Post on 01-Feb-2020
transcript
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
1. SUPPLY AND DELIVERY OF RELIEF VALVE, CAST BRONZE, 6 BAR (KORVAL) DNOW AUSTRALIA PTY LTD / SHELL
November 18, 2019 In Progress
2. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ
SAPURA FABRICATION SDN
BHD (INDIA 98/2 PROJECT)
November 07, 2019
Completed
3. SUPPLY OF WELDING ELECTRODE – ONGC KG-DWN 98-2 CPP & LQ
SAPURA FABRICATION SDN
BHD (INDIA PROJECT OFFICE)
October 25, 2019
Completed
4. ADDITIONAL SURFACE AREA FOR PFP WORK (FABRICATION OF JAMNAGAR BERTH A2 PROJECT)
SAPURA FABRICATION SDN
BHD October 23, 2019
In Progress
5. SUPPLY OF WELDING ELECTRODE – PEGAGA CPP TOPSIDE SAPURA
FABRICATION SDN BHD
October 18, 2019
Completed
6. SUPPLY OF BATTERIES ENQUEST October 17, 2019
In Progress
7. PFP MAINTENANCE WORK AT GUMUSUT KAKAP TOPSIDE SABAH SHELL PETROLEUM
COMPANY LIMITED October 17, 2019
In Progress
8. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT (ITEM 660-730 ONLY) MMHE October 10, 2019
Completed
9. SUPPLY AND DELIVER WIRELESS KEYBOARD AND LAPTOP STAND FOR PETRONAS LUBRICANTS MARKETING (M) SDN BHD
PETRONAS LUBRICANTS
MARKETING (M) SDN BHD
October 07, 2019
Completed
10. SUPPLY AND DELIVERY OF E&I BULK MTO FOR MEPA INFILL OCTOBER (DELTA WITH AFC) (POWER & INSTRUMENT CABLE) – COST PLUS
DAYANG ENTERPRISE /
MURPHY October 4, 2019
Completed
11. SUPPLY NU BOLT (GRIP/NON-GRIP) FOR SOGT PRESSURE VESSEL REDUDANCY PROJECT
EVOLUSI BERSATU SDN BHD / PCSB
October 4, 2019
Completed
12. SUPPLY NU BOLT C/W I-ROD FOR SOGT GTC SEAL GAS LINE EVOLUSI BERSATU
SDN BHD / PCSB October 3, 2019
Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
13. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES – SVOA NO.4 MMHE October 02, 2019
In Progress
14. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 CPP & LQ PROJECT
SAPURA FABRICATION SDN
BHD September 25, 2019
Completed
15. SUPPLY OF HUMIDUR PAINTS AT MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG September 24, 2019
Completed
16. SUPPLY OF WELDING ELECTRODE FOR PEGAGA PROJECT SAPURA
FABRICATION SDN BHD
September 18, 2019
Completed
17. PROCUREMENT OF INSTRUMENT CABLE LOC-PETROFAC MALAYSIA MENARA PRESTIGE
PETROFAC (PM304-MALAYSIA) LIMITED
August 21, 2019
Completed
18. SUPPLY AND DELIVERY OF SURFACE BOOK 2 i7 16GB
PETRONAS LUBRICANTS
INTERNATIONAL SDN BHD
August 21, 2019
Completed
19. SUPPLY OF WELDING ELECTRODE FOR JX NIPPON LAYANG DEVELOPMENT PROJECT
SAPURA OFFSHORE SDN BHD
August 19, 2019 Completed
20. SSJ - PROVISION OF DRY ICE MACHINE RENTAL BRUNEI LNG SDN
BHD August 7, 2019
In Progress
21. SUPPLY OF WELDING ELECTRODE FOR ENI MERAKES DEVELOPMENT PROJECT
SAPURA OFFSHORE SDN BHD
August 7, 2019
Completed
22. SUPPLY OF WELDING ELECTRODE FOR FABRICATION OF PEGAGA CPP PROJECT
SAPURA FABRICATION SDN
BHD August 2, 2019
Completed
23. SURFACE PREPARATION USING HiCO2 DRY ICE BLASTING FOR C-6942 EO TANK
DIALOG / PCOGD July 28, 2019 Completed
24. PROVISION OF ELECTRODE FOR KINARUT WEST – BASE SCOPE & LABUAN YARD
SAPURA PINEWELL SDN BHD
July 11, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
25. PURCHASE OF COMPUTER HARDWARE
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
July 11, 2019 Completed
26. STRUCTURAL WORKS FOR JACKET, BRIDGE AND APPURTENANCES FOR BOKOR CPP-JACKET
MMHE July 4, 2019 Completed
27. PROVISION TO SUPPLY MANPOWER, EQUIPMENTS, TOOLS AND CONSUMABLES FOR PFP COATING FOR RSDV (ADDITIONAL WORK)
SAPURA PINEWELL / KPOC
July 2, 2019 In Progress
28. SUPPLY OF WELDING ELECTRODE FOR PEGAGA CPP TOPSIDE PROJECT SAPURA
FABRICATION SDN BHD
June 25, 2019 Completed
29. SUPPLY OF HUMIDUR FP PLURAL PAINTS TO PT. BREDERO SHAW INDONESIA SHAWCOR
SINGAPORE PTE LTD June 25, 2019 Completed
30. SUPPLY AND DELIVERY OF INSTRUMENT BULK MATERIALS FOR MEPA 11 FLOWLINE INTERIM (INSTRUMENT CABLES) – COST PLUS
DAYANG ENTERPRISE /
MURPHY June 20, 2019 Completed
31. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE June 20, 2019 Completed
32. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE June 20 , 2019 Completed
33. SUPPLY AND DELIVERY OF KOBE ELECTRODE FOR FSO GOLDEN STAR MMHE June 17, 2019 Completed
34. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 SAPURA
FABRICATION SDN BHD
June 14, 2019 Completed
35. SUPPLY AND DELIVERY OF GASKET MALAYSIAN
REFINING COMPANY June 10, 2019 Completed
36. SUPPLY OF HUMIDUR PAINTS TO QESS ENERGY SUPPORT SERVICES SDN BHD BSP May 30, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
37. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG May 30, 2019 Completed
38. SUPPLY AND DELIVERY OF ELECTRICAL CABLE WOODGROUP /
EMEPMI May 29, 2019 Completed
39. SUPPLY OF WELDING ELECTRODE FOR ONGC KG-DWN 98-2 SAPURA
FABRICATION SDN BHD
May 27, 2019 Completed
40. SUPPLY AND DELIVERY OF MATERIALS FOR WHEATHER SHELTER (INSTRUMENT CABLES) – COST PLUS (GOPA)
DAYANG ENTERPRISE /
MURPHY May 24, 2019 Completed
41. SUPPLY OF HUMIDUR FP BRUSH TRANSFAME SDN
BHD May 24, 2019 Completed
42. REPAIR OF PFP COATING FOR C/01/FB/1039 – EPCC + I FFD HESS PHASE 2 FACILITIES, NMB
SAPURA FABRICATION SDN
BHD / HESS EXPLORATION
May 24, 2019 Completed
43. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTIVE COMPOUND FOR SSB/SSPC
SARAWAK SHELL BERHAD
May 23, 2019 Completed
44.
