General data3
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Name of the School
IIS MARCONI PIERALISI Hi h S h l
Type of school
IIS MARCONI PIERALISI High School
Hi h S h lHigh School
Number of students Owner
public766+356
Location
Municipality of Jesi (AN), ItalyVi R ff ll S i 8
Year of construction
1946 1960Via Raffaello Sanzio 8Altitude: 97 m AMSL
1946 – 1960Renovation in 2007 and 2009
4
General dataIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I l
Building typology Heated area (m2 )
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
4‐2 floors buildings 12425 m2
Heating degree days : 1899 (DPR 412/1993 – base 20)
Cooling degree days (base 26):
Site
Urban Plane
Building 1Building 2
5
Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
6
Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
7
Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Building 1 Building 2g g
8
Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I lIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Building 1 Building 2g g
9
Current Situation
Renovation needs Building use
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
High Priority: energy efficiencySchedule for High school:
Standard Use: From 9th of September till 14th of June
High Priority: energy efficiency
Reduce Use: From 15th of June till 12th of August
From 19th of August till 6th of September
2nd, 3rd, 4th of January
12th, 16th of April
23rd, 24th, 27th, 30th , 31st of December
Main Building: Marconi: Monday till Friday: 07.30 to 20.00, Saturday: 07.30 to 14.00
Pieralisi: Monday till Friday: 07 30 to 21 45 Saturday: 07 30 to 14 00Pieralisi: Monday till Friday: 07.30 to 21.45, Saturday: 07.30 to 14.00
Gymnasium: Marconi: Monday till Friday: 07.30 to 20.00, Saturday: 07.30 to 14.00
Pieralisi: Monday till Friday: 07.30 to 19.30, Saturday: 07.30 to 14.00
10
Current SituationIIS “M i Pi li i” Hi h S h l M i i li f J i (AN) I l
Building envelope: WallsBuilding 1
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Brick Wall with air gap
Building 2Precast Concrete Blocks
Building envelope: RoofBuilding 1
no insulationno insulation
Replacement of building 2 in 2007‐2009Insulation and waterproofing
Building envelope: GroundfloorGround floor consists of concrete
Building envelope: WindowsBuilding 1
D bl l d ith th l b k i l i i (6 7/12/6 7)Double glazed with thermal break, in aluminium (6.7/12/6.7)
Replacement of building 2 in 2007‐2009Double glazed with thermal break, in aluminium
11
Current Situation
Airtightness: No measurements
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Heating/Cooling: Radiators, manual control, activity sectors
V til ti N h i l V til tiVentilation: No mechanical VentilationVentilation by opening windows
Lighting: Fluorescent tubes T8 controlled by users
Appliances: Lab: PC, Projector, PrinterOffice: PC, Printer, Copy Machine
DHW: Not available
Cooking: No cooking
Current final energy consumption kWh/m2 conditioned area (from
*97.34 kWh/m² y for heating*27 63 kWh/m² y for electricitykWh/m2 conditioned area (from
bills, metering etc.):
27.63 kWh/m y for electricity*Total =124.96 kWh/m² per year
12
Current Situation
Equipment Age and Maintenance Needs
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Lighting : Fluorescent lamp T8 : continuous replacement.
HVAC/ B il B il i t ll d i 2007 d 2010 S b il d ti b ilHVAC/ Boiler: Boilers installed in 2007 and 2010. Some boilers are condensation boilers
HVAC/Distribution Network: Final element radiators installed in 2007Radiant heating in the new sector (condensation boiler)Radiant heating in the new sector (condensation boiler)
HVAC/other components no
HVAC/other components 2.8 kWp PV panels on the Roof (about 2520 kWh/y)
Windows Replacement in 2007‐2009
Other Building Components no
Other Maintenance Needs noOther Maintenance Needs no
Other Renovation Needs Structural Compliance just in 1980’s sector
13
Current Situation
Health & Comfort
IIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Summer comfort: No data
I t i i lit N d tInterior air quality: No data
Visual comfort: No data
Running Contracts and Management
Running cost: Energy (2013): 104339 (G)+ 68502 (E) = 172.841 €Water: no dataMaintenance: no data
Energy Supply Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in March 2017
Energy Management Contract CONSIP – Ministerial Central Society for PA SupplyingContract expiring in March 2017
M d di l b h P i h i l ffiBuilding Maintenance Managed directly by the Province technical office
14NZEB RenovationIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
ZEMedS Goals: ‐ Requeriment 1: CPE‐ProdRES≤ 0
Primary energy consumption yearly (heating, cooling, ventillation, DHW and lighting) is produced bylocal renewable energieslocal renewable energies.
‐ Requeriment 2: CFE≤ 25 kWh/m2 y
FE consumption yearly (heating, cooling, ventillation and lighting) per conditioned area
‐ Requeriment 3: Indoor air quality guaranteed (CO2≤1000 ppm) and temperature above 28ºC ≤40 hours yearly during occupancy
National factors for conversion in energy and CO2 have been taken into account (data 2014).gy 2 ( )
Primary Energy from non‐renewable energy sources covered by rene able energ
Final energy consumption (all uses except DHW & cooking)
Overheating limited toIndoor Environmental
Quality (IEQ) is guaranteedrenewable energy
0
p g) g
0 kWh/m².year
(annual balance)
CFE ≤ 25 kWh/m².year
40 hours over 28ºC annually
CO2 ≤ 1000 ppm
15NZEB Renovation StatusIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Actual status refering to the the foreseen ZEMedS Renovation Process
Diagnostic/Current Planning Design Companies Works Reception Use and /Currentsituation
Planning Design consulting Works of works maintenance
Diagnostic/ Current Situtation:An extended energy audit (including at least a basic environmental monitoring) is needed in order to collectAn extended energy audit (including at least a basic environmental monitoring) is needed, in order to collect detail information.
