IRWIN MIDDLE SCHOOL. IRWIN MIDDLE SCHOOL. IRWIN MIDDLE SCHOOL. BUDGET ALLOWANCE: FY 2014- $ 988K Internal UFR FY 2015- $208K Internal UFR FYDP16-20- $2.544M. IRWIN MIDDLE SCHOOL. IRWIN MIDDLE SCHOOL. PROCUREMENT PROJECTED TOTAL COST: $352,000 +/- SUPPORT TOTAL COST: $127,000 +/- - PowerPoint PPT Presentation

transcript

IRWIN MIDDLE SCHOOL

IRWIN MIDDLE SCHOOL

IRWIN MIDDLE SCHOOL

BUDGET ALLOWANCE:FY 2014- $988K Internal UFRFY2015- $208K Internal UFRFYDP16-20- $2.544M

IRWIN MIDDLE SCHOOL

IRWIN MIDDLE SCHOOL

• PROCUREMENT PROJECTED TOTAL COST: $352,000 +/-

• SUPPORT TOTAL COST: $127,000 +/-

• SUPPLIES UNIT COST: $52,000 +/-

IRWIN MIDDLE SCHOOL

• 2013NOV04- SITEC CONDUCTS INITIAL SITE SURVEY

• 2013NOV13- PROJECTED DATE FOR DETAILED ASSESSMENT TO DETERMINE NUMBER AND PLACEMENT OF SIPR/NIPR DROPS AND OUTLETS

IRWIN MIDDLE SCHOOL

• NIPR CABLE CAN BE REUSED

• SIPR MUST BE PULLED IN CONDUIT

• ALL NETWORK ELECTRONICS ARE OUT OF SPECIFICATION AND MUST BE REPLACED

IRWIN MIDDLE SCHOOL

• PROJECTED MOVE IN TIMEFRAME NLT MAY/JUNE 2014