FABRICATION AND INSTALLATION OF GRILLAGE, DEAD MAN ANCHOR, LINK BEAMS AND REMOVAL LSF SEAFASTENING AND GRILLAGE FOR BOKOR CPP TOPSIDE
MMHE May 15, 2019 In Progress
45. SUPPLY AND APPLY OF PFP WORKS FOR BOKOR CPP TOPSIDE MMHE May 15, 2019 In Progress
46. SUPPLY OF HUMIDUR PAINTS TO QET BSP May 14, 2019 Completed
47. SUPPLY OF HUMIDUR FP COATING BLACK FOR SS PUTERI INTAN EAGLESTAR
SHIPMANAGEMENT (L) PTE LTD
May 7, 2019 Completed
48. PROVISION TO SUPPLY MANPOWER, EQUIPMENTS, TOOLS AND CONSUMABLES FOR PFP COATING FOR RSDV
SAPURA PINEWELL / KPOC
April 29, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
49. PASSIVE FIRE PROTECTION WORK FOR CONSTRUCTION OF BERTH A2 AT MARINE TERMINAL, JAMNAGAR, INDIA
SAPURA FABRICATION SDN
BHD April 22, 2019 In Progress
50. SUPPLY AND DELIVERY OF CABLE SARAWAK SHELL
BERHAD April 25, 2019 Completed
51. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE April 23, 2019 Completed
52. FABRICATION AND INSTALLATION SEAFASTENING AND LOADOUT ACTIVITIES FOR GK PHASE 2
MMHE April 18, 2019 Completed
53. SUPPLY OF HUMICLEAN TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG April 16, 2019 Completed
54. STRUCTURAL WORKS FOR JACKET, BRIDGE AND APPURTENANCES FOR BOKOR CPP-JACKET
MMHE April 12, 2019 Completed
55. SUPPLY OF HUMIDUR FP QR SARAWAK SHELL
BERHAD April 5, 2019 Completed
56. SUPPLY OF HUMIDUR ME BRUSH SARAWAK SHELL
BERHAD April 5, 2019 Completed
57. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE OTHERS)
CARIMIN / PETRONAS CARIGALI
April 4, 2019 Completed
58. SUPPLY AND DELIVERY OF STUD BOLT FOR DULANG C PIPING UPGRADE (PACKAGE FLOWLINE/WELLHEAD)
CARIMIN / PETRONAS CARIGALI
April 3, 2019 Completed
59. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP April 1, 2019 Completed
60. MANPOWER SUPPLY (44 PAX) FOR JACKET BOKOR PROJECT MMHE March 29, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
61. PURCHASE OF COMPUTER HARDWARE
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
March 29, 2019 Completed
62. PROVISION OF TENSILE TEST ON HELIDECK NETTING TRANSFAME SDN
BHD March 29,2019 Completed
63. PRIMAVERA LICENSE RENEWAL PETRONAS TECHNICAL
SERVICES SDN BHD March 26, 2019 Completed
64. PAN MALAYSIA FIELD JOINT COATING SERVICES SARAWAK SHELL
BERHAD / SAPURA ENERGY
March 21, 2019 In Progress
65. SUPPLY OF WELDING ELECTRODE FOR BOKOR CPP PROJECT SAPURA OFFSHORE
SDN BHD March 22, 2019 Completed
66. CABLING & TV INSTALLATION FOR FGVT WAR ROOMS FELDA GLOBAL
VENTURES HOLDINGS BERHAD
March 20, 2019 Completed
67. SUPPLY OF HUMIDUR TC PAINTS TO QET BSP March 20, 2019 Completed
68. SUPPLY OF HUMIDUR FP PAINTS AND HUMICLEAN TO QET BSP March 20, 2019 Completed
69. SUPPLY AND DELIVERY OF STICKER / STENCIL FOR VESSEL (STATIC PTS-34) PETRONAS CARIGALI
March 19, 2019 Completed
70. PROVISION OF SUPPLY, COMMISSIONING OF HEAT SHIELD AND ROOF SHIELD FOR LIFEBOAT-D
CARIGALI HESS March 7, 2019 Completed
71. SUPPLY AND DELIVERY OF ELECTRICAL CABLE SARAWAK SHELL
BERHAD March 5, 2019 Completed
72. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD
BLNG March 5, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
73. SUPPLY OF HUMIDUR PAINTS TO TRANSFAME SDN BHD SARAWAK SHELL
BERHAD March 4, 2019 Completed
74. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD
BLNG February 28, 2019 Completed
75. SUPPLY AND DELIVERY OF WATER SHUT OFF VALVE 5K 125A (KORVAL) CHEE FATT CO. PTE
LTD February 22, 2019 Completed
76. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG February 22, 2019 Completed
77. SUPPLY OF HUMIDUR PAINTS TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG February 20, 2019 Completed
78. SUPPLY OF WELDING ELECTRODE FOR EPCI OF GALLAF SAPURA
FABRICATION SDN BHD
February 20, 2019
Completed
79. SUPPLY OF WELDING ELECTRODE FOR BOKOR TOPSIDE MMHE February 14, 2019 Completed
80. SUPPLY OF HUMIDUR ME COATING FOR SS PUTERI ZAMRUD EAGLESTAR
SHIPMANAGEMENT February 14, 2019 Completed
81. SUPPLY OF HUMIDUR FP COATING FOR SS PUTERI ZAMRUD EAGLESTAR
SHIPMANAGEMENT February 14, 2019 Completed
82. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) February 11, 2019 Completed
83. PASSIVE FIRE PROTECTION RECTIFICATION WORK FOR MALIKAI SABAH SHELL PETROLEUM
COMPANY LIMITED February 11, 2019 Completed
84. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) FOR HESS PHASE 2 PROJECT
SAPURA FABRICATION SDN
BHD / HESS EXPLORATION
February 7, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
85. SUPPLY OF HUMIDUR TC PAINTS AND TO QET BSP February 7, 2019 Completed
86. PASSIVE FIRE PROTECTION TEST PANEL (EARLY MOB) HESS / SAPURA February 7, 2019 Completed
87. SUPPLY OF IT HARDWARE & CONSUMABLES HESS February 1, 2019 In Progress
88. PROVISION OF ASSAI ONSITE SOFTWARE MAINTENANCE RENEWAL (JANUARY-DECEMBER 2019)
SAPURA EXPLORATION &
PRODUCTION (SARAWAK) INC.
January 31, 2019 In Progress
89. SUPPLY OF WELDING ELECTRODE FOR EPC OF GOREK SAPURA
FABRICATION SDN BHD
January 28, 2019 Completed
90. SUPPLY OF WELDING ELECTRODE FOR EPC OF LARAK SAPURA
FABRICATION SDN BHD
January 28, 2019 Completed
91. SUPPLY OF WELDING ELECTRODE FOR EPC OF BAKONG SAPURA
FABRICATION SDN BHD
January 28, 2019 Completed
92. SUPPLY OF WELDING ELECTRODE FOR HESS PHASE 2 SAPURA
FABRICATION SDN BHD
January 25, 2019 Completed
93. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE January 25, 2019 Completed
94. SUPLLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE January 22, 2019 Completed
95. SUPPLY AND DELIVERY OF INSTRUMENT CABLES – COST PLUS (GOPA) DAYANG
ENTERPRISE / MURPHY
January 16, 2019 Completed
96. SUPPLY OF WELDING ELECTRODE – PEGAGA PROJECT SAPURA
FABRICATION SDN BHD
January 15, 2019 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
97. SUPPLY OF FOXIT PHANTOM PDF BUSINESS ADDITION FELDA GLOBAL
VENTURES HOLDINGS BERHAD
January 11, 2019 Completed
98. SUPPLY OF HUMIDUR PAINTS FOR DARAT PROJECT E38 AND E15 TO MASHHOR OFFSHORE PAINTING SERVICES SDN BHD
BLNG December 28, 2018 Completed
99. SUPPLY OF WELDING ELECTRODE FOR JAMNAGAR PROJECT SAPURA
FABRICATION SDN BHD
December 26, 2018 Completed
100. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) December 24, 2018 Completed
101. SUPPLY OF WELDING ELECTRODE FOR PEGAGA JACKET SAPURA
FABRICATION SDN BHD
November 23, 2018 Completed
102. SUPPLY AND DELIVERY OF CABLE INSTRUMENT (ADDITIONAL) FOR HUC MODIFICATION AT D18MP-A FOR D28 PHASE 1 PROJECT
PETRONAS CARIGALI
December 17, 2018 Completed
103. SUPPLY OF HUMIDUR FP BRUSH TO MASHHOR GENERAL CONTRACTOR SDN BHD
BLNG December 6, 2018 Completed
104. PROVISION OF CISCO HARDWARE & SUPPORT SERVICES TO REFRESH NETWORK SYSTEM
HESS December 6, 2018 In Progress
105. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE – HESS PHASE 2 PROJECT
SAPURA FABRICATION SDN
BHD / HESS EXPLORATION
