Tero Järvinen - Design Your Buildings
Tero Järvinen/ 04.11.2012
Design Your Buildings
Design Maintenance
Tero Järvinen - Design Your Buildings
Tero Järvinen - Design Your Buildings
Release Date: Spring 2015
Tero Järvinen - Design Your Buildings
BIM Management Process during building life cycle
Tero Järvinen - Design Your Buildings
Integration of diagrams and Database
• Diagramsoftware: Progman MagiCAD System Designer
SQL
Tero Järvinen - Design Your Buildings
Browser based MEP PLM software
Under development: MEP PLM -System
Schematic design Detailed Design Construction FM
Spaces / Design
Equipment NetworkModeling
Equipment approval
Requ
irem
ents
BIM in FM
Supervision
Diagrams
Service areas
Simulations
SQL
IFC
Performance Metrix
Network BalancingAsBuilt info
PLM = Product Lifecycle ManagementFLM = Facility Lifecycle Management
FLM
BAS info
Bim to FM, roadmapConcept design Detail design Construction Facility
Management
Spaces / Zones
Bim from designers
FM demands for design BIMinFM
FM coordinator organises demands and follow that they are fulfilled
Confirmation of as-built -
information
Construction organisation FM organization
FM execution plan MonitoringExchange plan to FM information
handover
Organisation of handover and teaching
Tero Järvinen - Design Your Buildings
Tero Järvinen - Design Your Buildings
Granlund Designer
Con
cept
MEP
Site
BIM
2FM
Designer
Contractor
Project Management
Property owner
GRANLUND DESIGNER
Ultimate PLM solution for MEP Facility Lifecycle Management
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
• 2D graphics, IFC space import
• MEP Targets and/or Requirements connected to spacetypes through libraries
• Connections to Architectural requirements databases (webservices)
• External simulation software (Riuska, IES…)
• Graphical comparisions of different simulation cases
• Cost estimations based in square meters and MEP system selections (including service areas)
Granlund Designer
Con
cept
MEP
Site
BIM
2FM
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
• Comparison between requirements and simulation results (theme charts)
• Device database connected to diagrams
• Device libraries for rapid database creation
• MEP network model import (IFC)
• Comparision of design values to requirements and simulations
• Creation of combied model, visualizations (external software)
Granlund Designer
Con
cept
MEP
Site
BIM
2FM
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
• MEP network model version comparisations (tool for change orders)
• Design information queries from database
• Equipment approval process- Contractor propose devices according the designer information- Designer/Project Management accept / reject proposals- Approval process situation can be followed
• After approval, contractor imports all device information needed for FM (pdf’s etc.)
Granlund Designer
Con
cept
MEP
Site
BIM
2FM
Tero Järvinen - Design Your Buildings
Designer
Contractor
Project Management
Property owner
• Previous phases ensures that BIM information is available for FM usage – a starting point of FLM (Facility Lifecycle Management)
• Requirements can be compared to design and contractor values
• Service Areas and MEP networks/equipments are connected to spaces
• Device approval process information is stored in design database – usage in FM software through webservices etc.
