INVITATION FOR PROPOSAL YOU ARE HEREBY … 062_17-18 Bid... · Reasons for Disqualification ......

Post on 30-Jun-2018

213 views 0 download

transcript

Confidential Page 1 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

INVITATION FOR PROPOSAL

YOU ARE HEREBY INVITED TO SUBMIT PROPOSAL FOR THE REQUIREMENTS OF

NATIONAL HEALTH LABORATORY SERVICES (NHLS)

BID NUMBER: RFB 062/17-18

CLOSING DATE: 02 May 2018

CLOSING TIME: 11:00AM

PUBLIC TENDER

OPENING:

Date: 02 May 2018

Time: 11:30AM

Venue: National Health Laboratory Service

1 Modderfontein Road

SANDRINGHAM

BID VALIDITY PERIOD: 90 days (commencing from the RFB Closing Date)

IMPORTANT: A COMPULSORY SITE MEETING WILL BE HELD:

Date: 16 April 2018

Time: 10:00

Venue: National Health Laboratory Service

1 Modderfontein Road

SANDRINGHAM

PLEASE NOTE THAT LATE COMING WILL NOT BE ACCEPTED All questions must be sent per e-mail to aaron.mashilo@nhls.ac.za or before Monday

23 April 2018

DESCRIPTION:

PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE

BUILDING FOR NATIONAL HEALTH LABORATORY SERVICE

It is estimated that tenderers should have a cidb contractor grading designation of

3GB or higher.

Confidential Page 2 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

BID DOCUMENTS MUST BE MARKED WITH THE

FOLLOWING:

OR DEPOSITED IN THE BID BOX SITUATED AT:

NHLS PROCUREMENT TENDER OFFICE

RFB: RFB 062/17-18

Bidders Name: _____________________

_________________________________

RFB 062/17-18: Enclosed-Regret (delete N/A)

Closing Date: _____________________

NHLS MAIN RECEPTION

1 Modderfontein Road, Sandringham,

Johannesburg.

Confidential Page 3 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Bidders should ensure that Bids are delivered in time to the correct address. If the bid is late, it shall not be

accepted for consideration.

ALL BIDS MUST BE SUBMITTED ON THE OFFICIAL FORMS – (Please note that no changes on the content of this

document is allowed)

THIS TENDER IS SUBJECT TO THE GENERAL CONDITIONS OF THE TENDER, THE GENERAL CONDITIONS OF

CONTRACT (GCC) AND, IF APPLICABLE, ANY OTHER SPECIAL CONDITIONS OF CONTRACT.

THE FOLLOWING PARTICULARS MUST BE FURNISHED (FAILURE TO DO SO SHALL RESULT IN YOUR BID BEING

DISQUALIFIED)

BIDDING STRUCTURE

Indicate the type of Bidding structure by marking with an ‘X’:

Individual bidder

Joint venture

Consortium

Subcontractors

Other

If individual bidder, indicate the following:

Name of bidder

Registration number

VAT registration number

Contact person

Telephone number

Fax number

E-mail address

Postal address

Physical address

If Joint Venture or Consortium, indicate the following:

Name of prime contractor

Registration number

VAT registration number

Contact person

Telephone number

Confidential Page 4 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Fax number

E-mail address

Postal address

Physical address

If Joint Venture or Consortium, indicate the following:

Name of partners

Registration number

VAT registration number

Contact person

Telephone number

Fax number

E-mail address

Postal address

Physical address

If using other sub- contractors, indicate the following:

Name of prime contractor

Registration number

VAT registration number

Contact person

Telephone number

Fax number

E-mail address

Postal address

Physical address

If using subcontractors:

Name of subcontractors:

Registration number

VAT registration number

Contact person

Telephone number

Fax number

E-mail address

Confidential Page 5 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Postal address

Physical address

HAS AN ORIGINAL AND VALID TAX CLEARANCE CERTIFICATE/S BEEN

SUBMITTED?

HAS PROOF OF PAYMENT BEEN SUBMITTED?

IS THE BIDDING COMPANY A TERTIARY INSTITUTION OR A PUBLIC

COMPANY?

HAS AN ORIGINAL AND VALID B-BBEE STATUS LEVEL VERIFICATION CERTIFICATE OR CERTIFIED COPIES THEREOF

BEEN SUBMITTED?

I CERTIFY THAT THE INFORMATION FURNISHED ON THIS FORM IS TRUE AND CORRECT.

I FURTHER ACCEPT THAT, IN ADDITION TO CANCELLATION OF A CONTRACT, ACTION MAY BE TAKEN AGAINST ME SHOULD THIS DECLARATION PROVE TO BE FALSE.

NAME OF BIDDER (duly authorised): ……………….………………………………………………………………… SIGNATURE OF BIDDER (duly authorised): ……………….………………………………………………………… DATE: …………………….…………………………………………………………………………………………………………… CAPACITY UNDER WHICH THIS BID IS SIGNED: ……………………………………………………………………

Yes No

Yes No

Yes No

Yes No

Confidential Page 6 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Contents

1. Confidential information disclosure notice ...................................................................................................................... 7

2. Introduction ...................................................................................................................................................................... 7

3. Definitions ........................................................................................................................................................................ 7

4. Acronyms and abbreviations .......................................................................................................................................... 10

5. General Rules and Instructions ....................................................................................................................................... 11

6. Response format ............................................................................................................................................................ 14

7. Key personnel ................................................................................................................................................................. 15

8. Reasons for Disqualification ........................................................................................................................................... 15

9. Bid Preparation ............................................................................................................................................................... 16

10. Oral presentations and Briefing Sessions ................................................................................................................... 16

11. General Conditions of Bid and Conditions of Contract ............................................................................................... 16

12. Evaluation Criteria and Methodology ......................................................................................................................... 21

ANNEXURE A: Technical Specification ...................................................................................................................................... 23

ANNEXURE B: Tax Clearance Requirements (SBD 2) ................................................................................................................. 88

ANNEXURE C: Pricing Schedule……………………………………………………………………………………………………………………………………………..92

ANNEXURE D: Declaration of Interest (SBD 4)…………………….. .................................................................................................. 96

ANNEXURE E: National Industrial Participation (SBD 5) ..................................................................................................... 11021

ANNEXURE F: Preferential Procurement Claim Form (SBD 6.1) ......................................................................................... 10105

ANNEXURE G: Declaration Certificate for Local Production and Content for Designated Sectors Form (SBD 6.2) ................ 114

ANNEXURE H: Declaration of Bidders Past Supply Chain Practices (SBD 8)………………………………………………………………….………118

ANNEXURE I: Certificate of Independent Bid Determination (SBD 9) .................................................................................... 120

ANNEXURE J: Government Procurement: General Conditions Of Contract – July 2011 ........................................................ 136

Confidential Page 7 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

1. Confidential information disclosure notice

1.1 This document may contain confidential information that is the property of the NHLS and the Client.

1.2 No part of the contents may be used, copied, disclosed or conveyed in whole or in part to any party in any

manner whatsoever other than for preparing a proposal in response to this Bid, without prior written

permission from NHLS and the Client.

1.3 All Copyright and Intellectual Property herein vests with NHLS and its Client.

2. Introduction

2.1 Based on the Bids submitted and the outcome of the evaluation process according to the set evaluation

criteria, NHLS intends to select a preferred bidder with the view of concluding a service level agreement

(SLA) with such successful bidder. The Bid shall be evaluated in terms of the Preferential Procurement

Policy Framework Act (PPPFA)

2.2 Queries

2.2.1 Should it be necessary for a bidder to obtain clarity on any matter arising from or referred to in this RFP

document, please refer queries, in writing, and to the contact person email address number listed below

on or before 23 April 2018. Under no circumstances may any other employee within NHLS be approached

for any information. Any such action might result in a disqualification of a response submitted in

competition to the RFP. NHLS reserves the right to place responses to such queries on the website.

QUERIES: Aaron Mashilo

Telephone 011 555 0591

E-mail aaron.mashilo@nhls.ac.za

3. Definitions

3.1 National Health Laboratory Services [hereinafter referred to as NHLS] is a public health laboratory service

with laboratories across South Africa. Its activities comprise diagnostic laboratory services, research,

teaching and training, and production of sera for anti-snake venom, reagents and media.

3.2 NHLS was established in 2001 by an Act of Parliament to provide diagnostic pathology laboratory services

to the National and Provincial Health Department.

3.3 “Acceptable Bid” - means any bid, which, in all respects, complies with the specifications and conditions

of the RFB as set out in this document.

3.4 “B-BBEE” – means broad bases black economic empowerment as defined in section 1 of the Broad-Based

Black Economic Empowerment Act.

Confidential Page 8 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

3.5 “B-BBEE status level of contributor” means the B-BBEE status received by a measured entity based on its

overall performance using the relevant scorecard contained in the Codes of Good Practice on Black

Economic Empowerment, issued in terms of section 9(1) of the Broad-Based Black Economic

Empowerment Act.

3.6 “Bid” - means a written offer in a prescribed or stipulated form in response to an invitation by an organ

of state for the provision of services, works or goods through price quotations, advertised bidding

processes or proposals.

3.7 “Bidders” - means any enterprise, consortium or person, partnership, company, close corporation,

firm or any other form of enterprise or person, legal or natural, which has been invited by NHLS to submit

a bid in response to this bid invitation.

3.8 “Broad-Based Black Economic Empowerment Act” – means the Broad-Based Black Economic

Empowerment Act, 2003 (Act No. 53 of 2003).

3.9 “Client” - means the goods or services requestor.

3.10 “Comparative Price” - Means the price after the factors of a non-firm price and all unconditional discounts

that can be utilized have been taken into consideration.

3.11 “Consortium” - means several entities joining forces as an umbrella entity to gain a strategic collaborative

advantage by combining their expertise, capital, efforts, skills and knowledge for the purpose of executing

this tender.

3.12 “Contractor Agent” - means any person mandated by a Prime Contractor or consortium/joint venture to

do business for and on behalf of, or to represent in a business transaction, the Prime Contractor and

thereby acquire rights for the Prime Contractor or consortium/joint venture against NHLS or an organ of

state and incur obligations binding the Prime Contractor or consortium/joint venture in favour of NHLS

or an organ of state.

3.13 “Disability” - means, in respect of a person, a permanent impairment of a physical, intellectual, or sensory

function, which results in restricted, or lack of, ability to perform an activity in the manner, or within the

range, considered normal for a human being.

3.14 “Firm Price” - means the price that is only subject to adjustments in accordance with the actual increase

or decrease resulting from the change, imposition or abolition of customs or excise duty and any other

duty, levy or tax which, in terms of a law or regulation is binding on the contractor and demonstrably has

influence on the price of any supplies or the rendering cost of any service, for the execution of a contract.

Confidential Page 9 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

3.15 “Goods” – means any work, equipment, machinery, tools, materials or anything of whatever nature to be

rendered to NHLS or NHLS’s delegate by the Successful Bidder in terms of this bid.

3.16 “Historically Disadvantaged Individual” (HDI) - means a South African citizen:

3.16.1 Who, due to the apartheid policy that had been in place, had no franchise in national elections prior

to the introduction of the Constitution of the Republic of South Africa, 1983, (Act No. 110 of 1983) or

the Constitution of the Republic of South Africa, 1993 (Act No. 200 of 1993) (the Interim Constitution);

and/or;

3.16.2 who is a female; and/or;

3.16.3 who has a disability;

provided that a person who obtained South African citizenship on or after the coming to effect of the

Interim Constitution is deemed not to be an HDI.

3.17 “Joint Venture” - (Project) means two or more businesses joining together under a contractual agreement

to conduct a specific business enterprise with both parties sharing profit and losses. The venture is for

one specific project only, rather than for a continuing business relationship as in a strategic alliance. It is

about sharing risk with others and providing one or more missing and needed assets and competencies.

3.18 “Management” - in relation to an enterprise or business, means an activity inclusive of control, and

performed on a daily basis, by any person who is a principal executive officer of the company, by whatever

name that person may be designated, and whether or not that person is a director.

3.19 “Non-firm Price(s)” - means all price(s) other than “firm” price(s).

3.20 “Organ of State” - means a National Department or Provincial Administration as stipulated in Schedules

1 and 2 of the Public Service Act, Act 93 of 1994 (as amended).

3.21 “Person(s)” - refers to a natural and/or juristic person(s).

3.22 “Prime Contractor” – means any person (natural or juristic) who forwards an acceptable proposal in

response to this RFB with the intention of being the main contractor should the proposal be awarded to

him/her.

3.23 “Rand Value” - means the total estimated value of a contract in South African currency, calculated at the

time of invitations and includes all applicable taxes and excise duties.

3.24 “SMME” – bears the same meaning assigned to this expression in the National Small Business Act, 1996

(Act No. 102 of 1996).

Confidential Page 10 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

3.25 “Sub-contract” means the primary contractor’s assigning, leasing, making out work to, or employing,

another person to support such primary contractor in the execution of part of a project in terms of the

contract.

3.26 “Subcontractor” - means any person (natural or juristic) who is subcontracted a portion of an existing

contract by a Prime Contractor.

3.27 “Successful Bidder” - means the organization or person with whom the order is placed and who is

contracted to execute the work as detailed in the bid.

4. Acronyms and abbreviations

4.1 The following acronyms and abbreviations are used in this proposal and must be similarly used in the

proposal submitted in response and shall have the meaning ascribed thereto below.

Abbreviations/Acronyms Description

BBBEE Broad Based Black Economic Empowerment.

CPI Consumer Price Index.

DIR Directorate

EDMS Electronic Document Management System

HDI Historically Disadvantaged Individuals

ISO International Standard Organization

IT Information Technology

ITC Information Technology Committee

MISS Minimum Information Security Standard

OEM Original Equipment Manufacturer

PPPFA Preferential Procurement Policy Framework Act

RFB Request for Bid

RSA Republic of South Africa

NHLS National Health Laboratory Services

SLA Service Level Agreement

SW Software

LIS Laboratory Information system

24x7 24 hours a day, 7 days a week

Confidential Page 11 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

5. General Rules and Instructions

5.1 Confidentiality

5.1.1 The information contained in this document is of a confidential nature, and must only be used for

purposes of responding to this RFP. This confidentiality clause extends to Bidder partners and/or

implementation agents, whom the Bidder may decide to involve in preparing a response to this RFP.

5.1.2 For purposes of this process, the term “Confidential Information” shall include all technical and business

information, including, without limiting the generality of the foregoing, all secret knowledge and

information (including any and all financial, commercial, market, technical, functional and scientific

information, and information relating to a party’s strategic objectives and planning and its past, present

and future research and development), technical, functional and scientific requirements and

specifications, data concerning business relationships, demonstrations, processes, machinery, know-

how, architectural information, information contained in a party’s software and associated material and

documentation, plans, designs and drawings and all material of whatever description, whether subject

to or protected by copyright, patent or trademark, registered or un-registered, or otherwise disclosed

or communicated before or after the date of this process.

5.1.3 The receiving party shall not, during the period of validity of this process, or at any time thereafter, use

or disclose, directly or indirectly, the confidential information of NHLS (even if received before the date

of this process) to any person whether in the employment of the receiving party or not, who does not

take part in the performance of this process.

5.1.4 The receiving party shall take all such steps as may be reasonably necessary to prevent NHLS’s

confidential information coming into the possession of unauthorised third parties. In protecting the

receiving party’s confidential information, NHLS shall use the same degree of care, which does not

amount to less than a reasonable degree of care, to prevent the unauthorised use or disclosure of the

confidential information as the receiving party uses to protect its own confidential information.

5.1.5 Any documentation, software or records relating to confidential information of NHLS, which comes into

the possession of the receiving party during the period of validity of this process or at any time

thereafter or which has so come into its possession before the period of validity of this process:

5.1.5.1 shall be deemed to form part of the confidential information of NHLS;

5.1.5.2 shall be deemed to be the property of NHLS;

5.1.5.3 shall not be copied, reproduced, published or circulated by the receiving party unless and to the extent

that such copying is necessary for the performance of this process and all other processes as

contemplated in; and

5.1.5.4 shall be surrendered to NHLS on demand, and in any event on the termination of the investigations

and negotiations, and the receiving party shall not retain any extracts.

Confidential Page 12 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

5.2 News and press releases

5.2.1 Bidders or their agents shall not make any news releases concerning this RFP or the awarding of the same

or any resulting agreement(s) without the consent of, and then only in co-ordination with, NHLS and its

Client.

5.3 Precedence of documents

5.3.1 This RFP consists of a number of sections (see list). Where there is a contradiction in terms between the

clauses, phrases, words, stipulations or terms and herein referred to generally as stipulations in this RFP

and the stipulations in any other document attached hereto, or the RFP submitted hereto, the relevant

stipulations in this RFP shall take precedence.

5.3.2 Where this RFP is silent on any matter, the relevant stipulations addressing such matter and which appear

in the PPPFA shall take precedence. Bidders shall refrain from incorporating any additional stipulations in

its proposal submitted in terms hereof other than in the form of a clearly marked recommendation that

NHLS may in its sole discretion elect to import or to ignore. Any such inclusion shall not be used for any

purpose of interpretation unless it has been so imported or acknowledged by NHLS.

5.3.3 It is acknowledged that all stipulations in the PPPFA are not equally applicable to all matters addressed in

this RFP. It however remains the exclusive domain and election of NHLS as to which of these stipulations

are applicable and to what extent. Bidders are hereby acknowledging that the decision of NHLS in this

regard is final and binding. The onus to enquire and obtain clarity in this regard rests with the Bidder(s).

The Bidder(s) shall take care to restrict its enquiries in this regard to the most reasonable interpretations

required to ensure the necessary consensus.

5.4 Preferential Procurement Reform

5.4.1 NHLS supports B-BBEE as an essential ingredient of its business. In accordance with government policy,

NHLS insists that the private sector demonstrates its commitment and track record to B-BBEE in the areas

of ownership (shareholding), skills transfer, employment equity and procurement practices (SMME

Development) etc.

5.4.2 NHLS shall apply the principles of the Preferential Procurement Policy Framework Act, (Act No. 5 of 2000)

to this proposal.

5.4.3 Bidders shall complete the preference certificate attached to this proposal. In the case of a consortium

and sub-contractors, the preference certificate must be completed for each legal entity.

5.5 National Industrial Participation Programme

5.5.1 The Industrial Participation policy, which was endorsed by Cabinet on 30 April 1997, is applicable to

contracts that have an imported content. The NIP is obligatory and therefore must be complied with.

Bidders are required to sign and submit the Standard Bidding Document (SBD5).

Confidential Page 13 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

5.6 Language

5.6.1 Bids shall be submitted in English.

5.7 Gender

5.7.1 Any word implying any gender shall be interpreted to imply all other genders.

5.8 Headings

5.8.1 Headings are incorporated into this proposal and submitted in response thereto, for ease of reference

only and shall not form part thereof for any purpose of interpretation or for any other purpose.

5.9 Security clearances

5.9.1 Employees and subcontractors of the successful bidder may be required to be in possession of valid

security clearances to the level determined by the State Security Agency (SSA) and/or NHLS

commensurate with the nature of the project activities they are involved in. The cost of obtaining suitable

clearances is for the account of the bidders. The bidders shall supply and maintain a list of personnel

involved on the project indicating their clearance status.

5.9.1 Employees and subcontractors of the successful bidder will be required to sign a non-disclosure

agreement.

5.10 Occupational Injuries and Diseases Act 13 of 1993

5.10.1 The Bidder warrants that all its employees (including the employees of any sub-contractor that may be

appointed) are covered in terms of the Compensation for Occupational Injuries and Diseases Act 13 of

1993 and that the cover shall remain in force for the duration of the adjudication of this bid and/ or

subsequent agreement. NHLS reserves the right to request the Bidder to submit documentary proof of

the Bidder’s registration and “good standing” with the Compensation Fund, or similar proof acceptable

to NHLS.

5.11 Formal contract

5.11.1 This RFP, all the appended documentation and the proposal in response thereto read together, form the

basis for a formal contract to be negotiated and finalised between NHLS and/or its clients and the

enterprise(s) to whom NHLS awards the bid in whole or in part.

5.11.2 Any offer and/or acceptance entered verbally between NHLS and any vendor, such offer shall not

constitute a contract and thus not binding on the parties.

Confidential Page 14 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

5.12 Instructions for submitting a proposal

5.12.1 One (1) original, one (1) hard copy and 1 (one) electronic copy on compact disk (CD) in Portable Document

Format (PDF) of the Bid shall be submitted on the date of closure of the Bid.

5.12.2 Bidders shall submit proposal responses in accordance with the prescribed manner of submissions as

specified above.

5.12.3 Bids must be submitted in a prescribed response format herewith reflected as Response Format, and be

sealed in an envelope.

5.12.4 Bids that are too large to fit into the tender box must be handed in at the reception desk during office

hours from 08:00- 16:30 or before 11:00 on the closing date.

5.12.5 All Bids in this regard shall only be accepted if they have been placed in the bid box before or on the

closing date, 02 May 2018 and stipulated time, 11h00 am.

5.12.6 Bids received after the time stipulated shall not be considered.

5.12.7 Bid responses sent by post or courier must reach this office at least

36 hours before the closing date to be deposited into the proposal box. Failure to comply with this

requirement shall result in your proposal being treated as a “late proposal” and shall not be entertained.

Such proposal shall be returned to the respective bidders.

5.12.8 No proposal shall be accepted by NHLS if submitted in any manner other than as prescribed above.

6. Response format

6.1 Bidders shall submit response in accordance with the response format specified below. Failure to do so

shall result rejecting vendor’s response. No referrals may be made to comment. Failure to comply shall

result in the vendor being penalised.

6.2 Schedule Index:

6.2.1 Schedule 1: Pages 1 – 31 of this RFP document

6.2.2 Schedule 2: Mandatory Documents

6.2.2.1 Original and valid Tax Clearance Certificate (no certified copy or scanned copies shall be accepted).

If a Consortium, Joint Venture or Subcontractor, an original and valid Tax Clearance Certificate must

be submitted for each member.

6.2.2.2 National Industrial Participation Programme Certificate from the DTI (read paragraph 5.5 in

conjunction with Annex E – SBD 5) (If applicable).