December 5, 2018 Completed
106. SUPPLY OF WELDING ELECTRODE FOR PEGAGA JACKET SAPURA
FABRICATION SDN BHD
November 23, 2018 Completed
107. PROVISION OF SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION WORK FOR ZETUNG TOPSIDE
HESS / SAPURA November 22, 2018 Completed
108. PROVISION OF SERVER SOFTWARE, LICENSES AND SERVICES FOR MURPHY’S OPERATIONS
MURPHY November 22, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
109. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) November 11, 2018 Completed
110. SUPPLY OF HUMIDUR PAINT FOR MESPLT GUMUSUT DEVELOPMENT AND MALIKAI STORE
SABAH SHELL PETROLEUM
November 9, 2018 Completed
111. SUPPLY OF WELDING ELECTRODE FOR BOBE PROJECT SAPURA PINEWELL
SDN BHD October 18, 2018 Completed
112. SUPPLY OF WELDING ELECTRODE FOR NOC GALLAF PROJECT SAPURA
FABRICATION SDN BHD
October 17, 2018 Completed
113. MATERIAL FRO TELCO SATELLITE ANTENNA PEDESTAL AT WPPA – COST PLUS (ANTI-SLIP)
DAYANG ENTERPRISE /
MURPHY October 17, 2018 Completed
114. PFP RECTIFICATION WORK FOR ST. JOSEPH SEA HIBISCUS SDN
BHD October 16, 2018 Completed
115. PROVISION OF ELECTRONIC OFFICE APPLICATION LEAVE FOR PTTEP HK OFFSHORE LIMITED
PTTEP HK OFFSHORE LIMITED
October 12, 2018 Completed
116. SUPPLY OF WELDING ELECTRODE FOR BOKOR PROJECT MMHE October 12, 2018 Completed
117. SUPPLY OF WELDING ELECTRODE FOR EPC OF GOREK SAPURA
FABRICATION SDN BHD
October 9, 2018 Completed
118. SUPPLY OF PRIMARY UNIT REGULATOR VALVE 20K 50A WITH GAUGE (KORVAL)
PFLNG October 4, 2018 Completed
119. SUPPLY OF WELDING ELECTRODE FOR EPC OF BAKONG SAPURA
FABRICATION SDN BHD
September 25, 2018 Completed
120. SUPPLY AND DELIVERY ELECTRICAL MATERIAL FOR DULANG V-507 SEPARATOR CONTROL UPGRADE
PETRONAS CARIGALI
September 23, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
121. SUPPLY AND DELIVERY OF CABLE AND ACCESSORIES FOR DULANG WELL FLOW MEASUREMENT B23SL DULANG B PLATFORM
PETRONAS CARIGALI
September 21, 2018 Completed
122. SUPPLY OF SWA CABLE DAYANG
ENTERPRISE September 14, 2018 Completed
123. SUPPLY OF HUMIDUR PAINTS FOR MESPLT GUMUSUT DEVELOPMENT SABAH SELL PETROLEUM
August 30, 2018 Completed
124. SUPPLY & DELIVERY OF TOOLS AND CONSUMABLE (WELDING ELECTRODE) FOR MAINTENANCE, CONSTRUCTION AND MODIFICATION (MCM)
(SKG) SAPURA FAB-BORNEO
SEAOFFSHORE JV / PETRONAS CARIGALI
August 28, 2018 Completed
125. SUPPLY OF HUMIDUR PAINTS FOR BLNG CSIP USAGE BLNG August 20, 2018 Completed
126. SUPPLY OF INSTRUMENT CABLE FOR SAPA INFILL E & I BULK MATERIAL – COST PLUS
DAYANG ENTERPRISE
August 2, 2018 Completed
127. SUPPLY OF 3M 8515 N95 DISPOSABLE RESPIRATOR PETRONAS GAS
BERHAD July 31, 2018 Completed
128. SUPPLY OF HUMIDUR FP COATING FOR LNG PUTERI NILAM EAGLESTAR
SHIPMANAGEMENT July 27, 2018 Completed
129. RENTAL OF DRY-ICE BLASTING SYSTEM FOR 3 MONTHS EVERSOLVE July 23, 2018 Completed
130. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES EVERSOLVE July 23, 2018 Completed
131. SUPPLY & DELIVERY OF KOBE ELECTRODE FOR INVENTORY STOCK MMHE July 20, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
132. PROVISION OF PASSIVE FIRE PROTECTIONS (PFP) FOR BR-A PLATFORM REPSOL
REPSOL July 19, 2018 Completed
133. STRUCTURAL WORKS FOR BOKOR CPP TOPSIDES PETRONAS CARIGALI
July 18, 2018 Completed
134. PROVISION OF SUPPLY OF MANPOWER, MATERIALS AND EQUIPMENT FOR INSTALLATION OF A60 RATED FIRE INSULATION WORK AT SELIGI
ENQUEST July 18, 2018 Completed
135. SUPPLY AND DELIVERY OF CABLES FOR SUMANDAK SELATAN INFILL PROJECT
PETRONAS CARIGALI
July 13, 2018 Completed
136. SUPPLY OF DISPOSABLE RESPIRATOR (REPEAT ORDER) MALAYSIAN
REFINING COMPANY July 13, 2018 Completed
137.
SUPPLY AND DELIVERY OF CABLE INSTRUMENTATION FOR HUC MODIFICATION AT D18MP-A FOR HOST TIE IN DE-BOTTLENECKING FOR D18 PHASE 2 PROJECT
PETRONAS CARIGALI
July 12, 2018 Completed
138. SUPPLY OF SWA CABLE TAI CREST
RESOURCES July 11, 2018 Completed
139. PROVISION OF SUPPLY INSTRUMENT CONTROL CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM
PETRONAS CARIGALI
July 10, 2018 Completed
140. SUPPLY OF ELECTRODE FOR BOKOR-BETTY – BASE SCOPE
SAPURA PINEWELL SDN BHD / PETRONAS CARIGALI
July 4, 2018 Completed
141. SUPPLY OF DISPOSABLE RESPIRATOR MALAYSIAN
REFINING COMPANY July 3, 2018 Completed
142. PROVISION OF MOXA DEVICES PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) July 2, 2018 Completed
143. PROVISION OF SUPPLY FIBRE OPTIC CABLE FOR TIONG-A ICP 2.0 PROJECT AT TIONG-A PLATFORM
PCSB June 26, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
144. SUPPLY OF ELECTRODE NC36L FOR BOKOR BETTY – BASE SCOPE
SAPURA PINEWELL SDN BHD / PETRONAS CARIGALI
June 13, 2018 Completed
145. PASSIVE FIRE PROTECTION WORKS FOR ANJUNG BDEWC May 30, 2018 Completed
146. SUPPLY OF DRAKA CABLE PETRONAS CHEMICALS ETHYLENE
May 22, 2018 Completed
147. SUPPLY OF HEAT BARRIER PANEL FOR AHU AND VSAT ANTENNA HEAT PROTECTION AT EAST BELUMUT PLATFORM
NEWFIELD May 17, 2018 Completed
148. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) May 15, 2018 Completed
149. SUPPLY AND RENTAL OF ADDITIONAL DMR HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) May 15, 2018 Completed
150. PURCHASE ADOBE CREATIVE CLOUD PETRONAS GAS
BERHAD May 2, 2018 Completed
151. SUPPLY & DELIVERY OF DRAKA CABLE FOR FSU NAUTICA MUAR (BENTARA) EPOMS April 27, 2018 Completed
152. SUPPLY OF SPARE PART FOR 2WAY CONTROL VALVE (KORVAL) PFLNG April 26, 2018 Completed
153. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 17, 2018 Completed
154. PROVISION FOR RENEWAL OF ANNUAL SUBSCRIPTION FOR AUTOCAD COMMERCIAL
PETRONAS TECHNICAL
SERVICES SDN BHD April 23, 2018 Completed
155. SUPPLY OF BREAKING LOAD TENSILE TEST FOR HELIDECK NETTING GK MALIKAI – COST PLUS
PETRA RESOURCES April 12, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
156. CONFIGURATION OF ADDITIONAL CHANNEL AND FREQUENCY FOR LEASING PORTABLE RADIOS
PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) April 11, 2018 Completed
157. PROVISION OF MAINTENANCE RENEWAL (SOLARWINDS AND VEEAM)
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
April 11, 2018 Completed
158. SUPPLY OF ID CARD PRINTER FOR HSE SAPURA
EXPLORATION AND PRODUCTION
April 10, 2018 Completed
159. SUPPLY OF KOBE ELECTRODE FOR HESS PHRASE II HESS April 10, 2018 Completed
160. PROVISION OF MAINTENANCE RENEWAL (PRIMAVERA P6 ENTERPRISE) PETRONAS TECHNICAL SERVICES
March 28, 2018 Completed
161. PROVISION OF LCV ACTUATOR AND PLC NETWORK PETROFAC (PM304-MALAYSIA) LIMITED
March 27, 2018 Completed
162. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) AFS-887 – SATELLITES TURNAROUND (SATURN) PROJECT - GuF
EMEPMI March 23, 2018 Completed
163. PROVISION OF IT PERIPHERALS PETRONAS TECH
TRAINING March 19, 2018 Completed
164. SUPPLY OF HUMIDUR FP PAINTS TO QET BSP March 14, 2018 Completed
165.
