Post on 05-Dec-2014
description
transcript
© 2001 Construction Estimating Institute1
Fleet Screen
© 2001 Construction Estimating Institute2
Ownership Screen
© 2001 Construction Estimating Institute3
Ownership Cost changes
© 2001 Construction Estimating Institute4
Ownership With Financing
© 2001 Construction Estimating Institute5
Fuel Costs Change
© 2001 Construction Estimating Institute6
Fuel Use Under Light Load
© 2001 Construction Estimating Institute7
Fuel Use Under Heavy Load
© 2001 Construction Estimating Institute8
Slow Operator Temperament
© 2001 Construction Estimating Institute9
Fast Operator Temperament
© 2001 Construction Estimating Institute10
F.O.G.
© 2001 Construction Estimating Institute11
Other Important Costs
Planned Repairs Budget –Big $$$ Items (Engines, Transmission, Final Drives etc.)
Planned Repairs Frequent –Small items
Non-Planned Repairs Budget - Everything else
Undercarriage or Tires
Special Wear – Ground Engaging Tools
© 2001 Construction Estimating Institute12
Undercarriage Costs