6.2.2.3 Central Supplier Database (CSD) Registration Report

6.2.2.4 SBD 8 – Declaration of Bidders’ Past Supply Chain Practices

6.2.2.5 SBD 9 – Certificate of independent bid termination

6.2.3 Schedule 3: Executive Summary of proposal

6.2.4 Schedule 4: Technical/Functionality

Confidential Page 15 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

6.2.5 Schedule 5: Preferential Procurement Claim form and copy of the B-BBEE Verification Certificate(s) issued

by an authorised body or person, or a sworn affidavit prescribed by the B-BBEE Codes

of Good Practice.

6.2.6 Schedule 6: Declaration of interest SBD 4

6.2.7 Schedule 7: Bidder Profile:

6.2.7.1 Credentials of the company/consortium members etc.

6.2.7.2 Structure of the company/ consortium members etc.

6.2.7.3 Partnership agreements/contracts

6.2.10 Schedule 8: Bid Price (to be submitted in a separate envelop and marked clearly as follows: RFP

number, RFP description and bidder’s name)

6.3 Bidder background information materials:

6.3.1 Bidder Operating Organisation – Provide an overview of the operating structure and geographical

locations of the firm at the national, regional, and local levels.

6.3.2 Standards – Include information regarding your firm’s utilization of widely known Industry Standards and

guidelines, as they apply to your firm, your firm’s proposal and proposed hardware assets.

6.3.3 Company Contact(s) – Provide the name, title, street address, city, state, telephone and fax numbers and

e-mail of the primary company’s contact person, and for any sub-Contractors.

6.3.4 Corporate Financial Solvency - Provide solvency statement signed by a qualified independent auditor that

the financial position of the company is sound and that the company will be able to mobilise financial

resources to deliver the project.

7. Key personnel

7.1 Identify key personnel, by employer (include subcontractor(s), and provide contact information.

8. Reasons for Disqualification

8.1 NHLS reserves the right to disqualify any bidder which does any one or more of the following, and such

disqualification may take place without prior notice to the offending bidder, however the bidder shall be

notified in writing of such disqualification:

8.1.1 bidders who do not submit a valid and original Tax Clearance Certificate on the closing date and time of

the bid;

8.1.2 bidders who submitted did not sign the mandatory documents;

8.1.3 bidders who submitted information that is fraudulent, factually untrue or inaccurate, for example

memberships that do not exist, B-BBEE credentials, experience, etc.;

8.1.4 bidders who received information not available to other vendors through fraudulent means;

8.1.5 bidders who do not comply with mandatory requirements as stipulated in this RFB;

8.1.6 bidders who fail to supply a proof of payment will be disqualified; and/or

8.1.7 bidders who fail to price according to the costing template provided.

Confidential Page 16 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

9. Bid Preparation

9.1 All additions to the proposal documents i.e. annexes, supporting documentation pamphlets, photographs,

technical specifications and other support documentation covering the goods offered etc. shall be neatly

bound as part of the schedule concerned.

9.2 All responses regarding questions posed in the annex attached herewith shall be answered in accordance

with the prescribed RFP Response Format.

9.3 Telephonic, faxed, e-mailed or oral tenders shall not be accepted.

10. Oral presentations and Briefing Sessions

10.1 Bidders who submit Bids in response to this RFP may be required to give an oral presentation, which may

include, but is not limited to, an equipment/service demonstration of their proposal to NHLS. This provides

an opportunity for the vendor to clarify or elaborate on the proposal. This is a fact finding and explanation

session only and does not include negotiation. NHLS shall schedule the time and location of these

presentations. Oral presentations are an option of NHLS and may or may not be conducted and must not

be construed as being successful in, or, awarded the tender.

11. General Conditions of Bid and Conditions of Contract

11.1 Bidders shall provide full and accurate answers to all (including mandatory) questions posed in this

document, and, are required to explicitly indicate either "Comply/Accept (with a )" or "Do not comply/Do

not accept (with an X)" regarding compliance with the requirements. Where necessary, the bidder shall

substantiate their response to a specific question.

NOTE: It is mandatory for bidders to complete or answer this part fully (11.2 to 11.32); otherwise their bid

shall be treated as incomplete and shall be disqualified. Refer to paragraph 8 of this document (reasons for

disqualification).

11.2

This bid is subject to the General Conditions of Contract stipulated in this document. Accept Do not Accept

11.3

The laws of the Republic of South Africa shall govern this RFP and the Bidders hereby

accept that the courts of the Republic of South Africa shall have the jurisdiction.

Accept Do not Accept

11.4

NHLS shall not be liable for any costs incurred by the bidder in the preparation of

response to this RFB. The preparation of response shall be made without obligation to

acquire any of the items included in any bidder’s proposal or to select any proposal, or

to discuss the reasons why such vendor’s or any other proposal was accepted or

rejected.

Accept Do not Accept

Confidential Page 17 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

11.5

NHLS Procurement Services may request written clarification regarding any aspect

of this proposal. The bidders must supply the requested information in writing

within the specified time frames after the request has been made, otherwise the

proposal shall be disqualified.

Accept Do not Accept

11.6

In the case of Consortium, Joint Venture or subcontractors, bidders are required to

provide copies of signed agreements stipulating the work split and Rand value.

Accept Do not Accept

11.7

In the case of Consortium, Joint Venture or subcontractors, all bidders are required

to provide mandatory documents as stipulated in schedule 1 of the Response

format.

Accept Do not Accept

11.8

NHLS reserves the right to; cancel or reject any proposal and not to award the

proposal to the lowest bidder or award parts of the proposal to different bidders,

or not to award the proposal at all.

Accept Do not Accept

11.9

Where applicable, bidders who are distributors, resellers and installers of network

equipment are required to submit back-to-back agreements and service level

agreements with their principals.

Accept Do not Accept

11.10

By submitting a proposal in response to this RFP, the bidders accept the evaluation

criteria as it stands.

Accept Do not Accept

11.11

Where applicable, NHLS reserves the right to conduct benchmarks on

product/services offered during and after the evaluation.

Accept Do not Accept

11.12

NHLS reserves the right to conduct a pre-award survey during the source selection

process to evaluate contractors' capabilities to meet the requirements specified in

the RFB and supporting documents.

Accept Do not Accept

Confidential Page 18 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

11.13

Where the bid calls for commercially available solutions, bidders who offer to

provide future based solutions will be disqualified.

Accept Do not Accept

11.14

The bidder should not qualify the proposal with own conditions.

Caution: If the bidder does not specifically withdraw its own conditions of proposal

when called upon to do so, the proposal response shall be declared invalid.

Accept Do not Accept

11.15

Should the bidder withdraw the proposal before the proposal validity period expires,

NHLS reserves the right to recover any additional expense incurred by NHLS having

to accept any less favourable proposal or the additional expenditure incurred by

NHLS in the preparation of a new RFB and by the subsequent acceptance of any less

favourable proposal.

Accept Do not Accept

11.16

Delivery of and acceptance of correspondence between NHLS and

the bidder sent by prepaid registered post (by air mail if appropriate) in a correctly

addressed envelope to either party’s postal address or address for service of legal

documents shall be deemed to have been received and accepted after (2) two days

from the date of postage to the South African Post Office Ltd.

Accept Do not Accept

11.17

Should the parties at any time before and/or after the award of the proposal and

prior to, and-or after conclusion of the contract fail to agree on any significant

product price or service price adjustments, change in technical specification, change

in services, etc. NHLS shall be entitled within 14 (fourteen) days of such failure to

agree, to recall the letter of award and cancel the proposal by giving the bidder not

less than 90 (ninety) days written notice of such cancellation, in which event all fees

on which the parties failed to agree increases or decreases shall, for the duration of

such notice period, remain fixed on those fee/price applicable prior to the

negotiations.

Such cancellation shall mean that NHLS reserves the right to award the same

proposal to next best bidders as it deems fit.

Accept Do not Accept

Confidential Page 19 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

11.18

In the case of a consortium or JV, each of the authorised enterprise’s members

and/or partners of the different enterprises must co-sign this document.

Accept Do not Accept

11.19

Any amendment or change of any nature made to this RFP shall only be of force and

effect if it is in writing, signed by NHLS signatory and added to this RFB as an

addendum.

Accept Do not Accept

11.20

Failure or neglect by either party to (at any time) enforce any of the provisions of

this proposal shall not, in any manner, be construed to be a waiver of any of that

party’s right in that regard and in terms of this proposal. Such failure or neglect shall

not, in any manner, affect the continued, unaltered validity of this proposal, or

prejudice the right of that party to institute subsequent action.

Accept Do not Accept

11.21

Bidders who make use of subcontractors.

The proposal shall however be awarded to the Vendor as a primary contractor

who shall be responsible for the management of the awarded proposal. No

separate contract shall be entered into between NHLS and/or its client and any

such subcontractors. Copies of the signed agreements between the relevant

parties must be attached to the proposal responses.

Accept Do not Accept

11.22

All services supplied in accordance with this proposal must be certified to all legal

requirements as per the South African law.

Accept Do not Accept

11.23

No interest shall be payable on accounts due to the successful vendor in an event

of a dispute arising on any stipulation in the contract.

Accept Do not Accept

11.24

Evaluation of Bids shall be performed by a CFET established by NHLS.

Bids shall be evaluated on the basis of conformance to the required specifications

as outlined in the RFP. Points shall be allocated to each bidder, on the basis that

the maximum number of points that may be scored for price is 80, and the

maximum number of preference points that may be claimed for B-BBEE (according

to the PPPFA) is 20.

Accept Do not Accept

Confidential Page 20 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

11.25

Prior to the award of any tender or contract the NHLS will check the Prohibition

status of recommended suppliers/ service providers on the Treasury website

(restricted@treasury.gov.za) as well as the Treasury Register for Tender Defaulters

(www.treasury.gov.za)

Accept Do not Accept

11.26

The NHLS will act against the bidder or person awarded the contract upon detecting

that the B-BBEE status level of contribution has been claimed or obtained on a

fraudulent basis or any of the contract conditions have not been fulfilled.

Accept Do not Accept

11.27

The NHLS may, in addition to any other remedy that it may have against the bidder

or person:

Disqualify the bidder or person from the bidding process;

Recover all costs, losses or damages it has incurred;

or suffered as a result of that person’s conduct;

Cancel the contract and claim any damages which it;

has suffered as a result of having to make less;

favourable arrangements due to such cancellation;

Restrict the bidder or contractor, its shareholders;

and directors, or only the shareholders and directors;

who acted on a fraudulent basis, from obtaining business;

from any organ of state for a period not exceeding 10;

years, after applying the audi alteram partem (hear the other side) rule;

Forward the matter for Blacklisting by Treasury; and

Forward the matter for criminal prosecution

Accept Do not Accept

11.28

If the successful bidder disregards contractual specifications, this action may result

in the termination of the contract.

Accept Do not Accept

11.29

The bidders’ response to this Tender, or parts of the response, shall be included as

a whole or by reference in the final contract.

Accept Do not Accept

Confidential Page 21 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

11.30

NHLS has discretion to extend the validity period should the evaluation of this bid

not be completed within the stipulated validity period.

Accept Do not Accept

11.31

Upon receipt of the request to extend the validity period of the bid, the bidder must

respond within the required time frames and in writing on whether or not he agrees

to hold his original bid response valid under the same terms and conditions for a

further period.

Accept Do not Accept

11.32

Should the bidder change any wording or phrase in this document, the bid shall

be evaluated as though no change has been effected and the original wording

or phrasing shall be used.

Accept Do not Accept

12. Evaluation Criteria and Methodology

12.1 Evaluation of tenders and selection of contractors’/service providers

The NHLS is a Schedule 3A Government Institution subjected to the Public Finance Management Act

(PFMA), the Public Preferential Framework Act (PPPFA) and Treasury Regulations/ Instructions. Bidders

must assist the NHLS to eliminate corruption and fraud by completing and submitting form SBD4.

12.1.1. Any tender closing is followed by a Public Opening where the names and pricing of all bids received are

read out to the bidders attending. NHLS tender opening officials sign the pages where pricing is indicated

to prevent any alterations.

12.1.2 Next step of evaluation is the “technical” or so called “functional” evaluation which is purely based on

NHLS specifications (Annexure 2) and Scope of Work. NHLS end-user department (who requested the

bid), Procurement Services, Finance and subject specialists are part of the Cross Functional Evaluation

Team (CFET) meeting which is chaired by Quality Assurance (QA). All the members of the CFET must

complete Declaration of Interest forms and must recuse themselves in case of any conflict of interest.

12.1.3 The final stage of evaluation is done after the CFET has reached their verdict and is done by NHLS

Procurement Services and separately from the CFET meeting. B-BBEE score (commercial evaluation) is

being added in order to get the final order of merit for the bidders being evaluated.

12.1.4 Bidders that score the minimum threshold are recommended and submitted to the NHLS Tender

Evaluation Committee (TAC) for adjudication and the bid MUST be awarded to the bidder who scored

the highest points (Merit 1) during the CFET and Commercial evaluation(B-BBEE). All the members of

the CFET must complete Declaration of Interest forms and must recuse themselves in case of any conflict

of interest. Should the TAC decide on a bidder other than Merit 1, this decision must be motivated as

a Deviation from NHLS Policy & procedure and Treasury must be advised accordingly.

Confidential Page 22 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

12.1.5 The CEO of the NHLS must finally approve the recommendation by the TAC, in his capacity as the

Accounting Officer.

12.1.6 Details of the successful bidder to be advertised in the Government Tender Bulletin.

12.1.7 Suppliers must accept the Terms & Conditions of our contract(s) which will result from the RFP

document”. RFP conditions and pricing shall be fixed and firm from RFB closing date to the end of

contract.

12.2. Administrative Compliance

The following will be used to evaluate bids administratively:

Fully completed and signed SBD4

Submission of original and valid tax clearance

Audited financial statement not older than two years

Preferential Procurement Claim form and copy of the B-BBEE Verification Certificate(s) issued by an

authorised body or person, or a sworn affidavit prescribed by the B-BBEE Codes of Good Practice.

The service providers to have agree with NHLS general contract terms conditions

Proof of registration on Central Supplier Database (CSD)

12.2.1 The evaluation of the Proposal shall be based the Technical Functionality criteria and B-BBEE scorecard

Price points 80

B-BBEE status level contribution 20

Total 100 points

12.3 BID EVALUATION STAGES

The bid evaluation process consists of several stages that are applicable according to the nature of the

bid as defined below:

Stage 1: Administrative pre-qualification verification

Stage 2: Technical Mandatory requirement evaluation

Stage 3: Technical Functionality requirement evaluation

Stage 4: Price / B-BBEE evaluation

NOTE: The bidder must qualify for each stage to be eligible to proceed to the next stage of the evaluation.

Confidential Page 23 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE A: Technical Specification

1 SPECIAL INSTRUCTIONS TO VENDORS

1.1 Should a Bidder have reasons to believe that the Technical Specification is not open and/or is written for a

particular brand or product; the Bidder shall notify Procurement Services within ten (10) days after

publication of the bid.

1.2 Bidders shall provide full and accurate answers to the mandatory questions posed in this document, and,

where required explicitly state either “Comply/Not Comply” regarding compliance with the requirements.

Bidders must substantiate their response to all questions, including full details on how their

proposal/solution will address specific functional requirements. All documents as indicated must be

supplied as part of the submission.

1.3 Bidders are encouraged to promote the growth and development of SMME's, and will be assessed on their

efforts in this regard during the evaluation of this Tender.

2 ACRONYMS AND ABBREVIATIONS

Term Definition

CIDB Construction Industry Development Board

EBS Oracle e-Business Suite

DR Disaster Recovery

DB Database

NICD National Institute for Communicable Diseases

NHLS National Health Laboratory Service

NGS Next–Generation Sequencing

PMO Project Management Office

SLA Service Level Agreement

Confidential Page 24 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

3 BACKGROUND

The National Institute for Communicable Diseases (NICD) provides a strategic resource for laboratory

investigation of infectious disease of public health importance in South Africa but also the greater African

continent. The Institute houses several referral laboratories offering specialist laboratory testing serving

surveillance and outbreak detection and management. In 2014, a decision was made to consolidate the

Institute’s capacity for molecular sequencing in a Core Facility. The NICD Sequencing core facility was then

established to promote and expedite research and surveillance activities at the NICD aimed at providing

accurate, high quality and cost-effective next–generation sequencing (NGS) solutions. The Sequencing

Core facility currently supports all centres at the NICD in terms of NGS and bioinformatics needs, thus acts

as an extension of every centre with regards to NGS capacity.

The sequencing core facility building comprises of three laboratories and two offices. Currently there are

four staff members sharing one office space (12 sq.m), therefore the need for more office space is dire in

order to create favourable working conditions for staff members. The proposed plan is to extend the

existing building a further 80-100 sq.m, this will create sufficient space for new (already budgeted for)

and existing staff members.

4 SCOPE OF WORK

The scope of work is to extend the existing NICD building with a further 80-100 square meters, to create

sufficient space for staff members.

Pre-qualification Requirements. (MANDATORY)

The table below indicates the items that forms part of the Local Content with their stipulated

minimum thresholds

Description Stipulated minimum thresholds%

1. Not-applicable

2. Alterations Not-applicable

3. Carpentry & Joinery

3.1. Benches 90%

3.2. Fittings and Fixtures 70%

4. Ceilings, Partitions & Access Flooring

4.1. Doors 90%

4.2. Extension of existing skimmed ceiling Not-applicable

4.3. Windows 90%

4.4. Partitions Not-applicable

5. Floor Coverings, Plastic Linings, ETC Not-applicable

6. Paintwork Not-applicable

Confidential Page 25 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

7. Sanitary Ware Not-applicable

8. Electric Fittings 90%

9. Miscellaneous Items

9.1. Alumnium Multitrack coathook, 100%

Stipulated minimum threshold. Failure to comply with local content will lead to an immediate disqualification.

o The local content (LC) expressed as a percentage of the bid price will be calculated in accordance with the following formula:

LC = (1 – x/y)*100

Where

X is the imported content in Rand

Y is the bid price in Rand excluding value added tax (VAT)

o Prices referred to in the determination of x will be converted to Rand (ZAR) by using the exchange rate published by the SARB at 12:00 on the date that the bid has been advertised.

Item Description Unit Quantity Rate Amount

SECTION NO. 1 : PRELIMINARIES

BILL NO.1 : PRELIMINARIES

PRELIMINARIES

BUILDING AGREEMENT AND PRELIMINARIES

The JBCC Principal Building Agreement (March 2014 Edition 6.1) prepared by the Joint Building Contracts Committee shall be the applicable building agreement, amended as hereinafter described.

The JBCC Principal Building Agreement contract data form an integral part of this agreement.

The ASAQS Preliminaries (March 2014 edition) published by the Association of South African Quantity Surveyors for use with the JBCC Principal Building Agreement shall be deemed to be incorporated in these bills of quantities.

The contractor is deemed to have referred to the abovementioned documents for the full intent and meaning of each clause.

The clauses in the abovementioned documents are hereinafter referred to by clause

Confidential Page 26 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

number and heading only. Where standard clauses or alternatives are not entirely applicable to this agreement such modifications, corrections or supplements as will apply are given under each relevant clause heading and such modifications, corrections or supplements shall take precedence notwithstanding anything to the contrary contained in the abovementioned documents.

Where any item is not relevant to this agreement such item is marked N/A (signifying 'not applicable').

PREAMBLES FOR TRADES

The Model Preambles for Trades (2008 edition) as published by the Association of South African Quantity Surveyors shall be deemed to be incorporated in these bills of quantities and no claims arising from brevity of description of items fully described in the said Model Preambles will be entertained.

Supplementary preambles are incorporated in these bills of quantities to satisfy the requirements of this project. Such supplementary preambles shall take precedence over the provisions of the Model Preambles.

The contractor's prices for all items throughout these bills of quantities shall take account of and include for all of the obligations, requirements and specifications given in the Model Preambles and in any supplementary preambles.

PRICING OF PRELIMINARIES

Should the contractor select Option A in terms of clause 26.9.4 of the contract data for the purpose of adjustment of these preliminaries , the amount entered into the amount column in these preliminaries is to be divided into one or more of the

Confidential Page 27 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

three categories provided namely fixed (F), value related (V) and time related (T).

SECTION A: PRINCIPAL BUILDING AGREEMENT

Interpretation (A1-A7)

1 Clause 1.0 - Definitions and interpretation

Pricing of bills of quantities

The contractor is to allow opposite each item for all costs in connection therewith. All prices to include, unless otherwise stated, for all materials, fabrication, conveyance and delivery, unloading, storing, unpacking, hoisting, labour, setting, fitting and fixing in position, cutting and waste (except where to be measured in accordance with the standard system of measurement), patterns, models and templates, plant, temporary works, returning of packaging, duties, taxes, imposts, establishment charges, overheads, profit and all other obligations arising out of the agreement.

Items left unpriced will be deemed to be covered in prices against other items throughout these bills of quantities and no claim for any extras arising out of the contractor's omission to price any item will be entertained.

Prices for all plant, temporary works, services and other items shall include for the supply, maintenance, operating cost and subsequent removal and making good as necessary.

Legal status of contractor.

If the contractor constitutes a joint venture consortium or other unincorporated grouping of two or more persons then:

Confidential Page 28 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

1. These persons are deemed to be jointly and severally liable to the employer for the performance of this agreement.

2. These persons shall notify the employer of their leader who has authority to bind the contractor and each of these persons.

3. The contractor shall not alter its composition or legal status without the prior written consent of the employer.

Item 1.00 -

2 Clause 2.0 - Law, regulations and notices

Health and safety

Without limiting the generality of the provisions of clause 2.0, the contractor's attention is drawn to the provisions of Construction Regulations issued in terms of the Occupational Health and Safety Act, 1993. It is specifically stated that the employer shall prepare a documented health and safety specification for the works and that the employer shall ensure that the contractor has made provision for the cost of health and safety measures during the execution of the works. The contractor shall price opposite this item for compliance with the act and the regulations and the reasonable provisions of the aforementioned health and safety specification [2.1]

The contractor shall:

1. Comply with the health and safety specification for the works

2. Prepare and agree with the health and safety consultant the health and safety plan for the works

Confidential Page 29 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

3. Co-operate with the health and safety consultant in all respects

4. Manage the compliance of all subcontractors with the regulations and with the health and safety plan and specification

5. Conform to the conditions contained in the employer's safety specification

Item 1.00 -

3 Clause 3 .0 - Offer and acceptance

Item 1.00 -

4 Clause 4.0 - Assignment and cession

Item 1.00 -

5 Clause 5.0 - Contract documents

Value Added Tax

Provision is made in the summary page of these bills of quantities for the inclusion of Value Added Tax (VAT)

Contract drawings

Refer to Contract Data for a list of the contract drawings [5.1]

Priced document as specification

The principal agent shall decide which portion of the priced document may be used as a specification of materials and goods or methods, if any [5.3]

Item 1.00 -

6 Clause 6.0 - Employer's agents

Delegated authority

The authority of the principal agent to perform duties for specific aspects of the works is delegated to the agents as follows [6.2].