• Connections to Building Automation System -> BIM based Building Monitoring
Granlund Designer
Con
cept
MEP
Site
BIM
2FM
Tero Järvinen - Design Your Buildings
Dataflow between softwares
Software A
Software B, Granlund
Internalusage,
calculations
Internalusage,
calculations
Usage of extracted
Information
Return of calculation results, partial information extraction
Return ofcalculation results, partial information extraction
Usage of extracted
Information
Webservice or Granlund service bus, Client API Webservice
Tero Järvinen - Design Your Buildings
Dataflow between softwares, example
MEP service areas Comfort simulations
IFC update with MEP Zones (IfcZone)
Native Architect IFCOnly spaces (and space boundaries) are readed
Riuska makesenergy and comfortsimulations
Granlund Designercreates zones
IFC update with simulation results tied to spaces (Propertyset)
Requirements
Granlund Designercreates targets
IFC update with Requirements (Pset)
Ana
lyze
with
Gra
nlun
d D
esig
ner
Arch SpacesArch IFC
Software B Software DSoftware B
Software B
Software CSoftware A
WebService
Granlund Service Bus
Tero Järvinen - Design Your Buildings
Dataflow between softwares
Software”Equipments”
Software ”Energy”
Software”Schedule”
Software”N”
WebService usedin information
exchange betweensoftwares
Software ”Spaces”
Software”Requirements”
Information export (.IFC) storage:Propertyset in IfcSpaceOnly results will be stored
Tero Järvinen - Design Your Buildings
GD principles
Equipment list
Granlund Designer MEP
System Diagrams
Database of CombinedInformation
2015-17
Equipment approval
Equipment revisionmanagement
IFC Service area Charts Creation of RequirementsLinked to IFC-space types
IFC information to Database
Tero Järvinen - Design Your Buildings
GD principlesBIM2FM, 3D-view (external software required)
Bim software
Granlund Designer
BIM2FM: Intelligent 2D IFC-spaceview
Above information also linked
To IFC-spaces
Daily updated Information
is not in Graphical BIM software
but in shared databases
Tero Järvinen - Design Your Buildings
Origin: DPR Construction inc.
BIM based designing
• Creating requirementsRequirements
• Alternative solutionsSchematic
• Modelling chosen alternativeDesign
• Building according the ModelsConstruction
• Utilization of ModelsCommissioning
• BIM in FMMaintenance
Target consumption
Indoor air quality
Spatial Provisions
Energy Efficiency
Network Modelling
Network calculations
Combied Models
Information content
Device Validation
Information content
Service Area Charts
Device Database
Tero Järvinen - Design Your Buildings
Requirements management
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
1. Targets for spacetypes
2. Building Model
3. Linking requirements to spaces
5. Energy and Comfort simulation
4. Service Area Zones
6. Comparisation of alternative solutions
7. Chosen calculation to basis of CAD-system calculations
SQL
IFC
Software:RoomexRiuskaSolibriMagiCAD Room
Tero Järvinen - Design Your Buildings
Look also: Creating requirements in early stage of project
T5T6
BIM in Design Development -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Alterantive solutions
Diagrams and equipment databases
Spatial provisions and service area
zones
Energy- and comfort simulatations
Life Cycle
CFD-simulations 3D-mockups
Technical Visualizations
Lighting Simulations
SQLIFC
Design Developments –phase specifys investment costs, energy consumption and indoor air quality levels
Tero Järvinen - Design Your Buildings
Sustainability
BIM in Detail Design -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Combied Models Model AuditingModelling of MEP-networks
BIM basedProvision of Voids
Equipment database
Route Designing
SQL
IFC Common BIM Requirements
Information export from models
Detail Design is made according the Design Develompment
Tero Järvinen - Design Your Buildings
BIM in Construction -phase
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Installations are mabe according the Detailed Design Model
Combied Models Information export from models
IFC
SQLRevisionhandling
of Models, Documents and Equipment data
Model based assembly inspection
Equipment Validation
Tero Järvinen - Design Your Buildings
BIM in Commissioning
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Information export from models
Information of BIM is used in Commissioning
As-Bildt Model
Target values of energy consumption for
Facility ManagementSQL
IFC
Assembly Inspections
Tero Järvinen - Design Your Buildings
BIM in Facility Management
Requirements
Schematic
Design
Construction
Commissioning
Maintenance
Use of Models inFacility Management
Monitoring of Energy Efficiency
BIM Management Process during
building life cycle
Tero Järvinen - Design Your Buildings
BIM is helping Facility Management
Spacetypes and Requirements
SQL
Tero Järvinen - Design Your Buildings
For having MEP design strated, you need requirements for Indoor Quality, equipment
• With colloboration of customer, maximum temperatures etc. has to be decided
• With these requirements MEP designer makes comfort and energy simulations for fullfilling the requirements. End result is a target value for each space, which MEP designer has to fulfill. (for example:Requirement: max. 26oC -> simulation -> target value 1.2kW cooling
Software used:RoomexRiuska
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Linking requirements to spaces
Tero Järvinen - Design Your Buildings
Architectural model and requirements is linked together with ”Roomex”
• After that every space knows it’s requirements according to indoor quality
IFCSQL
Software:Roomex
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Service area charts
Tero Järvinen - Design Your Buildings
Spaces with requirements are loinked to service area charts (for example Air handling unit service areas)
• Linking is made using ifcSpaces, so ifcZones are created to IFC file
• 2D Visualization for example with Solibri etc.