SUPPLY MATERIALS AND APPLICATION FIRE PROOFING MATERIALS ON NEW LOADING PLATFORM STRICTURES FOR SPR 2 PROJECT FIRE PROOFING APPLICATION ON NEW JETTY PLATFORM STRUCTURES
BLNG March 7, 2018 In Progress
166. SUPPLY OF HUMIDUR PAINTS FOR UNIT 7200 LNG RUNDOWN LINE (GRE CLADDING) PAINTING WORK
BLNG February 26, 2018 Completed
167. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS EXPLORATION
& PRODUCTION MALAYSIA B.V
February 21, 2018 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
168. PROVISION OF ADOBE SOFTWARE PETRONAS
CHEMICALS GROUP BERHAD
February 20, 2018 Completed
169. SUPPLY OF WELDING ELECTRODE FOR STRUCTURAL INSTALLATION FOR SSB PAN MALAYSIA 2018
SSB February 12, 2018 Completed
170. SUPPLY OF INSTRUMENT CABLE (REPEAT ORDER) GUNTONG PRODUCTION OPTIMIZATION - GuD
EMEPMI February 9, 2018 Completed
171. SUPPLY OF HUMIDUR PAINTS - WESCO SHELL PHILIPPINES EXPLORATION B.V
February 5, 2018 Completed
172. PROVISION OF MOXA DEVICES PETRONAS GAS
BERHAD January 30, 2018 Completed
173. SUPPLY OF HEAT SHIELD PANEL FOR BLUE BRUSKER AT DUYONG LQ PETRONAS CARIGALI
January 24, 2018 Completed
174. PROVISION TO SUPPLY & DELIVER OF PIPELINE TAPE FOR PCSB-SBO PETRONAS
CARIGALI SDN BHD January 23, 2018 Completed
175. ASSAI CALL-OFF MAITENANCE AND SUPPORT SERVICES SAPURA
EXPLORATION & PRODUCTION
January 12, 2018 Completed
176.
PROVISION OF DESIGN, SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION FOR BOD HTI – PROVISION BUNGA PAKMA ACCOMODATION WORK BOAT GANGWAY PROJECT
REPSOL December 12, 2017 Completed
177. SUPPLY OF HUMIDUR PAINTS FOR U7200 TRESTLE STRUCTURE B/P ACTIVITIES BLNG November 29, 2017 Completed
178. SUPPLY OF HUMIDUR FP PAINTS TO MGC BSP November 17, 2017 Completed
179. RENTAL OF HAND PORTABLE RADIO PRPC UTILITIES AND FACILITIES SDN BHD
(PENGERANG) November 11, 2017 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
180. FLARE TOWER PFP REINSTATEMENT FOR KIKEH MURPHY September 11, 2017 Completed
181. PROVISION OF PASSIVE FIRE PROTECTION FOR M1 TOPSIDE MAINTENANCE AND STRUCTURAL REPAIR
PETRONAS August 25, 2017 Completed
182. SUPPLY OF PAINT-MANUFACTURER “ACOTEC & HUMIDUR” SHELL August 24, 2017 Completed
183. PROVISION OF MOTOROLA PORTABLE RADIO AND ACCESSORIES PETRONAS
CARIGALI SND BHD August 24, 2017 Completed
184. PROVISION OF MOTOROLA ACCESSORIES OCEAN MIGHT SDN
BHD August 22, 2017 Completed
185. PROVISION OF MOTOROLA PORTABLE RADIO ACCESSORIES SAPURA
EXPLORATION AND PRODUCTION
August 14, 2017 Completed
186. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – F06
SHELL August 9, 2017 Completed
187. SUPPLY OF MATERIALS AND SPARE PARTS FOR BERGADING-CPP FRESH WATER GENERATOR FOR NORTH MALAY BASIN FULL FIELD DEVELOPMENT
HESS August 7, 2017 Completed
188. SUPPLY OF AVAYA PABX TELECOMMUNICATION HARDWARE AND ACCESSORIES
HESS August 4, 2017 Completed
189. PROVISION FOR MATLAB SOFTWARE MAINTENANCE SUPPORT FOR 2 YEARS HESS EXPLORATION
& PRODUCTION MALAYSIA B.V
August 3, 2017 Completed
190. PROVISION OF MOTOROLA ACCESSORIES REPSOL OIL AND
GAS MALAYSIA LTD July 24, 2017 Completed
191. PURCHASE OF IT PERIPHERALS
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
July 19, 2017 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
192. RECTIFICATION OF MISALIGNED STEAM TURBINE PIPING ST 8100 AT ACRYLIC PLANT
BASF July 13, 2017 Completed
193.
PROVISION OF PASSIVE FIRE PROTECTION (PFP) COATING FOR BO-D RISER SPLASH ZONE SECTION FOR BUNGA PAKMA DEVELOPMENT PROJECT – REPSOL 2017
REPSOL July 10, 2017 Completed
194. HIRING OF DRY ICE BLASTING VENDOR FOR CARRYING OUT DI BLASTING AT BLNG-CSIP FOR TA 2017
BLNG June 24, 2017 Completed
195. PROVISION OF TELWIN ENERGY 650 START BATTERIES SAPURA
EXPLORATION & PRODUCTION
June 22, 2017 Completed
196. PROVISION FOR DESIGN, FABRICATE, SUPPLY AND INSTALLATION ASSISTANCE/SUPERVISION FOR HEAT SHIELD FOR SAPAWI PROJECT
MURPHY June 21, 2017 Completed
197. PROVISION OF HAYAMIM AVA ELECTRONIC WHITEBOARD AND ACCESSORIES HESS EXPLORATION
& PRODUCTION MALAYSIA B.V
June 1, 2017 Completed
198. PURCHASE OF IT PERIPHERALS PETRONAS DAGANGAN BERHAD
May 22, 2017 Completed
199. PURCHASE OF IT PERIPHERALS PETRONAS PENAPISAN (MELAKA)
May 8, 2017 Completed
200. PROVISION OF PASSIVE FIRE PROTECTION SUBCONTRACTING WORK BDEWC April 21, 2017 Completed
201. PROVISION OF MAINTENANCE RENEWAL OF SECURITY SYSTEM (FIREWALL-CYBEROAM)
SAPURA EXPLORATION &
PRODUCTION April 20, 2017 Completed
202. PURCHASE OF IT PERIPHERALS SAPURA
EXPLORATION & PRODUCTION
April 14, 2017 Completed
203. SUPPLY AND DELIVERY OF PRINTER EPOMS April 5, 2017 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
204. SUPPLY AND DLEIVERY SAMSUNG MOBILE SMARTPHONES EPOMS March 15, 2017 Completed
205. PROVISIONAL OF SUPERVISION, LABOUR SUPPLY, RENTAL OF MACHINERY AND SCAFFOLDING FOR INSULATION WORK AT LEMONGRASS PROJECT
BASF March 3, 2017 Completed
206. JUNIPER NETWORK SUPPORT
EXXONMOBIL EXPLORATION AND
PRODUCTION MALAYSIA INC.
February 22, 2017 Completed
207. FIRE PROOFING REPAIR FOR U-7420 c/w ALL MATERIALS EQUIPMENT & MANPOWER FOR U-7420
BLNG January 25, 2017 Completed
208. PURCHASE OF TELECON/NETWORK EXXONMOBIL December 14, 2016 Completed
209. PROVISION TO SUPPLY IT HARDWARE & CONSUMABLES HESS November 25, 2016 Completed
210. RECTIFICATION OF MISALIGNMENT STEAM TURBINE PIPE STAGE 1 BASF November 11, 2016 Completed
211. PURCHASE OF COMPUTER EQUIPMENT EXXONMOBIL November 1, 2016 Completed
212. SUPPLY AND DELIVERY OF SAMSUNG MOBILE SMARTPHONES PETRONAS TECHNICAL
TRAINING SDN BHD October 28, 2016 Completed
213. SUPPLY OF RIBBON ZEBRA
PETRONAS CHEMICAL
DERIVATIVES SDN BHD
October 25, 2016 Completed
214. SUPPLY OF RIBBON ZEBRA
PETRONAS CHEMICAL
DERIVATIVES SDN BHD
October 24, 2016 Completed
215. PASSIVE FIRE PROTECTION WORK FOR SK310 B15 DEVELOPMENT PETRONAS CARIGALI
September 28, 2016 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
216. PROVISION VSAT SERVICES SAPURAKENCANA SK GEOTECHNICS
August 22, 2016 Completed
217. SUPPLY OF KOBE ELECTRODE FOR SK310 B15 DEVELOPMENT - TOPSIDE PETRONAS CARIGALI
August 16, 2016 Completed
218. PASSIVE FIRE PROTECTION WORKS FOR BNJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT
PETRONAS CARIGALI
June 8, 2016 Completed
219. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC – WORKSCOPING AT E11, F23, F13 AND F06
SHELL May 18, 2016 Completed
220. CONTRACT NO: UI50960 - SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION COMPOUND FOR SSB/SSPC
SHELL April 1, 2016 Completed
221. PROVISION OF VIV STRAKES FOR MALIKAI’S PIPELINE SHELL March 16, 2016 Completed
222. PROVISION OF VSAT COMMUNICATION SERVICES & WIRELESS RADIO SERVICES FOR KBM CLUSTER FIELD DEVELOPMENT
COASTAL ENERGY January 28, 2016 Completed
223.
