-002 Alt. 4/b
Total 10 0 -10
RCF 170 0 -170NR/GZB 10 0 -10SCR/BZA 4 0 -4
22 BG MEMU TC Axles to Drg. No. WTAC3-0-2-303 Alt.F
Total 184 0 -184
ER/JMP 100 0 -100
SR/CW/PER 300 0 -300
23 Axles for BOX'N' to Drg. No.W/WL-4901/R (WD-89025/SL-2) Total 400 0 -400
NWR/BKN 50 0 -50RCF 16 16 0
24 MG ICF Coaching Axles to DRg. No. MG/T-0-2-023
Total 66 16 -50
25 20T powered axles for DHMU/DPC as
SCR/LGD 15 0 -15
pe ICF Drg. No.DHMU/DPC/0-2-001 item KPC 733-804-01-50 alt. (A)
Total 15 0 -15
RCF/KXH 800 789 -11
ER/LLH 25 32 7
WR/PL 30 32 2
26 Axles for LHB coaches to Drg. No.LW 021049
Total 855 853 -2
CR/MTN/PR 175 175 0ER/HLR 100 89 -11ER/JMP 100 97 -3NR/AMV 50 42 -8NR/ASR 350 200 -150NER/GKP 100 50 -50NWR/JU 50 42 -8SCR/LGD 50 42 -8SWR/AP 50 50 0SWR/UBL 200 164 -36WR/PL 700 669 -31WCR/BPL 69 41 -28ICF 800 795 -5RCF 700 688 -12
27 BG Coaching Axles to Drg. No.WTAC-3-02-303
Total 3494 3144 -350
TOTAL AXLES S.NOS. 19 to 27 IN NOS.
5659 4914 -745
GRAND TOTAL
AXLES IN NOS.= 7089 5821 -1268
GRAND TOTAL
AXLES IN EQUATED UNITS =
8143 6586 -1556.7
WHEELSETS RCF 300 155 -145ER/ 0 36 36
1 16T BG CHG.Wheelsets
Total 300 191 -109
Wagon Builders 18500 18566 662 BOX 'N' Wheelsets Total 18500 18566 66
TOTAL
WHEELSETS 18800 18757 -43
ANNEXURE - II
Allocation sheet for supply of WTA items for the IInd quarter i.e. July - September, 2011 on RWF/Bangalore.
S.NOS. DRAWING & DESCRIPTION
RLYS./PUs QTY. PLANNED (JULY -
SEPTEMBER, 2011
Consignee Remarks
WHEELS ER 400 HLR NR 100 JUDW NCR 1000 JHS SCR 400 RYPS SECR 400 RWSS
1 Wheel disc. BOX 'N' Type to Drg. No. W/WL-4764/R (WAP/SK/M-155)
Total 2300 ER 400 LLH SR 300 GOC SER 200 KGP SWR 200 UBL For BVZI WR 700 PL For supply of
wheelsets to BEML
ICF 500 RCF 900
2 BG Chg. Wheels to Drg. No.W/WL-1660/R
Total 3200 NR 300 JUDW NCR 100 JHS
3 840 dia Wheel for CONCOR for BLC Wagon Total 400
NER 200 IZN NFR 400 NBQ NWR 100 BKN WR 50 BVP
4 MG Chg. Wheels to RDSO's Drg. No.CG-K 6099 (WAP-W-031)
Total 750
TOTAL WHEELS 6650 AXLES
SR 25 GOC 1 BG DSL Loco Axles to Drg. No. W/WL-4973/R (WAP/SK/MA-245)
