Post on 03-Jun-2020
transcript
ISA 201Intermediate
Information Systems Acquisition
Lesson 22Practicum 3
Learning Objectives
3Practicum 3 Introduction
• Apply cybersecurity analysis throughout acquisition lifecycle phases.
• Given a DoD IT/SW development scenario, apply the best practices of IT Contracting that result in a best-value, competitive acquisition
• Given a DoD IT/SW Acquisition, apply cloud acquisition best practices to obtain cloud services.
• Given a DoD IT/SW acquisition scenario, apply DoD risk management policy in support of the program objectives and priorities.
• Given an IT acquisition scenario during the Operations and Sustainment (O&S) Phase, manage the optimal life-cycle sustainment approach for system software sustainment.
• Examine cybersecurity considerations in Systems Security Engineering (SSE)/Systems Engineering (SE) processes.
• Examine continuous monitoring of cybersecurity risks. • Recognize critical success factors for software transition. • Analyze factors that drive cybersecurity requirements.
Today you will learn to:
Lesson Overview
4Practicum 3 Introduction
• JTAMS Update • Marching Orders
Lesson Plan Status
5Practicum 3 Introduction
• Our Focus will be on Post-CDR, MS C and on planning for how we will transition JTAMS (1 and 2) to the field and support it!
• This Practicum allows more freedom to develop solutions on your own. Team brainstorming is a good thing!
JRATS and JTAMS Update
6Practicum 3
Practicum Timeline
Vers 5
Project StartMar FY0
JROC CDDJROC ICD
ASRNov FY1
JRATS
ITRJul FY0
JRATS
Sep FY1
Practicum 1 Creating/establishing a new Information Technology (IT) program (MS A & MS B)
JTAMSMRESPDR#1
Mar FY2
JTAMSSSR#1
Dec FY2
SRRMay FY1
JRATS
SFROct FY2 JRATS
- Significant JTAMSEvents
DRAFT JROC CDD
Oct FY3 Practicum 2 Managing IT
program development
(up to CDR)
JTAMSCDR
Feb FY3
JTAMSPDR#2Oct FY3
PDRMar FY2
JRATS
JTAMSSSR#2Jul FY2
PDROct FY3
JRATS
CDRMar FY3
JRATS
JROC CPD
Practicum 3 Post-CDR and Post MS C aspects of an IT/SIS Program
PRRApr FY4
JRATS
JTAMSIncrement #1
IOCMar FY4
IOCSep FY8
FOCFY12
Engineering and Manufacturing Development
Operations &
Support
MaterielSolutionAnalysis
FRP DecisionReview
Materiel Development Decision
ADMApr FY2 Apr FY6
ADMADMNov FY1
ADM
AJRATS-JTAMS
BJRATS-JTAMS
CJRATS-JTAMS
Technology Maturation and Risk Reduction
CDD-V
DRFPRD
Production & Deployment
FRP-DR
Lesson Overview
7Practicum 3 Introduction
• JTAMS Update
• Marching Orders
Lesson Plan Status
8Practicum 1
• You are members of the JTAMS PMO - You will have 2+ hours for research and development of the practicum solution.
• Go to your Student CD and open the folder for this Practicum.• Read/Review artifacts and documents found in the Practicum 3 folder • See the Student Template Slides for the practicum requirements• Remember to leverage course material from previous lessons in preparing
your answers
Practicum Marching Orders
Time Event Misc
1300 -1315
Practicum Intro Review Instructor
1315 -1530
Research and prepare analysis Student teams
1530 Submit entire analysis
Submit electronically on BB/shared drive
AND hard copy
1540 -1630
StudentPresentations
Instructors reinforce the major take-aways
Practicum Sections Team Assignment
Briefing Teams(Instr. Selects)
Cybersecurity Controls Analysis
3, 4
Cloud BCA Analysis 1, 2, 5
9Practicum 1
• STUDENT TEMPLATE SLIDE OVERVIEW
Student Template Slides
Summary
10Practicum 2
Today we learned to:• Apply cybersecurity analysis throughout acquisition
lifecycle phases.• Given a DoD IT/SW development scenario, apply the best
practices of IT Contracting that result in a best-value, competitive acquisition
• Given a DoD IT/SW Acquisition, apply cloud acquisition best practices to obtain cloud services.
• Given a DoD IT/SW acquisition scenario, apply DoD risk management policy in support of the program objectives and priorities.