PROVISION OF NAVAL ARCHITECTURE AND MARINE ENGINEERING FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BOKOR PHASE 3A PROJECT
PETRONAS CARIGALI November 2, 2015 Completed
224. PASSIVE FIRE PROTECTION WORKS FOR TTJT-K FOR EPCC TUKAU BARONIA WELLHEAD PLATFORMS (WHP) PROJECT
PETRONAS CARIGALI October 23, 2015 Completed
225. PROVISION OF 14” PIPELINE RISER COMPACT FLANGE INSPECTION AND TESTING WORKS FOR KPOC – RM 500,000
KPOC September 18, 2015 Completed
226. PROVISION OF FJC SERVICES FOR SHELL MALIKAI PACK B – USD 700,000 SHELL September 10, 2015 Completed
227. PASSIVE FIRE PROTECTION WORKS FOR EPCIC OF REMOTE WHPS FOR FULL FIELD DEVELOPMENT, NORTH MALAY BASIN PROJECT
HESS September 8, 2015 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
228. PROVISION OF VSAT COMMUNICATION SERVICES FOR SKE’S DRILLING RIG SAPURAKENCANA
ENERGY September 1, 2015 Completed
229. PROVISION OF NAVAL ARCHITECTURE SERVICES FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR BARAM HELIDECK PROJECT
PETRONAS CARIGALI
September 1, 2015 Completed
230.
PROVISION AND SUPPLY OF HDPF WITH SEA SLEEVE & INTRAFUSE FOR PROCUREMENT CONSTRUCTION & COMMISSIONING (PCC) OF REGASTIFICATION TERMINAL 2 PIPELINE PROJECT – USD 35,000
CPM GROUP July 28, 2015 Completed
231. SUPPLY OF STRAKES AND BENDS FOR SHELL GUMUSUT PHASE 2 SHELL July 6, 2015 Completed
232. SUPPLY OF STRAKES AND STRAPS FOR SHELL GUMUSUT PHASE 2 SHELL June 16, 2015 Completed
233. SUPPLY OF PIPELINE FIELD JOINT ANTI-CORROSION COATING SYSTEM FOR BESAR PIPELINE INSTALLATION – PCSB YEAR 2015
PETRONAS CARIGALI May 12, 2015 Completed
234. TO SUPPLY AND DELIVER CORROSION INHIBITOR TOTE TANK (TTJT-A) FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORMS (WHP)
PETRONAS CARIGALI May 6, 2015 Completed
235. TO SUPPLY AND DELIVER WASH WATER STORAGE TANK FOR EPCC OF BNJT-K AND TTJT-A WELLHEAD PLATFORM
PETRONAS CARIGALI April 29, 2015 Completed
236. PASSIVE FIRE PROTECTION WORKS FOR PCC OF BESAR-A WHP TOPSIDE PETRONAS CARIGALI April 24, 2015 Completed
237. PROVISION OF VSAT COMMUNICATION SERVICES TOTAL E&P MALAYSIA
October 1, 2014 Completed
238. PROVISION OF WASTE DISPOSAL MANAGEMENT FOR BINTULU OPERATIONS BC PETROLEUM SDN
BHD October 1, 2014 Completed
239. VSAT SATELITE TELECOMMUNICATION SYSTEM AND SERVICES FOR BOKOR PHASE 3A
SCHLUMBERGER September 29, 2014 Completed
240. TO SUPPLY AND DELIVER ATMOSPHERIC TANKS FOR EPCIC OF LAYANG DEVELOPMENT FACILITIES
JX NIPPON September 17, 2014 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
241. SUPPLY OF SERVIWRAP PETRONAS CARIGALI
August 8, 2014 Completed
242. PROVISION OF PASSIVE FIRE PROTECTION FOR WELLHEAD PLATFORM BLOCK PM 307 BERTAM FILED DEVELOPMENT
LUNDIN PETROLEUM July 16, 2014 Completed
243. PROVISION OF COMMUNICATION & ASTRO SERVICE SYSTEM FOR EPV PETRONAS CARIGALI
July 7, 2014 Completed
244. ELECTRODE (KOBELCO) FOR WHEATSTONE PROJECT LNG PLANT – MODULE FABRICATION ISBL
SAPURAKENCANA July 3, 2014 Completed
245. SUPPLY AND DELIVERY OF CABLES & ACCESSORIES FOR HUC FOR CENDOR PHASE 2 DEVELOPMENT PROJECT, BLOCK PM304
KENCANA PETROLEUM
May 28, 2014 Completed
246. VSAT SERVICES FOR TALISMAN MALAYSIA’S OFFSHORE PRODUCTION PLATFORMS
TALISMAN MALAYSIA
May 1, 2014 Completed
247. PROVISION OF 3RD PARTY SERVICES FOR PASSIVE FIRE PROTECTION AT FIREWALL EAST BELUMUT PLATFORM
MMC OIL & GAS April 30, 2014 Completed
248. DISPOSAL OF SCRAP METAL ITEMS DUE TO MAINTENANCE, DAMAGE METTALIC PARTS, USED SPARE PARTS, OBSOLETE AND EXPIRED MATERIAL
PETRONAS PENAPISAN
(MELAKA) SDN BHD April 21, 2014 Completed
249.
FABRICATION WORKS, SUPPLY OF MATERIAL, EQUIPMENT & MANPOWER AND DELIVERY OF PERMANENT FLANGE PROTECTOR & STUDBOLT FOR SSB PROJECT
TL OFFSHORE SDN BHD
April 16, 2014 Completed
250. PROVISION OF FIXED VSAT SERVICES FOR UMW NAGA JACK-UP RIGS FOR UMW OFFSHORE DRILLING SDN BHD
UMW OFFSHORE DRILLING
April 1, 2014 Completed
251. PROVISION OF VSAT SYSTEM SERVICES FOR EVA-NMB GAS PIPELINE INSTALLATION
GOM RESOURCES SDN BHD
April 1, 2014 Completed
252. M03PQ-A V-3030 AND 3040 STRUCTURE FRAMING PFP COATING REPAIR (OPTION NO.1)
SHELL February 12, 2014 Completed
253. PROVISION OF FIXED VSAT SERVICES FOR COASTAL ENERGY’S MOBILE PRODUCTION UNIT, THE EP5 AND EP6
COASTAL ENERGY January 1, 2014 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
254. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM FOR MAIN WORK BARGES / VESSELS 2014 – 2016 – TL OFFSHORE SDN BHD
TL OFFSHORE January 1, 2014 Completed
255. M03PQ-A VESSEL V-6210 PFP COATING SHELL December 27, 2013 Completed
256. PASSIVE FIRE PROTECTION SYSTEM ON DIESEL STORAGE TANK COLUMN T-S16270 AT KIKEH UNITL SCOPE COMPLETE
MURPHY November 28, 2013 Completed
257.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG C STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI November 13, 2013 Completed
258.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG B STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI November 13, 2013 Completed
259.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR TABU A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 28, 2013 Completed
260.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR PALAS A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 28, 2013 Completed
261.