Total 25
CR 30 PR NR 20 CB NER 10 GKP DMW 267
2 Axle for WDG-2 A (Axle RT (with light wt. 5002 FZ) to Drg. No. TPL-5868 Alt. 'b' part No. 11231622
Total 327
CLW 100 3 Axle rough turned for WAP-4 Loco to Drg. No.03/2/11/55 Total 100
DMW 220 4 Axle driving rough
turned for WDM-2C CR 10 PR
ER 10 JMP Locos to Drg. No. D/WL-5058/R Alt. NIL Total 240
ER 10 JMP 5 Axle rough machined
for WDG-2, WDG-3A, WDM-3D Locos to Drg. No. TPL-6292
Total 10
ER 30 KPA NR 10 LDH NCR 6 CNB SR 6 LW/PER SER 15 KGP WR 15 DHD CLW 250
BHEL 120
6 Axle rough machined for WDG-2 & WAG-7 to Drg. No.06/2/11/2
Total 452
DLW 60 7 Axle rugh for WDS-6 to Drg. No. TPL-2585 Total 60
CLW 370 CR 50 BSL
8 Axles for WAG-9 & WAP-7 (Rough machined) to CLW's Drg. No. 1209-01-011-002 Alt.
Total 420
CR 10 BSL
CLW 50
9 Axle (3 Phase) for WAP-5 Loco to CLW Drg. No. 1210-01-311-025 Total 60
SWR 10 UBL SCR 6 TPTY
10 Axle rough GM Loco to EMD Pt. No.40077315 (Geared) & DLW Part No.1730019 Total 16
DLW 360 WR 6 DHD
11 Axle rough for WDG-4 & WDP-4 to EMS-804 Drg. No.D/WL-5061/R Total 366
SR 4 GOC 12 X Class Loco Axle to
Drg. No.L/WL/2D/X Total 4
13 Axle rough turned for 140T Crane CR/808 ER 20 JMP
Total 20
CR 100 BSL SER 30 KGP
14 Axle rough machined for TAO-659 Hitachi type wheelset to Drg. No. SKEL-4516
Total 130
TOTAL AXLES (1) TO (14) IN NOS.
2230
TOTAL AXLES IN EQUATED NOS. (X by 1.9)=
4237
ICF 300 15 EMU Axles for Motor
Coaches to Drg. No. AC/DC/EMU/B-02-002 Alt. A/2 item 1 (WAP-A-087)
Total 300
RCF 65 16 Axle for MEMU/DMC to Drg. No. EMU/M-0-1-025 Alt. a Total 65
TOTAL EMU AXLES
IN NOS. 365
TOTAL EMU AXLES IN EQUATED NOS. (X by 1.2)=
438
ICF 400 17 EMU Axles for Trailor
Coaches to Drg. No. AC/DC/EMU/02/204-001 00/RWF-A-157
Total 400
RCF 150 18 BG MEMU TC Axles to
Drg. No. WTAC3-0-2-303 Alt.F
Total 150
RCF 240 KXH ER 20 LLH
19 Axles for LHB Coaches to Drg. No.LW 021049
Total 240
CR 50 MTN
ER 100 HLR
Eco.R 50 MCS
NR 50 JUDW NER 100 GKP
NWR 50 JU
20 16 T BG Coaching Axles to Drg. No. CG-K 6015
SR 200 CW/PER
SCR 50 TPTY
SWR 100 UBL
100 UBL For BVZI
WR 350 PL For supply of wheelsets to BEML
ICF 1000 RCF 600 Total 2800
TOTAL AXLES S.NOS. 17 to 20 IN NOS.
3590
GRAND TOTAL
AXLES IN NOS.= 6185
GRAND TOTAL
AXLES IN EQUATED UNITS =
8265
WHEELSETS
Wagon Builders
18500
Consignee to be advised by DRS(W)
1 BOX 'N' Wheelsets
Total 18500 TOTAL WHEELSETS 18500
GOVERNMENT OF INDIA MINISTRY OF RAILWAYS
RAILWAY BOARD No. 2011/RSF/649/2/RP-II/DSP New Delhi, dt . 15.07.11
1. M/s Steel Authority of India Ltd., Central Marketing Organisation, S&RM Division, Ispat Bhawan, 40-Jawahar Lal Nehru Marg, Kolkata – 700 071.
