Joint Navigation Warfare Center’s Common Operating Environment

Post on 13-Jan-2016

98 views 1 download

description

Joint Navigation Warfare Center’s Common Operating Environment. AGI UC – Oct 11 th , 2005. bad. HDOP. good. Purpose. Describe and Demonstrate the JNWC’s Common Operating Environment. Measures of Performance S/N, Availability, Coverage Measures of Effectiveness CEP, TLE, Range Errors. - PowerPoint PPT Presentation

transcript

Pg 1 of 15AGI www.agi.com

Joint Navigation Warfare Center’s Common Operating Environment

AGI UC – Oct 11th, 2005

Pg 2 of 15AGI www.agi.com

Describe and Demonstrate the JNWC’s Common Operating Environment

Purpose

•Measures of Performance

•S/N, Availability, Coverage

•Measures of Effectiveness

•CEP, TLE, Range Errors

0

0.5

1

1.5

2

2.5

3

0

0.5

1

1.5

2

2.5

3

HD

OP

good

bad

-180-150-120-90-60-30 0 306090120150180Longitude (deg)

Latit

ude

(deg

)

-180-150-120-90-60-30 0 306090120150180-90-60-300

306090

-180-150-120-90-60-30 0 306090120150180Longitude (deg)

Latit

ude

(deg

)

-180-150-120-90-60-30 0 306090120150180-90-60-300

306090

Prediction analysis &

Performance assessment

NCOE

Pg 3 of 15AGI www.agi.com

Outline

• Problem

• Description of Needs– Pre-flight– Real-time– Post-test

• Demonstration

Pg 4 of 15AGI www.agi.com

Problem

JNWC needs a tool that is…

– Easy to use (Reading in data, processing results)

– High Fidelity (Yields accurate predictions)

– Eye Pleasing (You can “see” what is happening)

– Common among all users (Repeatable results)

– Built to support all phases (Preflight, Real-time, Post)

– Built to support all missions (EA, ES, and EP)

Pg 5 of 15AGI www.agi.com

Needs – Pre-flight

• Perform Preflight prediction analysis– Mission Planning (Jammers / Routes placement)

• Power Levels• Assets in view• J/S contour• Predicted Nav solution

Pg 6 of 15AGI www.agi.com

Needs – Real-time

• Provide Real-time Situational Awareness– Data streaming from TSPI, TIBS, FAA, Comm links

• Positions, Collected data, performance data

– Projected data calculated via models• Power levels, In-view analysis, theoretical performance

Data – Strip Charts

3-D Situational Awareness

Bird’s Eye view of the test

Dat

a F

eeds

M

odel

s Quick Look

Analysis

Pg 7 of 15AGI www.agi.com

Needs – Post-test

• Perform Post Test analysis– Comparison results / analysis

• Truth (TSPI) versus Measured (calculated)• Predicted (models) versus Measured (calculated)

– Points of Interest Drill Down• Vulnerability Assessments / TTP development / Reports

Pg 8 of 15AGI www.agi.com

Started from…

Total RF (dBW) -133.2R/S (dB) 34J/S (dB 67

Nav Error (m) 34.52Azimuth (deg) 98.28Elevation (deg) 11.34

FOM data

Nav Error Instant

Total RF power

Nav Error over time Each Jammer

power

Color coded (FOM) Position (actual)

Jammer Gains and Coverage

Tracking Vectors (Colored

C/N)

Pg 9 of 15AGI www.agi.com

Description of NCOE - AOI

• 4DX Application

• User Friendly

• Built to task

Start with AOI

Pg 10 of 15AGI www.agi.com

Description of NCOE - Time

• Time dependant

• 1 sec time step

• GMT standard

Next enter Time

Pg 11 of 15AGI www.agi.com

Description of NCOE - Tasks

• Tasks chosen by JNWC for JNWC

• Task to Results

• Input data

Tasks

Pg 12 of 15AGI www.agi.com

Description of NCOE - Data

• External data wizard

• Import data smoothly

• No specific input format needed

Collected data

Pg 13 of 15AGI www.agi.com

Description of NCOE - Jammers

• Jammer data entry

• Types and locations

• Database included

Jammer data

Pg 14 of 15AGI www.agi.com

Description of NCOE - Platforms

• Platform data entry

• Types and equipment

• Database included

Platform data

Pg 15 of 15AGI www.agi.com

Description of NCOE - Finished

• Collected Data– Truth

– Measured

• Predicted Data

• Analysis Tool

4D Interactive Display