SUPPLY AND DELIVERY OF GRATING & ACCESSORIES FOR WAVE ZONE GRATING PHASE 2 FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM
EMEPMI October 25, 2013 Completed
262. PROVISION FOR REMOVAL AND INSTALLATION OF EPOXY-TYPE PASSIVE FIRE PROTECTION FOR HELANG INTEGRATED PLATFORM (HIP)
MMC OIL & GAS October 22, 2013 Completed
263. MODIFICATION AND FABRICATION OF NEW GRILLAGES / SKID RADOIL ONSHORE SUPPORT SYSTEM FOR J-LAY TOWER - SASB
SAPURA ACERGY SDN BHD
September 12, 2013 Completed
264. PROVISION OF FIREWALL UPGRADE (PFP COATING) FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM
EMEPMI September 6, 2013 Completed
265. PROVISION OF FIELD JOINT COATING SERVICES FOR EVA PROJECT 2013 HESS August 10, 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
266. PROVISION OF FIXED VSAT SERVICES FOR ATWOOD MANTA AND COASTAL ENERGY
ATWOOD August, 2013 Completed
267. SUBCONTRACT WORKS FOR PASSIVE FIRE PROTECTION WORKS FOR DAMAR-A PLATFORM
EMEPMI July 29, 2013 Completed
268. PROVISION OF FIELD JOINT COATING SERVICES FOR TUKAU PROJECT 2013 HESS July 18, 2013 Completed
269. PROVISION OF VSAT SERVICES FOR BUMI ARMADA AT-300 VESSEL BUMI ARMADA June, 2013 Completed
270. PROVISION OF STABILIZED VSAT SERVICES FOR PERISAI PETROLEUM ON THE PERISAI KAMELIA
PERISAI PETROLEUM June, 2013 Completed
271. SUPPLY AND DELIVER OF SLIDING PLATE FOR FABRICATION OF KBB TOPSIDES (BOAQ) - MMHE
KPOC May 23, 2013 Completed
272. PROVISION OF PASSIVE FIRE PROTECTION FOR SHELL D12 & LAILA FIELD DEVELOPMENT - THHE
SARAWAK SHELL BERHAD
May 9, 2013 Completed
273. PROVISION OF SUPPLY & SERVICE OF HBE COATING APPLICATION FOR 16” X 22KM DAMAR-A TO LAWIT-A CRA PIPELINE – TL OFFSHORE SDN BHD
EMEPMI May 2, 2013 Completed
274.
PROVISION OF RISER CLAMP & FLANGE PROTECTOR FOR 16” X 52KM GAS EXPORT PIPELINE FROM PLEM & LAWIT A PLATFORM – GOM RESOURCES SDN BHD
HESS EXPLORATION & PRODUCTION MALAYSIA B.V
April 29, 2013 Completed
275. PROVISION OF HEAT SHIELD FOR TAPIS EOR PROJECT FOR GUE TELOK PLATFORM – SHAPADU ENERGY & ENGINEERING
EMEPMI April 2013 Completed
276. SUPPLY AND INSTALLATION OF HEAT SHIELD FOR KINABALU KNPG-B - MMHE PETRONAS
CARIGALI SDN BHD April 2013 Completed
277. OFFSHORE CARRY OVER WORKS FOR PIPING OF TAPIS-Q TOPSIDES - MMHE EMEPMI April 2013 Completed
278.
PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS B WI HTI PIPE SUPPOR TSTOP (AFS003B) – SHAPADU ENERGY & ENGINEERING SDN BHD
EMEPMI April 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
279.
PROVISION FOR PURCHASE OF STRUCTURAL STEEL PIPES FOR TAPIS C PLATFORM TOPSIDE (EXCLUDE LER) - SHAPADU ENERGY & ENGINEERING SDN BHD
EMEPMI April 2013 Completed
280.
PROVISION OF FABRICATION AND DELIVERY OF 16” SE-PA RISER LOAD BEARING CLAMP AND SLIDING CLAMP FOR MOC YEAR 2013 PIPELINES INSTALLATION - SAPURA KENCANA PETROLEUM C/O TL OFFSHORE SDN BHD
MURPHY SARAWAK OIL. CO. LTD
April 2013 Completed
281.
SUPPLY AND DELIVER OF CEILING FINISHES - SUSPENDED CEILING SYSTEM SOUTH ACIS OIL & GAS DEVELOPMENT PROJECT (REPEAT ORDER) - BROOKE DOCKYARD & ENGINEERING WORKS CORPORATION
BROOKE DOCKYARD & ENGINEERING
WORKS CORPORATION
March 18, 2013 Completed
282.
ENGINEERING,SUPPLY OF MATERIAL, MANUFACTURING, FABRICATION, INSTALLATION AND MODIFICATION OF FIBERGLASS GRATINGS, STAIRTREADS AND GRE HANDRAILS FOR DAMAR A SUBSTRUCTURE PROJECT – MMHE
EMEPMI March 13, 2013 Completed
283. PROVISION OF 3LPE FIELD JOINT COATING ON 12” & 10” LINEPIPE SERVICES FOR SIAKAP NORTH PETAI (SNP) DEVELOPMENT PROJECT
MURPHY SNP March 11, 2013 Completed
284. PROVISION OF FIELD JOINT COATING SERVICES FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE
EMEPMI March 8, 2013 Completed
285.
SUPPLY & DELIVERY OF FIELD JOINT ANTI CORROSION COATING SYSTEM HEAT SHRINK SLEEVE (RAYCHEM WPC100) FOR EMEPMI 2013 TAPIS & DAMAR OFFSHORE INSTALLATION WORK – TL OFFSHORE
EMEPMI March 8, 2013 Completed
286. PROVISION OF PIPELINE FIELD JOINT INFILL MATERIAL FOR TAPIS EOR & DAMAR GAS DEVELOPMENT PROJECT Y2013
EMEPMI March 7, 2013 Completed
287. PROVISION OF FIRE PROTECTION (PFP) AND INSULATION WORK FOR WEST DESARU TOPSIDES - THHE FABRICATORS SDN BHD
AQUATERRA ENERGY LIMITED
March 7, 2013 Completed
288. M03 DAMAGED FPF COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed
289. M01 DAMAGED PFP COATING REPAIR - DAYANG ENTERPRISE SDN BHD SHELL March 2013 Completed
290.
PROVISION OF SUPPLY AND DELIVERY OF MONEL WELDING INTEGRATED TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR EARLY PRODUCTION SCHEME (EPS), INTEGRATED GAS DEVELOPMENT (IGD) PROJECT, NORTH MALAY BASIN (NMB) FIELD – GOM RESOURCES SDN BHD
HESS EXPLORATION & PRODUCTION
MSIA B.V. March 2013 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
291. PROVISION OF FIELD JOINT COATING SERVICES FOR HESS 2013 PROJECT – GOM RESOURCES
HESS February 26, 2013 Completed
292. PROVISION TO SUPPLY AND DELIVER CRUDE OIL WASHING MACHINE (COW MACHINE) SUPPLY FOR BERANTAI OPERATION - PETROFAC
PETRONAS January 29, 2013 Completed
293. SUBCONTRACTOR FOR PASSIVE FIRE PROTECTION WORKS FOR KBB TOPSIDES - MMHE
KPOC January 21, 2013 Completed
294. ARCHITECTURAL INSULATION PACKAGE SUPPLY OF M90 FIRETEX FOR GREATER EKOFISK AREA 2/4 - SMOE
CONOCO PHILIPS January 15, 2013 Completed
295.
PROVISION OF 3RD CAMPAIGN SEA-FASTENING WORKS OF J-LAY AND PES TOWER ON BOARD SAPURA 3000 – SAPURA ACERGY SDN BHD
SHELL January 11, 2013 Completed
296.
PROVISION OF SUPPLY AND DELIVERY OF CEILING FINISHES – SUSPENDED CEILING FOR SOUTH ACIS PROJECT – BROOKE DOCKYARD AND ENGINEERING WORKS.
MURPHY January 10, 2013 Completed
297. DESIGN, FABRICATION & DELIVERY OF FIREWALL FOR DAMAR-A TOPSIDE MMHE
EMEPMI January 08, 2013 Completed
298. SUPPLY OF PAINT EMEPMI December 27, 2012 Completed
299.
E & I WORKS-FABRICATION AND INSTALLATION FOR F14DR-A TOPSIDES & F14/F29 PROCESS MODULE – MALAYSIA MARINE AND HEAVY ENGINEERING SDN. BHD.
SHELL December 17, 2012 Completed
300. STRUCTURE WORKS FOR DAMAR-A PLATFORM (TOPSIDE) - MMHE EMEPMI November 12, 2012 Completed
301. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC October 18, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
302.
SUPPLY, DELIVERY, AND INSTALLATION SUPERVISION OF COMPOSITE MATERIALS (FIBERGLASS) & ACCESSORIES FOR WAVE ZONE GRATING FOR GUNTONG A STRUCTURAL AND PIPING SYSTEM REPAIR PROGRAM, EMEPMI EPCM BROWNFIELD PROJECT.
EMEPMI October 5, 2012 Completed
303. SUPPLY AND DELIVER OF OFFICE EQUIPMENT (HS1146630X FIRE FIGHTING SUIT) HS1146630X FIRE FIGHTING SUIT
UNIVERSITI TELNOLOGI
PETRONAS, TRONOH PERAK
October 2012 Completed
304.
SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (BOAQ)(5.12M002B) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC September 24, 2012 Completed
305. SUPPLY OF INSULATION MATERIALS FOR FABRICATION OF KEBABANGAN TOPSIDES (5.12M003C) – MALAYSIA MARINE HEAVY ENGINEERING SDN. BHD.
KPOC September 24, 2012 Completed
306.
PROVISION OF FABRICATION 18” AND 12” FLEXIJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 13, 2012 Completed
307.
PROVISION OF FABRICATION 8” AND 10” STRESSJOINT BODY SUPPORT ON ERECTOR FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 12, 2012 Completed
308. PROVISION OF FIELD JOINT COATING SERVICES FOR 8" AND 10" MALIKAI PIPELINE – GOM RESOURCES
SHELL September 11, 2012 Completed
309.
PROVISION OF FABRICATE AND SUPPLY OF WS2 UPPER MAST ELEMENT 2 LIFTING PAD EYE FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 5, 2012 Completed
310.
PROVISION OF FABRICATE AND SUPPLY OF NEW 18” ESCALATOR TROLLEY INSERTS, ACCESS TO HPU BOOST PUMPS, WS2 LOWER MAST ELEMENT 2, WS2 HINGE HATCH COVER, WS1 RAIN PROTECTION IMPROVEMENT FOR GUMUSUT KAKAP, J-LAY TOWER REFURBISIHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL September 5, 2012 Completed
311. PROVISION OF STABILIZED VSAT SATELLITE COMMUNICATIONS FOR SAPURAACERGY ON THE SAPURA3000
SAPURAACERGY September, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
312. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL August 30, 2012 Completed
313. PROVISION OF DISPOSAL OF DAMAGED KOSMO, IVECO AND MAN BUSES AND ITS COMPONENTS – SYARIKAT PRASANA NEGARA BERHAD
SPNB August 29, 2012 Completed
314. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TAPIS Q TOPSIDE – MMHE SDN BHD
EMEPMI August 28, 2012 Completed
315. SUPPLY AND DELIVERY OF HSS (WPC100M) FOR MALIKAI PIPELINE – GOM RESOURCES
SHELL August 18, 2012 Completed
316. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION (PFP) FOR TELOK A TOPSIDES – MMHE SDN BHD
EMEPMI August 9, 2012 Completed
317. PROVISION OF VSAT SERVICES IN GULF OF MEXICO – SAPURA ACERGY SDN BHD
SAPURA ACERGY August 9, 2012 Completed
318.
PROVISION OF FIELD JOINT COATING SERVICES AND SUPPLY OF ANTICORROSSION TAPE (SERVIWRAP M30B) FOR 6" X 7.6KM BEKOK-A TO TIONG-A PIPELINE INSTALLATION – GOM RESOURCES
PETRONAS August 2, 2012 Completed
319. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S TABU A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY
EMEPMI July 31, 2012 Completed
320. SUPPLY AND DELIVER OF HEAVY DUTY ANTI SLIP STEP COVER – TALISMAN MALAYSIA LIMITED
TALISMAN July 12, 2012 Completed
321. PROVISION OF TELECOMMUNICATION SYSTEM FOR TOISA PALADIN – FUGRO GEODETIC (M) SDN BHD
FUGRO GEODETIC July 12, 2012 Completed
322. FABRICATION AND INSTALLATION OF STRUCTURE WORKS FOR PACKAGE 1, DECK NORTH AND MISC FOR TAPIR R TOPSIDES PROJECT - MMHE SDN BHD
EMEPMI July 10, 2012 Completed
323.
SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) AND PACKAGE B: B-193 A-P FOR (PGC & AGRU) – SIME DARBY ENGINEERING SDN BHD
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) July 07, 2012 Completed
324.
SUBCONTRACT FOR PIPING WORKS FOR PACKAGE B: B-193 A-Q (LIVING QUARTERS, POWER GENERATION & WATER INJECTION) – SIME DARBY ENGINEERING SDN BHD
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) July 04, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
325. SUPPLY OF VINYL COATED CHAIN LINK FABRIC FOR EMEPMI’S PALAS A STRUCTURAL REPAIR PROJECT – PERUNDING RANHILL WORLEY
EMEPMI July 04, 2012 Completed
326. SUPPLY AND DELIVER OFSLIDING PLATE FOR FABRICATION ON KBB TOPSIDES (BOAQ) - MMHE
KPOC July 02, 2012 Completed
327.
TO SUPPLY MATERIALS, EQUIPMENT, CONSUMABLES, TOOLS AND MANPOWER FOR COOLING MANIFOLD RELOCATION FOR GUMUSUT KAKAP, J LAY TOWER REFURBISHMENT 2012 PROJECT – SAPURA ACERGY SDN BHD
SHELL June 12, 2012 Completed
328. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF VESSEL DLB264 – GOM RESOURCES
GOM RESOURCES June 11, 2012 Completed
329. PROVISION OF PULLING & REMOVE CABLE FOR LNGC SERI ALAM – MMHE SDN. BHD.
MISC May 21, 2012 Completed
330. SUPPLY, FABRICATE AND DELIVERY SEA FASTENING FOR CARGO BARGE FOR LAN DO DEVELOPMENT PROJECT – SAPURA ACERGY SDN BHD
TNK VIETNAM BV May 17, 2012 Completed
331.
PROVISION OF FIELD JOINT COATING SERVICES FOR MOC TRANSPORTATION AND INSTALLATION OF OFFSHORE PIPELINES AND FACILITIES FOR YEAR 2012 – TL OFFSHORE SDN BHD
MURPHY OIL May 9, 2012 Completed
332. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT PM318-PUTERI FWS PIPELINE REPLACEMENT PROJECT - NEWFIELD
NEWFIELD April 9, 2012 Completed
333. PROVISION OF VSAT TELECOMMUNICATION AND SERVICES FOR PETRONAS CARIGALI SDN BHD – IPERINTIS SDN BHD
IPERINTIS April 6, 2012 Completed
334. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - SCHLUMBERGER GROUP
SCHLUMBERGER April 4, 2012 Completed
335. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES - HALLIBURTON ENERGY SERVICES (M) SDN BHD
HALLIBURTON April 4, 2012 Completed
336. PROVIDING COMMUNICATION SYSTEMS (VSAT) AND SERVICES IN SUPPORT OF HEAVY LIFT PIPE LAY VESSEL LTS3000
L & T SAPURA April 1, 2012 Completed
337. DESIGN, FABRICATION AND DELIVERY OF FIREWALL FOR TELOK A & B PROJECT – MMHE SDN BHD
SHELL March 23, 2012 Completed
338. COMMISSIONING OF STABILISED VSAT SERVICES AND VPN ONBOARD MV. WANGSAMAJU – OCEANTECH GEOMATICS
OCEANTECH GEOMATIC
March 14, 2012 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
339.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION TAPE (SERVIWRAP M30B) FOR KEBABANGAN DEVELOPMENT PROJECT – GLOBAL OFFSHORE MALAYSIA
KPOC March 13, 2012 Completed
340.
SUPPLY AND DELIVERY OF HANGER FLANGE, RISER GUARD AND RISER CLAMP FOR PROVISION OF HOOK-UP AND COMMISSIONING FOR PETRONAS CARIGALI SKO PIPELINE REJUVENATION PROJECT. – CARIMIN ENGINEERING SERVICES
PETRONAS March 12, 2012 Completed
341. PROVISION OF TELECOMMUNICATION SYSTEM (VSAT) – SCOPETEL SDN. BHD SCOPETEL March 5, 2012 Completed
342.