2 The Controller of Stores, All India Railways & P/Units.
Sub:- Minutes of the Quarterly WTA Meeting for the planning of WTA items for the period II/2011-12 (July - September, 2011).
Minutes of quarterly WTA meeting for the period II/2011-12 (July - September, 2011) held with the representatives of M/s SAIL/DSP and Zonal Railways/PUs in Rail Bhawan, New Delhi on 07.07.11 has been uploaded on India Railway’s website www.indianrailways.gov.in. To access the Minutes kindly click on “Railway Board Directorates” under “About Indian Railways” Tab. Then click on “Stores”. Then click on “Conferences / Meetings” to open the page containing the minutes of the meeting.
Please ensure that the statement of requirements of WTA items for the Quarter III/2011-12 (October - December, 2011) should reach this office latest by 15.09.11 positively. The exact date and venue of the meeting would be advised later on.
(Hindi version will follow.)
( Sanjeev Misra )
Director, Railway Stores (F) Railway Board.
Copy to: 1. The Chief Mechanical Engineers, All Indian Railways/Production Units. 2. The Comptroller & Auditor General of India, Room No.222, Rail Bhawan, New Delhi. 3. GM (BBM & WAP), M/s SAIL/DSP, Durgapur – 713203. 4. The DGM I/C, WAP, M/s SAIL/DSP, Durgapur – 713203. 5. The Chief Marketing Manager, M/s SAIL, Commercial Directorate, 13th Floor,
Hindustan Times Building, 10-20 K.G. Marg, New Delhi. 6. Shri Vinay Kumar, Dy.GM, M/s SAIL/DSP, SCOPE MINAR (20th floor), North Block,
Laxmi Nagar District Centre, Delhi – 110 092. 7. GM(I), M/s RITES (ER), Quality Assurance Division, Central Station Building (Metro),
56, CR Avenue, 3rd Floor, Kolkata – 700 012. 8. S.I.E(M) Incharge, Inspection Wing, M/s RITES c/o DSP, Durgapur-713203. 9. M/s Jessop & Co. Ltd., 21 & 22, Jessore Road, Kolkata – 700 028. 10. M/s Titagarh Wagons Ltd., 113, Park Street, Kolkata – 700 016. 11. M/s Bharat Heavy Electrical Ltd., (Transportation Business Deptt.), Integrated Office
Complex, Lodhi Road, New Delhi-110 003 12. Adv./RS, AM/ME, AM/PU. EDRS(P), EDRS ( C), EDEE(RS), DME(PU), DME(P)-I,
DRS(W), DRS(M) & RS(WTA) Branch. 13. The Controller of stores, Metro Railway, Kolkata.
DSP Minutes Minutes of Quarterly WTA meeting held with representatives of RWF on 7.7.2011 in Rail Bhawan, New Delhi for planning the requirement of WTA items for the 2nd Quarter (July-September, 2011).
General
• COSs of all Indian Railways and Production Units, CME and COS of RWF,
GM(SAIL/DSP) and other officials from Railway Board and Railways were welcomed to
the WTA meeting.
• RWF was complimented for the production & supply of over 18500 wheelsets. RWF was
requested to enhance its production capacity to meet additional requirement of wheelsets
/ wheels and axles.
• Against a targeted supply of 17000 wheels per quarter, M/s SAIL has supplied only
12000 wheels. On axle front also performance of SAIL is below the target. SAIL was
advised to ensure supply as per their commitment and also to makeup for shortfall (in
first quarter) in 2nd quarter of 2011-12.
BG Coaching Wheels
• CR, E.CoR, NER, SR, SCR, SWR and WR have projected the demands of BG coaching
wheels on higher side as compared to their EAC. They have demanded almost 50% of
their annual requirement during this quarter. These Railways were requested to review
and reassess their requirement of BG coaching wheels.