Item 1.00 -

Confidential Page 30 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

1. Architect

The architect is responsible for the architectural design, functional design and quality inspection. Without derogating from the generality thereof the architect will perform the following specific functions and duties:

1.1 Give opinion on aspects of the works which are not in accordance with the agreement

1.2 Supply the specified number of drawings

1.3 Issue instructions if bills of quantities is to be used as a specification

1.4 Be responsible for primary co-ordination of design elements

1.5 Receive through the contractor and accept design documentation undertaken by subcontractors

1.6 Issue instructions to the contractor regarding:

1.6.1 Alteration to design, quality or quantity of the works provided that such instructions shall not substantially change the scope of the works

1.6.2 Removal of any materials and goods from the site and the substitution of any materials and goods therefor

1.6.3 Removal or re-execution of any work

1.6.4 Opening up of work for inspection

1.6.5 Testing of work and materials and goods

1.6.6 Protection of the works

Confidential Page 31 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

1.6.7 Making good physical loss and repairing damage to the works

1.6.8 Lists for practical completion and final completion

1.6.9 Compliance with Acts of Parliament, regulations and bylaws

1.7 Witness the handing over to the contractor of pegs, beacons and datum levels

1.8 Define levels and provide the contractor with the necessary information to set out the works

1.9 Acceptance of design by subcontractors

1.10 Inspect the works from time to time and give the contractor interpretation and guidance on the standard and state of completion required for practical completion

1.11 Inspect the works for practical completion

1.12 Issue the list for practical completion and re-inspect upon request of the contractor

1.13 Issue the certificate of practical completion

1.14 Inspect the works at the end of the defects liability period

1.15 Issue the list for final completion and re-inspect upon request of the contractor

1.16 Issue the certificate of final completion

2. Quantity surveyor

The quantity surveyor is responsible for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions. Without derogating from the generality thereof, the quantity surveyor will perform the following specific functions and duties:

2.1 Consult with the contractor in correction of rates or errors and discrepancies

Confidential Page 32 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

2.2 Complete the contract data

2.3 Supply the specified number of unpriced bills of quantities

2.4 Identify in the contract data any changes to the standard JBCC documentation and determine any loss and expense to the contractor caused by non-disclosure thereof

2.5 Deal with amounts paid by the contractor to authorities having jurisdiction over the works

2.6 Measure and value the making good of physical loss or damage

2.7 Issue instructions to the contractor regarding:

2.7.1 Rectification of discrepancies and errors in description or omissions in contract documents

2.7.2 Furnishing proof of payment to subcontractors

2.7.3 Budgetary allowances and work executed by the contractor

2.7.4 Contingency and other monetary provisions included in the contract sum

2.8 Prepare nominated and/or selected subcontract tender documents

2.9 Receive proof from the contractor that the contractor's payment obligations have been met in respect of subcontractors

2.10 Act on employer's instructions to pay subcontractors directly

Confidential Page 33 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

2.11 Adjustment of the contract value in respect of a revision to the date of practical completion

2.12 Calculate penalties for non-completion upon receipt of the relevant information from the principal agent

2.13 Valuation of payment claims for payment certificates

2.14 Calculate default and compensatory interest (if any) due to the parties

2.15 With each valuation for payment, issue:

2.15.1 A statement to the contractor and each subcontractor showing the amount certified for the relevant subcontractor.

2.15.2 A statement to the employer and contractor showing the total amount certified.

2.15.3 A recovery statement

2.16 Determine the value of adjustments to the contract value

2.17 Receive from the contractor details of expense and loss claims and assess such claims.

2.18 Prepare the final account and submit to the contractor

3. Civil and structural engineer

The civil and structural engineer is responsible for all aspects of civil and structural engineering design and quality inspection. Without derogating from the generality thereof, the civil and structural engineer will perform the

Confidential Page 34 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

following specific functions and duties in respect of the civil and structural engineering aspects of the works :

3.1 Give opinion on aspects of the works which are not in accordance with the agreement

3.2 Supply the specified number of drawings

3.3 Issue instructions if bills of quantities is to be used as a specification

3.4 Receive and accept design documentation undertaken by subcontractors

3.5 Issue instructions to the contractor regarding:

3.5.1 Alteration to design, quality or quantity of the works provided that such instructions shall not substantially change the scope of the works

3.5.2 Removal of any materials and goods from the site and the substitution of any materials and goods therefor

3.5.3 Removal or re-execution of any work

3.5.4 Opening up of work for inspection

3.5.5 Testing of work and materials and goods

3.5.6 Protection of the works

3.5.7 Making good physical loss and repairing damage to the works

Confidential Page 35 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

3.5.8 Compliance with Acts of Parliament, regulations and bylaws

3.6 Define levels and provide the contractor with the necessary information to set out the works.

3.7 Acceptance of design by subcontractors

3.8 Inspect the works from time to time and give the contractor interpretation and guidance on the standard and state of completion required for practical completion

3.9 Inspect the works for practical completion

3.10 Issue the list for practical completion and re-inspect upon request of the contractor

3.11 Inspect the works at the end of the defects liability period

3.12 Issue the list for final completion and re-inspect upon request of the contractor

4. Mechanical engineer NOT APPLICABLE

The mechanical engineer is responsible for all the aspects of mechanical engineering design and quality inspection? and, where appointed by the employer for quantity surveying services in respect of the mechanical installations, for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions? Without derogating from the generality thereof the mechanical engineer will perform the following specific functions and duties in respect of the mechanical engineering aspects of the works :

4.1 Give opinion on aspects of the works which are not in accordance with the agreement

Confidential Page 36 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

4.2 Supply the specified number of drawings

4.3 Issue instructions if bills of quantities is to be used as a specification

4.4 Receive and accept design documentation undertaken by subcontractors

4.5 Issue instructions to the contractor regarding:

4.5.1 Alteration to design, quality or quantity of the works provided that such instructions shall not substantially change the scope of the works

4.5.2 Removal of any materials and goods from the site and the substitution of any materials and goods therefor

4.5.3 Removal or re-execution of any work

4.5.4 Opening up of work for inspection

4.5.5 Testing of work and materials and goods

4.5.6 Protection of the works

4.5.7 Making good physical loss and repairing damage to the works

4.5.8 Compliance with Acts of Parliament, regulations and bylaws

4.6 Provide the contractor with the necessary information to set out the works

4.7 Acceptance of design by subcontractors

4.8 Inspect the works from time to time and give the contractor interpretation and guidance on the standard and state of completion required for practical completion

4.9 Inspect the works for practical completion

Confidential Page 37 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

4.10 Issue the list for practical completion and re-inspect upon request of the contractor

4.11 Inspect the works at the end of the defects liability period

4.12 Issue the list for final completion and re-inspect upon request of the contractor

5. Electrical engineer

The electrical engineer is responsible for all aspects of electrical engineering design and quality inspection? and, where appointed by the employer for quantity surveying services in respect of the electrical installations, for all measurements, valuations, financial assessments and all other quantity surveying and cost control functions? Without derogating from the generality thereof the electrical engineer will perform the following specific functions and duties in respect of the electrical engineering aspects of the works :

5.1 Give opinion of aspects of the works which are not in accordance with the agreement

5.2 Supply the specified number of drawings

5.3 Issue instructions if bills of quantities is to be used as a specification

5.4 Receive and accept design documentation undertaken by subcontractors

5.5 Issue instructions to the contractor regarding:

5.5.1 Alteration to design, quality or quantity of the works provided that such instructions shall not substantially change the scope of the works

5.5.2 Removal of any materials and goods from the site and the

Confidential Page 38 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

substitution of any materials and goods therefor

5.5.3 Removal or re-execution of any work

5.5.4 Opening up of work for inspection

5.5.5 Testing of work and materials and goods

5.5.6 Protection of the works

5.5.7 Making good physical loss and repairing damage to the works

5.5.8 Compliance with Acts of Parliament, regulations and bylaws

5.6 Provide the contractor with the necessary information to set out the works

5.7 Acceptance of design by subcontractors

5.8 Inspect the works from time to time and give the contractor interpretation and guidance on the standard and state of completion required for practical completion

5.9 Inspect the works for practical completion

5.10 Issue the list for practical completion and re-inspect upon request of the contractor

5.11 Inspect the works at the end of the defects liability period

5.12 Issue the list for final completion and re-inspect upon request of the contractor

6. Wet services engineer NOT APPLICABLE

Confidential Page 39 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

The wet services engineer is responsible for all the aspects of wet services engineering design and quality inspection. Without derogating from the generality thereof the wet services engineer will perform the following specific functions and duties in respect of the wet services aspects of the works :

6.1 Give opinion on aspects of the works which are not in accordance with the agreement

6.2 Supply the specified number of drawings

6.3 Issue instructions if bills of quantities is to be used as specification

6.4 Receive and accept design documentation undertaken by subcontractors

6.5 Issue instructions to the contractor regarding:

6.5.1 Alteration to design, quality or quantity of the works provided that such instructions shall not substantially change the scope of the works

6.5.2 Removal of any materials and goods from the site and the substitution of any materials and goods therefor

6.5.3 Removal or re-execution of any work

6.5.4 Opening up of work for inspection

6.5.5 Testing of work and materials and goods

6.5.6 Protection of the works

6.5.7 Making good physical loss and repairing damage to the works

Confidential Page 40 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

6.5.8 Compliance with Acts of Parliament, regulations and bylaws

6.6 Provide the contractor with the necessary information to set out the works

6.7 Acceptance of design by subcontractors

6.8 Inspect the works from time to time and give the contractor interpretation and guidance on the standard and state of completion required for practical completion

6.9 Inspect the works for practical completion

6.10 Issue the list for practical completion and re-inspect upon request of the contractor

6.11 Inspect the works at the end of the defects liability period

6.12 Issue the list for final completion and re-inspect upon request of the contractor

7. Fire consultant NOT APPLICABLE

The fire consultant is responsible for all the aspects of rational fire design and quality inspection. Without derogating from the generality thereof the fire consultant will perform the following specific functions and duties in respect of the rational fire design aspects of the works :

7.1 Give opinion on aspects of the works which are not in accordance with the agreement

7.2 Supply the specified number of drawings

7.3 Issue instructions if bills of quantities is to be used as specification

7.4 Receive and accept design documentation undertaken by subcontractors

Confidential Page 41 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

7.5 Issue instructions to the contractor regarding:

7.5.1 Alteration to design, quality or quantity of the works provided that such instructions shall not substantially change the scope of the works

7.5.2 Removal of any materials and goods from the site and the substitution of any materials and goods therefor

7.5.3 Removal or re-execution of any work

7.5.4 Opening up of work for inspection

7.5.5 Testing of work and materials and goods

7.5.6 Protection of the works

7.5.7 Making good physical loss and repairing damage to the works

7.5.8 Compliance with Acts of Parliament, regulations and bylaws

7.6 Provide the contractor with the necessary information to set out the works

7.7 Acceptance of design by subcontractors

7.8 Inspect the works from time to time and give the contractor interpretation and guidance on the standard and state of completion required for practical completion

7.9 Inspect the works for practical completion

7.10 Issue the list for practical completion and re-inspect upon request of the contractor

7.11 Inspect the works at the end of the defects liability period

7.12 Issue the list for final completion and re-inspect upon request of the contractor

8. Health and safety consultant

Confidential Page 42 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

The health and safety consultant is responsible for all aspects of health and safety. Without derogating from the generality thereof, the health and safety consultant will perform the following specific functions and duties in respect of the health and safety aspects of the works :

8.1 Act as the client's (employer's) agent in terms of Construction Regulations issued in terms of the Occupational Health and Safety Act, 1993

8.2 Prepare and update the health and safety specification for the works

8.3 Agree with the contractor the health and safety plan for the works

8.4 Carry out regular audits to ensure adherence to the safety plan and compliance with the Act and Regulations

7 Clause 7.0 - Design responsibility Item 1.00 -

Insurance and security (A8-A11)

8 Clause 8.0 - Works risk Item 1.00 -

9 Clause 9.0 - Indemnities Item 1.00 -

10 Clause 10.0 - Insurances Item 1.00 -

11 Clause 11.0 - Security Item 1.00 -

Execution (A12 - A17)

12 Clause 12.0 - Duties of the parties

Clause 12.1.6 - Handover of site in stages Site will be handed over in stages, see Annexure 1 for details

Confidential Page 43 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Clause 12.2.15 - Enclosure of the works

Enclosure of the works

The contractor shall erect, maintain and remove at completion hoardings with gantries, fans, safety screens, barriers, access gates, covered gangways and the like as necessary for the enclosure of the works and elements thereof, all for the protection of the public and others [12.2.15]

Clause 12.2.18 - Office accommodation

Office accommodation

The contractor shall erect, maintain and remove at completion air-conditioned office accommodation with suitable tables and chairs for meetings to be held on the site. Such offices shall be kept clean and fit for use at all times [12.2.18]

Clause 12.2.18 - Notice boards

Notice board

The contractor shall erect in a position approved by the principal agent, maintain and remove at completion a notice board as recommended by the South African Institute of Architects listing the names and logos of the employer, the contractor and the professional consultants. No subcontractor or supplier notice boards may be erected [12.2.18]

Geotechnical investigation report

Refer to Annexure 2 for the results of a geotechnical investigation report

Item 1.00 -

Confidential Page 44 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

13 Clause 13.0 - Setting out

Encroachments

The contractor shall notify the principal agent if any encroachment of adjoining foundations, buildings, structures, pavements, boundaries, services, etc. exist in order that the necessary arrangements may be made for the rectification of any such encroachments [13.2.1]

Item 1.00 -

14 Clause 14.0 - Nominated subcontractors

Item 1.00 -

15 Clause 15.0 - Selected subcontractors

Item 1.00 -

16 Clause 16.0 - Direct contractors

Attendance on direct contractors

In respect of direct contractors the contractor shall:

1. Designate an area for the direct contractor to establish a temporary office and workshop and storage of equipment and materials

2. Allow the use of personnel welfare facilities, where provided

3. Provide water, lighting and single phase electric power to a position within 50m of the place where the direct contract work is to be carried out, other than fuel or power for commissioning of any installation

4. Permit the direct contractor to use erected scaffolding, hoisting facilities, etc. provided by the contractor, in common with others having the like right while it remains erected on the site [16.1]

Item 1.00 -

Confidential Page 45 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

17 Clause 17.0 - Contract instructions

Site instructions

Instructions issued on site are to be recorded in a site instruction book which is to be supplied and maintained on site by the contractor

Item 1.00 -

Completion (A18 - A24)

18 Clause 18.0 - Interim completion Item 1.00 -

19 Clause 19.0 - Practical completion

Item 1.00 -

20 Clause 20.0 - Sectional completion

Clause 20.1 Sectional completion shall be according to details specified in Annexure 1 of PBA Contract Data

Item 1.00 -

21 Clause 21.0 - Defects liability period and final completion

Item 1.00 -

22 Clause 22.0 - Latent defects liability period

Item 1.00 -

23 Clause 23.0 - Revision of date for practical completion

Substitution of materials and goods

The removal or substitution of any materials and goods which do not conform to the specification or the contract drawings shall not constitute grounds for the extension of the construction period nor for the adjustment of the contract value [17.1.8, 23.1 & 2]

Item 1.00 -

24 Clause 24.0 - Penalty for late or non-completion

Item 1.00 -

Payment (A25 - A27)

25 Clause 25.0 - Payment

Confidential Page 46 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Materials and goods stored off site

The inclusion of materials and goods stored off site in the amount authorised for payment shall be at the sole discretion of the principal agent and such inclusion shall only be considered upon the provision, by the contractor, of an approved security [25.3.2]

Fluctuations in costs

All fluctuations in costs, with the exception of fluctuations in the rate of Value Added Tax, shall be for the account of the contractor [25.3.4]

Prices submitted

Where prices are submitted by the contractor or subcontractor during the progress of the works in respect of contract instructions or in regard to a claim under the terms of the agreement and notwithstanding the fact that such prices may be used in an interim payment certificate, there is to be no presumption of acceptance. Should the principal agent wish to accept any such prices prior to the issue of the certificate of final completion, it shall be in writing.

Item 1.00 -

26 Clause 26.0 - Adjustment of the contract value and final account

Cost of claims

All costs incurred by the contractor in the preparation of claims shall be borne by the contractor.

The contractor shall review, assess and adjudicate any claims received by him from any subcontractor and thereafter submit same to the principal

Item 1.00 -

Confidential Page 47 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

agent with a recommendation to assist the principal agent in adjudicating the claim [26.6]

27 Clause 27.0 - Recovery of expense and/or loss

Item 1.00 -

Suspension and termination (A28 - A29)

28 Clause 29.0 - Termination Item 1.00 -

29 Clause 28.0 - Suspension by the contractor

Item 1.00 -

Dispute resolution (A30)

30 Agreement

The required information of the parties and the amount of the contract sum shall be inserted in the agreement for signature of the agreement by the parties

Item 1.00 -

31 Clause 30.0 - Dispute resolution Item 1.00 -

32 Contract data

Before submission of his tender the contractor is to complete the tenderer's selection in the contract data.

Item 1.00 -

SECTION B: PRELIMINARIES

Interpretation (B1)

33 Clause 1.1 - Definitions Item 1.00 -

34 Clause 1.2 - Interpretation Item 1.00 -

Documents (B2)

35 Clause 2.1 - Checking of documents

Item 1.00 -

36 Clause 2.2 - Provisional bills of quantities

Multiple procurement

Confidential Page 48 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

These bills of quantities are in multiple procurement format i.e. the 'wet trades' - earthworks, concrete, formwork and reinforcement, precast concrete, masonry, waterproofing and sub-surface drainage - are provisionally measured and the subsequent trades are budgetary allowances and/or provisional sums

Item 1.00 -

37 Clause 2.3 - Availability of construction information

Budgetary allowances and provisional sums

The provisional sums allocated for subsequent trades included in this agreement will be separately procured, based on multiple procurement of subcontractors during the construction period

Item 1.00 -

Previous work and adjoining properties (B3)

38 Clause 3.1 - Previous work - dimensional accuracy

Item 1.00 -

39 Clause 3.2 - Previous work - defects

Item 1.00 -

40 Clause 3.3 - Inspection of adjoining properties

Item 1.00 -

Samples, shop drawings and manufacturer's instructions (B4)

41 Clause 4.1 - Samples of materials Item 1.00 -

42 Clause 4.2 - Workmanship samples

Item 1.00 -

43 Clause 4.3 - Shop drawings Item 1.00 -

44 Clause 4.4 - Compliance with manufacturer's instructions

Item 1.00 -

Deposits and fees (B5)

45 Clause 5.1 - Deposits and fees Item 1.00 -

Temporary services (B6)

Confidential Page 49 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

46 Clause 6.1 - Water Item 1.00 -

47 Clause 6.2 - Electricity Item 1.00 -

48 Clause 6.3 - Ablution and welfare facilities

Item 1.00 -

49 Clause 6.4 - Communication facilities

Item 1.00 -

Prime cost amounts (B7)

50 Clause 7.1 - Responsibility for prime cost amounts

Item 1.00 -

Attendance on subcontractors (B8)

51 Clause 8.1 - General attendance Item 1.00 -

52 Clause 8.2 - Special Attendance

Item 1.00 -

General (B9)

53 Clause 9.1 - Protection of the works

Item 1.00 -

Clause 9.2 - Protection/isolation of existing/sectionally occupied works

54 Clause 9.3 - Security of the works Item 1.00 -

55 Clause 9.4 - Notice before covering work

Item 1.00 -

56 Clause 9.5 - Disturbance Item 1.00 -

57 Clause 9.6 - Environmental disturbance

Item 1.00 -

58 Clause 9.7 - Works cleaning and clearing

Item 1.00 -

59 Clause 9.8 - Vermin Item 1.00 -

60 Clause 9.9 - Overhand work Item 1.00 -

Confidential Page 50 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Schedule (B10)

61 Information for completion of schedule

Information necessary for elections and completion of those clauses contained in the schedule which are necessary for tender purposes is given hereunder. Where no information is given it shall mean that no specific requirements are expected or that the clause is not relevant to this specific contract.

10.1 - Provisional bills of quantities [2.2]

The quantities are provisional Yes

10.2 - Availability of construction information [2.3]

Construction documentation is complete Yes

10.3 - Previous work - dimensional accuracy [3.1]

10.4 - Previous work - defects [3.2]

10.5 - Inspection of adjoining properties [3.3]

10.6 - Water [6.1]

Option A (by contractor ) Yes

Option B (by employer - free of charge) No

Option C (by employer metered) No

10.7 - Electricity [6.2]

Option A (by contractor ) Yes

Confidential Page 51 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Option B (by employer - free of charge) No

Option C (by employer metered) No

10.8 - Ablution and welfare facilities [6.3]

Option A (by contractor ) Yes

Option B (by employer ) No

10.9 - Communication facilities [6.4]

10.10 - Protection of the works [9.1]

10.11 - Protection/isolation of existing/sectionally occupied works [9.2]

Protection/isolation is required No

10.12 - Disturbance [9.5]

10.13 - Environmental disturbance [9.6]

Item 1.00 -

SECTION C: SPECIFIC PRELIMINARIES

The contractor shall provide free access to the site as and when required to relevant Government departments who will be visiting the site unannounced on a regular basis in order to sign off the works on completion prior to the issuing of the manufacturing licence. Government Department personnel to comply to all site rules and procedures during any site visit

62 Chief inspector of explosives visits Item 1.00 -

63 Department of Labour visits Item 1.00 -

Confidential Page 52 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Bill Total

Section Total

SECTION NO. 2 : EXTENSION TO EXISTING BUILDINGS

BILL NO.1 : ALTERATIONS

SUPPLEMENTARY PREAMBLES

View site

Before submitting his tender, the contractor shall visit the site and satisfy himself as to the nature and extent of the work to be done and the value of the materials contained in the buildings or portions of the buildings to be demolished. No claim for any variations of the contract sum in respect of the nature and extent of the work or of inferior or damaged materials will be entertained

Explosives

No explosives whatsoever may be used for demolition purposes unless otherwise stated

General

The contractor shall carry out the whole of the works with as little mess and noise as possible and with a minimum of disturbance to adjoining premises and their tenants. He shall provide proper protection and provide, erect and remove when directed, any temporary tarpaulins that may be necessary during the progress of the works, all to the satisfaction of the principal agent

Water supply pipes and other piping that may be encountered and found necessary to disconnect or cut, shall be effectually stopped off or grubbed up and removed, and any new connections that may be necessary shall be made with

Confidential Page 53 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

proper fittings, to the satisfaction of the principal agent

Doors, fanlights, fittings, frames, linings, etc. which are to be re-used shall be thoroughly overhauled before refixing including taking off, easing and rehanging, cramping up, re-wedging as required and making good cramps, dowels, etc., and easing, oiling, adjusting and repairing ironmongery as necessary, replacing any glass damaged in removal or subsequently and stopping up all nail and screw holes with tinted plastic wood to match timber, unless otherwise described. Re-painting or re-varnishing is given separately

Prices for taking out of doors, windows, etc. shall include for removal of all beads, architraves, ironmongery, etc.

