Health and Safety Executive 2013/14 Plan of Work Neil Stephens.

Post on 28-Mar-2015

216 views 2 download

Tags:

transcript

Health and Safety Executive

2013/14 Plan of Work

Neil Stephens

Current Position

Originally final year of 3 year plan

Plan extended by 1 year to align with HSE Business plan – 2014/15 = final year

Priority sectors

Small Sites (30%) – 37% delivered

Refurbishment (25%) – 18%

Asbestos (20%) – 19%

Major Projects & Large Contractors

Local Priorities

2013/14 Updates

Priority sectors remain same

Small Sites (increase to 35%)

Refurbishment (25%)

Asbestos (20%)

Major Projects & Large Contractors

Local Priorities

Inspection initiative

• Currently in last week of this year’s

• Delivered over 2176 inspections so far*

• Promoting – no change message on hard hats

• Excellent regional media coverage

• 2013/14 will take place in September 2013

2013/14 New Field Projects

• Fragile Materials – Inspection by

CD– Inspection FOD– Estates

Excellence– Busy Builder

(type) Sheet– CSkills videos

– WWT SHADs– Ag SHADs– ORR– Research on

human factor causes

– Trade articles– Presentations

(toolbox talk)

2013/14 field projects……..

• Fireplace Installation– VO led project

• Tile Cutting (roof valley)– NRFC guidance

• Health Risks in paving & block work– Noise– Havs– Silica

• Asbestos Removal in Retail

• Temp de-mountable structures and timber frame construction - continues

Non - Field work examples

• Clients Standard (or Charter)

• Client Engagement on Nuclear Build/Estate

• H&S and BIM - guidance

• Lift installation and maintenance

• Dust partnership – Visualisations (Elvis)– On-tool extraction– Resolving Face fit testing

• COHME - revision