MG Coaching Wheels
• NE, NF & NWR have expressed urgency of MG coaching wheels as these wheels
though allotted were not dispatched by RWF in past . CME/RWF was requested to
manufacture urgent requirement of MG coaching wheels. On this CME/RWF stated that
RWF could manufacture only 36000 loose wheels during this quarter as wheel shop is
being shut down for annual maintenance from 16/08/2011. Due to this shut down RWF
will not be in a position to manufacture and supply more than 36000 loose wheels.
• AM/PU directed RWF to manufacture 1500 MG coaching wheels in one lot (considering
the need for optimizing production) during this quarter in addition to 18,000 wheelsets or
36000 loose wheels. 1500 MG coaching Wheels will be sufficient to meet the
requirement of Railways for next 2-3 years.
- 2 -
LHB Wheels
• EDRS(P) informed that 1800-2000 LHB wheels are being offered for inspection in 3rd
week of July and are expected to be available by Aug /Sept.2011. RCF, NR, ER and WR
were advised to note the same and ensure optimum utilization of LHB wheels and
wheelsets available with them. AM(PU) directed RCF and NR to give feedback on the
utilization of LHB wheels which became partly defective during wheelset pressing.
EDRS(P) requested M/s SAIL/DSP to explore the possibility of taking up manufacture of
LHB Wheel as requirement of LHB Wheels is increasing on the Railways. Necessary
details (specification, drawings etc.) will be furnished. M/s SAIL was advised to give a
feedback on this issue by next WTA meeting.
Address by AM(PU)
• AM/PU stated that Railways were advised to de-axle the released wheelsets from
condemned stock. No feed back in this regard has been received. He advised all the
Railways to ensure de-axling of the released wheelsets from condemned coaches and
wagons to meet their maintenance requirement for axles. No released Wheelsets should
be sent to RWF as scrap.
• RWF was also advised to process TTCI clearance etc for the development of LHB wheels
as requirement of these wheels will increase. He also desired that RDSO should urgently
give trial scheme of LHB Wheels. AM(PU) directed RCF and NR to give feedback on
the utilization of LHB wheels which became partly defective during wheelset pressing.
• In view of increased requirement of WTA items for Production and Maintenance of
wagons, coaches, the production of wheels and wheelsets for BLC wagons (not owned by
IR) will not be taken up in this quarter.
Address by Adv(RS)
• Adv/RS has stated that consumption of wheelsets during the last quarter has increased
due to increase in wagon production The inventory of wheelsets available with wagon
builders has come down and it is apprehended that short supply may affect wagon
production in near future. As the requirement is more than supply, capacity of RWF
should be utilized for maximizing production of WTA items required for BOX’N wagons
- 3 -
and BG Coaches and Loco axles. Other WTA items can be sourced from DSP or through
purchase.
• Adv/RS also stated that in the last quarter number of global tenders for axles & wheelsets
have been processed. Procurement in these cases needs to be finalized on priority basis
and it is to be ensured that technical scrutiny etc. is done on top priority. Status of these
cases will be put up to AM/PU for review. In order to supplement supply of BOX-N
Wheels sets, procurement of 10000 nos wheelsets & 5000 nos BOX-N Axles have been
processed. This is in addition to the procurement of following items :-
1. Axles for WDG 4 locos
1986
2. Axles for LHB coaches
3350
3. BG coaching axles 6000
4. WAG7 & WDG3A Loco axles
1772
• Adv/RS expressed expressed his displeasure regarding non-supply of axles ordered by
RWF on M/s Amstead & directed COS/RWF to take penal action for firm’s failure to
supply.
Address by GM(Mills)/SAIL/DSP
• GM(Mills)/SAIL/DSP has stated that during inspections of wheels rejection due to batch
criteria is very high. Batch criteria of rejection of wheels was introduced by RDSO long
ago when inspection facilities at DSP were not adequate. Now every wheel produced at
SAIL/DSP under goes Dimensional checking, Ultrasonic Testing and Magnetic Particle
test . Thus batch criteria of rejection at this stage is unnecessary. This criteria is
hampering production of wheelsets at SAIL/DSP & also reducing supply of wheels to IR.
