Post on 10-Aug-2015
Preview:
Tags:
transcript
Build
Testing & IDE Integration
• Restore Packages
• Compile
• Test
321
Version Control
1. Drop & Create DB
Pipelines / Build Chains
• Clean Slate DB
• Apply All Changes
• Everything OK?
2. Simulate Prod Update
• Restore Prod Backup
• Apply Changes
• Capture Timing Stats
3. Prod Update
• TeamCity logos © 2000—2015 JetBrains s.r.o. All rights reserved.
• Kick image © 2015 presentermedia.com
Top related