Jet Works - Paint Presentation

Post on 14-Jun-2015

266 views 1 download

Tags:

transcript

Jet Works Air Center

Maintenance – Paint – Interior – Completions

FBO

Charter / Management

Aircraft Sales

Interior – Cabinetry

CNC Machine

Interior – Softgoods Engineering

Service Center

Paint

Interior – Softgoods

Interior – Cabinetry

Maintenance

Founded in 1996

109,000 Square Ft

168 Employees

ASF – Pilatus & Piaggio

Hangar # 1

30,000 Square Ft

Light – Medium Jets

Gulfstream V & Global Capable

Hangar # 2

43,000 Square Ft

Medium to Large Aircraft

757-200 Capable

Paint Hangar

12,000 Square Ft

Down Draft /Climate Controlled

Gulfstream G IV SP Capable

Renderings / Drawings

Custom Exterior Designer

9 Page Full Color Renderings

Turn time – 24 Hours

Strip & Paint Schedule

Challenger 604

Span time – 28 Days

DuPont Products

Paint Process

Incoming Inspection

0 Day

Span time – 0 Days

Paint Process

Mask Aircraft for Strip

2 Days

Span time – 2 Days

Paint Process

Strip Aircraft & Post Strip Insp.

2 Days

Span time – 4 Days

Paint Process

Mask & Prep Aircraft

4 Days

Span time – 8 Days

Paint Process

Wash, Etch & Alodine Aircraft

1 Day

Span time – 9 Days

Paint Process

Mask & Prime / Rivet Prime

1 Day

Span time – 10 Days

Paint Process

Prep Aircraft for Base Paint

3 Days

Span time – 13 Days

Paint Process

Mask & Paint Aircraft Base

1 Day

Span time – 14 Days

Paint Process

Layout Stripes & Logos

2 Days

Span time – 16 Days

Paint Process

Prep Stripes and Mask Aircraft

1 Day

Span time – 17 Days

Paint Process

Paint Stripes & Logos

1 Day

Span time – 18 Days

Paint Process

Prep Secondary Structures(Wing Tops, Pylons, Entry Door)

1 Day

Span time – 19 Days

Paint Process

Paint Secondary Structures(Wing Tops, Pylons, Entry Door)

1 Day

Span time – 20 Days

Paint Process

Detail Aircraft

6 Days

Span time – 26 Days

Paint Process

Squawks & Weight / Balance

1 Day

Span time – 27 Days

Paint Process

Final / Acceptance Flight

1 Day

Span time – 28 Days

Strip & Paint

Challenger 604

Matterhorn White

Custom Striping

Strip & Paint

Emivest SJ 30

Metallic Paint / Pearl Effect

Custom Logos (Tail)

Strip & Paint

Piaggio P-180

Black Pearl

Custom Graphics (Tazer)

Strip & Paint

Falcon 10

Snow White

Custom Metallic Stripes

DuPont Corrosion Primer

DuPont High Build Primer

DuPont High Solids Paint

DuPont Clear

Interior - Softgoods

Piaggio P-180

Complete Softgoods Refurb

Turn Time – 3 Weeks

Seats, Sidewalls & Headliner

Challenger 604

Interior LED Lighting

Premium Soundproofing

Cabin Seats

Gulfstream G IV

16 G Capabilities

Custom Material Selections

Cabinet Project # 1

Boeing 737

Remote Installation Support

Turn time – 6 Months

Cabinet Project # 2

Challenger 605

Multiple Configurations

Exotic Woods Available

Cabinet Project # 3

Gulfstream G III

Custom Artistry

Custom Faux Finishes

Maintenance Project # 1

Citation 560

Phase 5 Inspection

Turn time – 10 Days

Maintenance Project # 2

Lear 60

12 Year Inspection

Turn time – 32 Days

Maintenance Project # 3

Challenger 604

6/12/36 Month Inspection

Turn time – 5 Days

Maintenance Project # 4

Boeing 727 & 737

Line Maintenance

Avionics Installs

We’re not the highest bidder!

We’re not the lowest bidder!

But we’ll stack our quality,

Against ANY bidder!

?