Prices for taking out and removing doors and frames shall include for removing door stops, cabin hooks, etc. and making good floor and wall finishes to match existing

With regard to building up of openings in existing walls, cement screeds and paving's, granolithic, tops of walls, etc., shall be levelled and prepared for raising of brickwork

Making good of finishes shall include making good of the brick and concrete surfaces onto which the new finishes are applied, where necessary

The contractor will be required to take all dimensions affecting the existing buildings on the site and he will be held solely responsible for the accuracy of all such dimensions where used in the manufacture of new items (doors, windows, fittings, etc.)

REMOVAL OF EXISTING WORK

Confidential Page 54 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Taking out and removing paving blocks and store for later reuse

1 Paving blocks m² 189.00 -

2 Paving kerb m 10.00 -

Taking down and removing roofs, floors, panelling, ceilings, partitions, etc. (new roof elsewhere)

3 Inspect roof trusses for defects in members in varying sizes, cut out, slice or stiffen existing roof trusses with new members, screws, bolts, etc. as per Engineer's instructions

m² 150.00 -

4 Monopitched roof 8.10m x 5.7m x 2.57m high overall, of steel beams, corrugated iron roof covering, gutters and rainwater pipes to be reused elsewhere (hand over to client)

No 1.00 -

Taking down and removing roof sheeting

5 Corrugated iron roof sheeting from double pitched roof 15.95m x 9.4m x 4.48m high overall, fixed to timber trusses and purlins, fascia's, barge boards, gutters and rainwater pipes roof sheeting to be reused elsewhere (EXISTING OFFICE)

No 1.00 -

6 Gypsum plasterboard ceilings, including cornices, timber brandering, etc.

m² 3.00 -

Taking out and removing electrical/mechanical work and reinstall in new position including all necessary wiring, fixing, etc.

7 Biometrics security access panel with keypad

No 1.00 -

Taking out/off and removing sundry metalwork

Confidential Page 55 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

8 900mm x 2032mm high steel security gate and hand over to employer, make good all finishes, brickwork, etc.

No 1.00 -

9 Carefully take out and reposition emergency fire hydrant access box on four steel angles to new position as per architects drawings

No 1.00 -

BUILDING UP OPENINGS

Brickwork in NFP bricks in class II mortar in building up openings, including bonding new to existing and making good cement plaster on one side (making good paintwork elsewhere)

10 One brick wall m² 1.00 -

Sundries

11 Cutting toothings and bonding new brickwork to existing

m² 1.00 -

Bill Total

BILL NO.2 : EARTHWORKS

SUPPLEMENTARY PREAMBLES

Nature of ground

The nature of the ground is assumed to be gravel, therefore 'earth', but possibly interspersed with 'soft rock' or 'hard rock'

Excavation for working space in rock

Notwithstanding clause 11 page 8 of the Standard System of Measuring Building Work, excavation for working space in rock will be measured in cubic metres to the extent executed and given as 'extra over' bulk excavation or trench and hole excavation as the case may be

Confidential Page 56 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Carting away of excavated material

Descriptions of carting away of excavated material shall be deemed to include loading excavated material onto trucks directly from the excavations or, alternatively, from stock piles situated on the building site

Filling

Notwithstanding the reference to prescribed multiple handling in clause 1 page 6 of the Standard System of Measuring Building Work, prices for filling and backfilling shall include for all selection and any necessary multiple handling of material

Testing

Prices for filling are to include for all necessary density tests in accordance with SABS 1200D

BULK EXCAVATIONS ETC

Open face excavation in earth over sloping site

1 Open face excavation m³ 84.00 -

Extra over bulk excavations in earth for excavation in

2 Soft rock m³ 1.00 -

3 Hard rock m³ 1.00 -

Extra over all excavations for carting away

4 Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

m³ 8.00 -

Confidential Page 57 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Risk of collapse of excavations

5 Sides of bulk excavations not exceeding 1,5m deep

m² 20.00 -

BULK FILLING ETC

Compaction of surfaces

6 Compaction of ground surface under floors etc. including scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 95% Mod AASHTO density

m² 371.00 -

EXCAVATION ETC

Excavation in earth not exceeding 2m deep

7 Trenches m³ 17.00 -

Extra over all excavations for carting away

8 Surplus material from excavations and/or stock piles on site, to a dumping site to be located by the contractor

m³ 17.00 -

Risk of collapse of excavations

9 Sides of trench excavations not exceeding 1,5m deep

m² 53.00 -

Keeping excavations free of water

10 Keeping excavations free of all water other than subterranean water

Item 1.00 -

FILLING ETC OTHER THAN BULK

Earth filling obtained from the excavations and/or prescribed stock piles on site, compacted to 93% Mod AASHTO density

Confidential Page 58 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

11 Backfilling to trenches, holes, etc. m³ 9.00 -

Earth filling supplied by the contractor, compacted to 93% Mod AASHTO density

12 Under paving m³ 5.00 -

Coarse river sand filling supplied by the contractor

13 Under floors etc. m³ 12.00 -

SOIL POISONING

Soil insecticide in accordance with SANS 5859

14 Under floors etc. including forming and poisoning shallow furrows against foundation walls etc., filling in furrows and ramming

m² 371.00 -

15 Ditto in trenches m² 75.00 -

Bill Total

BILL NO.3 : CONCRETE, FORMWORK AND REINFORCEMENT

SUPPLEMENTARY PREAMBLES

Cost of tests

The costs of making, storing and testing of concrete test cubes as required under clause 7 Tests of SABS 1200 G shall include the cost of providing cube moulds necessary for the purpose, for testing costs and for submitting reports on the tests to the principal agent. The testing shall be undertaken by an independent firm or institution nominated by the contractor to the approval of the principal agent. (Test cubes are measured separately)

Confidential Page 59 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Formwork

Descriptions of formwork shall be deemed to include use and waste only (except where described as 'left in' or 'permanent'), for fitting together in the required forms, wedging, plumbing and fixing to true angles and surfaces as necessary to ensure easy release during stripping and for reconditioning as necessary before re-use

The vertical strutting shall be carried down to such construction as is sufficiently strong to afford the required support without damage and shall remain in position until the newly constructed work is able to support itself

Formwork to soffits of solid slabs etc. shall be deemed to be to slabs not exceeding 250mm thick unless otherwise described

Formwork to soffits of slabs, beams, etc. shall be deemed to be propped up exceeding 1,5m and not exceeding 3,5m high unless otherwise described

Formwork to sides of bases, pile caps, ground beams, etc. will only be measured where it is prescribed by the engineer for design reasons. Formwork necessitated by irregularity or collapse of excavated faces will not be measured and the cost thereof shall be deemed to be included in the allowance for taking the risk of collapse of the sides of the excavations, provision for which is made in Earthworks

UNREINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

Confidential Page 60 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

20MPa/19mm concrete

1 Apron slab to falls m³ 7.00 -

2 Raking slabs, ramps, etc. including beams

m³ 1.00 -

REINFORCED CONCRETE CAST AGAINST EXCAVATED SURFACES

20MPa/19mm concrete

3 Strip footings m³ 6.00 -

4 Surface beds on waterproofing m³ 12.00 -

TEST CUBES

Test cubes

5 Making and testing 150 x 150 x 150mm concrete strength test cube (Provisional)

No 1.00 -

CONCRETE SUNDRIES

Finishing top surfaces of concrete smooth with a steel trowel

6 Surface beds, slabs, etc. m² 150.00 -

SMOOTH FORMWORK (DEGREE OF ACCURACY II) (CPAP WORK GROUP NO. 111)

Smooth formwork to sides

7 Edges, risers, ends and reveals not exceeding 300mm high or wide

m 35.00 -

MOVEMENT JOINTS ETC

Expansion joints with 10mm soft board (bitumen impregnated soft board) between horizontal concrete and brick surfaces

8 Not exceeding 300mm high to edges of ramp

m 8.00 -

REINFORCEMENT (CPAP WORK GROUP NO. 114)

Fabric reinforcement

Confidential Page 61 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

9 Type 193 fabric reinforcement in concrete surface beds etc.

m² 154.00 -

Bill Total

BILL NO.4 : MASONRY

BRICKWORK

Sizes in descriptions

Where sizes in descriptions are given in brick units, 'one brick' shall represent the length and 'half brick' the width of a brick

BRICKWORK IN FOUNDATIONS (PROVISIONAL)

Brickwork of NFP bricks in class II mortar

1 One brick walls m² 21.00 -

BRICKWORK IN SUPERSTRUCTURE

Brickwork of NFP bricks in class II mortar

2 Half brick walls in beamfilling m² 4.00 -

3 One brick walls m² 89.00 -

BRICKWORK SUNDRIES

2,5mm Brickwork reinforcement

4 150mm Wide reinforcement built in horizontally

m 266.00 -

Prestressed fabricated concrete lintels including necessary temporary supports

5 110 x 75mm Lintels in lengths not exceeding 3m

m 38.00 -

Air bricks etc.

6 229 x 76mm Clay vermin proof air brick

No 6.00 -

Confidential Page 62 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Openings through existing brickwork

7 Breaking opening for pipes and sleeves not exceeding 100mm diameter including fair cutting and fitting of facings where necessary

No 2.00 -

FACE BRICKWORK

Face bricks to match existing on site, pointed with flush horizontal and vertical joints

8 Extra over brickwork for face brickwork in foundations (Provisional)

m² 15.00 -

9 Extra over brickwork for face brickwork

m² 94.00 -

Brick-on-edge header course copings, sills, etc. of face bricks, pointed with recessed joints on all exposed faces

10 220mm Wide sills set sloping and slightly projecting

m 14.00 -

Bill Total

BILL NO.5 : WATERPROOFING

WATERPROOFING

PREAMBLES

See latest edition of Specifications of Materials and Methods to be used (PW 371)

DAMPPROOFING OF WALLS AND FLOORS

One layer 375 micron embossed polyethylene damp proof course (SANS 952-1985 type B)

1 In walls m² 12.00 -

2 In walls vertically at reveals m² 10.00 -

Confidential Page 63 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

One layer 250 micron green polyethylene waterproof sheeting (SANS 952-1985 type C) sealed at laps with PVC self-adhesive tape

3 Under surface beds m² 150.00 -

0,6mm Galvanised sheet steel flashings

4 Cover flashings 150mm girth, including sealing top edge with mastic in and including groove in brickwork

m 10.00 -

SEALING STRIPS, JOINT SEALANTS, ETC

Bitumen impregnated foam plastic joint sealing strips

5 10mm Expansion joints m 38.00 -

Bill Total

BILL NO.6 : ROOF COVERINGS

PROFILED METAL SHEETING AND ACCESSORIES

The roofing shall be Klip-Lok 406™ profile, roll-formed in continuous lengths and can be light

industrial / heavy industrial in Chromadek® Z200 all in accordance with the manufacturer's recommendations

1 Roof covering with pitches not exceeding 25 degrees with side laps sealed with 6 x 20mm closed cell impregnated polyurethane strips and seam stitched

m² 412.00 -

2 Ridge cappings 460mm girth m 31.00 -

3 Narrow and broad flute closers m 40.00 -

Bill Total

Confidential Page 64 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

BILL NO.7 : CARPENTRY AND JOINERY

SUPPLEMENTARY PREAMBLES

Fixing

Items described as 'nailed' shall be deemed to be fixed with hardened steel nails or pins, or to be shot-pinned, to brickwork or concrete

Items described as 'plugged' shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding 500mm centres, and where described as 'bolted', the bolts have been given elsewhere

Joinery

Descriptions of frames shall be deemed to include frames, transoms, rails, etc.

Descriptions of hardwood joinery shall be deemed to include sinking and pelleting heads and nuts of bolts

Decorative thermosetting plastic laminate covering

Laminate covering shall be glued under pressure and edge strips of same shall be butt jointed at junctions with adjacent similar finish

ROOFS ETC

Plate nailed timber roof truss construction

Trusses are at maximum 1200mm centres

Roof coverings are Klip-Lok 406™profile metal sheeting

Confidential Page 65 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Ceilings are mainly nailed up ceilings

References given in descriptions refer to the respective types of trusses detailed on the architect's drawings accompanying these bills of quantities for tender purposes.

Dimensions in descriptions of trusses are nominal and actual measurements are to be obtained from the architect/engineer and/or taken on site before design or fabrication commences

Tenderers must allow for a Registered Engineer's Certificate for design, manufacture as well as on completion of installation

Roof truss construction is Mitek Gang-nail system or similar approved to receive Novotexi profiled metal sheeting (elsewhere) designed in accordance with International Truss Systems and manufactured in accordance with ITC all conforming to the relevant SABS codes of practice with a pitch of 30 degrees and a 600mm overhang including all relevant bracing, hops and valley sets

Sawn SA pine softwood

1 38 x 114mm Wall plates m 26.00 -

Plate nailed timber roof or "ultra span" construction, (Battens, fascia's an barge boards measured elsewhere)

2 Roof truss construction to double pitched roof for offices 13000 x 12400mm overall on plan 2980 mm high overall with two gable ends with ons end connected to existing building (Refer to drawing 1-170530-01)

No 1.00 -

Confidential Page 66 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Sundries

3 Two coats creosote on sawn timbers

m² 3.00 -

EAVES, VERGES, ETC

"Everite Flexit" pressed nutec-cement

4 12 x 225mm Fascia's and barge boards, including galvanised steel H-profile jointing strips

m 83.00 -

SKIRTINGS

Wrought meranti

5 70 x 20mm Skirting’s, plugged m 34.00 -

DOORS

Semi-solid flush doors with 3.2mm hardboard veneer, hung to steel frames

6 40mm Door 813 x 2032mm high No 1.00 -

Solid laminated external quality flush doors, hung to steel frames

7 40mm One and a half leaf door 1200mm x 2032mm high

No 2.00 -

JOINERY SUNDRIES

Wrought meranti

8 Heavy duty slatted shelving (brackets elsewhere)

m² 2.00 -

9 Heavy duty Meranti slatted shelving in accordance with POL2012/F1 (brackets elsewhere)

m² 2.00 -

NOTICEBOARDS, KEYBOARDS, DUCKBOARDS, ETC

Van Dyk 100% stain shield staple fibre pinning board complete with foam back and wooden frame

Confidential Page 67 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

10 20mm Pinning boards fixed to plastered walls

m² 2.00 -

Bill Total

BILL NO.8 : CEILINGS PARTITIONS AND ACCESS FLOORING

SUPPLEMENTARY PREAMBLES

Fixing

Items described as 'nailed' shall be deemed to be fixed with hardened steel nails or pins, or to be shot-pinned, to brickwork or concrete

Items described as 'plugged' shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding 500mm centres, and where described as 'bolted', the bolts have been given elsewhere

Ceilings

Unless otherwise described ceilings shall be deemed to be horizontal

CEILING TIMBERS, BEADS, INSULATION, ETC

Roof Insulation

1 Thermguard Cellulose fibre insulation evenly blown to a depth of 100mm thick and laid on top of suspended ceiling between roof timbers etc. (Down lighters and recessed light fittings to be isolated as per manufacturer's instructions)

m² 161.00 -

SUSPENDED CEILINGS

Proprietary suspended ceilings

Confidential Page 68 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

User Note - The following preamble to be included in the bills of quantities after confirmation of the basic design of the ceilings, lighting, air conditioning, etc.

Hangers, suspension grids, lay-in panels, etc. are to be in accordance with the manufacturers' recommendations

Electrical light fittings, diffusers, panels etc. are generally lay-in units of the same dimensions as the suspension grid described and allowance must be made in the rates accordingly for their support inclusive of any flexibility in setting out that may be required (ceiling panels have not been deducted and pricing is to take cognisance thereof)

600 x 600 x 12.5mm OWAdek ceiling panels face-covered with Fissured embossed vinyl acoustic panels laid on fire rated OWAconstruct® S3 exposed demountable Butt-cut T24 suspension system, comprising galvanised main tees and cross tees with main tees suspended by means of galvanised hangers at centres not exceeding 1200mm including hangers, necessary hold-down clips and wedges, etc. with ceiling perimeter finished with OWAconstruct Shadowline W-trim, plugged and screwed at 200mm centres, and all installed to manufacturer`s instructions.

2 Ceilings suspended not exceeding 1m below timber purlins at 1200mm centres (trusses at 1.2m centres)

m² 161.00 -

Cornices, perimeter trims, etc. to suspended ceilings

Confidential Page 69 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

3 Shadowline pre-painted wall channels, plugged

m 45.00 -

FIXED PARTITIONS (CPAP WORK GROUP NO. 138)

GypRoc Standard System steel stud partitions with both sides clad with one layer of 12,5mm Taper-edge Rhinoboard

4 Partitions 2.975m high with bottom and top tracks plugged.

m 8.00 -

5 Extra over partition 2.975m high for vertical abutment.

No 2.00 -

6 Extra over partition 2.975m high for corner.

No 1.00 -

Extra over 2.975m partitions for 40mm semi-solid flush doors with veneer on both sides and hardwood edge strips to vertical edges, hung to and including standard natural anodised aluminium door frame with one pair of 100mm nylon washered aluminium hinges to each hanging stile, including additional studding, trimming, etc. to partitions

7 Door 812 x 2032mm high including lockset

No 1.00 -

Bill Total

BILL NO.9 : FLOOR COVERINGS

FLOOR COVERINGS

Belgotex floors® Matrix colour Argent Stainproof SDX (solution dyed

nylon) Tufted Multi-Scroll Loop Pile Nexbac SABS Class 2 fire rating grade heavy commercial commercial carpet tiles, size 500 x 500 x 8mm thick, all installed by approved installer in accordance

Confidential Page 70 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

with SANS 10186:2010, the code of practice for textile floor coverings.

1 On floors m² 106.00 -

Bill Total

BILL NO.10 : IRONMONGERY

SUPPLEMENTARY PREAMBLES

Proprietary items

Where applicable the manufacturers' names or product catalogue titles are given in sub-headings preceding the items Prices are to be based on the specific products/articles specified. If tenderers wish to offer alternative products/articles for certain items, these items are to be clearly marked and the alternative specification given with supporting brochures etc. clarifying the features of the products/articles offered On request returnable samples are to be provided to the principal agent for consideration

LOCKS

"Dorma"

1 Dorma D036S' or equal approved stainless steel euro profile cylinder sash lock

No 3.00 -

SUNDRIES

2 Allow the amount of R10 000.00 for ironmongery sundries

No 1.00 -

Bill Total

BILL NO.11 : METALWORK

SUPPLEMENTARY PREAMBLES

Confidential Page 71 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Descriptions of bolts, anchors, etc.

Descriptions of bolts shall be deemed to include nuts and washers

Descriptions of expansion anchors and bolts and chemical anchors and bolts shall be deemed to include nuts, washers and mortices in brickwork or concrete

Items described as 'holed for bolt(s)' shall be deemed to exclude the bolts unless otherwise described

Items described as 'plugged' shall be deemed to include screwing to fibre, plastic or metal plugs at not exceeding 600mm centres

STEEL GATES, SCREENS, ETC

1 Allow the amount of R20 000.00 for steel gates, burglar proofing, etc.

Item 1.00 -

PRESSED STEEL DOOR FRAMES

1,6mm Rebated frames suitable for dry wall partitioning including building into dry wall partitioning

2 Frame for door 813 x 2032mm high

No 2.00 -

GALVANISED PRESSED STEEL DOOR FRAMES

1,2mm Rebated frames suitable for half brick walls

3 Frame for one and a half leaf door 1200mm x 2032mm high

No 2.00 -

ALUMINIUM WINDOWS, DOORS, ETC. (CPAP WORK GROUP NO. 140)

Confidential Page 72 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Anodised windows, complete with subframes, ironmongery, glass, sealing, etc. and fixing to brickwork or concrete

4 Window type 2400mm x 1200mm high

No 6.00 -

5 Glazed one and a half leaf door 1200mm x 2100mm high

No 2.00 -

Bill Total

BILL NO.12 : PLASTERING

PLASTERING

PLASTER MIX RATIO

The mix ratio indicated of e.g. (1:3) would mean one part of cement to three parts of sand

SCREEDS

Cement plaster screeds wood floated for tiles, on concrete

1 30mm Thick on floors and landings

m² 153.00 -

INTERNAL PLASTER

Cement plaster rendering coat with gypsum skim plaster finishing coat, on brickwork

2 On walls m² 147.00 -

3 On Existing faced brick walls m² 26.00 -

4 On narrow widths m² 1.00 -

Bill Total

BILL NO.13 : TILING

SUPPLEMENTARY PREAMBLES

Fixing

Confidential Page 73 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Unless described as 'fixed with adhesive to plaster (plaster elsewhere)' descriptions of tiling on brick or concrete walls, columns, etc. shall be deemed to include 1:4 cement plaster backing and descriptions of tiling on concrete floors etc. shall be deemed to include 1:3 plaster bedding

Tiling described as 'fixed with adhesive on power floated concrete' shall be deemed to include for approved tiling key-coat

Ceramic, porcelain, marble and granite tiles are to be fixed and grouted with suitable adhesives and grouts from the Tal Professional range of products as recommended by the manufacturer of the tiles

FLOOR TILING

Union Tiles 1SAMRBR2145TA ceramic tiles (Code: 1SAMRBR2145TA), size 500 x 500 x 8mm thick fixed to internal floor screed with TAL tile adhesive (elsewhere specified) with joints continuous in both directions and grouted with TAL tile grout (elsewhere specified), excess grout on the surface to be cleaned with water as work proceeds.

