INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 15-Apr-11
R Y G
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This Week
S. No. Activity/ Milestone/ Deliverable Planned
Start Date End Date1
9-Apr-11 9-Apr-112
9-Apr-11 9-Apr-113 Printers unable to connect 9-Apr-11 9-Apr-114 Value store SKU's with price null 9-Apr-11 9-Apr-115
9-Apr-11 9-Apr-116
9-Apr-11 9-Apr-117
9-Apr-11 9-Apr-118 RTV released from your side 10-Apr-11 10-Apr-119 Unable to receive ASN 10-Apr-11 10-Apr-1110 Shipping Label Error 10-Apr-11 10-Apr-1111 Data for Delivery Chalan(DC) 11-Apr-11 11-Apr-1112
11-Apr-11 11-Apr-1113 SKU Data sent to MLS 11-Apr-11 11-Apr-1114
11-Apr-11 11-Apr-1115
11-Apr-11 11-Apr-1116 Shipping Lable Invalid 11-Apr-11 11-Apr-1117 Retek trip sheet 11-Apr-11 11-Apr-1118
11-Apr-11 11-Apr-1119 ASN not in WMS 11-Apr-11 11-Apr-1120 RTW ASN to be deleted in WMS 11-Apr-11 11-Apr-11
Project Health Check
To check whether value of SKU's is in WMSReturn To Vendor(RTV) not reflecting 24807
Load ID - 0000681399 - please give the packing list print outDelivery Chalan(DC) view as it has been archieved, we have given it from backend--8000105278Printer Issue Tripsheet is not printing
Purchase Order Number not updated in SAP
Please change the Owner PEP to PEEX
Deleted Pick detail data sent to Srinivasan
Unable to receive ASN through Telnet
21 Allocated & Part Allocated for ASN 11-Apr-11 11-Apr-1122
LR Printing not happening Properly11-Apr-11 11-Apr-11
2311-Apr-11 11-Apr-11
2412-Apr-11 12-Apr-11
25 SKU master txt file 12-Apr-11 12-Apr-1126
12-Apr-11 12-Apr-1127
12-Apr-11 12-Apr-1128
12-Apr-11 12-Apr-1129
12-Apr-11 12-Apr-1130 Transpoter data 12-Apr-11 12-Apr-1131 Picking error For Orders 12-Apr-11 12-Apr-1132 Urgent TOs for silk shirt 12-Apr-11 12-Apr-1133
12-Apr-11 12-Apr-1134 Freight Program 12-Apr-11 12-Apr-1135 Airlift of trouser for 11092 12-Apr-11 12-Apr-1136 ASN not uploading in WMS 13-Apr-11 13-Apr-1137
13-Apr-11 13-Apr-1138 Data populated In Old PO's 13-Apr-11 13-Apr-1139 Assigning Carrier Key 13-Apr-11 13-Apr-1140
13-Apr-11 13-Apr-1141 Wave ID Unsuccessful 13-Apr-11 13-Apr-1142 Wave ID Release Unsuccessful 13-Apr-11 13-Apr-1143 Uploded these ASN 13-Apr-11 13-Apr-1144
13-Apr-11 13-Apr-1145 ASN not reflecting in WMS 13-Apr-11 13-Apr-1146
13-Apr-11 13-Apr-1147
13-Apr-11 13-Apr-1148 Uploaded file data not populated 13-Apr-11 13-Apr-1149
13-Apr-11 13-Apr-1150 Wave not released 31155 13-Apr-11 13-Apr-11
Unplanned Planned Activities During This Week
S.No. Activities Start Date End Date
1 Freight Report 12-Apr-11 12-Apr-112 Warehouse Efficiency Report 12-Apr-11 12-Apr-11
Picking error for order no 0000445265
Provide GRN Copy Re-print ASN NO>0000005821 [GRN CLOSE]
Assigning Carrier Key - Permit Stores
Change the status into Permit Category
Order created without availability of inventoryPlease send MG ,WMS to SAP to WMS in transit data for confirmation
Required Bulchee documentation printing at RDC VH floor
Transfer order raised for shirt- please despatch
Owner Change(OC 1605) 548 qty Process into WMS
Style Conversion RTV created: Very Urgent - RTV not reflecting
Allocation for Select ESP / Ambi ESP & Westside Infinity
Shipping lable need to be configured - ES2 Dispatches
Status of load Id 0000686598 from Loaded to Shipped
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Week Ending 15-Apr-11Status Report No. 1
Highlights of Week
Deliverables Freight Report,Warehouse Efficiency ReportDecisions
Others
Planned Activities During This Week
Actual Status Owner Remarks
Start Date End Date
9-Apr-11 9-Apr-11 Closed MG/Vinculum
9-Apr-11 9-Apr-11Closed MG/ Vinculum
9-Apr-11 9-Apr-11 Closed MG/ Vinculum
9-Apr-11 9-Apr-11 Closed MG/ Vinculum
9-Apr-11 9-Apr-11Closed MG/ Vinculum
9-Apr-11 9-Apr-11Closed MG/ Vinculum
9-Apr-11 9-Apr-11Closed MG/ Vinculum
10-Apr-11 10-Apr-11 Closed MG/ Vinculum
10-Apr-11 10-Apr-11 Closed MG/ Vinculum
10-Apr-11 10-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11Closed MG/ Vinculum
11-Apr-11 11-Apr-11Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11 Closed MG/ Vinculum
11-Apr-11 11-Apr-11Closed MG/ Vinculum
11-Apr-11 11-Apr-11Closed MG/ Vinculum
12-Apr-11 12-Apr-11Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
12-Apr-11 12-Apr-11Closed MG/ Vinculum
12-Apr-11 12-Apr-11Closed MG/ Vinculum
12-Apr-11 12-Apr-11Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
12-Apr-11 12-Apr-11Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
12-Apr-11 12-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11Closed MG/ Vinculum
13-Apr-11 13-Apr-11Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
13-Apr-11 13-Apr-11 Closed MG/ Vinculum
Unplanned Planned Activities During This Week
RemarksEffort (Person Hours)
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 22-Apr-11
R Y G
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable Planned
Start Date End Date
1 Upload the Asn 15/04/2011 15/04/20112
15/04/2011 15/04/20113 Data populated In Old PO's 15/04/2011 15/04/20114 SKU master file 15/04/2011 15/04/20115
15/04/2011 15/04/20116 PEM packing list not printing 15/04/2011 15/04/20117 Wave release unsuccessful 15/04/2011 15/04/20118
Allocate & Part allocate TOs detail 15/04/2011 15/04/20119
15/04/2011 15/04/201110 Value ASN Not reflecting -Esprit 15/04/2011 15/04/201111 Unable to receive ASN 15/04/2011 15/04/201112 Delete SKU from ASN no 5833 15/04/2011 15/04/201113
15/04/2011 15/04/201114 Value ASN Not reflecting -Esprit 15/04/2011 15/04/201115 PO to be updated 15/04/2011 15/04/201116 Check SAP external no 15/04/2011 15/04/201117 People audit req 18/04/2011 18/04/201118
PEM deleted pickto location details 18/04/2011 18/04/201119 ASN format not uploading 18/04/2011 18/04/201120 Nothing to do error - 0000445394 18/04/2011 18/04/201121 Delete Sku from ASN no 5925 18/04/2011 18/04/2011
Project Health Check
Uploaded ASN's but data not populated
WMS- ALL LOAD Information Report is not WORKING
Check asn for po no 4701049 /4701050/ 4701052 not getting upload
SAP external nos to be check in WMS
22 Insert RMS PO. 18/04/2011 18/04/201123 Value ASN not reflected 18/04/2011 18/04/201124 ASN is missing in WMS 18/04/2011 18/04/201125 Bins to be created for ES owner 19/04/2011 19/04/201128 SAP intransit information 19/04/2011 19/04/201129 Trip sheet is not generating 19/04/2011 19/04/201130 Picking error - 0000447660 19/04/2011 19/04/201131 Value store despatch 19/04/2011 19/04/201132 Part Allocation 19/04/2011 19/04/201133 Change the status 19/04/2011 19/04/201134 Part allocated TOs Detail 19/04/2011 19/04/201135
20/04/2011 20/04/201136 Change Type of ASN no 5935 20/04/2011 20/04/201137 ASN format not uploading 20/04/2011 20/04/201138 Error in file upload 20/04/2011 20/04/201139
20/04/2011 20/04/201140 Ezone stock requirement 130 qty 20/04/2011 20/04/201141 DC veiw ---8000089163 20/04/2011 20/04/201142 ASN format not uploading 20/04/2011 20/04/201143 Order release issue 20/04/2011 20/04/201144 ASN- 0000006259 20/04/2011 20/04/201145 Value ASN not reflecting in WMS 21/04/2011 21/04/201146 Wave id not release 21/04/2011 21/04/201147 Part allocated orders 21/04/2011 21/04/201148 RTV testing in devlopment env 21/04/2011 21/04/2011
GRN Info Vs SAP Dispatch - Data not flowing to BW
Please give the GRN & Discrepancy report printoutfor the ASN - 0
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Week Ending 22-Apr-11Status Report No. 2
Highlights of Week
Deliverables WMS SYSTEM ISSSUESDecisions
Others
Planned Activities During This WeekActual Status Owner Remarks
Start Date End Date
15/04/2011 15/04/2011 Closed MG/Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
15/04/2011 15/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
18/04/2011 18/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
19/04/2011 19/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
20/04/2011 20/04/2011 Closed MG/ Vinculum
21/04/2011 21/04/2011 Closed MG/ Vinculum
21/04/2011 21/04/2011 Closed MG/ Vinculum
21/04/2011 21/04/2011 Closed MG/ Vinculum
21/04/2011 21/04/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 29-Apr-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Wave release unsuccessful