IFCSQL
Software:RoomexSolibri
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Energy and Comfort simulations
Tero Järvinen - Design Your Buildings
Dynamic simulation of energy and comfort is made with requirements, building model and service area charts simulation.
• Every space is simulated
• Alternative simulations and comparisations for different envelopes, windows etc. -> beginning of LCC calculations
IFCSQL
Software:Riuska
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Optimisation of Energy usage
Tero Järvinen - Design Your Buildings
With parametric energysimulation in Riuska, you can get 200-2000 (or more) simulation results of building energy consumption.
Results are viewed in userfriendly cloud service for decission making purposes – real time search for optimate solution in one meeting with people having knowledge about expences and reality of limitations
SQL
Software:RiuskaGranlund Optimisation
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Building Performance
Tero Järvinen - Design Your Buildings
BAS system
Manager Metrix
Manager METRIX
• Connected to BAS system and offering ”one value of building Performance”• Offering interface for Facility management persons, who are not capable to
use BAS system• Offering interface for Building Management to analyze building performance
daily basis
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
SQL
Building Performance
Tero Järvinen - Design Your Buildings
BAS system
ManagerBuilding Info
Manager Building Info
• Information pops up on a large lobby screen or on your computer screen alongside newsletters providing information on your building's energy consumption, energy class and maintenance performance.
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
SQL
Requirements management in phase of Design Brief
Tero Järvinen - Design Your Buildings
IFC
Requirements
Concept
Detail
Construction
Commissioning
Maintenance
Software:- Cost estimation- Riuska / energysimulation- IFC-space objects
Tero Järvinen - Design Your Buildings
Different views to BIM
Performance
Quantities, schedule
Drawings, memos, schedule
Visualization models
Tero Järvinen - Design Your Buildings
Requirement management
Requirement
Client
Airflow 2 dm3/s /m2
Simulation
Designer
Airflow1,7 dm3/s /m2
Designed
Designer
Airflow2 dm3/s /m2
Offered
Contractor
Airflow2 dm3/s /m2
Measured
Contractor
Airflow1,8 dm3/s /m2
Tero Järvinen - Design Your Buildings
Equipment approval
Designed
Calculated values
Reference manufacturer
Pump2 dm3/s ,
35kPa
Wilo
Offered
Manufacturer approval
Grundfos
Approval
Manufacturerapproved
Grundfos
Offered
Values
Pump2,2 dm3/s ,
38kPa
Approval
Valuesapproved
Pump2,2 dm3/s ,
38kPa
As-builtInformation in Granlund Designer
Values
Pump2,2 dm3/s ,
38kPa
Grundfos
FM material to Granlund
Designer
PDF UploadLinked to
equipment
Manuals, service areas,
Step 1 Step 2
Granlund Designer ”Site” > BIM2FM
Step 3
22.3.2013 MJo
Construction Project Data Management – MEP
Management of interoperable construction data
Construction projectdata storage
Designmanagement
• Space program• End-user data• Requirements• Space data status• Time schedules
Construction management
• Procurement• Production• Resources• Costs• Time schedules
Structuraldesign
STRCT
• Design• Modeling• Publishing
ARCH
Architecturaldesign
• Design• Modeling• Publishing
MEPdesign
• Design• Modeling• Publishing
MEP
MEP information services
• System data• Building parts• Inspections• As-built data
input
MEP
Granlund Designer
Facilitiesmanagement
• O&M manual• Energy monitoring• Repairs• Budgeting
FM
Granlund Manager
• Documents• BIM 2D/3D views• BIM data
Management of real estate data
Real estatedata storage
• Documents• BIM 2D/3D views• BIM data
Contruction projectAs-built data
Renovation projectInput data
Tero Järvinen - Design Your Buildings