1 On floors and landings m² 16.00 -

SUNDRIES

Aluminium dividing strips

2 T-section dividing strips or equal approved between tiles and carpet

m 18.00 -

Bill Total

Confidential Page 74 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

BILL NO.14 : PLUMBING AND DRAINAGE

SUPPLEMENTARY PREAMBLES

Wire gratings

Descriptions of gutter outlets etc. shall be deemed to include wire balloon gratings

Stormwater channels

Descriptions of channels shall be deemed to include necessary excavation, surface preparation, compaction, etc., and disposal of surplus material on site

French drains

Descriptions of French drains shall be deemed to include excavation, stone filling graded from 300mm diameter at bottom to 75mm diameter at top, U24 geofabric filter blanket over stone, 300mm earth filling over and disposal of surplus material on site

Septic tanks

Descriptions of proprietary type septic tanks shall be deemed to include excavation, bedding and jointing, concrete base slabs, jointing to drains and backfilling, compaction, etc. all in accordance with the manufacturer's instructions and disposal of surplus material on site

Stainless steel basins, sinks, wash troughs, urinals, etc.

Stainless steel for economy basins, domestic sinks and worktops shall be Type 430 (17/0) Stainless steel for urinals, basins, quality sinks, wash troughs, institutional equipment, etc. shall

Confidential Page 75 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

be Type 304 (18/8) Stainless steel for laboratory sinks, photographic equipment, etc. shall be Type 316 (18/8) Units shall have standard aprons on all exposed edges and tiling keys against walls where applicable

Sealing of edges

Outer edges of sinks, basins, baths, urinals, etc. are to be sealed against adjacent surfaces with approved silicone

uPVC pipes and fittings

Sewer and drainage pipes and fittings shall be jointed and sealed with butyl rubber rings Soil, waste and vent pipes and fittings shall be solvent weld jointed or sealed with butyl rubber rings

uPVC pressure pipes and fittings

Pipes of 50mm diameter and smaller shall be plain ended with solvent welded uPVC loose sockets and fittings Pipes of 63mm diameter and greater shall have sockets and spigots with push-in type integral rubber ring joints. Bends shall be uPVC and all other fittings shall be cast iron, all with similar push-in type joints

High density polyethylene (HDPe) pipes and fittings

Pipes shall be type IV and of the class specified with Plasson or Alprene compression fittings

Polycop polypropylene pipes

Polypropylene pipes 54mm diameter and smaller shall be seamless copper coloured Class 16 pipes jointed with Fast-fuse heat welded thermoplastic or where so described Polylock

Confidential Page 76 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

compression fittings Pipes shall be firmly fixed to walls, etc. with coloured nylon snap-in pipe clips with provision for accommodating thermal movement and jointed and fixed strictly in accordance with the manufacturer's instructions

Copper pipes

Pipes shall be hard drawn and half-hard Maksal pipes of the class described. Class 0 (thin walled hard drawn) pipes shall not be bent. Class 1 (thin walled half-hard), Class 2 (half-hard) and Class 3 (heavy walled half-hard) pipes shall only be bent with benders with inner and outer formers. Fittings to copper waste, vent and anti-syphon pipes, capillary solder fittings and compression fittings shall be Cobra Watertech type. Capillary solder fittings shall comply with ISO 2016

Copper pipes are to be installed in accordance with the latest revision of the Code of Practice for Copper Plumbing soldering techniques. Flux, solder, etc. to be strictly in accordance with the manufacturer's requirements with special attention to copper flux composition

Reducing fittings

Where fittings have reducing ends or branches they are described as 'reducing' and only the largest end or branch size is given. Should the contractor wish to use other fittings and bushes or reducers he may do so on the understanding that no claim in this regard will be entertained

Fixing of pipes

Confidential Page 77 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Unless specifically otherwise stated, descriptions of pipes shall be deemed to include fixing to walls, etc., casting in, building in or suspending not exceeding 1m below suspension level

Paper wrapping to pipes

Pipes chased into brickwork must be wrapped with two layers of stout brown paper tied with wire. Rates are to include for wrapping around joints and fittings

Disinfection of water pipework

Water pipework is to be disinfected at completion in accordance with SABS 1200L (provision for disinfection elsewhere)

Densyl petrolatum anti-corrosion tape as manufactured by Denso SA (Pty) Ltd.

Pipes to be taped shall be coated with the appropriate primer and the tape shall be applied in the appropriate widths and with 50% overlaps Couplings and fittings to pipes shall be taped in strict accordance with the manufacturer's instructions including mastic, tape, Layflat sheeting, securing of same, etc.

Prices for wrapping of pipes shall include for all work as described to couplings in the length

Laying, backfilling, bedding, etc. of pipes

Pipes shall be laid and bedded in accordance with manufacturers' instructions and trenches shall be carefully backfilled

Confidential Page 78 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Where no manufacturers' instructions exist, pipes shall be laid in accordance with Clauses 5.1 and 5.2 of each of the following: SABS 1200L : Medium-pressure pipelines SABS 1200LD : Sewers SABS 1200LE : Stormwater drainage Pipe trenches, etc. shall be backfilled in accordance with Clauses 3, 5.5, 5.6, 5.7 and 7 of SABS 1200DB : Earthworks (Pipe trenches) Pipes shall be bedded in accordance with Clauses 3.1 to 3.4.1, 5.1 to 5.3 and 7 of SABS 1200LB : Bedding (Pipes) Unless otherwise described bedding of rigid pipes shall be Class B bedding

General

Descriptions of cast iron roof outlets shall be deemed to include joints to pipes and casting into concrete (adaptors for joints to PVC pipes, etc. are given separately) Descriptions of overflow pipes where measured in number, shall be deemed to include joints to cisterns and splay cut ends

As-built drawings

Where required, the contractor shall prepare an updated set of as-built drawings. At completion of the contract the contractor shall hand these drawings to the principal agent for reproducing onto the originals for handing over to the employer (provision for allowance of as-built drawings elsewhere)

RAINWATER DISPOSAL

0,6mm Galvanised sheet steel gutters and rainwater pipes with powder coated finish on outside

Confidential Page 79 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

1 75mm Diameter chromadek seamless rainwater pipes

m 6.00 -

2 Extra over rainwater pipe for shoe No 2.00 -

3 75mm x 100mm Chromadek seamless roof gutters

m 27.00 -

4 Extra over gutter for stopped end No 4.00 -

5 Extra over gutter for angle No 2.00 -

Bill Total

BILL NO.15 : MECHANICAL WORK

AIR CONDITIONING INSTALLATION

SPLIT TYPE UNITS

1 9 000 BTU Inverter type wall mounted unit complete with condenser section mounted on external wall

No 5.00 -

2 12000 BTU Inverter type wall mounted unit complete with condenser section mounted on external wall

No 1.00 -

Bill Total

BILL NO.16 : PAINTWORK

PAINTWORK ETC TO NEW WORK

ON INTERNAL FLOATED PLASTER SURFACES

Two coats eggshell enamel paint for interior use

1 Walls m² 113.00 -

ON FIBRE-CEMENT BOARD SURFACES

Confidential Page 80 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

One coat alkali resistant primer and two coats superior quality acrylic emulsion paint for interior and exterior use

2 Fascias and barge boards, including priming metal jointing strips

m² 49.00 -

ON METAL SURFACES

Two coat Premium quick drying high gloss enamel paint, on steel

3 Gates, grilles, burglar screens, balustrades, etc.

m² 40.00 -

4 Door frames etc. m² 2.00 -

One coat modified alkyd aluminium primer and two coats extremely durable UV-resistant washable pure acrylic paint, on cast iron

5 Rails, bars, pipes, etc. not exceeding 300mm girth

m 5.00 -

ON WOOD SURFACES

Three coats superior quality clear gloss varnish

6 Doors m² 4.00 -

7 Skirtings m 33.00 -

ON PLASTERBOARD SURFACES

Two coats superior quality PVA paint for interior and exterior use, on work in sound condition

8 Ceilings and cornices m² 161.00 -

Two coats Quick drying high gloss enamel paint for interior use, on work in poor condition.

9 Built-in cupboard shelves m² 8.00 -

Confidential Page 81 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Bill Total

Section Total

SECTION NO. 3 : EXTERNAL WORKS

BILL NO.1 : EXTERNAL WORKS

THE FOLLOWING IN ROADWORK, PARKING AREAS AND PAVING

Precast concrete block road surfacing

Paving shall be laid in accordance with SABS 1200 MJ, SANS 1058 and the Concrete Masonry Association's specifications

Paving shall be laid to herringbone pattern on 25mm thick clean river sand (preparation of ground or filling elsewhere)

Clean sand shall be swept into joints between roadstones at completion

Site clearance

1 Digging up and removing rubbish, debris, vegetation, hedges, shrubs, bush, etc. and trees not exceeding 200mm girth

m² 21.00 -

Excavation in earth not exceeding 2m deep

2 Over site between buildings, retaining walls, etc. to reduce levels and dispose in prescribed stock piles on site

m³ 1.00 -

Extra over all excavations for carting away

3 Surplus material from excavations and/or stock piles on site to a dumping site to be located by the contractor

m³ 1.00 -

Confidential Page 82 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

Keeping excavations free of water

4 Keeping excavations free of water other than subterranean water

Item 1.00 -

Earth filling supplied by the contractor under parking areas, roadways, etc.

5 Base course of G5 material in accordance with SABS 1200 ME, stabilised to attain UCS>1,0 MPa after seven days and compacted to 95% Mod AASHTO density

m³ 3.00 -

Compaction of surfaces

6 Compaction of sub-base layer under paving’s etc., including ripping and scarifying for a depth of 150mm, breaking down oversize material, adding suitable material where necessary and compacting to 93% Mod AASHTO density

m² 20.00 -

Weed killer (active ingredients Metalaclor 102,8 g/l, Terbitilasien 248,6 g/l and atrazine 248,6 g/l) mixed in the proportion of 100 ml weed killer to 100 l water and applied at a rate of 10 l/m²

7 Under paving etc. m² 21.00 -

30MPa/19mm reinforced concrete

8 300mm x 250mm edging to kerbs etc.

m 5.00 -

Finishing top surfaces of concrete with a power float and a coarse hard grass broom

9 Edging to kerbs etc. not exceeding 300mm wide

m² 2.00 -

Confidential Page 83 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

80mm ZZ INTERLOCKING BRICKS (30MPa) Thick grey precast concrete interlocking block paving in accordance with SABS 1200 MJ, top edges chamfered laid to falls in herring bone pattern on and including 150mm thick sand layer with joints filled in with sand, compacted to 93% MOD AASHTO density with a vibration compactor

10 Paving to parking areas etc. to falls

m² 21.00 -

11 Extra over 80mm thick paving for circular cutting and waste

m 12.00 -

Precast concrete finished smooth on exposed surfaces, including bedding, jointing and pointing

12 180 x 280mm High kerbs (SANS 927 fig 7) with 150 x 150 x 300mm unreinforced concrete haunching at back of each joint, including bedding, jointing and pointing inclusive of excavation, backfilling, etc.

m 10.00 -

Road signs

13 Standard STOP sign with 50mm diameter galvanised mild steel post bedded in and including unreinforced concrete base, including any necessary excavation, paint finish, etc.

No 2.00 -

PAINTWORK

Prepare and apply one coat white reflective road marking paint on bituminous road surfacing, precast concrete paving blocks, etc.

14 100mm Wide line m 15.00 -

15 Arrow 300 x 500mm overall No 2.00 -

16 300mm Letter No 10.00 -

Confidential Page 84 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

PRE-CONCRETE STORMWATER CHANNELS

Stormwater channels

17 600mm Diameter Rocla halfround pre-cast concrete channels in lengths of 2.44m laid to falls, including excavating, levelling, backfilling and compacting where necessary

m 5.00 -

Stormwater Dissipater

18 Install 1400mm wide x 2500mm long dissipater to the correct levels and slope at the bottom end of storm water canal

No 1.00 -

Bill Total

Section Total

SECTION NO. 4 : PROVISIONAL SUMS

BILL NO.2 : PROVISIONAL SUMS

PROVISIONAL SUMS FOR NOMINATED/SELECTED SUBCONTRACT WORKS

Window blinds to offices

1 Provide the sum of R R30 000 (THIRTY THOUSAND RAND) net for window blinds to offices

Item -

2 Profit Item 1.00 -

3 Attendance Item 1.00 -

Fire Equipment

4 Provide the sum of R 10 000 (TEN THOUSAND RAND) net for servicing of fire equipment

Item -

5 Profit Item 1.00 -

Confidential Page 85 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Description Unit Quantity Rate Amount

6 Attendance Item 1.00 -

Electrical

7 Provide the sum of R80 000 (EIGHTY THOUSAND RAND) net for Electrical

Item -

8 Profit Item 1.00 -

9 Attendance Item 1.00 -

Statutory Signage

10 Provide the sum of R 5000 (FIVE THOUSAND RAND) net for Statutory Signage

Item -

11 Profit Item 1.00 -

12 Attendance Item 1.00 -

Bill Total

Section Total

EXTENSION OF OFFICE BUILDING AT NATIONAL HEALTH LABORATORY SERVICE

PRINCIPAL BUILDING CONTRACT

Main Tender (FIXED PRICE)

SECTION FINAL SUMMARY PAGE AMOUNT

NO R c

1 Preliminaries

2 Extension to Existing Building

3 External Works

4 Provisional Sums

Sub-Total A

Confidential Page 86 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

3 Escalation Allowance

TOTAL TENDER AMOUNT (EXCL. VAT) Sub-Total B

3 VALUE ADDED TAX

Add provision for Value Added Tax:

Allow 15% of Sub-Total A

TOTAL TENDER AMOUNT (INCLUDING VAT) R

Confidential Page 87 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

MANDATORY REQUIREMENTS

If a bidder does not comply fully with each of the mandatory requirements, it Shall be regarded as

mandatory non-performance/non-compliance and the bid Shall be disqualified. No “unanswered”

questions will be allowed. If a response to a question has been indicated as comply but not elaborated

upon or substantiated it shall be regarded as mandatory non- performance/non-compliance and the

bid shall be disqualified.

Bidders shall provide full and accurate answers to the mandatory questions posed in this document,

and, where required, explicitly state either “Comply/Accept (with a “Yes”)” or “Do not comply/do not

accept (with a “No”)” regarding compliance to the requirements. Bidders must substantiate their

responses to all mandatory questions. PLEASE NOTE: If the response does not substantiate any of the

points or requirements in the body of the tender, it will be deemed to not comply, even if the ‘Comply’

field has been marked. Please note: All documentation to substantiate the mandatory requirements

has to be supplied.

6.1 Technical Suitability: Mandatory Requirements

The bidder must have a valid Construction Industry Development Board (CIDB)

registration with 3GB or higher.

Comply Do Not Comply

Substantiation: Attach to the bid’s technical response a valid CIDB rating certificate with a minimum rating of

3GB.

The bidder must provide a list of the below listed employees who will be working on

the project site:

Plumbers;

Electricians;

Bricklayers; and Painters

Comply Do Not Comply

Substantiation: The bidder must provide a list with the artisan certificate for the plumbers and a wiring man’s

licence for electrical link with below .

The bidder must be registered as an electrical contractor with the Department

of Labour and be certified to work on three phase power. NHLS reserves the

right to validate the certificate of registration prior to the award of the bid.

Comply Do Not Comply

Substantiation: Attached to the bid’s technical response a copy of the valid certificate of registration as an electrical

contractor certified to work on three phase power, as issued by the department of Labour.

Confidential Page 88 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

The bidder must have at least three (03) years’ experience in construction

related projects with a similar scope.

Comply Do Not Comply

Substantiation:

The bidder must provide a minimum of 3 contactable clients reference letters. Each letter must be dated, signed

and on a letterhead of the customer and indicates which is not older than 3 years:

(a) The customer Company name and physical address;

(b) Customer contact person’s name, telephone number and email address;

(c) Project Start and End Date

Copy of close out certificate after completion of project.

6.2 Special Conditions

The bidder must provide proof of Location (office/ workshops/ where

operating from lease agreement.)

Comply Do Not Comply

Substantiation: Provide proof of Location.

Provide project plan for this project including timelines and activities.

Comply Do Not Comply

Substantiation: The bidder must provide a Project Plan.

The bidder must have a dedicated company vehicle on site during the execution of the project.

Comply Do Not Comply

Substantiation: The bidder must provide a copy of the valid registration certificate of the company vehicle

This field applies only to bidders who are sub-contracting

In a case of a subcontractor being used the bidder must provide a list of sub-

contractors and their responsibilities and the necessary certificates, including signed

reference letters of the sub-contractor’s letters clients for similar work done

(including contact details).

Comply Do Not Comply

Substantiation: The bidder must provide subcontracting suppliers

Confidential Page 89 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE B: Tax Clearance Requirements (SBD2)

1 It is a condition of bid that the taxes of the successful bidder must be in order, or that satisfactory

arrangements have been made with South African Revenue Service (SARS) to meet the bidder’s tax

obligations.

2 In order to meet these requirement bidders are required to complete in full the attached form TCC 001

“Application for a Tax Clearance Certificate” and submit it to any SARS branch office nationally. The Tax

Clearance Certificate requirements are also applicable to foreign bidders/individuals who wish to submit

bids.

3 SARS shall then furnish the bidder with a Tax Clearance Certificate that shall be valid for a period of one

(1) year from the date of approval.

4 The original Tax Clearance Certificate must be submitted together with the bid. Failure to submit the

original and valid Tax Clearance Certificate shall result in the invalidation of the bid. Certified copies of

the Tax Clearance Certificate shall not be acceptable.

5 In bids where Consortia / Joint Ventures / subcontractors are involved, each party must submit a

separate Tax Clearance Certificate.

6 Copies of the TCC 001 “Application for a Tax Clearance Certificate” form are available from any SARS

branch office nationally or on the website www.sars.gov.za.

7 Applications for the Tax Clearance Certificates may also be made via eFiling. In order to use this

provision, taxpayers shall need to register with SARS as eFilers through the website www.sars.gov.za.

Confidential Page 90 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

TAX CLEARANCE

Application for a Tax Clearance Certificate

Particulars of applicant

Particulars of representative (Public Officer/Trustee/Partner)

Confidential Page 91 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Particulars of tender (If applicable)

Audit

Appointment of representative/agent (Power of Attorney)

Confidential Page 92 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Declaration

Notes:

1. It is a serious offence to make a false declaration.

2. Section 75 of the Income Tax Act, 1962, states: Any person who

(a) fails or neglects to furnish, file or submit any return or document as and when required by or under this Act;

or

(b) without just cause shown by him, refuses or neglects to

(i) furnish, produce or make available any information, documents or things;

(ii) reply to or answer truly and fully, any questions put to him ...

As and when required in terms of this Act ... shall be guilty of an offence ...

3. SARS shall, under no circumstances, issue a Tax Clearance Certificate unless this form is completed in full.

4. Your Tax Clearance Certificate shall only be issued on presentation of your South African Identity Document or

Passport (Foreigners only) as applicable.

Confidential Page 93 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE C: Pricing Schedule

Please indicate your total bid price here: R___________________________(compulsory)

Important:

It is mandatory to indicate your total bid price as requested above. This price must be the same as the total bid

price you submit in your pricing schedule. Should the total bid prices differ, the total bid price indicated above

shall be considered the correct price.

The following must be noted:

1. All prices must be VAT exclusive and must be quoted in South African Rand (ZAR).

2. All prices must be firm and fixed from the tender closing date and for the duration of the contract

3. All the consortium or joint venture partners must submit a complete set of the latest audited financial

statements.

4. All bidders must cost according to the costing template provided or this will lead to disqualification.

5.

The cost of installation, delivery, site preparation etc. Must be included in this

proposal.

Comply Do Not comply

Substantiate / Comments

6.

No price adjustments that are 100% linked to exchange rate variations shall be

allowed.

Comply Do Not comply

Substantiate / Comments

7.

The bidder must indicate clearly which portion of the purchase price as well as the monthly costs is linked to the exchange rate.

Comply Do Not comply

Substantiate / Comments

8.

All additional costs must be clearly specified. Comply Do Not comply

Substantiate / Comments

Confidential Page 94 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

SBD 3.1

PRICING SCHEDULE – FIRM PRICES

(PURCHASES)

NOTE: ONLY FIRM PRICES WILL BE ACCEPTED. NON-FIRM PRICES (INCLUDING PRICES SUBJECT TO RATES OF EXCHANGE VARIATIONS) WILL NOT BE CONSIDERED IN CASES WHERE DIFFERENT DELIVERY POINTS INFLUENCE THE PRICING, A SEPARATE PRICING SCHEDULE MUST BE SUBMITTED FOR EACH DELIVERY POINT

Name of bidder: ___________________________________________________________________

Bid number: RFB 062/17-18 Closing Time 11:00 am Closing date: 02 May 2018

Bid Price (Vat incl.) R______________________________________________________

OFFER TO BE VALID FOR 90 DAYS FROM THE CLOSING DATE OF BID.

ITEM QUANTITY DESCRIPTION BID PRICE IN RSA CURRENCY

NO. ** (ALL APPLICABLE TAXES INCLUDED)

- Required by: ___________________________ - At: ___________________________

___________________________

- Brand and model ________________________

- Country of origin ________________________

- Does the offer comply with the specification(s)? *YES/NO

- If not to specification, indicate deviation(s) ________________________

- Period required for delivery _______________________ *Delivery: Firm/not firm

- Delivery basis _______________________ Note: All delivery costs must be included in the bid price, for delivery at the prescribed destination.

** “all applicable taxes” includes value- added tax, pay as you earn, income tax, unemployment insurance fund contributions and skills development levies.

