John Stephenson, Business Solutions EMEA, Enterprise Software, ABB … availability and... · ©...

Post on 11-May-2020

5 views 0 download

transcript

© ABB

| Slide 1May 24, 2016

Asset availability and organisational responsiveness:

John Stephenson, Business Solutions EMEA, Enterprise Software, ABB

Bringing control within reach

© ABB

| Slide 2

Connected Asset Lifecycle Management (CALM)Our Vision for IT/OT Converged Asset Management

work orders / completions

Asset Performance

Management

Enterprise Asset

Management

Workforce

Management

Common

Business

Information

Model

Operations

Network Manager

Symphony Plus 800xA

© ABB

| Slide 3

Why do utilities talk to us about Asset Health? How to respond to these challenges

Information challenges

Aging workforce

Aging infrastructure

Regulatory requirements

ISO 55000/PAS55

Defer or control capital

expense

Flat O&M budgets

© ABB

| Slide 4

Asset Management Maturity

Reliability centered6

Financial optimization7

Predictive5

Condition-based4

Usage-based3

Run to failure1

Time-based2

Optimized,predictive

Strategic,proactive

© ABB

| Slide 5May 24, 2016

Maintenance Maturity

10%

30%

37%

ARC 2015 Survey of 141 Companies

Maintenance Activities

…but Companies Struggle to Achieve it.

© ABB

| Slide 6May 24, 2016

Connected Asset LifecycleA condition for response

© ABB

| Slide 7

The lifecycle of an outage

Prediction + Preparation

Schedule and prioritize resources and keep

stakeholders informed

Assessment + Restoration

Isolate, auto restore , deploy right crew to safely and efficiently restore remaining customers while keeping stakeholders informed

Repair + Closeout

Compliance, reporting and review helps build plan for next outage

PlanningForecast, plan and prepare resources with full visibility

and scenario-based planning

1

2

3

4

Outage

Lifecycle

© ABB

| Slide 8

Planning1

Plan and prepare systems through out the year

Plan and

Prepare

Build and maintain

library of Historical Storm

Models

Build statistic reports for

historical or different

storm types

Allows customer to

register for notifications

with preferences

© ABB

| Slide 9

Prepare2

Prepare restoration activities based on historical models and

projections and schedule resources accordingly

Project &

Analyze

Create projection models

for restoration analysis

Edit projections models

with scenarios to

understand impact of storm

and resource planning

Resource

Planning

Plan resource needs and

locations

Mutual assistance call outs

and on-boarding

© ABB

| Slide 10

Assess + Restore3

Isolate and restore automatically then deploy right crew to

safely and efficiently restore remaining customers

Outage

Analysis, work

prioritization

and dispatch

OMS analyzes troubles calls

from different sources,

Identify faulted section

through Fault location and

Damage Assessment

FLISR can auto isolate and

reconfigure

Prioritize work and dispatch to

crews for optimal restoration

Notification Notify stakeholders and keep

affected customers up to date

throughout the event

© ABB

| Slide 11

Closeout4

Post event Analysis & Reporting, Compliance, and plan for next outage

Post Event

Analysis and

Reports

Post analysis of crew work,

outage areas and issues

Addition of information for trend

reporting

Post Event Reports

Storm

Classification

Build data for future

preparation, back in to

Preparation phase

© ABB

| Slide 12

CenterPoint EnergyThe result of connected outage response

© ABB

| Slide 13

Connected Asset Lifecycle Management (CALM)Our Vision for IT/OT Converged Asset Management

work orders / completions

Asset Performance

Management

Enterprise Asset

Management

Workforce

Management

Common

Business

Information

Model

Operations

Network Manager

Symphony Plus 800xA

© ABB

| Slide 14May 24, 2016