Post on 24-Apr-2018
transcript
SUPPORT - HANGERModel No. FS-4 & FS-4R Copyright © 2013 the JTI Companies, Inc. All Rights Reserved
FINISHES: Primed, Hot Dip Galvanized,and Special Three Coat Epoxy.
MATERIALS: Carbon Steel, Stainless,and other alloys.
APPLICATION: This clamp-type supportshould be used where pipe is hung belowsupport steel or another FRP or other non-metallic pipe to control buckling.
NOTES: 1. FS-4R Identical to FS-4 except that slots are added for 3/4 in. insulation banding
2. Rod assembly, including J-66 must be ordered separately.
PIPE DIA. 2" 3" 4" 6" 8" 10" 12" 14" 16" 18""L" 8" 8" 8" 8" 8" 8" 12" 12" 12" 12""P" 5/8" 5/8" 5/8" 5/8" 3/4" 3/4" 1" 1" 1-1/8" 1-1/8"
Rod 3/8" 3/8" 3/8" 3/8" 1/2" 5/8" 3/4" 3/4" 7/8" 7/8"Vertical Load 610 610 610 610 610 1,810 2,710 2,710 3,770 3,770
PIPE DIA. 20" 24" 30" 36" 42""L" 14" 16" 16" 16" 16""P" 1-1/4" 1-3/8" 1-3/8" 1-3/8" 1-3/8"
Rod 1" 1-1/4" 1-1/4" 1-1/2" 2"Vertical Load 4,960 6,833 8,000 11,630 16,300
CL
APPLICATION: This clamp-type supportshould be used where pipe is hung belowsupport steel or another FRP or other non-metallic pipe to control buckling.
NOTES: 1. FS-4R Identical to FS-4 except that slots are added for 3/4 in. insulation banding
2. Rod assembly, including J-66 must be ordered separately.
INSULATION BANDINGSLOTS (FS-4R, SEE NOTE 1)
"L"
"P" DIA.JTI J-66 CLEVIS
JTI J-39 ROD
HEAVY HEX NUT (2)
"T"
6
7
INSULATION BANDINGSLOTS (FS-4R, SEE NOTE 1)
"L"
HEAVY HEX NUT (2)
"P" DIA.JTI J-66 CLEVIS
JTI J-39 ROD
JTI J-909 FORGEDCLEVIS
"T"
SUPPORT - GUIDED HANGERModel No. FS-4G & FS-4GR Copyright © 2013 the JTI Companies, Inc. All Rights Reserved
FINISHES: Primed, Hot Dip Galvanized,and Special Three Coat Epoxy.
MATERIALS: Carbon Steel, Stainless,and other alloys.
APPLICATION: This lateral guide should beused where pipe is hung below support steelor another FRP or other non-metallic pipeto control buckling.
NOTES: 1. FS-4GR Identical to FS-4G except that slots are added for 3/4 in. insulation banding
2. Rod assembly, including J-66 must be ordered separately from FS-4G.
CL
PIPE DIA. 2" 3" 4" 6" 8" 10" 12" 14" 16" 18""L" 8" 8" 8" 8" 8" 8" 12" 12" 12" 12""P" 5/8" 5/8" 5/8" 5/8" 3/4" 3/4" 1" 1" 1-1/8" 1-1/8"
Rod 3/8" 3/8" 3/8" 3/8" 1/2" 5/8" 3/4" 3/4" 7/8" 7/8"Vertical Load 610 610 610 610 610 1,810 2,710 2,710 3,770 3,770
PIPE DIA. 20" 24" 30" 36" 42""L" 14" 16" 16" 16" 16""P" 1-1/4" 1-3/8" 1-3/8" 1-3/8" 1-3/8"
Rod 1" 1-1/4" 1-1/4" 1-1/2" 2"Vertical Load 4,960 6,833 8,000 11,630 16,300
NOTES: 1. FS-4GR Identical to FS-4G except that slots are added for 3/4 in. insulation banding
2. Rod assembly, including J-66 must be ordered separately from FS-4G.
APPLICATION: This lateral guide should beused where pipe is hung below support steelor another FRP or other non-metallic pipeto control buckling.
PIPE DIA. 2" 3" 4" 6" 8" 10" 12" 14" 16" 18""L" 8" 8" 8" 8" 8" 8" 12" 12" 12" 12""P" 5/8" 5/8" 5/8" 5/8" 3/4" 3/4" 1" 1" 1-1/8" 1-1/8"
Rod 3/8" 3/8" 3/8" 3/8" 1/2" 5/8" 3/4" 3/4" 7/8" 7/8"Vertical Load 610 610 610 610 610 1,810 2,710 2,710 3,770 3,770
PIPE DIA. 20" 24" 30" 36" 42""L" 14" 16" 16" 16" 16""P" 1-1/4" 1-3/8" 1-3/8" 1-3/8" 1-3/8"
Rod 1" 1-1/4" 1-1/4" 1-1/2" 2"Vertical Load 4,960 6,833 8,000 11,630 16,300