*Delete if not applicable

Confidential Page 95 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

PRICE DECLARATION FORM

Dear Madam / Sir,

Having read through and examined the Tender Document, RFB 062/17-18, General Conditions, the requirement

and all other Annexures to the Tender Document, we offer to provide <insert tender description> as detailed in

the bid document, for the total Tendered Contract Sum of in:

______________________________________________________________ (VAT Incl.) Amount in Words

R______________________________________________________________ (VAT Incl.) Amount in Numbers

We confirm that this price covers all activities associated with RFB 062/17-18 PROPOSAL FOR BUILDING WORKS

FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR NATIONAL HEALTH LABORATORY SERVICES

(NHLS) but not limited to the supply of all required, for the RFB 062/17-18 PROPOSAL FOR BUILDING WORKS FOR

EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR NATIONAL HEALTH LABORATORY SERVICES (NHLS).

We confirm that NHLS will incur no additional costs whatsoever over and above this amount in connection with

the supply of this solution.

We further confirm that all licences required for complete implementation of the solution, and the costs associated

therewith, as well as any licences that may be required for future expansion have been fully described and

disclosed in this document.

We undertake to hold this offer open for acceptance for a period of 90 days from the date of submission of

offers. We further undertake that upon final acceptance of our offer, we will commence with delivery when

required to do so by the Client.

Moreover, we agree that until formal Contract Documents have been prepared and executed, this Form of Tender,

together with a written acceptance from the Client shall constitute a binding agreement between us, governed by

the terms and conditions set out in this Request for Proposals.

We understand that you are not bound to accept the lowest or any offer and that we must bear all costs which we

have incurred in connection with preparing and submitting this tender.

We hereby undertake for the period during which this tender remains open for acceptance not to divulge to any

persons, other than the persons to which the tender is submitted, any information relating to the submission of

this tender or the details therein except where such is necessary for the submission of this tender.

Confidential Page 96 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

SIGNED: DATE:

Print name of signatory)

Designation

FOR AND ON BEHALF OF: COMPANY NAME

Tel No

Fax No

Cell No

Confidential Page 97 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE D: Declaration of Interest (SBD4)

1. Any legal person, including persons employed by the state1, or persons having a kinship with persons

employed by the state, including a blood relationship, may make an offer or offers in terms of this

invitation to bid (includes a price quotation, advertised competitive bid, limited bid or proposal). In view

of possible allegations of favouritism, should the resulting bid, or part thereof, be awarded to persons

employed by the state, or to persons connected with or related to them, it is required that the bidder or

his/her authorised representative declare his/her position in relation to the evaluating/adjudicating

authority where:

1.1.1 the bidder is employed by the state; and/or

1.1.2 the legal person on whose behalf the bidding document is signed, has a relationship with persons/a

person who are/is involved in the evaluation and/or adjudication of the bid(s), or where it is known that

such a relationship exists between the person or persons for or on whose behalf the declarant acts and

persons who are involved with the evaluation and/or adjudication of the bid.

1.2 In order to give effect to the above, the following questionnaire must be completed and submitted with

the Bid.

1.2.1 Full name of bidder or his or her representative: _________________________

1.2.2 Identity number: __________________________________________________

1.2.3 Position occupied in the company (director, trustee, shareholder) _____________

1.2.4 Company registration number: _______________________________________

1.2.5 Tax reference number: _____________________________________________

1.2.6 VAT registration number: ___________________________________________

1.2.6.1 The names of all directors / trustees / shareholders / members, their individual identity numbers,

tax reference numbers and, if applicable, employee / persal numbers must be indicated in

paragraph 3 below.

1.2.6.2 Any legal person, including persons employed by the state¹, or persons having a kinship with

persons employed by the State, including a blood relationship, may make an offer or offers in terms

1“State” means –

a) any national or provincial department, national or provincial public entity or constitutional institution within the meaning of the Public Finance Management Act, 1999 (Act No. 1 of 1999);

b) any municipality or municipal entity; c) provincial legislature; d) national Assembly or the national Council of provinces; or e) Parliament.

Confidential Page 98 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

of this invitation to bid (includes a price quotation, advertised competitive bid, limited bid or

proposal). In view of possible allegations of favouritism, should the resulting Bid, or part thereof,

be awarded to persons employed by the State, or to persons connected with or related to them, it

is required that the bidder or his/her authorised representative declare his/her position in relation

to the evaluating/adjudicating authority where:

1.2.6.2.1 the bidder is employed by the state; and/or

1.2.6.2.2 the legal person on whose behalf the bidding document is signed, has a relationship with

persons/a person who are/is involved in the evaluation and/or adjudication of the Bid(s), or

where it is known that such a relationship exists between the person or persons for or on whose

behalf the declarant acts and persons who are involved with the evaluation and/or adjudication

of the Bid.

2 In order to give effect to the above, the following questionnaire must be completed and submitted with

the Bid.

2.1 Full name of the bidder or his or her representative: ________________________

2.2 Identity number: ____________________________________________________

2.3 Position occupied in the company (director, trustee, shareholder2): _____________

2.4 Company registration number: __________________________________________

2.5 Tax Reference Number: _______________________________________________

2.6 VAT Registration Number: _____________________________________________

2.6.1 The names of all directors / trustees / shareholders / members, their individual identity numbers, tax

reference numbers and, if applicable, employee / persal numbers must be indicated in paragraph 3 below.

2.7 Are you or any person connected with the bidder YES / NO

presently employed by the state?

2.7.1 If so, furnish the following particulars:

Name of person / director / trustee / shareholder/ member: ________________

2 ”Shareholder” means a person who owns shares in the company and is actively involved in the management of

the enterprise or business and exercises control over the enterprise.

Confidential Page 99 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Name of state institution at which you or the person connected to the bidder is employed:

_______________________________________________________

Position occupied in the state institution: _______________________________

Any other particulars: ______________________________________________

________________________________________________________________

________________________________________________________________

2.7.2 If you are presently employed by the state, did you obtain YES / NO

the appropriate authority to undertake remunerative

work outside employment in the public sector?

2.7.2.1 If yes, did you attach proof of such authority to the Bid document ? YES / NO

(NOTE: Failure to submit proof of such authority, where applicable,

may result in the disqualification of the bid.)

2.7.2.2 If not, furnish reasons for non-submission of such proof:

______________________________________________________________

______________________________________________________________

______________________________________________________________

2.8 Did you or your spouse, or any of the company’s directors / YES / NO

trustees / shareholders / members or their spouses conduct

business with the state in the previous twelve months?

2.8.1 If so, furnish other particulars: _______________________________________

________________________________________________________________

________________________________________________________________

2.9 Do you, or any person connected with the bidder, have YES / NO

any relationship (family, friend, other) with a person

Confidential Page 100 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

employed by the state and who may be involved with

the evaluation and or adjudication of this bid?

2.9.1 If so, furnish other particulars: _______________________________________

________________________________________________________________

________________________________________________________________

2.10 Are you, or any person connected with the bidder, YES/NO

aware of any relationship (family, friend, other) between

any other bidder and any person employed by the state

who may be involved with the evaluation and/or adjudication

of this Bid?

2.10.1 If so, furnish other particulars __________________________________________

________________________________________________________________

________________________________________________________________

2.11 Do you or any of the directors / trustees / shareholders / members YES/NO

of the company have any interest in any other related companies

whether or not they are bidding for this contract?

2.11.1 If so, furnish other particulars: _______________________________________

________________________________________________________________

________________________________________________________________

3. Full details of directors / trustees / members / shareholders

Full name Identity number Personal tax reference number

State employee number / Persal number

Confidential Page 101 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

4. Declaration

I, the undersigned (name) ____________________________________________________ certify that

the information furnished in paragraphs 2 and 3 above is correct.

I accept that the State may reject the bid or act against me in terms of paragraph 23 of the GCC should

this declaration prove to be false.

__________________________________ ___________________________ Signature Date ____________________ ________________________ Position Name of bidder

Confidential Page 102 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE E: National Industrial Participation (SBD5)

This document must be signed and submitted together with your bid THE NATIONAL INDUSTRIAL PARTICIPATION

PROGRAMME

INTRODUCTION

The National Industrial Participation (NIP) Program, which is applicable to all government procurement contracts

that have an imported content, became effective on the 1 September 1996. The NIP policy and guidelines were

fully endorsed by Cabinet on 30 April 1997. In terms of the Cabinet decision, all state and parastatal purchases /

lease contracts (for goods, works and services) entered into after this date, are subject to the NIP requirements.

NIP is obligatory and therefore must be complied with. The Industrial Participation Secretariat (IPS) of the

Department of Trade and Industry (DTI) is charged with the responsibility of administering the program.

1 PILLARS OF THE PROGRAMME

1.1 The NIP obligation is benchmarked on the imported content of the contract. Any contract having an

imported content equal to or exceeding US$ 10 million or other currency equivalent to US$ 10 million

shall have an NIP obligation. This threshold of US$ 10 million can be reached as follows:

(a) Any single contract with imported content exceeding US$10 million. or

(b) Multiple contracts for the same goods, works or services each with imported content exceeding US$3

million awarded to one seller over a 2-year period which in total exceeds US$10 million.

or

(c) A contract with a renewable option clause, where should the option be exercised the total value of the

imported content shall exceed US$10 million.

or

(d) Multiple suppliers of the same goods, works or services under the same contract, where the value of the

imported content of each allocation is equal to or exceeds US$ 3 million worth of goods, works or services

to the same government institution, which in total over a two (2) year period exceeds US$10 million.

1.2 The NIP obligation applicable to suppliers in respect of sub-paragraphs 1.1 (a) to 1.1 (c) above shall

amount to 30 % of the imported content whilst suppliers in respect of paragraph 1.1 (d) shall incur 30%

of the total NIP obligation on a pro-rata basis.

Confidential Page 103 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

1.3 To satisfy the NIP obligation, the DTI would negotiate and conclude agreements such as investments, joint

ventures, sub-contracting, licensee production, export promotion, sourcing arrangements and research

and development (R&D) with partners or suppliers.

1.3 A period of seven years has been identified as the time frame within which to discharge the obligation.

2 REQUIREMENTS OF THE DEPARTMENT OF TRADE AND INDUSTRY

1.1 In order to ensure effective implementation of the program, successful bidders (contractors) are required

to, immediately after the award of a contract that is in excess of R10 million (ten million rand), submit

details of such a contract to the DTI for reporting purposes.

1.2 The purpose for reporting details of contracts in excess of the amount of R10 million (ten million rand) is

to cater for multiple contracts for the same goods, works or services; renewable contracts and multiple

suppliers for the same goods, works or services under the same contract as provided for in paragraphs

1.1.(b) to 1.1. (d) above.

3 BID SUBMISSION AND CONTRACT REPORTING REQUIREMENTS OF BIDDERS AND SUCCESSFUL BIDDERS

(CONTRACTORS)

3.1 Bidders are required to sign and submit this Standard Bidding Document (SBD 5) together with the bid on

the closing date and time.

3.2 In order to accommodate multiple contracts for the same goods, works or services; renewable contracts

and multiple suppliers for the same goods, works or services under the same contract as indicated in sub-

paragraphs 1.1 (b) to 1.1 (d) above and to enable the DTI in determining the NIP obligation, successful

bidders (contractors) are required, immediately after being officially notified about any successful bid

with a value in excess of R10 million (ten million rand), to contact and furnish the DTI with the following

information:

bid or contract number.

description of the goods, works or services.

date on which the contract was accepted.

name, address and contact details of the government institution.

value of the contract.

imported content of the contract, if possible.

3.3 The information required in paragraph 3.2 above must be sent to the Department of Trade and Industry,

Private Bag X 84, Pretoria, 0001 for the attention of Mr. Elias Malapane within five (5) working days after

award of the contract. Mr. Malapane may be contacted at telephone (012) 394 1401, facsimile (012) 394

2401 or e-mail at Elias@thedti.gov.za for further details about the program.

Confidential Page 104 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

4 PROCESS TO SATISFY THE NIP OBLIGATION

4.1 Once the successful bidder (contractor) has made contact with and furnished the DTI with the information

required, the following steps shall be followed:

a. the contractor and the DTI shall determine the NIP obligation;

b. the contractor and the DTI shall sign the NIP obligation agreement;

c. the contractor shall submit a performance guarantee to the DTI;

d. the contractor shall submit a business concept for consideration and approval

by the DTI;

e. upon approval of the business concept by the DTI, the contractor shall submit detailed

business plans outlining the business concepts;

f. the contractor shall implement the business plans; and

g. the contractor shall submit bi-annual progress reports on approved plans to the DTI.

4.2 The NIP obligation agreement is between the DTI and the successful bidder (contractor) and, therefore,

does not involve the purchasing institution.

Bid number…………………………………………………… Closing date…………………………………………

Name of bidder…………………………………………………………………………………………………………………………

Postal address……………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………….

Signature……………………………………………………..Name(in print)………………………..………………………….

Date……………………………………………………………..

Confidential Page 105 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE F: Preferential Procurement Claim Form (SBD6.1)

PREFERENCE POINTS CLAIM FORM IN TERMS OF THE PREFERENTIAL PROCUREMENT REGULATIONS 2011

This preference form must form part of all bids invited. It contains general information and serves as a claim form

for preference points for Broad-Based Black Economic Empowerment (B-BBEE) Status Level of Contribution

NB: BEFORE COMPLETING THIS FORM, BIDDERS MUST STUDY THE GENERAL CONDITIONS, DEFINITIONS

AND DIRECTIVES APPLICABLE IN RESPECT OF B-BBEE, AS PRESCRIBED IN THE PREFERENTIAL PROCUREMENT

REGULATIONS, 2011.

1. GENERAL CONDITIONS

1.1 The following preference point systems are applicable to all bids:

- the 80/20 system for requirements with a Rand value of up to R50 000 000 (all applicable taxes

included); and

- the 90/10 system for requirements with a Rand value above R50 000 000 (all applicable taxes

included).

1.2 The value of this bid is estimated to not exceed or exceed R50 000 000 (all applicable taxes included) and

therefore the 80/20 or 90/10 preference point system shall be applicable. <remove the point system not

relevant>

1.2 Points for this bid shall be awarded for:

a) Price; and

b) B-BBEE Status Level of Contributor.

1.3 The maximum points for this bid are allocated as follows:

POINTS

Price 80 /90

B-BBEE Status Level Of Contributor 20 / 10

Total points for Price and B-BBEE must not exceed 100

1.4 Failure on the part of a bidder to submit proof of B-BBEE Status level of contributor together with the bid,

will be interpreted to mean that preference points for B-BBEE status level of contribution are not claimed.

1.5 The purchaser reserves the right to require of a bidder, either before a bid is adjudicated or at any time

subsequently, to substantiate any claim in regard to preferences, in any manner required by the

purchaser.

Confidential Page 106 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

2. DEFINITIONS

(a) “B-BBEE” means broad-based black economic empowerment as defined in section 1 of the Broad-

Based Black Economic Empowerment Act;

(b) “B-BBEE status level of contributor” means the B-BBEE status of an entity in terms of a code of good

practice on black economic empowerment, issued in terms of section 9(1) of the Broad-Based Black

Economic Empowerment Act;

(c) “bid” means a written offer in a prescribed or stipulated form in response to an invitation by an organ

of state for the provision of goods or services, through price quotations, advertised competitive

bidding processes or proposals;

(d) “Broad-Based Black Economic Empowerment Act” means the Broad-Based Black Economic

Empowerment Act, 2003 (Act No. 53 of 2003);

(e) “EME” means an Exempted Micro Enterprise in terms of a code of good practice on black economic

empowerment issued in terms of section 9 (1) of the Broad-Based Black Economic Empowerment

Act;

(f) “functionality” means the ability of a tenderer to provide goods or services in accordance with

specifications as set out in the tender documents.

(g) “prices” includes all applicable taxes less all unconditional discounts;

(h) “proof of B-BBEE status level of contributor” means:

1) B-BBEE Status level certificate issued by an authorized body or person;

2) A sworn affidavit as prescribed by the B-BBEE Codes of Good Practice;

3) Any other requirement prescribed in terms of the B-BBEE Act;

(i) “QSE” means a qualifying small business enterprise in terms of a code of good practice on black

economic empowerment issued in terms of section 9 (1) of the Broad-Based Black Economic

Empowerment Act;

(j) “rand value” means the total estimated value of a contract in Rand, calculated at the time of bid

invitation, and includes all applicable taxes.

3. ADJUDICATION USING A POINT SYSTEM

3.1 THE 80/20 or 90/10 PREFERENCE POINT SYSTEMS

A maximum of 80 or 90 points points is allocated for price on the following basis:

Confidential Page 107 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

80/20 or 90/10

min

min180

P

PPtPs or

min

min190

P

PPtPs

Where

Ps = Points scored for price of bid under consideration

Pt = Price of bid under consideration

Pmin = Price of lowest acceptable bid

4. Points awarded for B-BBEE Status Level of Contribution

4.1 In terms of Regulation 6 (2) and 7 (2) of the Preferential Procurement Regulations, preference points must

be awarded to a bidder for attaining the B-BBEE status level of contribution in accordance with the table

below

B-BBEE Status Level of Contributor Number of points

(90/10 system)

Number of points

(80/20 system)

1 10 20

2 9 18

3 6 14

4 5 12

5 4 8

6 3 6

7 2 4

8 1 2

Non-compliant contributor 0 0

5. BID DECLARATION

5.1 Bidders who claim points in respect of B-BBEE Status Level of Contribution must complete the following:

6. B-BBEE STATUS LEVEL OF CONTRIBUTION CLAIMED IN TERMS OF PARAGRAPHS 1.4 AND 4.1

6.1 B-BBEE Status Level of Contribution: …………. = ……… (maximum of 20 points) (Points claimed

in respect of paragraph 7.1 must be in accordance with the table reflected in paragraph 4.1 and must be

substantiated by means of a B-BBEE certificate issued by a Verification Agency accredited by SANAS or a

Registered Auditor approved by IRBA or an Accounting Officer as contemplated in the CCA).

Confidential Page 108 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

7. SUB-CONTRACTING

7.1 Will any portion of the contract be sub-contracted?

(Tick applicable box)

YES NO

7.1.1 If yes, indicate:

(i) what percentage of the contract will be subcontracted? ___________________%

(ii) the name of the sub-contractor? ______________________________________

(iii) the B-BBEE status level of the sub-contractor? ___________________________

(iv) whether the sub-contractor is an EME?

(Tick applicable box)

YES NO

(v) Specify, by ticking the appropriate box, if subcontracting with an enterprise in terms of Preferential

Procurement Regulations,2017:

Designated Group: An EME or QSE which is at last 51% owned by: EME

√ QSE

Black people

Black people who are youth

Black people who are women

Black people with disabilities

Black people living in rural or underdeveloped areas or townships

Cooperative owned by black people

Black people who are military veterans

OR

Any EME

Any QSE

8. DECLARATION WITH REGARD TO COMPANY/FIRM

8.1 Name of company/firm: ………………………………………………………………………………………………

8.2 VAT registration number: ……………………………………….……………………………………………………

8.3 Company registration number: ………….……………………….………………………………………………

8.4 Type of Company/Firm

Partnership/Joint Venture / Consortium

Confidential Page 109 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

One-person business/sole propriety

Close corporation

Company

(Pty) Limited

[TICK APPLICABLE BOX]

8.5 Describe Principal Business Activities

………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………

………………………………………………………………………………………………………………………………………………………………

…………………………………………………..

8.6 Company Classification

Manufacturer

Supplier

Professional service provider

Other service providers, e.g. transporter, etc.

[TICK APPLICABLE BOX]

8.7 Total number of years the company/firm has been in business: ……………………………

8.8 I/we, the undersigned, who is / are duly authorised to do so on behalf of the company/firm, certify that

the points claimed, based on the B-BBE status level of contributor indicated in paragraphs 1.4 and 6.1

of the foregoing certificate, qualifies the company/ firm for the preference(s) shown and I / we

acknowledge that:

i) The information furnished is true and correct;

ii) The preference points claimed are in accordance with the General Conditions as indicated in

paragraph 1 of this form;

iii) In the event of a contract being awarded as a result of points claimed as shown in paragraphs 1.4

and 6.1, the contractor may be required to furnish documentary proof to the satisfaction of the

purchaser that the claims are correct;

iv) If the B-BBEE status level of contributor has been claimed or obtained on a fraudulent basis or any

of the conditions of contract have not been fulfilled, the purchaser may, in addition to any other

remedy it may have –

Confidential Page 110 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

(a) disqualify the person from the bidding process;

(b) recover costs, losses or damages it has incurred or suffered as a result of that person’s

conduct;

(c) cancel the contract and claim any damages which it has suffered as a result of having to

make less favourable arrangements due to such cancellation;

(d) recommend that the bidder or contractor, its shareholders and directors, or only the

shareholders and directors who acted on a fraudulent basis, be restricted by the National

Treasury from obtaining business from any organ of state for a period not exceeding 10

years, after the audi alteram partem (hear the other side) rule has been applied; and

(e) forward the matter for criminal prosecution.

……………………………………….

SIGNATURE(S) OF BIDDERS(S)

DATE: …………...…………………………………..

ADDRESS …………………………………………….....

……………………………………………….

………………………………………………..

……………………………………………….

WITNESSES

1. ……………………………………..

2. …………………………………….

Confidential Page 111 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

SWORN AFFIDAVIT: B-BBEE QUALIFYING SMALL ENTERPRISE: GENERAL

I, the Undersigned

Full Name and Surname:

Identity Number:

Hereby declare under oath as follows:

1. The contents of this statement are to the best of my knowledge a true reflection of the facts.

2. I am a Member / Director / Owner of the following enterprise and am duly authorised to act on

its behalf:

Enterprise Name:

Trading (if applicable):

Enterprise Physical

Address:

Type of Entity (CC, Pty Ltd,

Sole Prop etc.)

