Installation guide • Package list • Materials • Technical drawings

1 April 2019

!1

ROSENHAGA

4x40

FLOOR ELEMENT

Material:

Steps For measurements and exact position of beams look drawing 001 (mariedal_floor) • Connect side beams with iron plates, mark the positions by the given measurements on a drawing 001 • Screw cross beams using two 6x120 screws on each side.

No. Item Quantity

1.1 50X150 beams 4860mm+1640mm 2

1.2 50x150 cross beams 3700mm 16

3.3 Nail plate (steel 120x240mm) and screws 2

4.1 Screw 6x120 60

!2

ROSENHAGA

TELL

IJA

PROJ

EKT

TELE

FON

ALLK

IRI

VAST

UTAV

ARH

ITEK

T

JOON

ESTA

S

STAA

DIUM

FAIL

KUUP

ÄEV

TÖÖ

NR

JOON

ISM

ÕÕTK

AVA

JOON

ISE

NR

ROSE

NHAG

A

WALL ELEMENTS Material:

Steps Elements by number • Before installing remove transport blocks • Connect wall element (numbered) side by side and to the wall element with 6x80 screws • Positions ot the walls on drawing 002.

No. Item Quantity

EL 1-10 Wall elements (numbered) 10

4.2 Screw for joints, base and wall to wall 6x80 100

!3

ROSENHAGA

TELLIJA

PROJEKT

TELEFON

ALLKIRIVASTUTAV ARHITEKT

JOONESTAS

STAADIUMFAIL

KUUPÄEVTÖÖ NR

JOONISMÕÕTKAVA

JOONISE NR

ROSENHAGA

INNER-WALLS AND FLOOR Material:

Steps

For measurements and exact position of elements look drawing 002 (mariedal_floorplan) • Connect side by side, screws s.500

No. Item Quantity

VS-(1-2) Inner-wall elements (down-stairs) 2

4.2 Screws 6x80 (wall) 26

VS-3 Wall upstairs 1

!4

ROSENHAGA

CEILING PANEL

Material:

Steps Elements by number • Screw cross beams using two 6x120 screws on each side. • Positions on drawing 001 • Floorboard (cut to length at site)

No. Item Quantity

2.1, 2.2 Ceiling element material: beams 2x1860, 4x3700 10

4.1 Screw for beams 6x120 16

4.2 Screws for connecting to wall 6x80 10

2.3 Floorboards 18x100x1860 36

2.5 Floorboard screws 4x45 170

!5

ROSENHAGA

ROOF CONSTRUCTION

Material:

Steps Placement of the rafters • Rafters jointed with brackets • Positions and dimensions visible on drawing 004

No. Item Quantity

PS-01 Rafters 44x194 2

PS-02 Rafters 44x194 11

PS-01 Tie 45x145 3

3.2 Angle brackets 26

!6

ROSENHAGA

TELL

IJA

PROJ

EKT

TELE

FON

ALLK

IRI

VAST

UTAV

ARH

ITEK

T

JOON

ESTA

S

STAA

DIUM

FAIL

KUUP

ÄEV

TÖÖ

NR

JOON

ISM

ÕÕTK

AVA

JOON

ISE

NR

ROSE

NHAG

A

NR

mm

m3

mm

tkm

3K

LAS

S

MA

TER

JALI

SP

ETS

IFIK

ATS

IOO

NP

OS

.N

IME

TUS

RIS

TLÕ

IGE

TK/M

AH

TP

IKK

US

AR

VM

AH

T K

OK

KU

RK

US

338

0044

x144

PU

ITTA

LAP

T-01

2xx

x44

x194

PU

ITS

AR

IKA

SP

S-0

111

xxx

44x1

94P

UIT

SA

RIK

AS

PS

-02

PS -0

1

PS -0

2

PT -0

1

ROOFING

Material:

Steps • Layout of panels visible on drawing 006

No. Item Quantity

KP 101-1031 OSB 10mm, screws (4x35) 400 pcs 12

Ventilation distance, screws (4x60) 120pcs 12

KP 181-1831 OSB 18mm, screws (4x45) 400pcs 12

5.4 Edges (metal), screws 36pcs set

!7

ROSENHAGA

TELLIJA

PROJEKT

TELEFON

ALLKIRIVASTUTAV ARHITEKT

JOONESTAS

STAADIUM FAIL

KUUPÄEVTÖÖ NR

JOONIS MÕÕTKAVA

JOONISE NR

ROSENHAGA

FLOOR AND DOOR!

Material:

Steps • Floor installation plan drawing 003. Floor boards will be cut to length on site! • Door installation manual, separately

No. Item Quantity

1.4 Floorboards 4,5m (screws 4x45 included) 33

1.5 Floorboards 3,9m (screws 4x45 included) 18

D(I) 1 Wooden door, package 1

!8

ROSENAHAGA

TELLIJA

PROJEKT

TELEFON

ALLKIRIVASTUTAV ARHITEKT

JOONESTAS

STAADIUMFAIL

KUUPÄEVTÖÖ NR

JOONISMÕÕTKAVA

JOONISE NR

ROSENHAGA

FINISHING TOUCHES Material:

Steps • Doors and windows installation manual separately. • Finish, enjoy!

No. Item Quantity

D1, D2 Doors 3

W1, W2 Windows 2

5,5 Window drip edge (fittings) set

5.1 Cladding 6

5.2 Overhead boards 2

5.3 Corner finishing boards 8

!9

ROSENAHAGA