Hotel Management SystemProject

DONE BY : MOHAMMED AL BABELI

Outlines

Introduction. The Problem. System Environment Overview. Network Diagram . Requirement specification analysis. Data Flow Diagram (level Zero). Data Flow Diagram (level one). ERD Description. User Interface Proposed. System Testing Plan. System Implementation Plan.

Introduction

The system provides to managing the reservation process. the system will able user to add, delete, edit and update reservation.

The system provide employee who work in the reception of hotel to make reservation for visitor or guest and confirm it by searching for available rooms, add guest information, and payment process. the system will find solution for recording the bill automatically. the procedure of hotel reservation has been analyzed by logging into booking website for hotel.

The system is build and developing using visual studio 2010 and SQL Server 2008 to build and manage system database

The Problem

Increase the electronic activates and Innovation in information system today require to faster response to exchange all traditional operations to systematic operations, from this point in our Hotel Management system we will try to Exchange all Hotel and Reservations traditional Process to systematic process

The main objective from this system is Build and development system to manage all Hotel activities

System Environment Overview

Network Diagram

Requirement specification analysis

Brief Description: - Guests and employee can reserve available room dependent on data that were enter it in the search process. Pre-condition: - Room that is selected must be available. The number of persons stay in the room should be the same limited number for the room. Initial Step-By-Step Description: - Enter the first name, last name, phone, credit card number, Nationality and other details about guest. Enter the check in and checkout date. The system must be checking all details before save it. Post-condition: - The system must be complete reservation process successfully and save it in the database. Exception: - The guest or employee enters previous date from current date the system must show message for user explains

that. Alternative: - The system Suggest for guest the earliest date.

Reservation Use Case

Requirement specification analysis

Brief Description: - The guest can request services. Pre-condition: - The guest already checks in. Initial Step-By-Step Description: - The guest request services. The guest enters type of services. The guest selects level of services. The System shows cost of services to the guest. Post-condition: - The system provides guest service. The system adds cost of service to guest balance.

Request Services Use Case

Data Flow Diagram (level Zero)

Data Flow Diagram (level one)

ERD Description

User Interface Proposed

System Testing Plan

System Implementation Plan

Resource Requirements Hardware Requirements

Lab tops. PC devices. Internet connection devices. Network Infrastructure

Software Requirements MS visual studio 2015 In Our project, we will use MS visual studio using C# programming Language MS SQL Server 2012 There are many different relational database management systems (RDBMSs) from a number of software manufacturers both from the open source and proprietary markets.in our project we decision to

use Microsoft SQL Server 2012 is consistent with the choices made with the rest of the infrastructure Asp.net Environment to build Dynamic website HTML Cascading Style sheet (CSS).

The End

Thanks