Nature of Business:

Definition of “Black People:

As per the Broad-Based Black Economic Empowerment Act 53 of 2003 as

Amended by Act No 46 of 2013 “Black People” is a generic term which means

Africans, Coloureds and Indians –

a. Who are citizens of the Republic of South Africa by birth or descent; or

b. Who became citizens of the Republic of South Africa by naturalization-

i. Before 27 April 1994; or

ii. On or after 27 April 1994 and who would have been entitled to

acquire citizenship by naturalization prior to that date

3. I hereby declare under Oath that:

The Enterprise is ______________% Black Owned as per Amended Code Series 100 of the Amended Codes

of Good Practice issued under section 9 (1) of B-BBEE Act No 53 of 2003 as Amended by Act No 46 of

2013,

The Enterprise is ______________% Black Woman Owned as per Amended Code Series 100 of the

Amended Codes of Good Practice issued under section 9 (1) of B-BBEE Act No 53 of 2003 as Amended by

Act No 46 of 2013,

The Enterprise is ______________% Black Designated Group Owned as per Amended Code Series 100 of

the Amended Codes of Good Practice issued under section 9 (1) of B-BBEE Act No 53 of 2003 as Amended

by Act No 46 of 2013,

Confidential Page 112 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Based on the Financial Statements/Management Accounts and other information available on the latest

financial year-end of _________________, the annual Total Revenue was between R10,000,000.00 (Ten

Million Rands) and R50,000,000.00 (Fifty Million Rands),

Please confirm on the table below the B-BBEE level contributor, by ticking the applicable box.

100% Black Owned Level One (135% B-BBEE procurement recognition level)

At least 51% Black Owned Level Two (125% B-BBEE procurement recognition level)

4. I know and understand the contents of this affidavit and I have no objection to take the

prescribed oath and consider the oath binding on my conscience and on the Owners of the Enterprise

which I represent in this matter.

5. The sworn affidavit will be valid for a period of 12 months from the date signed by commissioner.

Deponent Signature: __________________________

Date: __________________________

_____________________________

Commissioner of Oaths

Signature and Stamp

Confidential Page 113 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

SWORN AFFIDAVIT: B-BBEE QUALIFYING MICRO ENTERPRISE: GENERAL

I, the Undersigned

Full Name and Surname:

Identity Number:

Hereby declare under oath as follows: 1. The contents of this statement are to the best of my knowledge a true reflection of the facts.

2. I am a Member / Director / Owner of the following enterprise and am duly authorised to act on its behalf:

Enterprise Name:

Trading (if applicable):

Enterprise Physical

Address:

Type of Entity (CC, Pty Ltd,

Sole Prop etc.)

Nature of Business:

Definition of “Black People:

As per the Broad-Based Black Economic Empowerment Act 53 of 2003 as

Amended by Act No 46 of 2013 “Black People” is a generic term which means

Africans, Coloureds and Indians –

c. Who are citizens of the Republic of South Africa by birth or descent; or

d. Who became citizens of the Republic of South Africa by naturalization-

iii. Before 27 April 1994; or

iv. On or after 27 April 1994 and who would have been entitled to

acquire citizenship by naturalization prior to that date

3. I hereby declare under Oath that:

The Enterprise is ______________% Black Owned as per Amended Code Series 100 of the Amended Codes

of Good Practice issued under section 9 (1) of B-BBEE Act No 53 of 2003 as Amended by Act No 46 of

2013,

The Enterprise is ______________% Black Woman Owned as per Amended Code Series 100 of the

Amended Codes of Good Practice issued under section 9 (1) of B-BBEE Act No 53 of 2003 as Amended by

Act No 46 of 2013,

The Enterprise is ______________% Black Designated Group Owned as per Amended Code Series 100 of

the Amended Codes of Good Practice issued under section 9 (1) of B-BBEE Act No 53 of 2003 as Amended

by Act No 46 of 2013,

Confidential Page 114 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Based on the Financial Statements/Management Accounts and other information available on the latest

financial year-end of _________________, the annual Total Revenue was between R10,000,000.00 (Ten

Million Rands) or less.

Please confirm on the table below the B-BBEE level contributor, by ticking the applicable box.

100% Black Owned Level One (135% B-BBEE procurement recognition level)

At least 51% Black Owned Level Two (125% B-BBEE procurement recognition level)

Less than 51% Black Owned Level Four (100% B-BBEE procurement recognition level)

4. I know and understand the contents of this affidavit and I have no objection to take the prescribed oath and

consider the oath binding on my conscience and on the Owners of the Enterprise which I represent in this

matter.

5. The sworn affidavit will be valid for a period of 12 months from the date signed by commissioner.

Deponent Signature: __________________________

Date: __________________________

_____________________________

Commissioner of Oaths

Signature and Stamp

Confidential Page 115 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE G: Declaration Certificate for Local Production and Content for Designated Sectors (SBD 6.2)

DECLARATION CERTIFICATE FOR LOCAL PRODUCTION AND CONTENT FOR DESIGNATED SECTORS

This Standard Bidding Document (SBD) must form part of all bids invited. It contains general information and serves

as a declaration form for local content (local production and local content are used interchangeably).

Before completing this declaration, bidders must study the General Conditions, Definitions, Directives applicable

in respect of Local Content as prescribed in the Preferential Procurement Regulations, 2017, the South African

Bureau of Standards (SABS) approved technical specification number SATS 1286:2011 (Edition 1) and the Guidance

on the Calculation of Local Content together with the Local Content Declaration Templates [Annex C (Local Content

Declaration: Summary Schedule), D (Imported Content Declaration: Supporting Schedule to Annex C) and E (Local

Content Declaration: Supporting Schedule to Annex C)].

1. General Conditions

1.1 Preferential Procurement Regulations, 2017 (Regulation 8) make provision for the promotion of local

production and content.

1.2 Regulation 8.(2) prescribes that in the case of designated sectors, organs of state must advertise such

tenders with the specific bidding condition that only locally produced or manufactured goods, with a

stipulated minimum threshold for local production and content will be considered.

1.3 Where necessary, for tenders referred to in paragraph 1.2 above, a two stage bidding process may be

followed, where the first stage involves a minimum threshold for local production and content and the

second stage price and B-BBEE.

1.4 A person awarded a contract in relation to a designated sector, may not sub-contract in such a manner

that the local production and content of the overall value of the contract is reduced to below the

stipulated minimum threshold.

1.5 The local content (LC) expressed as a percentage of the bid price must be calculated in accordance with

the SABS approved technical specification number SATS 1286: 2011 as follows:

LC = [1 - x / y] * 100

Where

x = is the imported content in Rand

y = is the bid price in Rand excluding value added tax (VAT)

Prices referred to in the determination of x must be converted to Rand (ZAR) by using the exchange rate

published by South African Reserve Bank (SARB) on the date of advertisement of the bid as indicated in

paragraph 3.1 below.

Confidential Page 116 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

The SABS approved technical specification number SATS 1286:2011 is accessible on

http://www.thedti.gov.za/industrial_development/ip.jsp at no cost.

1.6 A bid may be disqualified if this Declaration Certificate and the Annex C (Local Content Declaration:

Summary Schedule) are not submitted as part of the bid documentation;

2. The stipulated minimum threshold(s) for local production and content (refer to Annex A of SATS

1286:2011) for this bid is/are as follows:

Description of services, works or goods Stipulated minimum threshold

_______________________________ _______%

_______________________________ _______%

_______________________________ _______%

3. Does any portion of the goods or services offered have any imported content?

(Tick applicable box)

3.1 If yes, the rate(s) of exchange to be used in this bid to calculate the local content as prescribed in

paragraph 1.5 of the general conditions must be the rate(s) published by SARB for the specific currency

on the date of advertisement of the bid.

3.2 The relevant rates of exchange information is accessible on www.resbank.co.za.

3.3 Indicate the rate(s) of exchange against the appropriate currency in the table below (refer to Annex A of

SATS 1286:2011):

Currency Rates of exchange

US Dollar

Pound Sterling

Euro

Yen

Other

NB: Bidders must submit proof of the SARB rate (s) of exchange used.

4. Where, after the award of a bid, challenges are experienced in meeting the stipulated minimum threshold

for local content the dti must be informed accordingly in order for the dti to verify and in consultation

with the AO/AA provide directives in this regard.

YES NO

Confidential Page 117 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

LOCAL CONTENT DECLARATION

(REFER TO ANNEX B OF SATS 1286:2011)

LOCAL CONTENT DECLARATION BY CHIEF FINANCIAL OFFICER OR OTHER LEGALLY RESPONSIBLE PERSON

NOMINATED IN WRITING BY THE CHIEF EXECUTIVE OR SENIOR MEMBER/PERSON WITH MANAGEMENT

RESPONSIBILITY (CLOSE CORPORATION, PARTNERSHIP OR INDIVIDUAL) IN RESPECT OF BID NO. RFB034/17-

18

ISSUED BY: NATIONAL HEALTH LABORATORY SERVICE (NHLS)

NB 1 The obligation to complete, duly sign and submit this declaration cannot be transferred to an external

authorized representative, auditor or any other third party acting on behalf of the bidder.

2 Guidance on the Calculation of Local Content together with Local Content Declaration Templates

(Annex C, D and E) is accessible on http://www.thedti.gov.za/industrial_development/ip.jsp. Bidders

should first complete Declaration D. After completing Declaration D, bidders should complete

Declaration E and then consolidate the information on Declaration C. Declaration C should be

submitted with the bid documentation at the closing date and time of the bid in order to substantiate

the declaration made in paragraph (c) below. Declarations D and E should be kept by the bidders for

verification purposes for a period of at least 5 years. The successful bidder is required to continuously

update Declarations C, D and E with the actual values for the duration of the contract.

I, the undersigned, ___________________________________________________ (full names),

do hereby declare, in my capacity as______________________________________________ of

_______________________________________________ (name of bidder entity), the following:

(a) The facts contained herein are within my own personal knowledge.

(b) I have satisfied myself that:

(i) the goods/services/works to be delivered in terms of the above-specified bid comply with the

minimum local content requirements as specified in the bid, and as measured in terms of SATS

1286:2011; and

(c) The local content percentage (%) indicated below has been calculated using the formula given in clause

3 of SATS 1286:2011, the rates of exchange indicated in paragraph 3.1 above and the information

contained in Declaration D and E which has been consolidated in Declaration C:

Bid price, excluding VAT (y) R

Imported content (x), as calculated in terms of SATS 1286:2011 R

Confidential Page 118 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Stipulated minimum threshold for local content (paragraph 3 above)

Local content %, as calculated in terms of SATS 1286:2011

If the bid is for more than one product, the local content percentages for each product contained in

Declaration C shall be used instead of the table above.

The local content percentages for each product has been calculated using the formula given in clause 3 of

SATS 1286:2011, the rates of exchange indicated in paragraph 3.1 above and the information contained in

Declaration D and E.

(d) I accept that the Procurement Authority / Institution has the right to request that the local content be

verified in terms of the requirements of SATS 1286:2011.

(e) I understand that the awarding of the bid is dependent on the accuracy of the information furnished in

this application. I also understand that the submission of incorrect data, or data that are not

verifiable as described in SATS 1286:2011, may result in the Procurement Authority / Institution

imposing any or all of the remedies as provided for in Regulation 14 of the Preferential Procurement

Regulations, 2017 promulgated under the Preferential Policy Framework Act (PPPFA), 2000 (Act No. 5

of 2000).

SIGNATURE: _________________________________ Date: _____________

WITNESS No. 1 ________ Date: _____________

WITNESS No. 2 ________ Date: _____________

Confidential Page 119 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE H: Declaration of Bidders Past Supply Chain Practices (SBD8)

DECLARATION OF BIDDER’S PAST SUPPLY CHAIN MANAGEMENT PRACTICES 1 This Standard Bidding Document must form part of all bids invited.

2 It serves as a declaration to be used by institutions in ensuring that when goods and services are being

procured, all reasonable steps are taken to combat the abuse of the supply chain management system.

3 The bid of any bidder may be disregarded if that bidder, or any of its directors have:

a. abused the institution’s supply chain management system;

b. committed fraud or any other improper conduct in relation to such system; or

c. failed to perform on any previous contract.

4 In order to give effect to the above, the following questionnaire must be completed and submitted

with the bid.

Item Question Yes No

4.1 Is the bidder or any of its directors listed on the National Treasury’s Database of

Restricted Suppliers as companies or persons prohibited from doing business with

the public sector?

(Companies or persons who are listed on this Database were informed in writing of

this restriction by the Accounting Officer/Authority of the institution that imposed the

restriction after the audi alteram partem rule was applied).

The Database of Restricted Suppliers now resides on the National Treasury’s

website(www.treasury.gov.za) and can be accessed by clicking on its link at the

bottom of the home page.

Yes

No

4.1.1 If so, furnish particulars:

4.2 Is the bidder or any of its directors listed on the Register for Tender Defaulters in terms

of section 29 of the Prevention and Combating of Corrupt Activities Act (No 12 of

2004)?

The Register for Tender Defaulters can be accessed on the National Treasury’s website (www.treasury.gov.za) by clicking on its link at the bottom of the home page.

Yes

No

4.2.1 If so, furnish particulars:

4.3 Was the bidder or any of its directors convicted by a court of law (including a court

outside of the Republic of South Africa) for fraud or corruption during the past five

years?

Yes

No

Confidential Page 120 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

Item Question Yes No

4.3.1 If so, furnish particulars:

4.4 Was any contract between the bidder and any organ of state terminated during the

past five years on account of failure to perform on or comply with the contract?

Yes

No

4.4.1 If so, furnish particulars:

SBD 8

CERTIFICATION

I, THE UNDERSIGNED (FULL NAME) ___________________________________

CERTIFY THAT THE INFORMATION FURNISHED ON THIS DECLARATION FORM IS TRUE AND CORRECT.

I ACCEPT THAT, IN ADDITION TO CANCELLATION OF A CONTRACT, ACTION MAY BE TAKEN AGAINST ME

SHOULD THIS DECLARATION PROVE TO BE FALSE.

__________________________________ ___________________________ Signature Date ____________________ ________________________ Position Name of bidder

Confidential Page 121 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE I: Certificate of Independent Bid Determination (SBD9)

CERTIFICATE OF INDEPENDENT BID DETERMINATION

1 This Standard Bidding Document (SBD) must form part of all bids3¹ invited.

2 Section 4 (1) (b) (iii) of the Competition Act No. 89 of 1998, as amended, prohibits an agreement

between, or concerted practice by, firms, or a decision by an association of firms, if it is between parties

in a horizontal relationship and if it involves collusive bidding (or bid rigging).4 Collusive bidding is a pe

se prohibition meaning that it cannot be justified under any grounds.

3 Treasury Regulation 16A9 prescribes that accounting officers and accounting authorities must take all

reasonable steps to prevent abuse of the supply chain management system and authorizes accounting

officers and accounting authorities to:

a. disregard the bid of any bidder if that bidder, or any of its directors have abused the institution’s

supply chain management system and or committed fraud or any other improper conduct in relation

to such system.

b. cancel a contract awarded to a supplier of goods and services if the supplier committed any corrupt

or fraudulent act during the bidding process or the execution of that contract.

4 This SBD serves as a certificate of declaration that would be used by institutions to ensure that, when bids

are considered, reasonable steps are taken to prevent any form of bid-rigging.

5 In order to give effect to the above, the attached Certificate of Bid Determination (SBD 9) must be

completed and submitted with the bid:

Certificate of Independent Bid Determination

I, the undersigned, in submitting the accompanying bid:

3 Includes price quotations, advertised competitive bids, limited bids and proposals.

4 Bid rigging (or collusive bidding) occurs when businesses, that would otherwise be expected to compete, secretly

conspire to raise prices or lower the quality of goods and / or services for purchasers who wish to acquire goods

and / or services through a bidding process. Bid rigging is, therefore, an agreement between competitors not to

compete.

Confidential Page 122 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

________________________________________________________________________

(Bid Number and Description)

in response to the invitation for the bid made by:

________________________________________________________________________

(Name of Institution)

do hereby make the following statements that I certify to be true and complete in every respect:

I certify, on behalf of___________________________________________________ that:

(Name of Bidder)

1. I have read and I understand the contents of this certificate.

2. I understand that the accompanying bid will be disqualified if this certificate is found not to be true and

complete in every respect.

3. I am authorised by the bidder to sign this certificate, and to submit the accompanying bid, on behalf of

the bidder.

4. Each person whose signature appears on the accompanying bid has been authorised by the bidder to

determine the terms of, and to sign the bid, on behalf of the bidder.

5. For the purposes of this certificate and the accompanying bid, I understand that the word “competitor”

shall include any individual or organisation, other than the bidder, whether or not affiliated with the

bidder, who:

5.1 has been requested to submit a bid in response to this bid invitation;

5.2 could potentially submit a bid in response to this bid invitation, based on their qualifications, abilities or

experience; and

5.3 provides the same goods and services as the bidder and/or is in the same line of business as the bidder.

6. The bidder has arrived at the accompanying bid independently from, and without consultation,

communication, agreement or arrangement with any competitor. However, communication between

partners in a joint venture or consortium5 will not be construed as collusive bidding.

5 Joint venture or Consortium means an association of persons for the purpose of combining their expertise, property, capital, efforts, skill and knowledge in an

activity for the execution of a contract.

Confidential Page 123 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

7. In particular, without limiting the generality of paragraphs 6 above, there has been no consultation,

communication, agreement or arrangement with any competitor regarding:

a. prices;

b. geographical area where product or service will be rendered (market allocation)

c. methods, factors or formulas used to calculate prices;

d. the intention or decision to submit or not to submit, a bid;

e. the submission of a bid which does not meet the specifications and conditions of the bid; or

f. bidding with the intention not to win the Bid.

8. In addition, there have been no consultations, communications, agreements or arrangements with any

competitor regarding the quality, quantity, specifications and conditions or delivery particulars of the

products or services to which this bid invitation relates.

9. The terms of the accompanying bid have not been, and will not be, disclosed by the bidder, directly or

indirectly, to any competitor, prior to the date and time of the official bid opening or of the awarding of

the contract.

10. I am aware that, in addition and without prejudice to any other remedy provided to combat any restrictive

practices related to Bids and contracts, Bids that are suspicious will be reported to the Competition

Commission for investigation and possible imposition of administrative penalties in terms of section 59

of the Competition Act No 89 of 1998 and/or may be reported to the National Prosecuting Authority (NPA)

for criminal investigation and/or may be restricted from conducting business with the public sector for a

period not exceeding ten (10) years in terms of the Prevention and Combating of Corrupt Activities Act

No 12 of 2004 or any other applicable legislation.

_________________________________ ___________________

Signature Date

_________________________________ ___________________

Position Name of bidder

Confidential Page 124 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

ANNEXURE J: Government Procurement: General Conditions Of Contract – July 2011

NOTES

The purpose of this document is to:

(i) Draw special attention to certain general conditions applicable to government Bids, contracts and orders; and

(ii) To ensure that clients be familiar with regard to the rights and obligations of all parties involved in doing

business with government.

In this document words in the singular also mean in the plural and vice versa and words in the masculine also mean

in the feminine and neuter.

The GCC will form part of all bid documents and may not be amended.

Special Conditions of Contract (SCC) relevant to a specific bid, should be compiled separately for every bid (if

(applicable) and will supplement the GCC. Whenever there is a conflict, the provisions in the SCC shall prevail.

TABLE OF CLAUSES

1. Definitions

2. Application

3. General

4. Standards

5. Use of contract documents and information; inspection

6. Patent rights

7. Performance security

8. Inspections, tests and analysis

9. Packing

10. Delivery and documents

11. Insurance

12. Transportation

13. Incidental services

14. Spare parts

15. Warranty

16. Payment

17. Prices

18. Contract amendments

19. Assignment

20. Subcontracts

21. Delays in the supplier’s performance

Confidential Page 125 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

22. Penalties

23. Termination for default

24. Dumping and countervailing duties

25. Force Majeure

26. Termination for insolvency

27. Settlement of disputes

28. Limitation of liability

29. Governing language

30. Applicable law

31. Notices

32. Taxes and duties

33. National Industrial Participation Programme (NIPP)

34. Prohibition of restrictive practices

General conditions of contract

1. Definitions

The following terms shall be interpreted as indicated:

1.1 “Closing time” means the date and hour specified in the bidding documents for the receipt of Bids.

1.2 “Contract” means the written agreement entered into between the purchaser and the supplier, as

recorded in the contract form signed by the parties, including all attachments and appendices thereto

and all documents incorporated by reference therein.

1.3 “Contract price” means the price payable to the supplier under the contract for the full and proper

performance of his contractual obligations.

1.4 “Corrupt practice” means the offering, giving, receiving, or soliciting of anything of value to influence the

action of a public official in the procurement process or in contract execution.

1.5 "Countervailing duties" are imposed in cases where an enterprise abroad is subsidized by its government

and encouraged to market its products internationally.

1.6 “Country of origin” means the place where the goods were mined, grown or produced or from which the

services are supplied. Goods are produced when, through manufacturing, processing or substantial and

major assembly of components, a commercially recognized new product results that is substantially

different in basic characteristics or in purpose or utility from its components.

1.7 “Day” means calendar day.

1.8 “Delivery” means delivery in compliance of the conditions of the contract or order.

1.9 “Delivery ex stock” means immediate delivery directly from stock actually on hand.

Confidential Page 126 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

1.10 “Delivery into consignees store or to his site” means delivered and unloaded in the specified store or

depot or on the specified site in compliance with the conditions of the contract or order, the supplier

bearing all risks and charges involved until the supplies are so delivered and a valid receipt is obtained.

1.11 "Dumping" occurs when a private enterprise abroad market its goods on own initiative in the RSA at lower

prices than that of the country of origin and which have the potential to harm the local industries in the

RSA.

1.12 “Force majeure” means an event beyond the control of the supplier and not involving the supplier’s fault

or negligence and not foreseeable. Such events may include, but is not restricted to, acts of the purchaser

in its sovereign capacity, wars or revolutions, fires, floods, epidemics, quarantine restrictions and freight

embargoes.

1.13 “Fraudulent practice” means a misrepresentation of facts in order to influence a procurement process or

the execution of a contract to the detriment of any bidder, and includes collusive practice among bidders

(prior to or after bid submission) designed to establish bid prices at artificial non-competitive levels and

to deprive the bidder of the benefits of free and open competition.

1.14 “GCC” means the General Conditions of Contract.

1.15 “Goods” means all of the equipment, machinery, and/or other materials that the supplier is required to

supply to the purchaser under the contract.

1.16 “Imported content” means that portion of the bidding price represented by the cost of components, parts

or materials which have been or are still to be imported (whether by the supplier or his subcontractors)

and which costs are inclusive of the costs abroad, plus freight and other direct importation costs such as

landing costs, dock dues, import duty, sales duty or other similar tax or duty at the South African place of

entry as well as transportation and handling charges to the factory in the Republic where the supplies

covered by the bid will be manufactured.