They requested to advise RDSO to review the rejection criteria during inspection. It was
decided that RDSO will examine this issue in light of present inspection methods adopted
at SAIL/DSP.
- 4 - The position regarding supplies made by M/s SAIL/DSP during the previous quarter i.e.
April - June, 2011 was discussed. The same is tabulated as under:-
SUPPLIES DURING APRIL - JUNE, 2011 S.No. Item Quantity
Planned (April - June,
2011)
Actual Supplies
(April - June, 2011)
Variation (+) excess (-) shortfall
Total Supplies from April, –
June, 2011
A ASSEMBLED WHEELSETS
(i) 16T BG Coaching Wheelsets
300 177 123 177
B LOOSE WHEELS
(i) BG Chg. Wheels W/WL-1660/R
6000 5116 884 5116
(ii) BG Loco Wheels W/WL-4948/R
5349 4897 452 4897
(iii) BG Loco Wheels “S” Shaped
3300 1661 1639 1661
(iv) MG Loco Wheels W/WL-4955/R
185 0 185 0
(v) EMU/DEMU Wheels to Drg. No.K-4004
1460 284 1176 284
TOTAL WHEELS 16294 11958 4336 11958 C LOOSE AXLES (i) 16T BG Coaching
Axles WTAC-3-02-303
2550 890 1660 890
(ii) Axles forgings (heat treated and tempered but without machining)
0 0 0 0
TOTAL AXLES 2550 890 1660 890 The detailed supply position (Railway wise/Consignee wise) is given in the enclosed
Annexure-I.
The item-wise planning for July - September, 2011 is shown in Annexure - II.
ANNEXURE - I Position regarding quantities planned vis a - vis actual supplies made by M/s SAIL/DSP during the Ist Quarter (April - June, 2011). S.NOS. DRAWING &
DESCRIPTION RLY./CONSIGNEE QTY.
PLANNED (APRIL - JUNE, 11)
QTY. SUPPLIED (APRIL - JUNE, 11)
VARIATION (+) EXCESS (-) SHORTFALL
AXLES CR/MTN 50 41 -9ER/LLH 300 100 -200Eco.R/MCS 100 42 -58NR/AMV 100 85 -15NER/GKP 200 0 -200NFR/NBQ 100 73 -27NWR/AII 50 42 -8SR/GOC 100 96 -4SCR/TPTY 50 42 -8SER/KGP 100 42 -58SWR/UBL 200 0 -200ICF 700 193 -507RCF 500 134 -366
1 BG Chg. Axles to Drg. No. WTAC-3-02-303
TOTAL 2550 890 -1660 TOTAL AXLES 2550 890 -1660 WHEELS
CR/MTN 400 323 -77ER/LLH/HLR 400 360 -40Eco.R/MCS 300 261 -39NR/AMV 200 170 -30NER/GKP 300 289 -11NFR/DBRT 100 69 -31SR/CW/PER 100 85 -15SCR/LGD 700 665 -35SER/KGP 800 800 0SWR/AP 500 470 -30WCR/BPL 200 200 0ICF 1000 814 -186RCF 1000 610 -390
1 BG Chg. Wheels to Drg. No.W/WL-1660/R
TOTAL 6000 5116 -884CR/BSL/PR 1200 1025 -175ER/KPA 250 225 -25NR/CB 550 550 0NCR/CNB 135 115 -20NWR/AII 164 143 -21SR/GOC/LW/PER 400 378 -22SCR/RYPS/TPTY 600 563 -37
SER/KGP/Tatanagar 1000 975 -25SECR/RWSS 50 31 -19SWR/AP 150 96 -54WR/DHD 500 486 -14DMW 200 200 0