2 Shipping label now generating
3 ASN not populating
4 Shipping Label invalid
5 SHIPPLING LABEL INVALID -URGENT
6 ARS order not reflecting
7 no retake DC No in stock inward riscepency report
8 ASN receive all error
9 Trip sheet not generating
10 RTV release
11 Trip sheet is not generating
12 PEM printing stopped
13 Mens & Womens allocation for Ezone 467 qty
14 Customer code relased {800179}
15 Value store code is incorrect in WMS
16 Allocated status to details
17 Shipping Lable And Packing Slip Not generating
18 Wave release unsuccessful
19 TO'S to be released
20 OC 1607 3059 qty
21 Wave id: Status Allocated ..
22 Not able to take FORM 403( Gujarat entry Form)
23 Packing list for load id 707514
24 Allocated Status TOs detail
25 Trip sheet not generating
26 ASN not reflecting in WMS
Project Health Check
27 Printer Issue at Ground Floor
28 ASN not refecting in WMS
29 Please change the Owner PEP to PEEX
30 ASN - 0000006396 - Uploaded file data not populated
31 In Process Status - Error in unallocation
32 Data required from WMS
33 ASN status required from WMS
34 Assign Carrier Key
35 Wave unsuccesful
36 ASN confirmation not gone to SAP
37 OC 1607 3059 qty
38 OC 1609 4033 qty
39 Pls create the single box ID No
40 ASN - 0000006396 ,datanot populated
41 ASN - 0000006425 ,datanot populated
42 DC confirmation from WMS
43 ASN - 0000006426 PO PRINTOUT
44 ASN-0000006426, data populated in old PO-2200002943
45 Royal meenakshi mall store uhold
46 Pl. send me Sku master file
47 warehouse closing for MLS migration
48 RTV not reflecting in WMS
49 Error in Asn uploading
50 Shipping label printed invalid
51 Shipping Label Printer Setup
52 Change permit status
53 Part allocated TO( Stores TO Urgent)
54 Change in City Name
55 Part Alloacted TO
56 Kindly delete RTW ASN
57 Don't send any good for 21750-Mumbai store, put this under hold
58 Kindly make changes in MLS ALL SKU INVENTORY REPORT
59 print DC / VAT 515 / Carton List for load id 0000710761
60 pep1 grn data missing in SAP
61 PO print out for the ASN - 0000006397
62 open qty should be zero
63 LBRD &PEM SAP EXTERNAL NOS TO BE CHECK
64 ASN- 0000006431
65 Trip not generating
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending 29-Apr-117-Jan-09 Status Report No. 329-Apr-11
Highlights of Week
Y G Deliverables Form 403 Printer Issue,RAM UpgradationDecisions
Others
Planned Activities During This WeekPlanned Actual Status
Start Date End Date Start Date End Date
22/04/2011 22/04/2011 22/04/2011 22/04/2011 Closed
22/04/2011 22/04/2011 22/04/2011 22/04/2011 Closed
22/04/2011 22/04/2011 22/04/2011 22/04/2011 Closed
22/04/2011 22/04/2011 22/04/2011 22/04/2011 Closed
24/04/2011 24/04/2011 24/04/2011 24/04/2011 Closed
24/04/2011 24/04/2011 24/04/2011 24/04/2011 Closed
24/04/2011 24/04/2011 24/04/2011 24/04/2011 Closed
24/04/2011 24/04/2011 24/04/2011 24/04/2011 Closed
24/04/2011 24/04/2011 24/04/2011 24/04/2011 Closed
25/04/2011 25/04/2011 25/04/2011 25/04/2011 Closed
25/04/2011 25/04/2011 25/04/2011 25/04/2011 Closed
25/04/2011 25/04/2011 25/04/2011 25/04/2011 Closed
25/04/2011 25/04/2011 25/04/2011 25/04/2011 Closed
25/04/2011 25/04/2011 25/04/2011 25/04/2011 Closed
25/04/2011 25/04/2011 25/04/2011 25/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
26/04/2011 26/04/2011 26/04/2011 26/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
27/04/2011 27/04/2011 27/04/2011 27/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
28/04/2011 28/04/2011 28/04/2011 28/04/2011 Closed
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
29-Apr-113
Highlights of Week
Form 403 Printer Issue,RAM Upgradation
Planned Activities During This WeekOwner Remarks
MG/Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 6-May-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 RTV NOT REFLECTING IN WMS
2 ASN - 0000006434 NOT POPULATED
3 Printer IP change
4 2 RTV IN Development for testing
5 P.O information required
6 Load ID 0000711046
7 ASN - 0000006433
8 Push the ASN from WMS
9 PO 22000022935 no in sap
10 provide me reprint of grn for asn no 5759
11 ASN NOs not reflecting in WMS
12 please change the Owner PEEX to PEP
13 Shipping Label Printer Setup
14 SHIPPLING LABEL PRINTED INVALID
15 SAP external nos to be check in WMS
16 Allocated TOs detail
17 Experiment store Not allocated
18 OC 1609 4033 qty
19 ASN Receive issue
20 From Loc is missing in DC information
21 pl check sap external nos available in wms or not
22 Pls check the ASN 0000448484
23 PROVIDE THE PICK LIST FOR BELOW SO
24 OC 1609 4033 qty
25 WAVE UNSUCCESSFUL
26 Please change the Owner PEP to PEEX
Project Health Check
27 MLS-PF TESTING IN DEVELOPMENT RMS_WMS_SAP
28
29
30 Kindly realease and cofirm --Fwd: RJ ALLOCATION - 30 QTY
31 Data populated In Old PO's
32 store hold
33 RTV NOT REFLECTING IN WMS.
34 report additinal field to be add {PEM&LBRD}
35 please change the Owner PEEX to PEP
36 ASN - 0000006382
37 Not able to take printout of form 403 at Bulchee wh (IP 172.23.2
38 Ezone requirement 290 qty
39 Customization changes in Dispatch Detail Report
40 report additinal field to be add {PEM&LBRD/PEP}
41 Error during GRN - Kindly check
42 Load ID 0000712282
43 trispsheet issue
44 Grn not showing in RMS - kindly confirm
45 Data populated In Old PO's
46 Load ID 0000713034
47 Unable to pick the orders for store code - 21750
48 HOLD INFORMATION
49 STATUS NOT CHANGED IN WMS
50 ASN format not uploading
51 Customization changes in Dispatch Detail Report
52 SR2-ARS ORDERS FILTER ID TO BE REMOVE
53 Load ID 0000713037 PACKING LIST PRINT OUT
54
55 Data populated In Old PO's
56 please change the Owner PEEX to PEP
57 ASN format not uploading
58 WH efficiency STORE CODE TO BE INSERTED
59 Sample requirement for Steven fit difference Checking - DC NO re
60 please change the Owner PEP to PEEX
61 DC/GRN data from cycle count
62 Dispatch Detail Report - Error
63 Assigning Carrier Key
64 OC 1611 961 qty
65 TO no 3000545872 is in approved status
66 ASN - 0000006465 NOT POPULATED SUCCESSFULLY
67 EXPERIMENTAL STORE NOT ALLOCATED
68 PICKTO LOCATION INVNETORY DETAILS
69 OC 1611 961 qty
70 Ean code in sku no 9900000000408
71 RTV No. 25689
ARMANI COLLEZIONI ALLOCATION 28 QTY - PLS. ALLOCATE & PROVIDE PO
VIVIENNE WESTWOOD ALLOACTIO 4 PCS - PLS. RELEASE & SEND US THE P
Ezone stocks requirement ORDERS ALLOCATION FROM PARTICULAR BINS
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending 6-May-117-Jan-09 Status Report No. 46-May-11
Highlights of Week
Y G Deliverables Freight, User Productivity Report and CustomisationsDecisions
Others
Planned Activities During This WeekPlanned Actual Status
Start Date End Date Start Date End Date
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
29/04/2011 29/04/2011 29/04/2011 29/04/2011 Closed
30/04/2011 30/04/2011 30/04/2011 30/04/2011 Closed
30/04/2011 30/04/2011 30/04/2011 30/04/2011 Closed
30/04/2011 30/04/2011 30/04/2011 30/04/2011 Closed
30/04/2011 30/04/2011 30/04/2011 30/04/2011 Closed
30/04/2011 30/04/2011 30/04/2011 30/04/2011 Closed
30/04/2011 30/04/2011 30/04/2011 30/04/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
2/5/2011 2/5/2011 2/5/2011 2/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
3/5/2011 3/5/2011 3/5/2011 3/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
4/5/2011 4/5/2011 4/5/2011 4/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
5/5/2011 5/5/2011 5/5/2011 5/5/2011 Closed
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
6-May-114
Highlights of Week
Freight, User Productivity Report and Customisations
Planned Activities During This WeekOwner Remarks
MG/Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 13-May-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Today ARS Orders Still not released 08.25 am
2 Unable to pick for 13 pcs
3 OC 1611 961 qty
4 ASN-0000006386, please give the PO print
5 Please give the Receipt detail information printout
6 OC 1612 2251 qty
7 ASN - 0000006464
8 Ship label invalid
9 RTV DETAILS AS ON 6.5.2011
10 OC 1613 1802 qty
11 8000055570 LR ,DC data
12 ASN - 0000006464 PRINT OUT
13 Today ARS Orders Still not released 08.25 am
14 SR-2 ARS ORDERS not released
15 ASN to be check in WMS
16 Wave Unsuccessful
17 Value store PO came with wrong store location
18 ASN to be check in WMS
19 OC 1614 7888 qty
20 RTV NOT REFELECTING IN SAP
21 Trip sheet generating
22 ASN - 0000006507 AND 0000006508
23 RTV not reflecting in WMS
24 RTV FOT MANISH MALHOTRA- Not recv. in WMS
25 Access 63 qty
26 Issue wrto date format in report AND RTV
Project Health Check
27 Packing slip not printing in PEM warehouse
28 Location SAMPLE to be on hold
29 Reprocess the ASN from wms
30 TO'S - GUNTUR 42124
31 OC 1614 7888 qty
32 No pick Task foudn - Orderno 0000473365
33 Load ID 0000719526
34 DC reversed for GPF owner
35 Order been part released at PF
36 Data not populated
37 PO-2200003006 NOT POPULATED
38 Data populated in old PO
39 Material doc. posting with different value
40 FOO6 plant configuration
41 Document Park Issue
42 PEM - New Storage Locations for plant PW01.
43 Excise Registraton No. Assignment
44 Blend Code to be created
45 MG - Purchase orders for release code testing for Fabric andGRMT
46 MG - MLS PF testing po required for mateial VSA1001 and 2.
47 Error in MIGO transaction
48 AOS setup for new system
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending 13-May-117-Jan-09 Status Report No. 513-May-11
Highlights of Week
Y G Deliverables
Decisions
Others
Planned Activities During This WeekPlanned Actual Status
Start Date End Date Start Date End Date
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
6/5/2011 6/5/2011 6/5/2011 6/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
9/5/2011 9/5/2011 9/5/2011 9/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
10/5/2011 10/5/2011 10/5/2011 10/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
11/5/2011 11/5/2011 11/5/2011 11/5/2011 Closed
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
13-May-115
Highlights of Week
Planned Activities During This WeekOwner Remarks
MG/Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 20-May-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Shipping Labels Invalid
2 ASN is not populating.
3 Value asn came with wrong po.
4 Store under hold
5 Packing slip is not generating.
6 RTV confirmation check
7 Report is not working
8 Shifts_ SR-2 orders should get released by 0530hrs
9 0008695674 LOADID NOT ABLE TO GENERATE TRIPSHEET
10Please change the owner PEP to PEEX
11 ASN - 0000006521-please give the GRN printout
12 8500067546 - Check whether This DC is in RMS or not
13Please change the owner PEEX to PEP
14 ADJUSTMENT TO BE DONE IN WMS
15 RTV REQUIRED FROM RMS {DEVELOPMENT}
16 Value diffrence in Dc
17 Pls reprocess the d.C in list
18 cancel the OC 1619
19Missing DC report on 14-May-2011
20 GOR ASN_ RTW Inward error
21Printing not happening
22ASN - 0000006416 , grn COPY NOT PRINTED
23 Missing DC report on 14-May-2011
Project Health Check
24Load id - 0000723103 ,DC not print
25 Assigning Carrier Key
26GOR ASN_ RTW Inward error
27 SR-2 ORD STILL NOT RELEASED
28 Packing slip not generating in RDC
29 Allocation priority to WMS ( Pls check and revert )
30 ASN - 0000006477 , GRN and Discrepancy printout
31 ASN - 0000006477 , GRN and Discrepancy printout
32 Movement mall stocks
33 ASN - 0000006621 , Data not populated
34 Assigning Carrier Key
35 Carton variations in Tripsheet & Carton List
36 please change the owner PEEX to PEP
37 Reconciliation of stock WMS Vs RMS as on 16/05/2011
38 ASN - 0000006565
39 WMS printer IP
40 Despatch for belts
41 Eyewear despatch
42 ES ASN not reflecting in WMS
43 ASN - '0000006557
44 SHIPPING LABEL IS NOT COMING.
45 please change the Owner PEP to PEEX
46 SR-2 ORDERS not released {PEM}
47 Urgent ocal store requirement - Pls despatch in the afternoon V
48 Packing slip are not generating in RDC
49 Sku not showing in Stock Report
50 wms printer IP
51 RTV NOT REFLECTING FROM WMS-RMS
52 Wave unsuccessful
53 LOCATION PRINT OUTS...
54 VALUE STORE AUTO ASN RECEIVE/CLOSE
55 pl. add EN codes in New Sku
56 ASN - 0000006638
57 please change the owner PEEX to PEP
58 Please update storerkey in RTW ASN
59 packing list for load id 0000727795
60 ASN - 0000006524
61 Pls create the RTV for _sundry cash purpose
62 packing list for load id 0000727795
63 ASR 2 orders are still showing in created internally
64 URGENT : change loadid for the cartons # given
65 Value store PO not created
66 VALUE ASN STATUS NEW
67 Packing slip not printing in PEM warehouse
68 Order released unsuccessful
69 Status showing Craeted Internally
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending 20-May-117-Jan-09 Status Report No. 620-May-11
Highlights of Week
Y G Deliverables MLS Free stock ReportDecisions
Others
Planned Activities During This WeekPlanned Actual Status Owner
Start Date End Date Start Date End Date
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/Vinculum
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/ Vinculum
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/ Vinculum
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/ Vinculum
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/ Vinculum
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/ Vinculum
12/5/2011 12/5/2011 12/5/2011 12/5/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
13/05/2011 13/05/2011 13/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
14/05/2011 14/05/2011 14/05/2011 Closed MG/ Vinculum
14/05/2011 14/05/2011 14/05/2011 Closed MG/ Vinculum
14/05/2011 14/05/2011 14/05/2011 Closed MG/ Vinculum
13/05/201113/05/201113/05/201113/05/201113/05/201113/05/201113/05/201113/05/201113/05/201113/05/201113/05/201116/05/201116/05/201114/05/201114/05/201114/05/2011
14/05/2011 14/05/2011 14/05/2011 Closed MG/ Vinculum
14/05/2011 14/05/2011 14/05/2011 Closed MG/ Vinculum
14/05/2011 14/05/2011 14/05/2011 Closed MG/ Vinculum
15/05/2011 15/05/2011 15/05/2011 Closed MG/ Vinculum
15/05/2011 15/05/2011 15/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
16/05/2011 16/05/2011 16/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
17/05/2011 17/05/2011 17/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
14/05/201114/05/201114/05/201115/05/201115/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201116/05/201117/05/201117/05/201117/05/201117/05/201117/05/201117/05/201117/05/201117/05/201117/05/201117/05/201117/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/201118/05/2011
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/2011 18/05/2011 18/05/2011 Closed MG/ Vinculum
18/05/201118/05/201118/05/2011
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 27-May-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Data populated in old PO
2 WMS and RMS stock Reconcilation
3 Creating new Loadid
4 SAP external no to check.
5 ASN received twice time
6 Confirmation check
7 Confirmation required
8 ASN not reflecting in WMS
9 Picked but not packed report-let we have filter criteria custome
10 RTW ASN to be checked
11 WMS PO key - 0000003093
12 Assigning Carrier Key
13 WMS In Transit - Daily Intransit View
14 GRN not came ..Please reprocess
15 Packing slip not generating
Project Health Check
16 WMS PO key - 0000003093-PRINT OUT
17 ASN - 0000006691- PO MISSING
18 PEP CC DISCREPANCY WH / PEP CC DISCREPANCY AUDIT
19
20 Load ID 0000730284
21 Tripsheet not generating the value store 83195 load id 000898453
22
23 Wave Unsuccessful
24 SKU'S having price Null- Value store
25 PEM pickto
26 Location Print
27 Wave Unsuccessful
28 Stopping of Application Server
29 Tripsheet not generated
30 Telnet checking
31 ITEM &SKU&PRICE TO BE CHECK IN WMS ON A DAILY BASIS.
32 TRIPSHEET NOT GENERATED
33 PEP CC DISCREPANCY WH / PEP CC DISCREPANCY AUDIT
34 SR-2 allocation over
35 SR2 orders-PEM
36 Pl. check report spooling for my ID 0
37 ASN - 0000006706 , data not populated
38 Location Print
39 SS-11 allocation details
40 Wave Unsuccessful
41 'MLS FREE STOCK INFORMATION to avtivate for all MLS users
42 SR-2 ORDER'S OF PEM AND LBRD NOT GETTING RELEASED
43 Details of deleted pickto
VALUE STORE WRONG OWNER & WRONG STORE CODE TO BE CORRECT.
VALUE STORE ALL LOADID SKU& VALUE TO BE CHECK IN WMS_RMS
44 ASN IS MISSING FOR PEM
45 Please check MLS FREE STOCK REPORT
46 ASN TO BE CHECK IN WMS
47 LEVI'S IN WARD DETAILS LOC-3114
48 ASN - 0000006706 po- PRINT OUT
49 LEVI'S IN WARD DETAILS LOC-3114-REPORT ERROR
50 PT FILE NOT RECEIVED
51 OC 1633 2360 qty
52 Value store transfer orders not created
53 LBRD ALL LOAD INFORMATION to BE avtivate for all LBRD users
54 WMS order no 0000485226
55 Value store transfer orders not created
56 RTV Not reflecting in WMS - 26201
57 LEVI'S IN WARD DETAILS LOC-3114-TO NOT PRESENT IN WMS
58 Change the status from Non Permit to Permit
59 Value ASN not reflected - Very Urgent
60 load id for packing list 0000732861
61 ASN not reflecting in WMS
62 Carrier Key Assigning
63 ASN uploaded, but data not populated
64 Unable to receive the ASNs in telnet for GVH Owner
65 Insert the rms.po no 108883
66 Reconciliation Activity-DATE POPULATION
67 Jalandhar - 13036 - New store opening - stock despatch
68 GRN for ASN# 0000005875
69 LEVI'S IN WARD DETAILS LOC-3114
70 Tripsheet not generating for 800182 the load in 0009046622
71 ASN format not uploading
72 SKU'S HAVING PRICE NULL
73 Reco of Item and SOH WMS - RMS
74 PEP CC DISCREPANCY WH / PEP CC DISCREPANCY AUDIT
75 Change the status of Non Permit to Permit
76 RTV not reflecting in wms
77 SR2 Order Shows Created Internally
78 ASN - 0000006724 , GRN not printed
79 RTV FOR MG BRANDS
80 ASN - 0000006725 , data not populated
81 WMS-RMS RECONCILATION ACTIVITY
82 Assigning Carrier Key
83 Retail Pilot discussions
84 PCS are not allocated
85 PEM & LBRD out bound material report changes to be made.
86 ASN - 0000006725 , data not populated
87 PACKIN SLIP not generating
88 ASN - 0000006727-PRINT OUT
89 ASN - 0000006726 . DATA NOT POPULATED
90 ASN no 9000788205 & 9000788206 is not reflecting in WMS.
91 ASN qty not matching with Open load id for PF Value store
92 OC 1634 3269 qty
93 ASN - 0000006726 . DATA MISMATCH
94 Assigning Carrier Key
95 ASN not reflecting-PEM
96 ASN - 0000006726-GRN PRINT OUT.
97 Please change the owner PEEX to PEP
98 ASN to be check in WMS
99RTV FOR ADIDAS [ ADIDAS RTV order not showing in WMS Kindly Chec
100 Orders on hold status
101 ASN - 0000006605-GRN PRINT OUT
102 Weight Variance Issue in SKUs
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending 27-May-117-Jan-09 Status Report No. 727-May-11
Highlights of Week
Y G Deliverables
Decisions
Others
Planned Activities During This WeekPlanned Actual Status Owner
Start Date End Date Start Date End Date
19/05/2011 19/05/2011 19/05/2011 Closed MG/Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
19/05/2011 19/05/2011 19/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
MLS Free stock Report,LBD PICKED BUT NOT PACKED CARTONS REPORT,PEEX CC
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
19/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
20/05/2011 20/05/2011 20/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
21/05/2011 21/05/2011 21/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
20/05/2011
20/05/2011
20/05/2011
20/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
21/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
23/05/2011 23/05/2011 23/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
24/05/2011 24/05/2011 24/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
23/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
24/05/2011
25/05/2011
25/05/2011
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
25/05/2011 25/05/2011 25/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
25/05/2011
25/05/2011
25/05/2011
25/05/2011
25/05/2011
25/05/2011
25/05/2011
25/05/2011
25/05/2011
25/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011 26/05/2011 26/05/2011 Closed MG/ Vinculum
26/05/2011
26/05/2011
26/05/2011
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 3-Jun-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 ASN format not uploading
2 WMS In Transit - Daily Intransit View
3 OC 1634 3269 qty
4 Assign Carrier Key
5 ALL Load Information Report
6 Load ID 0000737319- PO PRINT OUT
7 0009105860 LOAD ID TRIPSHEET NOT GENERATING IN WMS
8 oc no 1635- 1256 pcs
9 Assigning Carrier Key
10 TESTING OF VIEW FOR ASN-PUTAWAY REPORT
11 Value asn not reflected
12 ASN issue
13 Null price sku
14 Data populated in two po
15 Data populated in two po
16 wms report error
17 Value ASN auto receiving against store 84009
18 please change the Owner PEEX to PEP
19 pl print packing list for load id 0000738514
20 0009138605 LOAD ID TRIPSHEET NOT GENERATING IN WMS
21 Null price sku
22 ASN in received status
23 pl print packing list for load id 0000738560
24 please change the owner PEP to PEEX
25 ASN STATUS TO BE CHANGE
26 SR-2 ORDER ISSUE
Project Health Check
27 SKU'S having price null.
28 DC CONFIRMATION NEED TO BE CHECKED
30 uploaded files - data not popilated
31 pl print packing list for loadid 0000738903
32 Trip sheet not generating in wms
33 ASSIGN CARRIER SET UP
34 please change the owner PEEX to PEP
35 print RTW & discrepency for ASN # 0000006736
36 STORE ON HOLD CHECK
37 ASN TO BE CHECKED IN WMS
38 change the owner PEP TO PEEX
39 Reprocess the ASN from WMS with RMS P.O
40 asn-0000006725 , has populated in multiple PO's
41VALUE STORES NULL SKU'S TO BE PROCESSED FROM RMS
42 ASN-0000006725, pls give PO printout
43 New Rack Sticker Requirment at MLS-406 Qty
44 PO-2200003025 NOT POPULATED
45 ASN not reflecting in WMS
46 Transporter No. and name should flow from WMS for each DC
47 asn-0000006725 , has populated in multiple PO's
48 ASN-0000006725, pls give PO printout
49 INWARD AND OUTWARD DATA
50 ASN - 0000006756 , Data not populated
51 SAP Intransit data
52 TELNET TRANSMITTING CHECKING
53 ASN-PUTAWAY REPORT-NEW
54 Packing slip & shipping label not generating for some box ids.
55 SAP Intransit data
56 Qty Differnce in Packing slip print andSystem preview
57 OC-1635
58 Pls create the single box ID No
59 RTW ASNs not reflecting in WMS
60 Load ID 0000740790 PACKING LIST PRINT OUT
61 MLS RACK LABLES SIZE ISSUE
62 OC-1637 NEED TO BE CHECK
63 Transporter No. and name should flow from WMS for each DC
64 DATE FORMAT IN SHIPPING DOCUMENTS
65 Load ID 0000740786 PACKING SLIP
66 MODIFICATION IN LBD ASN PUTAWAY REPORT
67 RTV NOT REFLECTING IN WMS
68 OWNER CHANGE FROM PEEX TO PEP
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
3-Jun-11
Highlights of Week
Y G Deliverables
Decisions
Others
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
27/05/2011 27/05/2011 27/05/2011 27/05/2011
28/05/2011 28/05/2011 28/05/2011 28/05/2011
28/05/2011 28/05/2011 28/05/2011 28/05/2011
28/05/2011 28/05/2011 28/05/2011 28/05/2011
28/05/2011 28/05/2011 28/05/2011 28/05/2011
28/05/2011 28/05/2011 28/05/2011 28/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
30/05/2011 30/05/2011 30/05/2011 30/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
31/05/2011 31/05/2011 31/05/2011 31/05/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
1/6/2011 1/6/2011 1/6/2011 1/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
2/6/2011 2/6/2011 2/6/2011 2/6/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
3-Jun-118
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
27/05/2011 Closed MG/Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
27/05/2011 Closed MG/ Vinculum
28/05/2011 Closed MG/ Vinculum
28/05/2011 Closed MG/ Vinculum
28/05/2011 Closed MG/ Vinculum
28/05/2011 Closed MG/ Vinculum
28/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
30/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
ASN PA Report, Transporter No. and name should flow from WMS for each DC
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
31/05/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 ClosedMG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
1/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
2/6/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 10-Jun-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 2 Carton's missing from the packing slip
2 print packing list for load id 0000741844
3 OC 1639 663 qty
4 Uploaded file - data is not populated
5 Load ID 0000742398
6 Delete 1 more SKU from ASN No 6127
7 SAP Intransit data.
8 pem carrier set up file required
9 Please block the BIN DA0105A for allocation
10 PEM carrier set up needed to be done
11 Null Price SKU's to be processed
12 Load ID 0000742399
13 Make open qty zero.
14 ASN Receiving error
15 RTV releasing
16 TELNET CHECKING
17 Load ID 0000742810 PACKING LIST
18 SAP Intransit data
19 Load ID 0000742801
20 Retek trip sheet not generating
21 Telnet Transmitting checking
22 Wave Unsuccesful
23 ASN - 0000006811 PO PRINT OUT
24 SKU'S having null price
25 Tripsheet posting in LBRD and PEM
26 ASN closing of type Q2
Project Health Check
27 Deletion of these TOs 3000583721 to 751 & 3000583758 to 763
28 OC 1641 2215 qty
30
31 TO is not reflecting in WMS
32 Create the single Box ID_Levis Returns receipt stock
33 Qty Diference in Report
34 LR NO TO 42108(instution Order)
35 SKU'S having null price
36 SKU'S checking for Null price
37 OC 1641 2215 qty
38 ASN - 0000006785 data not populated
39 Packing list for load id 0000743374
40 OC 1642
41 ASN Receive Error
42 Stock Reco as on 06 June 2011
43 Single Box ID for_Jockey stocks
44 ASN No.0000468100 ASN RECEIVE ERROR.
45 Load ID 0000744126 PACKING LIST
46 Guwahati TO numbers PART ALLOCATED
47 CARRIER SETUP
48 ASN-0000006821 , give the PO printout
49 ASN - 0000006758 NOT POPULATED
50 Assigning Carrier Key
51 Load ID 0000744126 PACKING LIST PRINT OUT
52 please change the Owner PEEX to PEP
53 ASN- 0000006733 GRN print out
54 Assign Carrier Key
55 please change the Owner PEP to PEEX
56 ASN-0000006822 , data is populated in old PO
57 Uploaded files - data is populated in multiple PO's
58 Report additional field to be add
59 ASN-0000006824 NOT POPULATED.
60 OC 1645 not reflecting
61 ASN SUMMARY REPORT
62 ASN Receiving Error
63 TIN No Not Reflecting in DC for LP Guwahati Store
64 Part Allocated TOs
65 Unable to Print the ship label _ at PF Entoma
66 DC data
67 PF JAMMU - 42145 part allocation
68 Trip sheet not generated :800186
69 Pls provide the single Box ID for _Returns stock JOCKEY
70 42145- Change Non Permit to Permit
71 ASN - 0000006825 not populated
72 Load ID 0000746976 PACKING LIST
73 ASN - 0000006830 DATA NOT POPULATED
74 Pla release the order From DA0105A
75 Price Variance In DC
Telnet showing Transmitting at PF&SB area DUE TO NETWORK PROBLEM
76 8000026223- pod required urgent
77 Stocks not received
78 Pushing SKU's Into WMS
79 RTV no. - 26604 not reflecting in WMS.
80 SKU'S having price NULL
81 Master SKU's data
82 Data for the DC No 8000054732
83 Load ID 0000747170 PACKING LIST
84 3 boxes are not reflecting in tripsheet 1000009037
85 Telnet checking slow due to huge qty wave release
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
10-Jun-11
Highlights of Week
Y G Deliverables
Decisions
Others
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
4/6/2011 4/6/2011 4/6/2011 4/6/2011
3/6/2011 3/6/2011 3/6/2011 3/6/2011
4/6/2011 4/6/2011 4/6/2011 4/6/2011
4/6/2011 4/6/2011 4/6/2011 4/6/2011
4/6/2011 4/6/2011 4/6/2011 4/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
6/6/2011 6/6/2011 6/6/2011 6/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
7/6/2011 7/6/2011 7/6/2011 7/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
8/6/2011 8/6/2011 8/6/2011 8/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
9/6/2011 9/6/2011 9/6/2011 9/6/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
10-Jun-119
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
3/6/2011 Closed MG/Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
4/6/2011 Closed MG/ Vinculum
3/6/2011 Closed MG/ Vinculum
4/6/2011 Closed MG/ Vinculum
4/6/2011 Closed MG/ Vinculum
4/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
ASN Summary Report,Inventory Checking before stock Audit
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
6/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
7/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
8/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
9/6/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 17-Jun-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 pem carrier setup to be done
2 WH Stock Audit-PEM
3 attached carton 8800054460 to load id 0000746686
4 asn - 0000006831 PO PRINT OUT
5 Null price sku PROCESSING
6 asn - 0000006832 NOT POPULATING
7 Pushing Sku's Into WMS FOR THE PO 106378
8 DATA FOR DC 8000049659
9 ASN TO BE CHECK IN WMS
10 VAT form printing for seconds dispatch
11 asn -0000006834 / 6835
12 OC 1648
13 wave Unsuccessful
14 APPLICATION SERVER DOWN FOR CLUSTER ACTIVITY
15 APPLICATION RESTARTING FOR CHEKCKING
16 Packing slip not generating in RDC
17 Mismatch between RMS and WMS data
18 Null Price sku
19 OC 1648
20 asn -0000006834 / 6835
21 SR2 Order releasing
22 change the Owner PEEX to PEP
23 Bag requirement-ORDERS ARE NOT REFLECTING IN WMS
24 DATA FOR DC 8000046265
25 OC 1649
26 PEM ASN IS MISSING
Project Health Check
27 OC 1650 3017 qty
28 update EN code for below sku's
29 sku master file in TXT format
30 Allocated qty showing as Created Internally Status
31 Remove box id 8800054932 from load id 0000570117
32 ASN - UPLOADED ASN FILES - DATA NOT POPULATED.
33 Telnet transmitting in RDC CHECKING
34 TODAY ARS Orders not released
35 loadid 0000752136 PACKING LIST PRINT OUT
36 ASN format not uploading
37 PEM STOCK AUDIT DETAILS REQUIRED URGENTLY
38 WMS vs RMS data reconcilation
39 packing list for load id 0000751291
40 Mysore order 1651
41 packing list for loadid 0000753153
42 OC 1652
43 Loreal MRP Updation CHECK IN WMS
44 EN code in Below Newly created WMS SKU.
45 Load ID 0000753152
46 NULL PRICE SKU'S TO BE CHECKED
47 Pls release from DA0105A
48 process the reversal rtv
49 OPEN LOAD ID STATUS TO BE CHECK URGENTLY
50 RELEASE THE ORDER 0000503377
51 WMS vs RMS data reconcilation.
52 New stocks to Dilshuknagar (wms # 00000074220) RELEASING.
53Wave Released Successfully but Order status showing as Created
54 ES ARS ORDERS PROBLEM
55 ASN TO BE CHECK IN WMS
56 OC 1652
57 STATUS CHANGED TO NORMAL IN PEP
58 RTV not reflecting in WMS.
59 OC 1653
60
61 PACKING SLIPS NOT GENERATING
62 TODAY ARS Orders not reflecting in WMS
63 Ship label are not genrating in PF area
64 PLS CHECK THE STATUS OF THE GIVEN ASN
65 Null price sku
66 RTV NOT REFLECTING IN WMS.
67 PEM WAREHOUSE CYCLE COUNT DATA
68 PEP WAREHOUSE AUDIT DATA CHECKING
69 ASN - 0000006849 NOT POPULATED SUCCESSFULLY
70 WMS-RMS STOCK RECONCILIATION
71 PO prnt out for asn # 0000006839
72 FREE STOCK REPORT REQUIRED FOR PEP URGENTLY
73 please change the Owner PEP to PEEX
TELNET DOWN DUE TO POWER FAILURE-SCHEDULERS CHECKING
74 RTV No - 26769 NOT REFLECTING IN WMS
75 sku information are not reflecting in Barcode lable
76 loadid 0000754389 PACKING LIST
77 PROVIDE LR number for these DC s
78 UNABLE TO RELEASE THE REGULAR ORDERS
79 Provide the packing slip preview
80 SKU VALUE ISSUE FOR PEM
81 ASN not reflecting in WMS
82 PACKING LIST FOR LOADID 0000755479
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
17-Jun-11
Highlights of Week
Y G Deliverables
Decisions
Others
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
10/6/2011 10/6/2011 10/6/2011 10/6/2011
11/6/2011 11/6/2011 11/6/2011 11/6/2011
12/6/2011 12/6/2011 12/6/2011 12/6/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
13/06/2011 13/06/2011 13/06/2011 13/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
14/06/2011 14/06/2011 14/06/2011 14/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
15/06/2011 15/06/2011 15/06/2011 15/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
16/06/2011 16/06/2011 16/06/2011 16/06/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
17-Jun-1110
Highlights of Week
PEP FREE STOCK REPORT
Planned Activities During This WeekActual Status Owner
End Date
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
10/6/2011 Closed MG/ Vinculum
11/6/2011 Closed MG/ Vinculum
12/6/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
13/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
14/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 ClosedMG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 Closed MG/ Vinculum
15/06/2011 ClosedMG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
16/06/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 24-Jun-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 SKU VALUE ISSUE FOR PEM
2 Null price sku
3 DC Detail- 298992 URGENT
4 WMS - RMS data reconcilation
5 WMS TO SAP - MG - Log Details 20110616 191015 FOR DC
6 2 PCS difference in Inventory-PEP CYCLE COUNT
7 Two Order cretaed for same Qty -ES2 owner
8 Wave ID not there in Saved Filter for AS created internally
9 DC-8000147065-DATA REQUIRED
10 Grn Confirmation date not coming correctly
11 DC DATA REQUIRED 8000041878
12 REPROCESSING OF SKU'S WITH ALTSKU
13 PEP INBOUND,OUTBOUND AND OWNER CHANGE DATA
14 Authorization for the owner "DL" to pick in pick all
15 Esprit inventory To be moved to DA0105A
16 Pls allocate the below TO in bin No. AF0105A
17 Pl. check and revert diffrence 2 Two Sku's inCycle count
18 MLS Stock Audit at Warehouse on 17/JUN'11
19 INVENTORY POSTING FOR MLS AFTER STOCK COUNT
20 CYCLE COUNT DATA PEM CHECKING
21 Main screen and reports are working very slow
22 CARRIER SETUP FILE
23 PEM DATA LOC WISE - UPDATED
24 Unable to ASN received for LP Owner
25 Assigning Carrier Key.
26 TRIPSHEET NOT GENERATED
Project Health Check
27 NULL PRICE SKU'S PROCESSING
28 CYCLE COUNT PEM SCANNED DATA REQUIRED
29 scanning done FINAL DATA REQUIRED
30 duplicate qty in sku P41011920299000
31 PEM INVENTROY POSTED IN WMS {STOCK AUDIT}
32 SKU without C
33 NULL PRICE SKU'S REPROCESSING
34 Final stock with brand and category of PEM
35 ASN format not uploading
36 Value store TO not created
37 CC WH REPORT additional filed to be add
38 VALUE STORES ASN NOT CLOSED
39 T.O NOT REFLECTING IN WMS
40 PEP Audit June 2011 - Final data for upload
41 SAP - WMS - SAP Intransit - 20 June 2011 DATA CHECK
42 WMS - RMS data reconcilation
43 PEP Audit June 2011 DATA LOC,QTY WISE FINAL
44 DC-DATA 8000002217
45 Unable to move from ESSTAGE location
46 WAREHOUSE EFFICIENCY REPORT NOT WORKING
47 Inward data is missing from the PEP Receipt Information Report
48 Unable to receive the ASN for PF Owner
49 NULL PRICE SKU'S
50 TO DELETION TO BE CHECKED
51 DELETE THE ORDER IN WMS
52 RTV not reflecting
53 VAT form printing for seconds dispatch
54 TRIPSHEET NOT GENERATED LOAD ID : 0009527673
55 PEP STOCK AUDIT DATA DIFFERENCE
56 CUSTOMER HOLD TO BE CHECK
57 Assigning Carrier Key
58 8000002217- DC CORRECT OR NOT
59 WMS - RMS data reconcilation.
60Kindly allocate- Fw: GRN -Love moschi.-QTY 188 / Simon Carter-2
61 Carton wrongly deliver- Pls check the PAcking slip Qty
62 Inventory Adjustment item missing
63 Block the location DA0105A for allocation
64 ASN NOT UPLOAD
65 ASN not reflecting in wms.
66 Pushing Sku's Into WMS
67 ORDER NOT RELEASED
68 check value asn for PEM not reflecting in WMS
69 TIN NO NOT UPDATED IN DC FOR 21758
70 ASN-0000006851
71 ASN - Data not Populated
72 LP ARS Orders Reflecting in WMS Still now
73 TODAY ARS ORDERS NOT RELEASED YET
74 RTV NOT REFLECTING IN WMS
75 NULL PRICE SKU'S
76 ASN-0000006857 , please give the GRN printout .
77 TO despatch for Indrangr store - imp
78 ASN-0000006857 , please give the GRN printout .
79 ASN - 0000006853 UPLOADED DATA NOT POPULATED
80 value store ASN PEM2
81 Pushing Sku's Into WMS
82 Price Variation in DC
83 data not populated
84 packing lst for loadid 0000757467
85 Loadid # 0000757467 - Save failed. Please try again.
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
24-Jun-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
17/06/2011 17/06/2011 17/06/2011 17/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
18/06/2011 18/06/2011 18/06/2011 18/06/2011
19/06/2011 19/06/2011 19/06/2011 19/06/2011
19/06/2011 19/06/2011 19/06/2011 19/06/2011
19/06/2011 19/06/2011 19/06/2011 19/06/2011
19/06/2011 19/06/2011 19/06/2011 19/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
20/06/2011 20/06/2011 20/06/2011 20/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
21/06/2011 21/06/2011 21/06/2011 21/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
22/06/2011 22/06/2011 22/06/2011 22/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
23/06/2011 23/06/2011 23/06/2011 23/06/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
24-Jun-1111
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
17/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
18/06/2011 Closed MG/ Vinculum
LBD WAREHOUSE EFFICIENCY REPORT,LBD ASN PUTAWAY REPORT,ORDER STATUS SUMMARY REPORT,ORDER STATUS DETAIL REPORT,LBD OUTWARD MATERIAL INFORMATION,WAREHOUSE
18/06/2011 Closed MG/ Vinculum
19/06/2011 Closed MG/ Vinculum
19/06/2011 Closed MG/ Vinculum
19/06/2011 Closed MG/ Vinculum
19/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
20/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
21/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011Closed
MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
22/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
23/06/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 2-Jul-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Downtime
2 PO printout for the ASN-0000006866
3 Disorder of columns of grid in WMS page
4 Disorder of columns of grid in WMS page
5 ASN not closed
6 ORDER STATUS ALLOCATED
7 DC No 8000041963 Closed or not
8 TIN NO NOT UPDATED FOR STORE -13037
9 ASN not closed
10 Wave ID released Unsuccessful
11 Downtime for schedulers checking activity
12 Wave ID released Unsuccessful
13 Loadid # 0000757467 - Save failed. Please try again
14 ASN - 0000006853
15 Load ID 0000759672
16 Loadid # 0000757467 - Save failed. Please try again
17 load id 759717 - save failed
18 wave unsuccessful
19 ASN Not showing in Receieved Complete status
20 ASN not reflected and Mismatch
21 need stk detail for ezone for ezone 0000007556
22 ASN not closed
23 unable to receive ASN
24 Load ID 0000762002
25 Assigning Carrier Key
26 Load 0000762004
Project Health Check
27 please change the Owner PEEX to PEP
28 Load ID 0000761597
29 Orders can't pick
30 Packing slip not generated in RDC
31 CARTON LIST NOT MACKING WITH TRIPSHEET
32 Orders can't pick
33 Orders can't pick
34 Orders can't pick
35 TODAY ARS Orders Still not released
36 Packing slip not generated in RDC
37 Packing slip not generating in PF Area
38 Orders can't pick
39 TRIPSHEET NOT GENERATED
40 ASN - 0000006859
41 TRIPSHEET NOT GENERATED
42 ASN - 0000006859
43 WMS-RMS data Reconcilation
44 Reminder: PEM value store PO issue
45 Change the store into Permit
46 Customer Req
47 Load ID 0000762616
48 assign the carrier key
49 RTV MISSING IN SAP TABLE{80000161636}
50 Price Variation in DC
51 please change the owner PEP to PEEX
52 DC Reversal completed and create RTV
53 Load id not getting genrated for Tripsheet
54 Load id not getting genrated for Tripsheet
55 LOAD ID - 0000763133
56 TRIPSHEET NOT GENERATED
57 Assigning Carrier Key
58 shippinglable not printing in PEM warehouse
59 More Aurengabad OC change 1656
60 Shipping Label not generating in RDC
61 Unable print the packing slip&ship lable in PF area
62 waveid unsuccessful
63 Multiple customer picking working fine
64 Shipping Label not generating in RDC remainder
65 Unable to receive the ASN
66 Shipping Label not generating in RDC remainder
67 Packing slip not generated in RDC
68 Assigning Carrier Key
69 Unable to print ship label from yesterday 5:30pm to till today
70 Load Id 0000763238
71 Value store TO not created
72 ASN not able to Close
73 TRIPSHEET NOT GENERATED
74 waveid unsuccessful
75 ASN format not uploading
76 ASN not reflected and Mismatch
77 ASN NOT UPLOADE
78 RETEK VALUE STORE PEM2 PENDING TO BE SHIP
79 SAP_WMS Intransit - Report Regarding
80 RTW ASN need to be deleted
81 Orders can't pick
82 RTW ASN need to be deleted
83 Load id not getting genrated for Tripsheet
84 ARS Order Not Release 29.06.2011
85 Load id not getting genrated for Tripsheet
86 WMS-RMS data Reconcilation.
87 The store are of permit, change & confirm
88 PEM2 VALUE STORE SERIES TO BE CAHNGE
89 ASN TO BE CHECK IN WMS pem & lbrd BOTH
90 Load id not getting genrated for Tripshee
91 DC 8000057998
92 TRIPSHEET NOT GENERATED
93 Not able to take printout
94
95 PO and TO created in RMS
96 TRIPSHEET NOT GENERATED
97 pl cancel order # 0000007720
98 Doc No date to change
99 Change the date format in WE Report
100 EAN is not available
101 Load ID 0000763932
102 Load ID 0000762160
103 VALUE STORE TRIPSHEET ISSUE
104 WMS Reports Working Very Slow
105 Pushing Sku's Into WMS
106 Orders can't relesed
107 OC for 1658
108 VALUE STORE TRIPSHEET ISSUE
109 ASN not closed
activate all the value store document printing in to IP no 172.2
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
2-Jul-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
24/06/2011 24/06/2011 24/06/2011 24/06/2011
25/06/2011 25/06/2011 25/06/2011 25/06/2011
25/06/2011 25/06/2011 25/06/2011 25/06/2011
25/06/2011 25/06/2011 25/06/2011 25/06/2011
25/06/2011 25/06/2011 25/06/2011 25/06/2011
25/06/2011 25/06/2011 25/06/2011 25/06/2011
25/06/2011 25/06/2011 25/06/2011 25/06/2011
26/06/2011 26/06/2011 26/06/2011 26/06/2011
26/06/2011 26/06/2011 26/06/2011 26/06/2011
26/06/2011 26/06/2011 26/06/2011 26/06/2011
26/06/2011 26/06/2011 26/06/2011 26/06/2011
26/06/2011 26/06/2011 26/06/2011 26/06/2011
26/06/2011 26/06/2011 26/06/2011 26/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
27/06/2011 27/06/2011 27/06/2011 27/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
28/06/2011 28/06/2011 28/06/2011 28/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
29/06/2011 29/06/2011 29/06/2011 29/06/2011
30/06/2011 30/06/2011 30/06/2011 30/06/2011
30/06/2011 30/06/2011 30/06/2011 30/06/2011
30/06/2011 30/06/2011 30/06/2011 30/06/2011
30/06/2011 30/06/2011 30/06/2011 30/06/2011
30/06/2011 30/06/2011 30/06/2011 30/06/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
2-Jul-1112
Highlights of Week
LBD CC SUMMARY REPORT
Planned Activities During This WeekActual Status Owner
End Date
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
24/06/2011 Closed MG/ Vinculum
25/06/2011 Closed MG/ Vinculum
25/06/2011 Closed MG/ Vinculum
25/06/2011 Closed MG/ Vinculum
25/06/2011 Closed MG/ Vinculum
25/06/2011 Closed MG/ Vinculum
25/06/2011 Closed MG/ Vinculum
26/06/2011 Closed MG/ Vinculum
26/06/2011 Closed MG/ Vinculum
26/06/2011 Closed MG/ Vinculum
26/06/2011 Closed MG/ Vinculum
26/06/2011 Closed MG/ Vinculum
26/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
27/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
28/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
29/06/2011 Closed MG/ Vinculum
30/06/2011 Closed MG/ Vinculum
30/06/2011 Closed MG/ Vinculum
30/06/2011 Closed MG/ Vinculum
30/06/2011 Closed MG/ Vinculum
30/06/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 15-Jul-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Unavailability of VPN Service
2 Dc preview reports shows as blank
3 TOs Still not reflecting in WMS
4 ASN NOT AVAILABLE
5 City Column shows blank
6 cancel the order
7 send me sku master file in txt format
8 CITY NAME NOT CAPTURING
9 Part Allocated TOs Dertail
10 change the status from non permit to permit-21765
11 Packing Slip Not generating in RDC
12 changes required in report
13 pem carrier set up file
14 PEM RTV IS MISSING
15 asn is not reflecting in wms.
16 Part Allocated TOs Dertail
17 Tripsheet posting issue
18 Pls check the ASN Status
19 Pls check the ASN Status
20 Part Allocated TOs Detail
21 Pl check and release these orders.& conform
22 assign the carrier key
23 release it from ESSTAGE location
24 please change the Owner PEEX to PEP
25 provide the soft copy for these below Dc
26 assign the carrier ke
Project Health Check
27 Packing slip not printing for AS & LP in first floor
28 ASN NOT AVAILABLE : PEM2
29 send me sku master file in txt format
30 Packing slip not generated in RDC
31 Data not loaded properly into Intransit Reports
32 ASN format not uploading
33 Load id 0000778278 Save failed
34 TOs Still not released
35 Create the single LPN for attached ASNs
36 cancel TO's from WMS
37 Pl provide the Load ID details for CArrier Key
38 check the orders status and confirm asap
39 check issue of vendor code in ASN no 6349 .
40 Shipped & canceled order shows again for picking while store cod
41 PF the part allocated TOs of VH
42 LOAD ID.Trip sheet generation
43 PLEASE CHANGE THE OWNER PEP TO PEEX
44 RTV Not reflecting in WMS
45 loadid 0000775785 - save failed on SHIPPING
46 data not populated
47 Order status summary report
48 order numbers which is showing difference in RMS qty and WMS
49 Packing slip not generated in PF&SB area
50 provide the SKU detail let us check at our end
51 Picking SLip report not working
52 Load-ids for SHIP (to print shipping documents
53 Unable to pick the orders for ES
54 LOAD ID issue
55 Pls check the PA status in back end
56PEP -TEST RMS P.O & SAP ASN to be check in WMS test server
57 wave key is showing Release Unsuccessful
58 wave id status is showing un allocation completed successfuly
59 unable to generate Picking Slip
60 Un alloaction is not happening for the order
61 Wave Id Status Unsuccessful
62 WAVE ID RELEASED UNSUCCESSFUL
63 wave is not released it shows in allocated
64 value asn not colsed
65 Allocated Status TOs Detail
66 ASN not closed
67 Not started TO Nos for AS
68 RTW GRN DETAILS REQUIRED BY HOLLA
69 TOs SHOWING IN NOT STARTED STATUS
70 create three T.O & two RTV and confirm quickly
71 Packing not generating in RDC
72 Allocated Status TOs Detail - Reminder
73 Barcode Printer Configuration
74 Pls confirm the OC
75 ASN format not uploading
76 PEM2 VALUE ASN TO BE CHECK
77 Part Allocated TOs Detail
78 Permit Store Carrier Setup
79 pls change the Owner PEP to PEEX
80 not able to make tripsheet for below
81 not able to make tripsheet for below
82 create the below given new Location
83 confirm the Order status
84 Null Price SKU's
85 DUMMY BIN LOCATION FOR ASN RECEIVING PROCESS
86 Shipping Labal Not Generated
87 Shipping Labal Not Generated
88 PEP -TEST RMS T.O & RTV to be check from RMS development
89 Winterwear stock in retail loc - RTV not reflecting Iin WMS
90 sku's Price is not showing correct in DC
91Need Subtotal Column for Cartons & Weight in Open Load Informat
92 ASN not closed - urgent
93 ship label not generated
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
15-Jul-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
8/7/2011 8/7/2011 8/7/2011 8/7/2011
8/7/2011 8/7/2011 8/7/2011 8/7/2011
8/7/2011 8/7/2011 8/7/2011 8/7/2011
8/7/2011 8/7/2011 8/7/2011 8/7/2011
8/7/2011 8/7/2011 8/7/2011 8/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
9/7/2011 9/7/2011 9/7/2011 9/7/2011
10/7/2011 10/7/2011 10/7/2011 10/7/2011
10/7/2011 10/7/2011 10/7/2011 10/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
11/7/2011 11/7/2011 11/7/2011 11/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
12/7/2011 12/7/2011 12/7/2011 12/7/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
13/07/2011 13/07/2011 13/07/2011 13/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
14/07/2011 14/07/2011 14/07/2011 14/07/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
15-Jul-1114
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
8/7/2011 Closed MG/ Vinculum
8/7/2011 Closed MG/ Vinculum
8/7/2011 Closed MG/ Vinculum
8/7/2011 Closed MG/ Vinculum
8/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
9/7/2011 Closed MG/ Vinculum
10/7/2011 Closed MG/ Vinculum
10/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
11/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
12/7/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
13/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
14/07/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 8-Jul-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Order # 0000007737 - release error
2 add 'JAMMU' state in to report name
3 assign the carrier key
4 Orders shoes no pick tasks found
5 packing slip not printing in pem warehouse
6 Order Showing as Part Allocated
7 Packing slip not printing at RDC FF
8 9000801688 NOT REFLECTING IN WMS
9 Ord qty showing variance in telnet screen
10 Order Qty is showing as shipped complete without shipping
11 Null Price Sku's
12 ES LOCATION TO BE CREATED
13 Location Print - VH EBO
14 Location Print - VH EBO
15 upload data not populated
16 TRIPSHEET NOT GENERATED
17 TO BE Create BIN Location Detail
18
19 RTV to be closed in WMS
20 SHIP LABEL ERROR
21 Request for barcode bin print out
22 SHIP LABEL ERROR
23 Request for barcode bin print out
24 ZONE LP Normal
25 upload files data not populated
Project Health Check
VALUE AUTO ASN RECEIVEING & ORDER CREATION FAILURE FREQUENTLY
26 load id error
27 upload files data not populated
28 Null Price Sku's. ---PEM2
29 Skus are allocated to some other customers
30 order is not releasing
31 Request to create the Bin Locations for VH EBO
32 ASN NOT CLOSED
33 Month end intrasit
34 Print locations at Ground Floor RDC
35 Requesting you to Push These Sku's in the Existing PO to WMS
36 Request for bin barcode printout
37 Transfer Orders for PEM in RMS
38 Request for barcode bin print out_PF area
39 not able to make tripsheet post
40 not able to make tripsheet post{PEM2}
41 Null price SKU's
42 Request for barcode bin print out_PF area
43 REPORTS IS NOT WORKING
44 Pls create the BIN Location
45 confirm how many pcs OC was done
46 add EN code in newly created wms sku and confirm
47 please change the Owner PEEX to PEP
48 Request for barcode bin print out_PF area
49 PEM SKU's Having null price
50 Pls create the Bin location for (ES ACC Normal)
51 Network related issue
52 ASN No Date to change
53 SAP_WMS_Intransit details_MG_June
54 heck for sku no 8903745069580-its not showing in master file
55 Data not populated
56 Request for bin creation for PF
57 Issue of Vendor code updation from RMS to WMS
58 WMS Report not working pl check
59 Issue of Vendor code updation from RMS to WMS
60 Shipping label not printing in PEM warehouse
61 Problem in ASN upload
62 Error in closing GRN for asn no 6262
63 freight program
64 Require print out for the bin nos mentioned at PF printer
65 LBRD's WMS Stock audit concluded & scanned data can be uploaded
66 send me sku master file in txt format
67 check value asn not closed
68 ARS2 ORDER NOT RELEASED ON LAST MONTH
69 ARS2 ORDER NOT RELEASED ON LAST MONTH
70 ASN format not uploading
71 check issue of Sku non-availibility in master file
72 wave Unsuccessful
73 ASN format not uploading
74 wave Unsuccessful
75 .Provide GRN Copy Re-print ASN NO>0000006262
76 ASN format not uploading
77 store status needs to be changed
78 value store outward issue
79 ASN - 0000006966 , data not populated
80 File not uploading
81 File not uploading
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
8-Jul-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
1/7/2011 1/7/2011 1/7/2011 1/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
4/7/2011 4/7/2011 4/7/2011 4/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
5/7/2011 5/7/2011 5/7/2011 5/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
6/7/2011 6/7/2011 6/7/2011 6/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
7/7/2011 7/7/2011 7/7/2011 7/7/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
8-Jul-1113
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
1/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
4/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
5/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
6/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
7/7/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 22-Jul-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 sku's Price is not showing correct in DC.
2 WMS to SAP In transit
3 TRIP SHEET NOT GENERATED
4 TRIP SHEET NOT GENERATED
5 Barcode Printer Configuration
6 TRIP SHEET NOT GENERATED
7 Assign Carrier Key
8 RTW GRN DETAILS REQUIRED BY HOLLA
9 Unavailability of WMS, DMS and SAP R3 Application
10 Pl. confirm for order no 4717 & 4718
11 insert rms p.o and process the ASN from WMS
12 Pl close the below PEM2 value asn
13 pl check and revart for PO
14 send sku matser file in txt format in my and vipin's ID
15 Permit stores Carrier Key setup for allocation
16 Order can't pick
17 SAP In transit
18 SR2 Orders Still not released
19 send me sku master file as on Today
20 Carrier Key Assigning
21 Need Subtotal Column for Cartons & Weight in Open Load Informati
22 PEM2 Storer Key Not Showing
23 Carrier Key Assigning
24 cancel the below order nos in WMS
25 DC to check
Project Health Check
26 ASN receiving Error in telnet for AS
27 Pls allocate the below TO in AA0103
28 Error report Modification
29 WMS-RMS data reconcilation.
30 NOT UPDATED IN WMS
31 Carrier Key Assigning
32 Tripsheet not generated
33 uploaded ASN's but data is not populated
34 RTV number not find
35 ASN format not uploading
36 send us sku master file
37 receive the ASN in AA0103 Bin
38 rtw discrepancy report
39 Barcode Printer Configuration
40 ASN NOT UPLOADE IN WMS
41 Drop ID is showing as ZERO
42 SKU cost is null
43 Drop ID Showing 0
44 allocate TO No
45 uploaded ASN's but data is not populated
46 ASN format not uploading
47 ASN format not uploading
48 difference between picked and shipping label qty
49 ASN NOT UPLOADE IN WMS
50 Tripsheet not generated
51 uploaded ASN's but data is not populated
52 PERL - Company name Change
53 ASN format not uploading
54 send me sku master file
55 Trip sheet not generated
56 uploaded ASN's but data is not populated
57 Tripsheet not generated
58 ASN NOT UPLOADE IN WMS
59 ASN format not uploading
60 trip sheet carton list wrong
61 TO no. not reflecting in WMS
62 assign the carrier
63 Qty Difference In OSR & Picking SLip report
64 Issue with STO-6200013093
65 solved issues in classification updation
66 Changes in the program named:ypdmr35
67 P.O TO BE CHECK
68 give rtw dicrepancy for two rms
69 ASN format not uploading
70 Pl add City Name and Product category in efficency report
71 AP & FA Training.
73 error while creating STO
74 wave Unsuccessful
75 Pls give Data for "PEM ALL LOAD INFORMATION"
76 ASN with invalid pokey
77 ASN format not uploading
78 kindly delete sku from ASN
79 ASN with invalid pokey PEM
80 Wave Unsuccessful_ 35152 for AS due to link down
81 Ean nos to be made primary to update in WMS
82 delete sku from ASN
83 Kindly close Below asn for GRN closing
84 Order Status Is Allocated Pls Check & Confirm
85 Unable to receive the ASN for VH EBO
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
22-Jul-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
15/07/2011 15/07/2011 15/07/2011 15/07/2011
16/07/2011 16/07/2011 16/07/2011 16/07/2011
17/07/2011 17/07/2011 17/07/2011 17/07/2011
17/07/2011 17/07/2011 17/07/2011 17/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
18/07/2011 18/07/2011 18/07/2011 18/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
19/07/2011 19/07/2011 19/07/2011 19/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
20/07/2011 20/07/2011 20/07/2011 20/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
21/07/2011 21/07/2011 21/07/2011 21/07/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
22-Jul-1115
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
15/07/2011 Closed MG/ Vinculum
16/07/2011 Closed MG/ Vinculum
17/07/2011 Closed MG/ Vinculum
17/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
18/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
19/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
20/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
21/07/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 29-Jul-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 MLS-PF RMS P.O TO BE CHECK IN RMS TEST SERVER
2 Rayban EAN nos
3 uploaded ASN's but data is not populated
4 Tripsheet not generating
5 Tripsheet not generating
6 ASN NOT UPLOADE IN WMS
7 ASN format not uploading
8 Need 01st Jan'10 to 31st Dec'10 DATA
9 ASN NOT UPLOADE IN WMS
10 Barcode Printer Configuration
11 uploaded ASN's but data is not populated
12 kindly check issue of Lable printing
13 ASN Erorr
14 not getting freight report
15 RTV No 27433 Not Reflecting in WMS
16 Data not populated
17 WMS-RMS data reconciliation
18 ASN - 0000007029 data not populated
19 ASN not reflecting in WMS
20 ASN not reflecting in WMS
21 ASN not reflecting in WMS
22 please populate the asn in PO-2200003017
23 Trip sheet not generated
24 change the owner peex to pep
25 One Qty short in wms
26 Trip sheet not generated
Project Health Check
27 order is showing error in PF owner
28 ASN NOT UPLOADE IN WMS
29 Trip sheet not generated
30 Reports Missing in WMS Front SCreen
31 ASN NOT UPLOADE IN WMS
32 ASN not reflecting
33 need to delete qty from ASN no 6433
34 Pl allocate the TO
35 Report not generating
36 Unable to generat ship label for VH S&B three carton ID's
37 Load id not getting genrated for Tripsheet.
38 Load id not getting genrated for Tripsheet.
39 need DC detail
40 asn # 0000007030 not populated
41 Owner change 1681
42 owner change for 1681
43 asn # 0000007030 not populated
44 WMS NEW USER ID TO BE CREATE
45 INSERT THE RMS P.O NO 119383
46 ASN RECEIVE NOT CLOSED REPORT DATA SHOWS BLANK
47 Owner change for 1682
48 ASN RECEIVE NOT CLOSED REPORT DATA SHOWS BLANK
49 not started order status
50 unable to move the below SKU from GU0303 to GZ
51 not able to generate the Order status report
52 the OC -1685 is still not reflecting in our system
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
29-Jul-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
22/07/2011 22/07/2011 22/07/2011 22/07/2011
22/07/2011 22/07/2011 22/07/2011 22/07/2011
22/07/2011 22/07/2011 22/07/2011 22/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
25/07/2011 25/07/2011 25/07/2011 25/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
26/07/2011 26/07/2011 26/07/2011 26/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
27/07/2011 27/07/2011 27/07/2011 27/07/2011
28/07/2011 28/07/2011 28/07/2011 28/07/2011
28/07/2011 28/07/2011 28/07/2011 28/07/2011
28/07/2011 28/07/2011 28/07/2011 28/07/2011
28/07/2011 28/07/2011 28/07/2011 28/07/2011
28/07/2011 28/07/2011 28/07/2011 28/07/2011
28/07/2011 28/07/2011 28/07/2011 28/07/2011
29/07/2011 29/07/2011 29/07/2011 29/07/2011
29/07/2011 29/07/2011 29/07/2011 29/07/2011
29/07/2011 29/07/2011 29/07/2011 29/07/2011
29/07/2011 29/07/2011 29/07/2011 29/07/2011
29/07/2011 29/07/2011 29/07/2011 29/07/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
29-Jul-1116
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
22/07/2011 Closed MG/ Vinculum
22/07/2011 Closed MG/ Vinculum
22/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
25/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
26/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
27/07/2011 Closed MG/ Vinculum
28/07/2011 Closed MG/ Vinculum
28/07/2011 Closed MG/ Vinculum
28/07/2011 Closed MG/ Vinculum
28/07/2011 Closed MG/ Vinculum
28/07/2011 Closed MG/ Vinculum
28/07/2011 Closed MG/ Vinculum
29/07/2011 Closed MG/ Vinculum
29/07/2011 Closed MG/ Vinculum
29/07/2011 Closed MG/ Vinculum
29/07/2011 Closed MG/ Vinculum
29/07/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 5-Aug-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 ASN not reflecting in WMS
2 Trip sheet not generated
3 Pls add the grand Total in this report -RTW DISCREPANCY REPORT
4 freight report
5 confirm whether all sku updated with corrected EAN in WMS
6 Trip sheet not generated
7 Not able to connect to printer.
8 Trip sheet not generated
9 ARS order are not realased in PF area
10 ARS order not realased in LP area
11 ASN format not uploading
12 ASN not reflecting in WMS
13 INSERT THE RMS P.O NO 120575
14 ASN not reflecting in WMS
15 ARS order not realased in LP area
16 which PO are inwarded for below mentioned value store TO
17 Entire qty got allocated but status showing Created Internally
18 ASN not reflecting in WMS
19 pl check and update the status as cancelled/deleted for TO
20 ORDER NOT RELASEING THROUGH WAVE
21 PEP sap external ASN not reflecting in WMS
22 ASN NOT UPLOAD
23 Requested u to push the below sku's qty into WMS
24 Tripsheet not generating
25 user permission for syed and ramanji
Project Health Check
26 ASSIGN THE CARRIER KEY
27 Picking slip report showing Blank
28 PEP- PUTAWAY ERROR IN WMS
29 assign the carrier key
30 ARS2 Order not Released.
31 Processing of TIN Nos from SAP - WMS for New strores
32 RTV NOT RELASED
33 allocate from stage location and confirm
34 SAP_WMS_SAP Intransit
35 asn no 6533,6534,6532 are not updated inWMS
36 delete sku from asn no 6533
37 ARS2 Order not Released.
38 City name differs in SAP & WMS. Pl check & revert.
39 Partially consumption of transfer orders at WMS
40 RMS TO qty numbers is not matching with WMS qty
41 unable to print picklist for order no 4771,4772,4773
42 slow QC pcs count @ packing stage
43 update vendor code for asn no 6516
44 ASN Partially Uploaded
45 Trip sheet not generated
46 assign the carrier key
47 assign the carrier key
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
5-Aug-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
30/07/2011 30/07/2011 30/07/2011 30/07/2011
30/07/2011 30/07/2011 30/07/2011 30/07/2011
30/07/2011 30/07/2011 30/07/2011 30/07/2011
30/07/2011 30/07/2011 30/07/2011 30/07/2011
30/07/2011 30/07/2011 30/07/2011 30/07/2011
31/07/2011 31/07/2011 31/07/2011 31/07/2011
31/07/2011 31/07/2011 31/07/2011 31/07/2011
31/07/2011 31/07/2011 31/07/2011 31/07/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
1/8/2011 1/8/2011 1/8/2011 1/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
2/8/2011 2/8/2011 2/8/2011 2/8/2011
3/8/2011 3/8/2011 3/8/2011 3/8/2011
3/8/2011 3/8/2011 3/8/2011 3/8/2011
3/8/2011 3/8/2011 3/8/2011 3/8/2011
3/8/2011 3/8/2011 3/8/2011 3/8/2011
3/8/2011 3/8/2011 3/8/2011 3/8/2011
3/8/2011 3/8/2011 3/8/2011 3/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
4/8/2011 4/8/2011 4/8/2011 4/8/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
5-Aug-1117
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
30/07/2011 Closed MG/ Vinculum
30/07/2011 Closed MG/ Vinculum
30/07/2011 Closed MG/ Vinculum
30/07/2011 Closed MG/ Vinculum
30/07/2011 Closed MG/ Vinculum
31/07/2011 Closed MG/ Vinculum
31/07/2011 Closed MG/ Vinculum
31/07/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
1/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
2/8/2011 Closed MG/ Vinculum
3/8/2011 Closed MG/ Vinculum
3/8/2011 Closed MG/ Vinculum
3/8/2011 Closed MG/ Vinculum
3/8/2011 Closed MG/ Vinculum
3/8/2011 Closed MG/ Vinculum
3/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
4/8/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 12-Aug-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Asset PO creation error
2 solved issues in table maintainance ybrdprd for PLM
3 New VC 8905 assignment for ZRX_GBB_PERL
4 PF Hierarchy
5 Changes in the report named:ypdmrr37
6 po not released -3300133067-FWSA2471 - Done
7 J1id updated but tax not showing
8 Please update" ZDLR "
9 ACC orders are not ralased in PF area
10 WMS error in Jockey
11 send me sku master file as on Today
12 assign the carrier key
13 CCL factory not able to do MIGO for the STO No.6200013191
14 Changes in the program named:YSOLARR26
15 Assistacne provided to Add additional Bank data for in MLS
16 solved issues in masters creation and price changes
17 Provided FOB option for auto inward process YPDMMRB38A
18 Solved issue for packing slip inserting into staging table YSOLS
19 Compitators Brand Type to be added
20 Sales & Returns Across Channel
21 Changes in the auto sending mail while GRN
22 VH-115 & VH-117 Packing List
23 Vh sport po no not able to inward
24 not showing bom in CS03-style code LYS211J009
25 Solved issue in TRIP sheet for proforma invoice and normal invoi
26 BRAND MASTER DATA MAPPING (NEW)
Project Health Check
27 check for Size in CMS for below sku's
28 Belt PF orders are not getting released
29 Pl close all NOT STARTED orders
30 reprocess vendor code for asn no 6587
31 Tripsheet not generating
32 Packing slip is not generating
33 ASN Not reflectin in WMS_ AS
34 RTLBILLH summary -Report New field
35 solvedd issues in PLM yardagepo creation for some fabrics
36 Po number 2920000021 is not getting printed in ypilr51a
37 Consolidated dayendpgms table to Bicentral Database
38 solved issues in retek fields updation
39 Requested u to push the below sku's qty into WMS
40 ASN not receiving
41 issue of vendor code in ASN no 6584 , pl. reprocess its VEndor
42 sku in ASN no 6582 is also having Data issue
43 return GOR Nos not reflecting in WMS
44 Weav ID NO 35766 is Not Release
45 AOS database error
46 Shoper data request
47 Fabric inventory Doubled
48 2nd qty to inward_Girish exports
49 Changes in the BW program named:yfactrkpi
50 GL codes 110251 created for the company code PEM & PERL
51 Packing slip not generated in RDC
52 Trip sheet not generated
53 Kindly check at your end whether same EAN is maintained for ment
54 SR 2 ORDERS RECEIVED LATE
55 Issue of vendor Code updation in ASN & Order Processing
56 Pls The City give the city name
57 RMS ORDER QTY NOT MATCHING WITH WMS TO QTY
58 Tripsheet not generating
59 Assigning Carrier Key
60 Unable to Receive ASN
61 Unable to take print
62 PEM - PEP STO
63 New Movement type Z27 & Z29
64 Changes done for Re-Open Rejected Sales Orders based on order ty
65 code extension
66 reg p.o deletion
67 non deductible tax is coming
68 Wearer trail sample
69 Unable to Receive ASN
70 Assigning Carrier Key
71 order is not released.
72 check and update, store 42166 and 42167 showing in NONPERMIT
73 error in tripsheet loadid 0000816217
74 need City name instead of Store name because that makes easy
75 order status not started to cancelled and deleted
76 Kindly release two orders
77 shiplabeltype error
78 Changes in the BW report named:YRTLRSH2SH
79 solved issues in PLM wrong data deletion in sap
80 Trip sheet not generated
81 pl confirm RELEASE status of these orders
82 Tripsheet not generating
83 Product Help LP Waist Coat
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
12-Aug-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
5/8/2011 5/8/2011 5/8/2011 5/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
6/8/2011 6/8/2011 6/8/2011 6/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
8/8/2011 8/8/2011 8/8/2011 8/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
9/8/2011 9/8/2011 9/8/2011 9/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
10/8/2011 10/8/2011 10/8/2011 10/8/2011
11/8/2011 11/8/2011 11/8/2011 11/8/2011
11/8/2011 11/8/2011 11/8/2011 11/8/2011
11/8/2011 11/8/2011 11/8/2011 11/8/2011
11/8/2011 11/8/2011 11/8/2011 11/8/2011
11/8/2011 11/8/2011 11/8/2011 11/8/2011
11/8/2011 11/8/2011 11/8/2011 11/8/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
12-Aug-1118
Highlights of Week
PEP Reports
Planned Activities During This WeekActual Status Owner
End Date
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
5/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
6/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
8/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
9/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
10/8/2011 Closed MG/ Vinculum
11/8/2011 Closed MG/ Vinculum
11/8/2011 Closed MG/ Vinculum
11/8/2011 Closed MG/ Vinculum
11/8/2011 Closed MG/ Vinculum
11/8/2011 Closed MG/ Vinculum
11/8/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 19-Aug-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 assign the Carrier Key
2 Mentioned Allocation order not yet deleted in RMS
3 require store code status change
4 update the Carrierkey as per the attachment
5
6 two ASN numbers are getting generated for one billing document
7 Carton variations in Tripsheet & Carton List
8 Allocated Status TOs Detail, Pls release
9 PERL Data Mismatch Please correct the data immediately
10 Carrier Key Assigning
11 Pl provide ES owner carrier set up details
12 assign the Carrier Key
13 ARS Order Not Released
14 correct the PERL data as it is completely mismatching with SAP d
15 WAVE Unsuccessful
16 send me sku master file as on date
17 ASN format not uploading
18 RMS TO numbers is not matching with WMS qty
19 Requested u to push the below sku's qty into WMS
20 ASN not reflecting in WMS
21 Weights are showing are very high - AS Brand
22 assign the Carrier Key
23 Part Alloacted Orders
24 issue of sku 0206002161A11004A1027 in stock
25 TRIP SHEET NOT GENERATED
Project Health Check
allocate the TO NOS 3000645593 & 3000645594 from BIN no : VH2222
26 ORDERS ARE NOT reflecting in WMS
27 TO duplicate
28 ASN format not uploading
29 ASN not reflecting in WMS LP - 9000820357
30 Orders are not getting released
31 TRIP SHEET NOT GENERATED
32 Two Order cretaed for same Qty -ES2 owner
33 Change Non Permit to Permit for stores
34 DC GENERATED FOR DOUBLE QTY
35 assign the Carrier Key.