1.17 “Local content” means that portion of the bidding price which is not included in the imported content

provided that local manufacture does take place.

1.18 “Manufacture” means the production of products in a factory using labour, materials, components and

machinery and includes other related value-adding activities.

1.19 “Order” means an official written order issued for the supply of goods or works or the rendering of a

service.

1.20 “Project site,” where applicable, means the place indicated in bidding documents.

1.21 “Purchaser” means the organisation purchasing the goods.

1.22 “Republic” means the RSA.

1.23 “SCC” means the Special Conditions of Contract.

1.24 “Services” means those functional services ancillary to the supply of the goods, such as transportation

and any other incidental services, such as installation, commissioning, provision of technical assistance,

training, catering, gardening, security, maintenance and other such obligations of the supplier covered

under the contract.

1.25 “Written” or “in writing” means handwritten in ink or any form of electronic or mechanical writing.

Confidential Page 127 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

2. Application

2.1 These general conditions are applicable to all Bids, contracts and orders including Bids for functional and

professional services, sales, hiring, letting and the granting or acquiring of rights, but excluding immovable

property, unless otherwise indicated in the bidding documents.

2.2 Where applicable, SCC are also laid down to cover specific supplies, services or works.

2.3 Where such SCC are in conflict with these general conditions, the special conditions shall apply.

3. General

3.1 Unless otherwise indicated in the bidding documents, the purchaser shall not be liable for any expense

incurred in the preparation and submission of a bid. Where applicable a non-refundable fee for

documents may be charged.

3.2 With certain exceptions, invitations to bid are only published in the Government Tender Bulletin. The

Government Tender Bulletin may be obtained directly from the Government Printer, Private Bag X85,

Pretoria 0001, or accessed electronically from www.treasury.gov.za

4. Standards

4.1 The goods supplied shall conform to the standards mentioned in the bidding documents and

specifications.

5. Use of contract documents and information; inspection

5.1 The supplier shall not, without the purchaser’s prior written consent, disclose the contract, or any

provision thereof, or any specification, plan, drawing, pattern, sample, or information furnished by or on

behalf of the purchaser in connection therewith, to any person other than a person employed by the

supplier in the performance of the contract. Disclosure to any such employed person shall be made in

confidence and shall extend only so far as may be necessary for purposes of such performance.

5.2 The supplier shall not, without the purchaser’s prior written consent, make use of any document or

information mentioned in GCC clause 5.1 except for purposes of performing the contract.

5.3 Any document, other than the contract itself mentioned in GCC clause 5.1 shall remain the property of

the purchaser and shall be returned (all copies) to the purchaser on completion of the supplier’s

performance under the contract if so required by the purchaser.

5.4 The supplier shall permit the purchaser to inspect the supplier’s records relating to the performance of

the supplier and to have them audited by auditors appointed by the purchaser, if so required by the

purchaser.

6. Patent rights

6.1 The supplier shall indemnify the purchaser against all third-party claims of infringement of patent,

trademark, or industrial design rights arising from use of the goods or any part thereof by the purchaser.

Confidential Page 128 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

7. Performance security

7.1 Within thirty (30) days of receipt of the notification of contract award, the successful bidder shall furnish

to the purchaser the performance security of the amount specified in SCC.

7.2 The proceeds of the performance security shall be payable to the purchaser as compensation for any loss

resulting from the supplier’s failure to complete his obligations under the contract.

7.3 The performance security shall be denominated in the currency of the contract, or in a freely convertible

currency acceptable to the purchaser and shall be in one of the following forms:

7.3.1 a bank guarantee or an irrevocable letter of credit issued by a reputable bank located in the purchaser’s

country or abroad, acceptable to the purchaser, in the form provided in the bidding documents or

another form acceptable to the purchaser; or

7.3.2 a cashier’s or certified cheque

7.4 The performance security will be discharged by the purchaser and returned to the supplier not later than

thirty (30) days following the date of completion of the supplier’s performance obligations under the

contract, including any warranty obligations, unless otherwise specified in SCC.

8. Inspections, tests and analyses

8.1 All pre-bidding testing will be for the account of the bidder.

8.2 If it is a bid condition that supplies to be produced or services to be rendered should at any stage during

production or execution or on completion be subject to inspection, the premises of the bidder or

contractor shall be open, at all reasonable hours, for inspection by a representative of the Department or

an organisation acting on behalf of the Department.

8.3 If there are no inspection requirements indicated in the bidding documents and no mention is made in

the contract, but during the contract period it is decided that inspections shall be carried out, the

purchaser shall itself make the necessary arrangements, including payment arrangements with the testing

authority concerned.

8.4 If the inspections, tests and analyses referred to in clauses 8.2 and 8.3 show the supplies to be in

accordance with the contract requirements, the cost of the inspections, tests and analyses shall be

defrayed by the purchaser.

8.5 Where the supplies or services referred to in clauses 8.2 and 8.3 do not comply with the contract

requirements, irrespective of whether such supplies or services are accepted or not, the cost in

connection with these inspections, tests or analyses shall be defrayed by the supplier.

8.6 Supplies and services which are referred to in clauses 8.2 and 8.3 and which do not comply with the

contract requirements may be rejected.

8.7 Any contract supplies may on or after delivery be inspected, tested or analysed and may be rejected if

found not to comply with the requirements of the contract. Such rejected supplies shall be held at the

cost and risk of the supplier who shall, when called upon, remove them immediately at his own cost and

Confidential Page 129 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

forthwith substitute them with supplies which do comply with the requirements of the contract. Failing

such removal, the rejected supplies shall be returned at the suppliers cost and risk. Should the supplier

fail to provide the substitute supplies forthwith, the purchaser may, without giving the supplier further

opportunity to substitute the rejected supplies, purchase such supplies as may be necessary at the

expense of the supplier.

8.8 The provisions of clauses 8.4 to 8.7 shall not prejudice the right of the purchaser to cancel the contract

on account of a breach of the conditions thereof, or to act in terms of Clause 23 of GCC.

9. Packing

9.1 The supplier shall provide such packing of the goods as is required to prevent their damage or

deterioration during transit to their final destination, as indicated in the contract. The packing shall be

sufficient to withstand, without limitation, rough handling during transit and exposure to extreme

temperatures, salt and precipitation during transit, and open storage. Packing, case size and weights shall

take into consideration, where appropriate, the remoteness of the goods’ final destination and the

absence of heavy handling facilities at all points in transit.

9.2 The packing, marking, and documentation within and outside the packages shall comply strictly with such

special requirements as shall be expressly provided for in the contract, including additional requirements,

if any, specified in SCC, and in any subsequent instructions ordered by the purchaser.

10. Delivery and documents

10.1 Delivery of the goods shall be made by the supplier in accordance with the terms specified in the contract.

The details of shipping and/or other documents to be furnished by the supplier are specified in SCC.

10.2 Documents to be submitted by the supplier are specified in SCC.

11. Insurance

11.1 The goods supplied under the contract shall be fully insured in a freely convertible currency against loss

or damage incidental to manufacture or acquisition, transportation, storage and delivery in the manner

specified in the SCC.

12. Transportation

12.1 Should a price other than an all-inclusive delivered price be required, this shall be specified in the SCC.

13. Incidental services

13.1 The supplier may be required to provide any or all of the following services, including additional services,

if any, specified in SCC:

13.1.1 performance or supervision of on-site assembly and/or commissioning of the supplied goods;

13.1.2 furnishing of tools required for assembly and/or maintenance of the supplied goods;

Confidential Page 130 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

13.1.3 furnishing of a detailed operations and maintenance manual for each appropriate unit of the supplied

goods;

13.1.4 performance or supervision or maintenance and/or repair of the supplied goods, for a period of time

agreed by the parties, provided that this service shall not relieve the supplier of any warranty obligations

under this contract; and

13.1.5 training of the purchaser’s personnel, at the supplier’s plant and/or on-site, in assembly, start-up,

operation, maintenance, and/or repair of the supplied goods.

13.2 Prices charged by the supplier for incidental services, if not included in the contract price for the goods,

shall be agreed upon in advance by the parties and shall not exceed the prevailing rates charged to other

parties by the supplier for similar services.

14. Spare parts

14.1 As specified in SCC, the supplier may be required to provide any or all of the following materials,

notifications, and information pertaining to spare parts manufactured or distributed by the supplier:

14.1.1 such spare parts as the purchaser may elect to purchase from the supplier, provided that this election

shall not relieve the supplier of any warranty obligations under the contract; and

14.1.2 in the event of termination of production of the spare parts:

14.1.2.1 Advance notification to the purchaser of the pending termination, in sufficient time to permit the

purchaser to procure needed requirements; and

14.1.2.2 following such termination, furnishing at no cost to the purchaser, the blueprints, drawings, and

specifications of the spare parts, if requested.

15. Warranty

15.1 The supplier warrants that the goods supplied under the contract are new, unused, of the most recent or

current models, and that they incorporate all recent improvements in design and materials unless

provided otherwise in the contract. The supplier further warrants that all goods supplied under this

contract shall have no defect, arising from design, materials, or workmanship (except when the design

and/or material is required by the purchaser’s specifications) or from any act or omission of the supplier,

that may develop under normal use of the supplied goods in the conditions prevailing in the country of

final destination.

15.2 This warranty shall remain valid for twelve (12) months after the goods, or any portion thereof as the case

may be, have been delivered to and accepted at the final destination indicated in the contract, or for

eighteen (18) months after the date of shipment from the port or place of loading in the source country,

whichever period concludes earlier, unless specified otherwise in SCC.

15.3 The purchaser shall promptly notify the supplier in writing of any claims arising under this warranty.

15.4 Upon receipt of such notice, the supplier shall, within the period specified in SCC and with all reasonable

speed, repair or replace the defective goods or parts thereof, without costs to the purchaser.

Confidential Page 131 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

15.5 If the supplier, having been notified, fails to remedy the defect(s) within the period specified in SCC, the

purchaser may proceed to take such remedial action as may be necessary, at the supplier’s risk and

expense and without prejudice to any other rights which the purchaser may have against the supplier

under the contract.

16. Payment

16.1 The method and conditions of payment to be made to the supplier under this contract shall be specified

in SCC.

16.2 The supplier shall furnish the purchaser with an invoice accompanied by a copy of the delivery note and

upon fulfilment of other obligations stipulated in the contract.

16.3 Payments shall be made promptly by the purchaser, but in no case later than thirty (30) days after

submission of an invoice or claim by the supplier.

16.4 Payment will be made in rand unless otherwise stipulated in SCC.

17. Prices

17.1 Prices charged by the supplier for goods delivered and services performed under the contract shall not

vary from the prices quoted by the supplier in his bid, with the exception of any price adjustments

authorised in SCC or in the purchaser’s request for bid validity extension, as the case may be.

18. Contract amendments

18.1 No variation in or modification of the terms of the contract shall be made except by written amendment

signed by the parties concerned.

19. Assignment

19.1 The supplier shall not assign, in whole or in part, its obligations to perform under the contract, except

with the purchaser’s prior written consent.

20. Subcontracts

20.1 The supplier shall notify the purchaser in writing of all subcontracts awarded under this contract if not

already specified in the bid. Such notification, in the original bid or later, shall not relieve the supplier

from any liability or obligation under the contract.

21. Delays in the supplier’s performance

21.1 Delivery of the goods and performance of services shall be made by the supplier in accordance with the

time schedule prescribed by the purchaser in the contract.

21.2 If at any time during performance of the contract, the supplier or its subcontractor(s) should encounter

conditions impeding timely delivery of the goods and performance of services, the supplier shall promptly

notify the purchaser in writing of the fact of the delay, its likely duration and its cause(s). As soon as

practicable after receipt of the supplier’s notice, the purchaser shall evaluate the situation and may at his

Confidential Page 132 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

discretion extend the supplier’s time for performance, with or without the imposition of penalties, in

which case the extension shall be ratified by the parties by amendment of contract.

21.3 No provision in a contract shall be deemed to prohibit the obtaining of supplies or services from a national

department, provincial department, or a local authority.

21.4 The right is reserved to procure outside of the contract small quantities or to have minor essential services

executed if an emergency arises, the supplier’s point of supply is not situated at or near the place where

the supplies are required, or the supplier’s services are not readily available.

21.5 Except as provided under GCC Clause 25, a delay by the supplier in the performance of its delivery

obligations shall render the supplier liable to the imposition of penalties, pursuant to GCC Clause 22,

unless an extension of time is agreed upon pursuant to GCC Clause 21.2 without the application of

penalties.

21.6 Upon any delay beyond the delivery period in the case of a supplies contract, the purchaser shall, without

cancelling the contract, be entitled to purchase supplies of a similar quality and up to the same quantity

in substitution of the goods not supplied in conformity with the contract and to return any goods delivered

later at the supplier’s expense and risk, or to cancel the contract and buy such goods as may be required

to complete the contract and without prejudice to his other rights, be entitled to claim damages from the

supplier.

22. Penalties

22.1 Subject to GCC Clause 25, if the supplier fails to deliver any or all of the goods or to perform the services

within the period(s) specified in the contract, the purchaser shall, without prejudice to its other remedies

under the contract, deduct from the contract price, as a penalty, a sum calculated on the delivered price

of the delayed goods or unperformed services using the current prime interest rate calculated for each

day of the delay until actual delivery or performance. The purchaser may also consider termination of the

contract pursuant to GCC Clause 23.

23. Termination for default

23.1 The purchaser, without prejudice to any other remedy for breach of contract, by written notice of default

sent to the supplier, may terminate this contract in whole or in part:

23.1.1 if the supplier fails to deliver any or all of the goods within the period(s) specified in the contract, or

within any extension thereof granted by the purchaser pursuant to GCC Clause 21.2;

23.1.2 if the Supplier fails to perform any other obligation(s) under the contract; or

23.1.3 if the supplier, in the judgment of the purchaser, has engaged in corrupt or fraudulent practices in

competing for or in executing the contract.

23.2 In the event the purchaser terminates the contract in whole or in part, the purchaser may procure, upon

such terms and in such manner as it deems appropriate, goods, works or services similar to those

undelivered, and the supplier shall be liable to the purchaser for any excess costs for such similar goods,

Confidential Page 133 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

works or services. However, the supplier shall continue performance of the contract to the extent not

terminated.

23.3 Where the purchaser terminates the contract in whole or in part, the purchaser may decide to impose a

restriction penalty on the supplier by prohibiting such supplier from doing business with the public sector

for a period not exceeding 10 years.

23.4 If a purchaser intends imposing a restriction on a supplier or any person associated with the supplier, the

supplier will be allowed a time period of not more than fourteen (14) days to provide reasons why the

envisaged restriction should not be imposed. Should the supplier fail to respond within the stipulated

fourteen (14) days the purchaser may regard the intended penalty as not objected against and may

impose it on the supplier.

23.5 Any restriction imposed on any person by the Accounting Officer / Authority will, at the discretion of the

Accounting Officer / Authority, also be applicable to any other enterprise or any partner, manager,

director or other person who wholly or partly exercises or exercised or may exercise control over the

enterprise of the first-mentioned person, and with which enterprise or person the first-mentioned

person, is or was in the opinion of the Accounting Officer / Authority actively associated.

23.6 If a restriction is imposed, the purchaser must, within five (5) working days of such imposition, furnish the

National Treasury, with the following information:

23.6.1 the name and address of the supplier and / or person restricted by the purchaser;

23.6.2 the date of commencement of the restriction

23.6.3 the period of restriction; and

23.6.4 the reasons for the restriction.

23.7 These details will be loaded in the National Treasury’s central database of suppliers or persons prohibited

from doing business with the public sector.

23.8 If a court of law convicts a person of an offence as contemplated in sections 12 or 13 of the Prevention

and Combating of Corrupt Activities Act, No. 12 of 2004, the court may also rule that such person’s name

be endorsed on the Register for Tender Defaulters. When a person’s name has been endorsed on the

Register, the person will be prohibited from doing business with the public sector for a period not less

than five years and not more than 10 years. The National Treasury is empowered to determine the period

of restriction and each case will be dealt with on its own merits. According to section 32 of the Act the

Register must be open to the public. The Register can be perused on the National Treasury website.

24. Anti-dumping and countervailing duties and rights

24.1 When, after the date of bid, provisional payments are required, or anti-dumping or countervailing duties

are imposed, or the amount of a provisional payment or anti-dumping or countervailing right is increased

in respect of any dumped or subsidized import, the State is not liable for any amount so required or

imposed, or for the amount of any such increase. When, after the said date, such a provisional payment

is no longer required or any such anti-dumping or countervailing right is abolished, or where the amount

Confidential Page 134 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

of such provisional payment or any such right is reduced, any such favourable difference shall on demand

be paid forthwith by the contractor to the State or the State may deduct such amounts from moneys (if

any) which may otherwise be due to the contractor in regard to supplies or services which he delivered

or rendered, or is to deliver or render in terms of the contract or any other contract or any other amount

which may be due to him.

25. Force majeure

25.1 Notwithstanding the provisions of GCC Clauses 22 and 23, the supplier shall not be liable for forfeiture of

its performance security, damages, or termination for default if and to the extent that his delay in

performance or other failure to perform his obligations under the contract is the result of an event of

force majeure.

25.2 If a force majeure situation arises, the supplier shall promptly notify the purchaser in writing of such

condition and the cause thereof. Unless otherwise directed by the purchaser in writing, the supplier shall

continue to perform its obligations under the contract as far as is reasonably practical, and shall seek all

reasonable alternative means for performance not prevented by the force majeure event.

26. Termination for insolvency

26.1 The purchaser may at any time terminate the contract by giving written notice to the supplier if the

supplier becomes bankrupt or otherwise insolvent. In this event, termination will be without

compensation to the supplier, provided that such termination will not prejudice or affect any right of

action or remedy which has accrued or will accrue thereafter to the purchaser.

27. Settlement of disputes

27.1 If any dispute or difference of any kind whatsoever arises between the purchaser and the supplier in

connection with or arising out of the contract, the parties shall make every effort to resolve amicably such

dispute or difference by mutual consultation.

27.2 If, after thirty (30) days, the parties have failed to resolve their dispute or difference by such mutual

consultation, then either the purchaser or the supplier may give notice to the other party of his intention

to commence with mediation. No mediation in respect of this matter may be commenced unless such

notice is given to the other party.

27.3 Should it not be possible to settle a dispute by means of mediation, it may be settled in a South African

court of law.

27.4 Mediation proceedings shall be conducted in accordance with the rules of procedure specified in the SCC.

27.5 Notwithstanding any reference to mediation and/or court proceedings herein,

27.5.1 the parties shall continue to perform their respective obligations under the contract unless they

otherwise agree; and

27.5.2 the purchaser shall pay the supplier any monies due the supplier.

Confidential Page 135 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

28. Limitation of liability

28.1 Except in cases of criminal negligence or wilful misconduct, and in the case of infringement pursuant to

Clause 6;

28.1.1 the supplier shall not be liable to the purchaser, whether in contract, tort, or otherwise, for any indirect

or consequential loss or damage, loss of use, loss of production, or loss of profits or interest costs,

provided that this exclusion shall not apply to any obligation of the supplier to pay penalties and/or

damages to the purchaser; and

28.1.2 the aggregate liability of the supplier to the purchaser, whether under the contract, in tort or otherwise,

shall not exceed the total contract price, provided that this limitation shall not apply to the cost of

repairing or replacing defective equipment.

29. Governing language

29.1 The contract shall be written in English. All correspondence and other documents pertaining to the

contract that is exchanged by the parties shall also be written in English.

30. Applicable law

30.1 The contract shall be interpreted in accordance with South African laws, unless otherwise specified in SCC.

31. Notices

31.1 Every written acceptance of a bid shall be posted to the supplier concerned by registered or certified mail

and any other notice to him shall be posted by ordinary mail to the address furnished in his bid or to the

address notified later by him in writing and such posting shall be deemed to be proper service of such

notice

31.2 The time mentioned in the contract documents for performing any act after such aforesaid notice has

been given, shall be reckoned from the date of posting of such notice.

32. Taxes and duties

32.1 A foreign supplier shall be entirely responsible for all taxes, stamp duties, license fees, and other such

levies imposed outside the purchaser’s country.

32.2 A local supplier shall be entirely responsible for all taxes, duties, license fees, etc., incurred until delivery

of the contracted goods to the purchaser.

32.3 No contract shall be concluded with any bidder whose tax matters are not in order. Prior to the award of

a bid the Department must be in possession of a tax clearance certificate, submitted by the bidder. This

certificate must be an original issued by the SARSs.

Confidential Page 136 of 136

RFB 062/17-18 : PROPOSAL FOR BUILDING WORKS FOR EXTENSION OF NICD SEQUENCING OFFICE BUILDING FOR

NATIONAL HEALTH LABORATORY SERVICE (NHLS)

33. National Industrial Participation (NIP) Programme

33.1 The NIP Programme administered by the DTI shall be applicable to all contracts that are subject to the NIP

obligation.

34. Prohibition of restrictive practices

34.1 In terms of section 4 (1) (b) (iii) of the Competition Act No. 89 of 1998, as amended, an agreement

between, or concerted practice by, firms, or a decision by an association of firms, is prohibited if it is

between parties in a horizontal relationship and if a bidder (s) is / are or a contractor(s) was / were

involved in collusive bidding (or bid rigging).

34.2 If a bidder(s) or contractor(s), based on reasonable grounds or evidence obtained by the purchaser, has /

have engaged in the restrictive practice referred to above, the purchaser may refer the matter to the

Competition Commission for investigation and possible imposition of administrative penalties as

contemplated in the Competition Act No. 89 of 1998.

34.3 If a bidder(s) or contractor(s), has / have been found guilty by the Competition Commission of the

restrictive practice referred to above, the purchaser may, in addition and without prejudice to any other

remedy provided for, invalidate the bid(s) for such item(s) offered, and / or terminate the contract in

whole or part, and / or restrict the bidder(s) or contractor(s) from conducting business with the public

sector for a period not exceeding ten (10) years and / or claim damages from the bidder(s) or contractor(s)

concerned.

The above General Conditions of Contract (GCC) are accepted by:

Name:

Designation:

Bidder:

Signature:

Date: