HALLETTSVILLE ISD 2014 FACILITIES BOND PROJECT

Post on 20-Jan-2016

17,066 views 0 download

Tags:

description

HALLETTSVILLE ISD 2014 FACILITIES BOND PROJECT

transcript

1

HALLETTSVILLE ISD2014 FACILITIES BOND PROJECT

2

TABLE OF CONTENTS

The Vision and Strategic Goal Elementary Need and Solution Junior High Need and Solution Financial Information Election Information

3

The STRATEGIC PLANNING COMMITTEE developed the

following goal related to Safety & Facilities:

HISD has appropriate facilities and a comprehensive plan

providing a safe and secure environment for students,

employees, and community members.

January 19, 2013

The Need

The Shared Vision of HISD developed by the strategic planning committee in January of 2013 states that:

Our learning environment Includes facilities that meet the needs of

students and staff. Provides physical and emotional safety.

4

SAFETY AND SECURITY IS OUR TOP PRIORITY

5

AGE OF ELEMENTARY FACILITIES

Year Age ELEM SCHOOL 1956 58 KINDERGARTEN ADDITION 1984 30 ELEM PE FACILITY 1989 25 ELEM LIBRARY ADDITION 1993 21 ELEM ADDITION 2004 10

The Need

Needs of Elementary

Increase safety and security by enclosing the elementary

from “walk-up” access (34 exterior doors at HES)

Additional classrooms and restrooms to accommodate

growing numbers

Library expansion

Technology, electrical, and air system upgrades

6

7

CURRENT ELEMENTARY FACILITY

Restroom Converted to Classroom Space

8

Open Walkways for Students and Staff Members

9

Portable Currently Leased to Provide Additional Classrooms

10

Small Group Instruction Conducted in Closet Space

11

Elementary Student Walkways Outdoors and Accessible to All

12

Outdated Ceiling Tiles That Can No Longer Be Replaced

13

Exposed Electrical, Gas, and Technology Lines

14

Patched Areas and Exposed Drainage Systems and Wires

15

Outdated Air Systems and Weathered Trim on Buildings

16

Limited Classroom Space in Kindergarten Wing

17

Limited Space in HES Library for Group Lessons and Storage

18

Limited Classroom Space for Increased Enrollment

19

Walk-up Access to Classrooms

20

21

PROPOSED TOTALLY ENCLOSED ELEMENTARY FACILITY

22

23

AGE OF JUNIOR HIGH FACILITIES

Year Age JR HIGH CAFETERIA 1970 44 JR HIGH LIBRARY ADDITION 1992 22 MINI GYM 1996 18 JR HIGH ADDITION/RENOVATION 2007 7

The Need

Needs of Junior High Construction of cafeteria to address

kitchen and dining area space limitations Eliminate cafeteria foundation issues Resolve drainage issues between the

gym and the cafeteria Increase library space Additional classroom space More efficient flow of student traffic in

hallways

24

Storage Building and Cooler Outside of Existing Cafeteria

25

Exterior Mop Storage Area on Cafeteria Porch

26

Foundation Problem in Cafeteria

27

Trip Hazards Created by Foundation Problems

28

Limited Storage for Cafeteria Supplies and Food Products

29

Buckled Floor in the Student Dining Area Along East Wall

30

Area Where Students Wait Outside in Line for Cafeteria Service

31

Safety and Security concerns regarding entrance to HJHS Cafeteria

Students are exposed to the elements while waiting to enter the cafeteria.

School entrance is directly connected to the back parking lot.

Parking lot is also used for deliveries to the cafeteria as well as by the community to deposit recyclable items.

Visitors to the campus through this entrance come in unnoticed by staff.

32

Need to Close Off Food Preparation Area from Testing Area

33

Tables Set up to Create Makeshift Serving Line

34

Limited Seating Space for Projected Enrollment

35

Current seating capacity of cafeteria: 168 students Current number of students per lunch: 142 students Number of lunch groups: 2 Projected number of students per lunch in 2016 –

2017+: 140 Projected number of student per lunch in 2017 -

2018+: 170+ Cafeteria is used as a multipurpose room during the

school year for cafeteria purposes and large group meeting room/testing room.

