How do we start the 4D process?
How is this BIM art created?
What is the schedulers role in BIM?
How does the BIM scheduler interface with the
rest of the project?
Objectives
There are many different views on the worth of a
schedule.
How valuable a schedule is depends greatly on
how well it is put together, operated and
maintained.
A schedule can be a beautiful thing.
Introduction
Art?
Art!
Gödel, Escher,
Bach: An Eternal
Golden Braid
It is the “And”!
AND
How do we start the 4D
process?
Part 1
BuildingInformationModeling Process Map www.yatescompanies.com
bcrosby@wgyates.com 781 Larson St. Jackson, MS 39202 O: 601-352-7396 M: 601-383-8359 www.wgyates.com www.yatescompanies.com
Field Installation
Author Shop /
Fab Models
Author Design
Model
Schematic
Design
Model
Marketing
Prefabrication
Modularizatio
n
Estimating
Scheduling
Syn
c
6D Owner Information
Phase (COBie)
3D Coordination Phase
(Clash Detection)
4D and 5D
Models
(Schedule and
Cost)
Adam Smith needs revision!!
Nash Equilibrium – from A Beautiful Mind
BuildingInformationModeling Process Map www.yatescompanies.com
bcrosby@wgyates.com 781 Larson St. Jackson, MS 39202 O: 601-352-7396 M: 601-383-8359 www.wgyates.com www.yatescompanies.com
Field Installation
Author Shop /
Fab Models
Author Design
Model
Schematic
Design
Model
Marketing
Prefabrication
Modularizatio
n
Estimating
Scheduling
Syn
c
6D Owner Information
Phase (COBie)
3D Coordination Phase
(Clash Detection)
4D and 5D
Models
(Schedule and
Cost)
Architec
ts
General
Contractor
Construction
Manager
Owners
General
Contractor
Construction
Manager
General
Contractor
Constructio
n Manager
General
Contractor
Construction
Manager
Modelers
Construction
Manager
General
Contractor
Owners
General
Contractor
Modelers
Trades
Owners
Specialty
Contractors
Specialty
Contractors
General
Contractor
Trades
Specialty
Contractors
General
Contractor
Trades
Owners
Engineers
Arch/CM/G
C/Owner
All
Architec
ts
How is this BIM art
created?
Part 2
BuildingInformationModeling Process Map www.yatescompanies.com
bcrosby@wgyates.com 781 Larson St. Jackson, MS 39202 O: 601-352-7396 M: 601-383-8359 www.wgyates.com www.yatescompanies.com
Field Installation
Author Shop /
Fab Models
Author Design
Model
Schematic
Design
Model
Marketing
Prefabrication
Modularizatio
n
Estimating
Scheduling
Syn
c
6D Owner Information
Phase (COBie)
3D Coordination Phase
(Clash Detection)
4D and 5D
Models
(Schedule and
Cost)
Schedule – Model - Field
What is the schedulers role in BIM?
How does the BIM scheduler interface with the rest of the
project?
Part 3 and 4
Schedule – Model - Field
Project Management
Daily Reports
Job Walks
Phone Calls
Schedule Updates
Pay Applications
Meetings
What does the project require?
Role and Interface
Contractors
Old Style Management
Designers
Suppliers
CM Agent
OWNER
BIM Style
InContractorsDesigners
Contracts
Incentives
CollaborationRelationships
Efficiency
Productivity
Sharing
Accountability
Information
Suppliers
CM Agent
OWNER
In
Suppliers
Contractors
TEAMWORK
Designers
INFORMATION
CM Agent
OWNER
Conclusion
The Schedule is the Keystone of Information.
Use all of the tools available to communicate and work to the
schedule.
A Beautiful Project
A collaborative schedule
well communicated is an
amazing thing.
Be An Artist.
Paul Teicholz
Labor-Productivity Declines in the Construction Industry: Causes and Remedies (Another Look)
100% Design Coordination
90% Reduced Rework
75% Prefabrication
50% Less Change Orders
20% Shorter Duration
10% Cost Savings for Owner
Zero Punch List
Where is BIM going?
Start Learning
Don’t start with the software,
Start Learning the Process.