Imagine! Dixon Street Office Remodel

Progress

Before Remodel 2/13/2015

Before Remodel 2/13/2015

Before Remodel 2/13/2015

Before Remodel 2/13/2015

2/20/2015Staff, Equipment Moved Out

2/20/2015Staff, Equipment Moved Out

2/20/2015Staff, Equipment Moved Out

2/20/2015Staff, Equipment Moved Out

2/27/2015Furniture Is (Mostly) Gone

2/27/2015Furniture Is (Mostly) Gone

2/27/2015Temporary walls installed to block off areas so staff in a few

departments (HR, Finance, Administration) may continue to work in limited areas

3/6/2015Demolition Is Underway

3/6/2015Don’t worry – we saved all the pictures of the monthly recipients of

Imagine!’s Excellence in Customer Service Award

3/6/2015For those hearty souls still working at Dixon,

bathroom availability is at a premium

3/13/2015First floor break area

3/13/20151st floor looking southeast, former IBHS and EI support

offices

3/13/20152nd floor looking South and West on Case Management

wing

3/13/20152nd floor Case Management wing

3/13/20151st floor looking through O’Shea Room

3/13/20151st floor looking South and West through O’Shea Room

3/13/2015Two new ten person conference rooms framed (near

former IBHS space), new office for HR Director

3/20/20151st floor meeting room,

adjacent to Human Resources

3/20/2015Reception area

3/20/2015First floor hallway looking into patio and break area

3/20/2015First floor large meeting room West wing

3/20/2015First floor large meeting room West wing

3/20/2015First floor small meeting room West wing

3/20/2015First floor office West wing (old FSSP area)

3/20/2015First floor old FSSP area, looking East

3/20/2015Women’s second floor bathroom

3/20/2015First floor IBHS office

3/20/2015First floor South Wing meeting room

3/27/2015New meeting room adjacent to IBHS

3/27/2015IBHS on right side of hall. Meeting rooms on left.

3/27/2015Meeting room adjacent to HR on left. Meeting room across

from IBHS on right.

3/27/2015HR Director’s Office

3/27/2015Door from HR Director’s office to HR office

3/27/2015New meeting room adjacent to work stations, 1st floor,

Southeast wing

3/27/2015Two offices, 1st floor, Southeast wing

3/27/2015IBHS office and treatment room

4/3/2015This week walls started to go up, like the walls for this

small meeting room in South wing first floor.

4/17/2015We have a hint of color! These pictures are from the

Southeast 1st floor.

4/17/2015We have a hint of color! These pictures are from the

Southeast 1st floor.

4/17/2015We have a hint of color! These pictures are from the West

wing 2nd floor.

4/17/2015We have a hint of color! These pictures are from the West

wing 2nd floor.

4/24/20151st floor break area

4/24/20151st floor reception area

4/24/20152nd floor break area

4/24/2015Got mail? We’ve go the space for it.

4/24/20151st floor West wing office

4/24/2015Tiling the reception area

4/24/2015Tile for the kitchen backsplash, created by Imagine!

CORE/Labor Source artists

5/1/2015Reception area with finished tile

5/1/2015Meeting rooms near reception area

5/1/20151st floor break area

5/1/20151st floor South wing with carpet

5/8/2015Ceilings

5/8/2015Furnishings first floor South wing

5/8/2015Second floor copy area

5/8/2015Second floor kitchen

5/8/2015First floor West wing furniture

5/22/2015Second floor kitchen with custom backsplash designed by

CORE/Labor Source artists

5/22/2015Imagine! Foundation/Public Relations Workspace

5/22/2015Furniture is returning

5/22/2015Hallway lighting – this area will feature artwork by

CORE/Labor Source artists

5/22/2015Second floor women’s bathroom

5/22/2015Case Manager Supervisor office with frosted glass

5/22/2015Entryway artwork restored

5/22/2015First floor break area with custom backsplash tiles created

by CORE/Labor Source artists

5/22/2015Family Support office

5/22/2015Inside view of small meeting room with frosted glass for

privacy

5/22/2015New furniture second floor West wing

5/22/2015Second floor West wing

5/22/2015First floor West wing

5/22/2015First floor South wing

5/22/2015New workstations

5/22/2015Kitchen/break area