Drainage Problem Between Gym and Cafeteria Building

36

Limited Library Space for Group Meetings and Circulation

37

Library book space at capacity. Limited library seating area for grade level

activities: 58 chairs Current average class size: 66 Projected average class size in 2016-2017:

70 Projected average class size in 2017 –

2018+: 75 More space would allow a reconfiguration of

shelving and seating to meet campus needs.

3838

PROPOSEDJUNIOR HIGH

FACILITY

39The Solution

HISD’s comprehensive plan for providing a safe and secure environment for ALL students, employees, and community members includes:

• Remodeling the structurally sound HES main building

• Constructing new additional classrooms for HES and HJHS campuses to accommodate growth

• Building a new HJHS cafeteria

This approach would provide safe, appropriate learning environments at ALL campuses in the Hallettsville Independent School District.

Bond Project Timeline

February 2014 - Board Calls Bond Election February-April 2014 – Community Presentations May 2014 – Bond Election May 2014 – Finalize Facilities Plans May/June 2014 – HES Staff Moves to Portables June 2014 – Construction Begins Summer 2015 – Construction is Completed Fall 2015 – HES/HJHS Students and Staff Begin Using

New Facilities

The Solution

Estimated Cost by Area

Totals:Junior High Cafeteria $ 1,290,000Junior High Library Expansion $ 640,000Junior High Classrooms $ 600,000Junior High Re-roof $ 375,000Elementary School Construction $ 7,850,000Temporary Classrooms $ 400,000Furniture Fixtures and Equipment $ 325,000Asbestos Abatement $ 150,000

Total $ 11,630,000

***NEEDS UPDATED***

The Solution

19992000

20012002

20032004

20052006

20072008

20092010

20112012

2013$0.0000

$0.2000

$0.4000

$0.6000

$0.8000

$1.0000

$1.2000

$1.4000

Hallettsville ISD Historical Tax Rates – Before Bond

I&S RateM&O Rate

The Solution

After Bond (if it passes)

The Solution

How are the values distributed in Hallettsville ISD?

Based upon a bond issue of $11,630,000, what is the effect on my taxes?

The tax rate needed would be 13 cents.Based upon conservative values.

Home owners 65 and older WILL NOT have an increase in taxes on their homestead.

The Solution

2013 TAX RATES FOR NEIGHBORING DISTRICTS

The Solution

DISTRICTEdnaWeimarIndustrialEast BernardRiceGanadoGoliadColumbusSchulenburgYoakumCueroHallettsvilleShinerMoultonYorktown

M&O RATE1.040001.040001.170001.170001.040001.170001.040001.040001.040001.040001.040000.960001.040000.980000.96000

I&S RATE.26960.24000.09100.08920.19107.02950.14535.14000.12250.11400.06403.14265.00000.01008.01212

TOTAL1.309601.280001.261001.259201.231001.199501.185351.180001.162501.154001.104031.102651.040000.990080.97120

2013 Bond*

.20 (50 Mil) .33 (75 Mil) .13 (11.63 M)

*Cents to be added if bond passes;

Based on current property values.M&O Rate=Maintenance and OperationsI&S Rate=Interest and Sinking

What is the effect on my taxes?

With a Taxable Value of $100,000 – Per Year $ 130.00 Per Month $ 10.83

Per Week $ 2.50 Per Day $ .36

The Solution

48

ARE BOND FUNDS SUBJECT TO RECAPTURE?

Taxes Paid for Facilities Through Maintenance and Operations (M&O) Budget

This is recapture (Robin Hood)

Taxes Pd to HISD $15,218,529

Amt Pd to State $3,588,529

Amt Available $11,630,000For Project

Project Cost $15,218,529

Taxes Paid for Facilities Through Bonds

(I&S)We keep all taxes for bonds

Taxes Pd to HISD $11,630,000

Amount Pd to State $ 0.00

Amt Available $11,630,000For Project

Project Cost $11,630,000

WHEN FINANCING CAPITAL PROJECTS

Election Information

Board met to call Election- Feb. 10, 2014

Early Voting- April 28th through May 6th, Monday through Friday, 8 a.m. until 5 p.m. at the Lavaca

County Courthouse Annex, 412 N. Texana Street

Election day- Saturday, May 10th at the Lavaca County Courthouse Annex. The polls will be open from 7 a.m. until 7 p.m. All registered voters in HISD are eligible to vote.

The Solution