16Energy Saving PotentialIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)
Consumption by BillsFinal energy
consumption (all uses
ZEMedS Target
Consumption by BillsNatural Gas: 115.798 nm3/year = 97.34 kWh/m².yearElectricity: 27.63 kWh/m².yearOther Fuel: 0 kWh/m² year
p (except DHW & cooking)
CFE ≤ 25 kWh/m² yearOther Fuel: 0 kWh/m .year
Total: 124.96 kWh/m².year
Estimation:
kWh/m .year
Heating/Cooling and Ventilation: Estimation:
Specific Electricity Consumption (not including Lighting): 11 kWh/m².yearDomestic Hot Water Consumption: 1 kWh/m².yearExpected Total Consumption after successful ZEMedS Renovation:
CHVAC ≤ 20 kWh/m².year
Lighting: Cligh ≤ 5 kWh/m².year
Expected Total Consumption after successful ZEMedS Renovation: 37 kWh/m².year
Energy Saving Potential(heating, cooling, ventillation and lighting)
Theoretical Saving88 kWh/m².year
Theoretical Gain70 %
17Energy Saving PotentialIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Actual Final Energy Consumption ZEMedS Targetgy p(heating, cooling, ventillation and lighting)
Consumption by BillsFinal energy
consumption (all uses
ZEMedS Target
Consumption by BillsNatural Gas: 115.798 nm3/year = 1.209.394 kWh/yearElectricity: 343.282 kWh/yearOther Fuel: 0 kWh/year
p (except DHW & cooking)
CFE ≤ 25 kWh/m² yearOther Fuel: 0 kWh/year
Total: 1.552.676 kWh/year
Estimation:
kWh/m .year
Heating/Cooling and Ventilation: Estimation:
Specific Electricity Consumption (not including Lighting): 136.675 kWh/yearDomestic Hot Water Consumption: 12.425 kWh/yearExpected Total Consumption after successful ZEMedS Renovation:
CHVAC ≤ 20 kWh/m².year
Lighting: Cligh ≤ 5 kWh/m².year
Expected Total Consumption after successful ZEMedS Renovation: 459.725 kWh/year
Theoretical SavingEnergy Saving Potential(heating, cooling, ventillation and lighting)
Theoretical Saving1.092.951 kWh/year
Theoretical Gain70 %
18Renewable Energy Source PotentialIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
System Considerations and Recommendation PotentialSystem Considerations and Recommendation PotentialProduction
Photo VoltaicS
Flat Roof, south oriented panels125 kW ( b 3000 2 f f f )
12.28kWh/ ²System 125 kWp (about 3000 m2 of roof surface) kWh/m².year
Solar Thermal for DHW
XX kWh/m².yearfor DHW kWh/m .year
RES Heat Pump XX kWh/m².year
Others
RES Potential RES Production Potential12.28 kWh/m².year
19Recommended MeasuresIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Solar Protection PV system
E Building
NOW Use and management
Demandreduction
Energyefficientsystems
Renewable energysupply
u d gManagement System
NZEB
Controlled naturalControlled naturalventilation BMS for Heating
20Recommended MeasuresIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
Measure Why is recommended and whatMeasure Why is recommended and what
Building Management S
Avoid wastes due to managementSystem
Solar protection Comfort (visual, overheating)
Controlled Natural Ventilation
Energy Saving and ComfortAvoid wastes due to management
Photovoltaic System Further Electric Energy Production
21Specific Features and RemarksIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
f kSpecific Remarks
The school is composed by 2 different building blocks with different history and features.The “Pieralisi” block was almost completely renovated between 2007‐2010. Structural Compliance has to be assessed in the 80’s building.They were analyzed together in this project because the energy meters were shared, so the
il bl i d f d h f h b ildiavailable consumption data referred to the sum of the two buildings.
22Funding OpportunitiesIIS “Marconi‐Pieralisi” High School, Municipality of Jesi (AN), Italy
l f iRelevant Information:• Until the Energy Supplying and Management Contract are managed through
CONSIP (Ministerial Central Society for PA Supplying and Purchasing), the ESCOs cannot be involved in the funding mechanism
Funding Potential:g• Self funding: no • Regional Initiatives:
– DGR 124 02 03 2015 – Regional Government Criteria for getting Ministerial Fund “3‐year PlanningDGR 124 02.03.2015 Regional Government Criteria for getting Ministerial Fund 3 year Planning for School Buildings” (art.10 Law 128/2013, DM 23.01.2015, also known as “IEB loan decree”
– ERDF – Thematic Objective 4 – Action 13.1 Promozione dell’eco‐efficienza e riduzione di consumi di energia primaria negli edifici e strutture pubbliche
• National Funding:
• European Direct Funding: