Innerbelt Bridge Public MeetingJune 7, 2006

Welcome to the

INNERBELT BRIDGE

PUBLIC MEETING

Meeting #1June 7, 2006

Innerbelt Bridge Public MeetingJune 7, 2006

A fiscally responsible design that reflects technology of our time and

respects history and culture of Cleveland

Bridge Type Selection Goal

Innerbelt Bridge Public MeetingJune 7, 2006

Today’s Discussion

Welcome and Introductions

Project Status

Bridge Type Selection Process

Initial Bridge Concepts

Open Discussion

Innerbelt Bridge Public MeetingJune 7, 2006

Public Input

Your Input is Important !

First of Two Public Meetings for Bridge Type SelectionFocus on Bridge & Global AestheticsProject Website (www.innerbelt.org)

Innerbelt Bridge Public MeetingJune 7, 2006

Innerbelt Project Update

Innerbelt Bridge Public MeetingJune 7, 2006

Central Viaduct Bridge Site

Innerbelt Bridge Public MeetingJune 7, 2006

Project Budget

Construction Group 1

Current Project Construction Budget = $274M (2010 $)

Viaduct Bridge Approx 60% - 70% of Cost of Construction Group

Innerbelt Bridge Public MeetingJune 7, 2006

Preliminary Schedule

Innerbelt Bridge Public MeetingJune 7, 2006

Timeline of Subcommittee and Public Meetings

Innerbelt Bridge Public MeetingJune 7, 2006

Project Team

Innerbelt Bridge Public MeetingJune 7, 2006

Innerbelt Bridge Subcommittee

Will recommend a bridge type to ODOT byOctober 2006

Evaluation Criteria

Concepts

Feasible Alternatives

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Type Selection Process

Multiple Bridge Types

Final Alternatives

Initial Concepts

Recommended Alternative

Iterative Evaluation and Selection Process

Innerbelt Subcommittee Public

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Concept Development

Integrated Concept Development

Project Parameters

Structural Requirements

Aesthetics

Contextual Issues

The Result – A fiscally responsible design that reflects technology of our time and respects history and culture of Cleveland

Innerbelt Bridge Public MeetingJune 7, 2006

Project Parameters

Preliminary Bridge Cross Section5 Lanes + Shoulders

Uni-directional Outbound Traffic

Innerbelt Bridge Public MeetingJune 7, 2006

Project Parameters

Clearances River Navigation

Railroads

Roadways

Innerbelt Bridge Public MeetingJune 7, 2006

Project Parameters

GeometricsRamps

Horizontal Curve

Profile

Innerbelt Bridge Public MeetingJune 7, 2006

Structural Requirements

Safety / Security

Site-Specific Loads

Pier Placement

Span Configuration

Ongoing Subsurface Investigation

West Slope

Innerbelt Bridge Public MeetingJune 7, 2006

Global Aesthetics

Major Element Shapes - Arches and Cables

Innerbelt Bridge Public MeetingJune 7, 2006

Global Aesthetics

Compatibility - Similar or Distinct?

Innerbelt Bridge Public MeetingJune 7, 2006

Detailed Aesthetics - LATER

Defer to Final Design

Textures, Colors, Feature Lighting etc.

Innerbelt Bridge Public MeetingJune 7, 2006

Global Aesthetics

Diversity of Views

•From Downtown

•Jacobs Field

•Adjacent Bridges

•Tremont

•Cuyahoga River Valley

Innerbelt Bridge Public MeetingJune 7, 2006

Context

Surrounding Elements

Innerbelt Bridge Public MeetingJune 7, 2006

Context

Should the bridge stand out or blend in?

Innerbelt Bridge Public MeetingJune 7, 2006

Context

View from Existing BridgeBridge supported from Below or AboveImpact on Skyline view

Innerbelt Bridge Public MeetingJune 7, 2006

Context

Theme - What Defines Cleveland?

Innerbelt Bridge Public MeetingJune 7, 2006

“Signature” vs. “Exotic”

Scale

Effect on Cost

OUR GOAL: A fiscally responsible design that reflects technology of our time and respects history and culture of Cleveland

Innerbelt Bridge Public MeetingJune 7, 2006

Concept Development Team

Michael Baker Jr., Inc.

Innerbelt Bridge Public MeetingJune 7, 2006

Michael Baker Bridge Design Team

John Dietrick - National Director of Bridge Engineering Services

Bob BondiIronton Russell BridgeWeirton-Steubenville BridgeMaysville BridgeBlennerhassett Island Bridge

Jeff BroadwaterFulton Road BridgeFleet, Grant and Railroad Bridges over I-77

Innerbelt Bridge Public MeetingJune 7, 2006

Concept Development Team

Christian Menn

Aesthetics, Economy, Constructability

All Go Hand-in-Hand

Innerbelt Bridge Public MeetingJune 7, 2006

Concept Development Team

Daniel Tassin

Concrete Bridge Expert

Long Career Working with Contractors

Innerbelt Bridge Public MeetingJune 7, 2006

Concept Development Team

Peter Taylor

World-renowned Cable-supported Bridge Expert

Construction Engineering

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Types – Truss

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Types – Cable Stayed

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Types – Box Girder

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Types – Extradosed

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Types – Tied Arch

Innerbelt Bridge Public MeetingJune 7, 2006

Bridge Types – Plate Girder

Innerbelt Bridge Public MeetingJune 7, 2006

Typical Evaluation Criteria

Maintenance

Cost

Constructibility

Aesthetics

Public Input

Environmental Impacts

Innerbelt Bridge Public MeetingJune 7, 2006

Evaluation Sub-Criteria – Aesthetics & Context

Travelers perspective: Approach to Downtown Cleveland Leaving Downtown Cleveland

Community perspective: Street Level view from TremontStreet Level view from GatewayView from the Cuyahoga River ValleyView from the Flats

Downtown skyline perspective: Stand Out or Blend?

Tremont skyline perspective: Stand Out or Blend?

Innerbelt Bridge Public MeetingJune 7, 2006

Preliminary Concepts

1. Concrete Box Girder2. Steel Deck Truss3. Steel Plate Girder4. Extradosed5. Steel Tied Arch6. Single Tower Cable Stayed (I)7. Single Tower Cable Stayed (II)8. Two Tower Cable Stayed

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 1 – Concrete Box Girder

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 1 – Concrete Box Girder

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 2 – Steel Deck Truss

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 2 – Steel Deck Truss

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 3 – Steel Plate Girder

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 3 – Steel Plate Girder

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 4 – Extradosed

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 4 – Extradosed

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 5 – Steel Tied Arch

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 5 – Steel Tied Arch

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 6 – Single Tower Cable Stay (I)

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 6 – Single Tower Cable Stay (I)

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 7 – Single Tower Cable Stay (II)

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 7 – Single Tower Cable Stay (II)

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 8 – Two Tower Cable Stay

Innerbelt Bridge Public MeetingJune 7, 2006

Concept 8 – Two Tower Cable Stay

Innerbelt Bridge Public MeetingJune 7, 2006

Next Public Meeting

Three (+/-) Feasible Alternatives

Date: September 13, 2006

Place: Greek Orthodox Church

Contact Us!www.innerbelt.org

Innerbelt Bridge Public MeetingJune 7, 2006

Evaluation Sub-Criteria – Aesthetics & Context

Travelers perspective: Approach to Downtown Cleveland Leaving Downtown Cleveland

Community perspective: Street Level view from TremontStreet Level view from GatewayView from the Cuyahoga River ValleyView from the Flats

Downtown skyline perspective: Stand Out or Blend?

Tremont skyline perspective: Stand Out or Blend?

Innerbelt Bridge Public MeetingJune 7, 2006

Context

Surrounding Elements

Innerbelt Bridge Public MeetingJune 7, 2006

Context

Theme - What Defines Cleveland?

Innerbelt Bridge Public MeetingJune 7, 2006

Let’s Talk