36 ASN NOT RECEIVED
37 wave unsuccessful
38 Qty not showing on picking slip report
39 order 0000009304 error on release
40 ASN Not showing in WMS
41 Tripsheet not generating
42 order status to be change
43 ASN CHECKING
44 wave unsuccessful
45 Pl check and populate the ASN urgently{ Value asn 0850016408
46 push the below sku's qty into WMS
47 Kindly add EAN code details in sku no 9900000000501
48 Wave IS Unsuccessful
49 ASN Partially Uploaded
50 Carton variations in  Tripsheet & Carton List  Pls check confirm
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
19-Aug-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
12/8/2011 12/8/2011 12/8/2011 12/8/2011
13/08/2011 13/08/2011 13/08/2011 13/08/2011
13/08/2011 13/08/2011 13/08/2011 13/08/2011
13/08/2011 13/08/2011 13/08/2011 13/08/2011
16/08/2011 16/08/2011 16/08/2011 16/08/2011
16/08/2011 16/08/2011 16/08/2011 16/08/2011
16/08/2011 16/08/2011 16/08/2011 16/08/2011
16/08/2011 16/08/2011 16/08/2011 16/08/2011
16/08/2011 16/08/2011 16/08/2011 16/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
17/08/2011 17/08/2011 17/08/2011 17/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
18/08/2011 18/08/2011 18/08/2011 18/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
19/08/2011 19/08/2011 19/08/2011 19/08/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
19-Aug-1119
Highlights of Week
PEP Reports
Planned Activities During This WeekActual Status Owner
End Date
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
12/8/2011 Closed MG/ Vinculum
13/08/2011 Closed MG/ Vinculum
13/08/2011 Closed MG/ Vinculum
13/08/2011 Closed MG/ Vinculum
16/08/2011 Closed MG/ Vinculum
16/08/2011 Closed MG/ Vinculum
16/08/2011 Closed MG/ Vinculum
16/08/2011 Closed MG/ Vinculum
16/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
17/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
18/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
19/08/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 26-Aug-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Unable to receive the ASN for AS EBO
2 Pl update these below stores under Nonpermit location
3 Value ASN not reflected
4 assign the Carrier Key
5 ASN not reflecting in WMS- VH - 9000822211
6 ASN NO -9000823386 not reflecting in wms
7 SR2 - ARS orders why not released
8 below all the orders are in allocated condition pl check and rel
9 TO No 3000659644 not reflecting in WMS
10 PO not coming to wms
11 pl insert rms p.o no 124771
12 SR2-ARS order issue
13 PO not coming to wms
14 Value ASN not reflected
15 Kindly update tax type (tax type-1)in RMS & WMS and confirm
16 Trip sheet not generated
17 request you to create additional location in wms PEP
18 Value ASN not reflected
19 send me if any ASN invalid P.O in WMS
20 LATE RECEIPT OF SR-2 ORDERS
21 GOR Nos not reflecting in WMS
22 PO NOT REFLECTING IN WMS
23 provide the carrier setup for store code 42167 Agra.
24 Pl assign the Carrier Key as 42165
25 update the STORERKEY for these attached ASN
26 Pl. give reprint of GRN for asn no 6654
Project Health Check
27 PO NOT REFLECTING IN WMS
28 user productivity report not working
29 convert LPNs of stock in location RETURNS / RETURN / RE0001
30 allocation orders against po no 105227----its not showing in wms
31 ASN no 9000823476 not reflecting inWMS
32 MISSING ASN DETAILS FROM SAP TO WMS
33 TOs not reflecting
34 MISSING ASN DETAILS FROM SAP TO WMS
35 Picked pcs showing in In process Status
36 request you to activate LPN label printing for PEOPLE
37 release the order in BINS location as we are not able to release
38 ASN not reflecting in WMS 9000824773
39 CITY COLUMN BLANK
40 carrier set up for STORE - 42167
41 release these orders across all bin locations from AP0101 to AX8
42 ASN Not Reflecting 0861000388
43 Today ARS Orders not reflecting in WMS
44 Pl confirm if data is flown from wms to rms for ASN #s 000000754
45 LPN printed, but our serial starts with 88000XXXXX
46 ASN not reflecting due to RMS PO not created
47 The below ASN not reflecting in WMS
48 release these orders
49 Orders not in WMS
50 VALUE ASN NOT SHOWING WMS
51 Please confirm if the location is RETURNS in both WMS & RMS
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
26-Aug-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
20/08/2011 20/08/2011 20/08/2011 20/08/2011
20/08/2011 20/08/2011 20/08/2011 20/08/2011
20/08/2011 20/08/2011 20/08/2011 20/08/2011
20/08/2011 20/08/2011 20/08/2011 20/08/2011
20/08/2011 20/08/2011 20/08/2011 20/08/2011
20/08/2011 20/08/2011 20/08/2011 20/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
22/08/2011 22/08/2011 22/08/2011 22/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
23/08/2011 23/08/2011 23/08/2011 23/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
24/08/2011 24/08/2011 24/08/2011 24/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
25/08/2011 25/08/2011 25/08/2011 25/08/2011
26/08/2011 26/08/2011 26/08/2011 26/08/2011
26/08/2011 26/08/2011 26/08/2011 26/08/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
26-Aug-1120
Highlights of Week
Planned Activities During This WeekActual Status Owner
End Date
20/08/2011 Closed MG/ Vinculum
20/08/2011 Closed MG/ Vinculum
20/08/2011 Closed MG/ Vinculum
20/08/2011 Closed MG/ Vinculum
20/08/2011 Closed MG/ Vinculum
20/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
22/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
23/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
24/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
25/08/2011 Closed MG/ Vinculum
26/08/2011 Closed MG/ Vinculum
26/08/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 2-Sep-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 Restarted the system 172.18.68.95.
2 Value ASN not reflected wms
3 three Loadids in tripsheet under transport code "0009999999"
4 ASN NOT SHOWING IN WMS
5 assign the Carrier Key
6 sku deletion from asn no 6818
7 9000826695 ASN not reflecting in WMS.
8 8420000568 sto not reflect in wms
9 Carton variations in Tripsheet & Carton List
10 ASN not reflecting in WMS
11 any deleted inventory details in WMS pl send me asap.
12 Pl send me the missing ASN details urgently owner wise.
13 Value ASN not reflected wms
14 9000823535 ASN is not reflecting in WMS
19 partial Inward Confirmation from WMS
20 PO's ARE NOT REFLECTING IN WMS
21 8420000665 STO still not reflecting in wms
22 0850016801 asn not showing in wms
23 give me reprint of grn for asn no 6896 & 6897
24 ASN number reflecting two different status.
25 Pl edit the P.O and reprocess the ASN
26 WAVE unsuccessful
27 Value ASN not reflected wms
28 PEP 8420000700 ASN is not reflecting in WMS
29 error in wave release
30 Unable to pick for the store as the city column is blank
Project Health Check
31 ASN is missing in WMS
32 Assign Carrier Key
33 Pls find the below part allocated order
34 each pcs putaway delay from single LPN
35 TIN Nos are missing
36 value asn status is required
37 Carton variations in Tripsheet & Carton List.
38 Pl send me the missing ASN details
39 INWARD & OUTWARD DETAILS REQUIRED URGENTLY
40 9000831477 Value ASN not reflected wms
41 still not reflecting the XML file trip sheet no 1000010087.
42 Asn 0850016706 not showing in wms
43 Grn Not processed from WMS to RMS
44 Pl update these customers under permit location
45 assign the carrier key
46 Pl find the orders status showing Not started
47 ASN Receipt Reversal Error
48 Value ASN 9000832819 not reflected wms
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
2-Sep-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
27/08/2011 27/08/2011 27/08/2011 27/08/2011
28/08/2011 28/08/2011 28/08/2011 28/08/2011
29/08/2011 29/08/2011 29/08/2011 29/08/2011
29/08/2011 29/08/2011 29/08/2011 29/08/2011
29/08/2011 29/08/2011 29/08/2011 29/08/2011
29/08/2011 29/08/2011 29/08/2011 29/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
30/08/2011 30/08/2011 30/08/2011 30/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
31/08/2011 31/08/2011 31/08/2011 31/08/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
2/9/2011 2/9/2011 2/9/2011 2/9/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
2-Sep-1121
Highlights of Week
PEP reports
Planned Activities During This WeekActual Status Owner
End Date
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
27/08/2011 Closed MG/ Vinculum
28/08/2011 Closed MG/ Vinculum
29/08/2011 Closed MG/ Vinculum
29/08/2011 Closed MG/ Vinculum
29/08/2011 Closed MG/ Vinculum
29/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
30/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
31/08/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
2/9/2011 Closed MG/ Vinculum
INFOR WMS - Weekly Status ReportDistribution List Business Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
Project Name INFOR WMSProject Start Date 7-Jan-09Date 9-Sep-11
R
Schedule
Cost
Scope
Stakeholders
Team
Risks
Planned Activities During This WeekS. No. Activity/ Milestone/ Deliverable
1 assign the carrier key
2 Value ASN not reflected wms
3 Asn 0850016706 not showing in wms
4 below mentioned documents, the owner key is coming blank.
5
6 Asn 850017010 not showing in wms
7 ASN 9000829764 IS NOT POPULATING IN WMS
8 wave # 36950 - release unsuccessful
9 asn 850017019 not showing in wms
10 SKU_GROUP field req in WMS LR report
11
12 PO is not reflecting inWMS
13 RTV NO 28034 not reflecting in WMS
14 asn 850017026 not showing in wms
15 WMS NEW USER ID TO BE CREATE
16 Value ASN 9000834058 not reflected wms
17 ASN 0850017020 NOT SHOWING IN WMS
18 create a separate Zone (Accessories)
19 0850017044 ASN NOT REFLECTING IN WMS
20 Pl send me the missing ASN details urgently owner wise
21 REQUIRED deleted inventory details in WMS
22 Dc Uploading Problem
23 0850017121 asn not showing in wms
24 850017121 asn not showing in wms
Project Health Check
Pl insert RMS P.O no 127550 against the below SAP external no 90
Sku no 8903226301246 is having qty 1but itsQCHOL REPORT Shows2
25 Pls check DC's
26 Value ASN 9000834715 not reflected wms
27 Packing Slip Printer issue
28 Value ASN not reflected wms
29 RTV 28308 Not reflecting in WMS,
30 required deleted inventory details in WMS
31 Pl change the password for these users
32 sr-2 ars orders not released
33 Value ASN not reflected wms
34 release the order # 0000010165
35 PO's are not reflecting inWMS
36 Load id's showing more weight .
37 CANCLE THE ORDER
38 RTV no - 28437 is not reflecting in WMS.
39 Load id's showing more weight
40 asn 850017200 not showing in wms
41 ASN 9000835389 not reflecting in WMS
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
INFOR WMS Week Ending
7-Jan-09 Status Report No.
9-Sep-11
Highlights of Week
Y G Deliverables
Planned Activities During This WeekRequested Date Planned Actual
Start Date End Date Start Date
3/9/2011 3/9/2011 3/9/2011 3/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
5/9/2011 5/9/2011 5/9/2011 5/9/2011
6/9/2011 6/9/2011 6/9/2011 6/9/2011
6/9/2011 6/9/2011 6/9/2011 6/9/2011
6/9/2011 6/9/2011 6/9/2011 6/9/2011
6/9/2011 6/9/2011 6/9/2011 6/9/2011
6/9/2011 6/9/2011 6/9/2011 6/9/2011
6/9/2011 6/9/2011 6/9/2011 6/9/2011
7/9/2011 7/9/2011 7/9/2011 7/9/2011
7/9/2011 7/9/2011 7/9/2011 7/9/2011
7/9/2011 7/9/2011 7/9/2011 7/9/2011
7/9/2011 7/9/2011 7/9/2011 7/9/2011
7/9/2011 7/9/2011 7/9/2011 7/9/2011
7/9/2011 7/9/2011 7/9/2011 7/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
8/9/2011 8/9/2011 8/9/2011 8/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
9/9/2011 9/9/2011 9/9/2011 9/9/2011
INFOR WMS - Weekly Status ReportBusiness Process Team, Change Management Team, Infrastructure Team, Operational Readiness Team, Integration Team,Support Team
9-Sep-1122
Highlights of Week
All Load Information Report
Planned Activities During This WeekActual Status Owner
End Date
3/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
5/9/2011 Closed MG/ Vinculum
6/9/2011 Closed MG/ Vinculum
6/9/2011 Closed MG/ Vinculum
6/9/2011 Closed MG/ Vinculum
6/9/2011 Closed MG/ Vinculum
6/9/2011 Closed MG/ Vinculum
6/9/2011 Closed MG/ Vinculum
7/9/2011 Closed MG/ Vinculum
7/9/2011 Closed MG/ Vinculum
7/9/2011 Closed MG/ Vinculum
7/9/2011 Closed MG/ Vinculum
7/9/2011 Closed MG/ Vinculum
7/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
8/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum
9/9/2011 Closed MG/ Vinculum