Hutchinson Sports Arena

Post on 06-Aug-2015

801 views 0 download

Tags:

transcript

HUTCHINSONARENA RENOVATION MASTER PLAN

HOW CAN WE IMPROVE THE ARENA?

How can we improve the Hutchinson Sports Arena?

Improvements lead to Benefits…• Upgrade to meet codes and ADA requirements• Improve experience for spectators and participants• Expand community use• Expand ability to attract visitors to Hutchinson

CURRENT ARENA CHALLENGES

Improved Spectator Experience• Reduce entry lobby/ticket area

congestion• Increase number and quality of

concession areas• Increase number and quality of

restrooms• Add modern heat and air

conditioning

Improved Participant Experience• Regulation size practice court that

is ADA accessible• Modern locker rooms with

adequate fixtures• Modern training rooms

What’s the vision for the next 50 years?

SITE MASTER PLAN CONCEPT

Main entry on South—11th Street

Entry to feature more windows—more natural light by day and more attractive by night

Multipurpose facilities on north addition

MAIN LEVEL PLAN

north

Entry Level

SECOND LEVEL PLAN

north

Second Level

THIRD LEVEL PLAN

north

Third Level

FOURTH LEVEL PLAN

Fourth Level

FOURTH LEVEL PLAN

Basement Level

Design approach for arrival and entry experience.

Design approach for restroom improvements

Design approach for strength training areas

Design approach for sports medicine areas

Design approach for concession improvements

Design approach for ADA improvements

Total Project Costs

What does a .0035 sales tax mean?

.35% on a $5.95 lunch = 2 cents

For someone who spends $10,000/yr in Hutchinson … $0.67 per week

A small investment for 10 years improves quality of life in our communityfor the next 50 years!

The message on the original jump circle that was preserved as part of the 1981 remodel says

“…reminded now of our past and the hospitality of our people, we rededicate the “new” sports arena, believing, as we do, the best is yet to come.”