2 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. D/WL-4948/R
BHEL 150 110 -40
TOTAL 5349 4897 -452
CR/BSL 400 274 -126NR/ASR 200 115 -85SER/KGP 600 476 -124WR/DHD 100 100 0CLW 700 246 -454DMW 600 450 -150
3 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R
TOTAL 2600 1661 -939
SWR/UBL/MYSS 300 0 -300WR/DHD 50 0 -50DLW 350 0 -350
4 BG Loco Wheels "S" Shaped to DLW's Drg. No. 17230251 "C" TOTAL 700 0 -700
NFR/NBQ 120 0 -120NWR/AII 35 0 -35SR/GOC 30 0 -30TOTAL 185 0 -185
5 MG Loco Wheels to Drg. No.W/WL-4955/R
CR/MTN 400 284 -116NR/GZB 200 0 -200NWR/AII 20 0 -20SCR/LGD 180 0 -180WR/DHD 100 0 -100RCF 200 0 -200TITAGARH/KPA 144 0 -144BEML/MYSS/RWF 216 0 -216
6 EMU/DEMU Wheels to Drg. No.K-4004
TOTAL 1460 284 -1176
TOTAL WHEELS 16294 11958 -4336 WHEELSETS
RCF 300 177 -1231 16T BG Coaching Wheelsets
TOTAL 300 177 -123
ANNEXURE - II Allocation sheet for supply of WTA items for the IInd quarter i.e. July - September, 2011 on M/s SAIL/DSP.
S.NOS. DRAWING & DESCRIPTION
RLYS./PUs QTY. PLANNED
(JULY - SEPTEMBER,
2011)
Consignee Remarks
AXLES CR 100 MTN ER 200 LLH Eco.R 50 MCS NR 100 AMV NER 200 GKP NFR 100 NBQ NWR 100 AII SR 100 CW/PER SCR 100 LGD SER 50 KGP SECR 24 R WR 100 PL WCR 100 BPL ICF 800 RCF 500
1 BG Chg. Axles to Drg. No. WTAC-3-02-303
TOTAL 2624 WHEELS
CR 500 MTN ER 600 300-LLH
300-HLR
Eco.R 400 MCS NR 600 300-ASR
300-AMV
NER 300 GKP
NFR 400 NBQ
NWR 500 250-AII 250-JU
SR 500 CW/PER
SCR 500 LGD SER 400 KGP SECR 100 R SWR 300 UBL WR 200 PL WCR 400 BPL ICF 1500
1 BG Chg. Wheels to Drg. No.W/WL-1660/R
RCF 1200
TOTAL 8400 NER 50 IZN NFR 50 NBQ NWR 90 AII SR 50 GOC WR 75 SBI
2 MG Loco Wheels to Drg. No.W/WL-4955/R
TOTAL 315 CR 600 BSL
ER 500 KPA
Eco.R 100 VSKP
NR 200 100-CB 100-ASR
NCR 100 CNB NWR 100 AII
SR 300 200-GOC 100-LW/PER
SCR 300 200-RYPS 100-TPTY
SER 800 600-KGP 200-Tatanagar
SECR 100 RWSS SWR 100 AP WR 100 DHD DMW 300 BHEL 240
3 BG Loco Wheels /DSL Mono Block Rough machined WDM2, WDM3 and WAG5 to Drg. No. W/WL-4948/R
TOTAL 3840 CR 300 PR ER 300 JMP SR 100 GOC SCR 300 RYPS SER 300 KGP WR 100 DHD CLW 1000 DMW 300
4 BG Loco Wheels "S" Shaped to Drg. No. D/WL-5060/R
TOTAL 2700
DLW 1000 5 BG Loco Wheels "S" Shaped to Drg. No. 17230251 "C"
TOTAL 1000
CR 350 MTN
NWR 20 AII
SCR 180 LGD
6 EMU/DEMU Wheels to Drg. No. K-4004
BEML 216 144-ICF 72-MYSS on
BEML A/C
TOTAL 766 TOTAL WHEELS 17021 WHEELSETS
RCF 350 1 Complete Wheelsets (Forged) TOTAL 350
*******