SUPPLY AND DELIVERY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR TCOT PWSU TAIL END & REMEDIAL WORK FOR EMEPMI EPCM BROWNFIELD PROJECT – PERUNDING RANHILL WORLEY
EMEPMI March 1, 2012 Completed
343. PROVISION OF FIELD JOINT COATING FOR SOGT PROJECT – ALAM SWIBER PETRONAS February 27, 2012 Completed
344.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF HSS (RAYCHEM WPC100M) FOR EMEMPI’S TAPIS EOR REJUVENATION AND TELOK DEVELOMENT PROJECT. – TL OFFSHORE SDN BHD
EMEPMI February 24, 2012 Completed
345. DESIGN, ENGINEERING, AND DELIVERY OF FAIRINGS & THRUST COLLARS FOR DRILLING RISERS – SONGA OFFSHORE
PETRONAS February 22, 2012 Completed
346. PROVIDING STABILISED VSAT SYSTEM FOR SEMI-SUBMERSIBLE RIG, OCEANROVER FOR DEEPWATER PROJECT, KIKEH – DIAMOND OFFSHORE
MURPHY OIL February 14, 2012 Completed
347. PROVISION OF VSAT SYSTEM AND PROVIDING VPN RENTAL SERVICES FOR DLB264 – GLOBAL OFFSHORE MALAYSIA
GLOBAL OFFSHORE February 09, 2012 Completed
348. PIPELINE AND SPOOLS FIELD JOINT COATING SERVICES FOR LAN DO DEVELOPMENT PROJECT VIETNAM – SAPURA ACERGY SDN BHD
TNK VIETNAM BV January 20, 2012 Completed
349.
PROVISION FOR DETAILED DESIGN ENGINEERING SERVICES FOR PACKAGE THIRD PARTY VERIFICATION OF GUE H RATED FIREWALL TO WITH STAND 30-MINUTES JET FIRE FOR TELOK GAS DEVELOPMENT PROJECT – PERUNDING RANHILL WORLEY SDN BHD
EMEPMI December 29, 2011 Completed
350. PROVISION OF INSTALLATION AND MAINTENANCE OF VPN INTERNET SERVICES – ASIAN SUPPLY BASE SDN BHD
ASIAN SUPPLY BINTULU
December 21, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
351. SUPPLY AND INSTALLATION OF PASSIVE FIRE PROTECTION AT M01 AND E11 FOR TI-FIX AND IR PROJECT - SHELL
SHELL December 21, 2011 Completed
352. SUPPLY MANPOWER, EQUIPMENTS AND MATERIALS FOR PM329 EAST PIATU TOPSIDES – KENCANA HL SDN BHD
NEWFIELD December 1, 2011 Completed
353. E & I FABRICATION, INSTALLATION, TESTING, PRE-COMMISSIONING WORK, FOR TAPIS EOR PROJECT (PACKAGE B AND PACKAGE C) – MMHE SDN BHD
EMEPMI December, 2011 Completed
354. PIPING FABRICATION AND INSTALLATION FOR TAPIS Q LIVING QUARTERS – MMHE SDN BHD
EMEPMI November, 2011 Completed
355. SUPPLY OF H120 FIRE/BLAST WALL FOR KEBABANGAN TOPSIDES – SIME DARBY ENGINEERING SDN BHD
KPOC November 25, 2011 Completed
356. PROVISION OF FIELD JOINT COATING FOR BCOT PROJECT – ALAM SWIBER PETRONAS October 10, 2011 Completed
357.
PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION CASTING FOR SDV ON BUNGA RAYA-B – APEX ENERGY SDN. BHD.
TALISMAN September 27, 2011 Completed
358.
PROVISION OF PASSIVE FIRE PROTECTION (PFP) SERVICES FOR PCC OF TOPSIDES AND PIPELINE FOR PM318 PUTERI PIPELINE RESTORATION PROJECT – KENCANA HL SDN BHD
NEWFIELD September 15, 2011 Completed
359.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIAL (SERVIWRAP) FOR 14” AND 24” EXPORT PIPELINE SHORE APPROACH INSTALLATION FOR KEBABANGAN NORTHERN HUB DEVELOPMENT – PBJV GROUP SDN BHD
PETRONAS CARIGALI SDN BHD
September 15, 2011 Completed
360.
PROVISION OF PASSIVE FIRE PROTECTION (PFP), TOOLS/ EQUIPMENT & MATERIALS TO REMOVE THE DEGRADED PFP & APPLICATION OF NEW PFP AT M3PQ-A LIVING QUARTER WEST WALL – SARKU ENGINEERING SERVICES SDN. BHD.
SHELL September 15, 2011 Completed
361.
PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR HELANG TOPSIDES (E-9550 & E-9650) – MONT TRINITY
NIPPON OIL September 12, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
362.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR INTRAGRATED TRANSPORTATION & INSTALLATION OF OFFSHORE FACILITIES (TIONG A) PROJECT – GLOBAL OFFSHORE MALAYSIA SDN BHD
NEWFIELD August 17, 2011 Completed
363. PROVISION OF REMOVAL, REPAIR & REINSTATEMENT OF BLASTWALL ON M3P-Q PLATFORM – DAYANG ENTERPRISE & SSB
SHELL August 5, 2011 Completed
364.
DESIGN, MANUFACTURE AND SUPPLY OF VIV SUSPRESSION STRAKES FOR BLOCK 06.1 PHASE III PROJECT – LAN DO DEVELOPMENT PROJECT – RANHILL WORLEYPARSONS SDN BHD
BP EXPLORATION OPERATING CO. LTD
August 3, 2011 Completed
365.
PROVISION OF FIELD JOINT COATING AND SUPPLY OF ANTI CORROSION MATERIALS (SERVIWRAP) FOR TRANSPORTATION AND INSTALLATION OF OFFSHORE FACILITIES FOR SKO PIPELINE REPLACEMENT PROJECT – TARGET ENERGY CO. (M) SDN. BHD.
PETRONAS CARIGALI SDN BHD
July 25, 2011 Completed
366.
FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH) TAPIS-R DECK (SOUTH), TAPIS-R LIVING QUARTERS & BRIDGES SKID BEAM AND TAPIS-Q DECK – MMHE SDN. BHD.
EMEPMI July 15, 2011 Completed
367. FABRICATION AND INSTALLATION OF TAPIS-R DECK (NORTH), TAPIS-Q DECK, MISCELLANEOUS WORKS TAPIS-Q – MMHE SDN. BHD.
EMEPMI July 3, 2011 Completed
368. SUPPLY, DELIVERY AND INSTALLATION OF STRAKES FOR GUMUSUT KAKAP JUMPERS - FMC
SHELL June 17,2011 Completed
369. PROVISION OF PIPELINE FIELD JOINT COATING WORKS FOR THE FABRICATION SERVICES OF FLOWLINE JUMPER – LABUAN SHIPYARD
SAPURA ACERGY/ SHELL
April 14, 2011 Completed
370.
PROVISION OF PIPELINE INFIELD FIELD JOINT COATING FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD
PETRONAS CARIGALI SDN BHD
April 12, 2011 Completed
371.
PROVISION OF PIPELINE ANTI CORROSION MATERIAL (SERVIWRAP) FOR PETRONAS CARIGALI INTERGRATED TRANSPORTATION INSTALLATION OF OFFSHORE FACILITIES FOR YEAR 2010-2012 – GLOBAL OFFSHORE MALAYSIA SDN BHD
PETRONAS CARIGALI SDN BHD
March 31, 2011 Completed
372. PROVISION OF FIELD JOINT COATING SERVICES FOR F28DR-A/F6K-A PIPELINE PROJECT – TL OFFSHORE SDN BHD
SHELL March 18, 2011 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
373.
FABRICATION AND INSTALLATION OF STRUCTURAL WORKS FOR TOPSIDES A-Q COMPRISING PART OF SURVEY, DESIGN, ENGINEERING, PROCUREMENT, FABRICATION, LOAD OUT, TIE-DOWN/SEAFASTENING, TRANSPORTATION, INSTALLATION, HOOK-UP, TESTING, COMMISSIONING (EPCIC) OF PROCESS PLATFORM FOR B-193 PROJECT – SIME DARBY ENGINEERING
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) February 25, 2011 Completed
374. PROVISION OF PIPELINE MATERIALS WITH SEA SLEEVES C/W EQUIPMENT FOR NEWFIELD’S EAST PIATU INSTALLATION – TL OFFSHORE SDN BHD
NEWFIELD February 24, 2011 Completed
375. PROVISION OF PASSIVE FIRE PROTECTION SERVICES) FOR NEWFIELD'S EAST PIATU'S JACKET & TOPSIDES - KENCANA HL
NEWFIELD February 11, 2011 Completed
376. PROVISION OF FIELD JOINT COATING AND INFILL MATERIALS FOR PUTERI PIPELINE RESTORATION PROJECT – TL OFFSHORE SDN BHD
NEWFIELD February 11, 2011 Completed
377.
PROVISION OF REMOVAL, REPAIR, & REINSTATEMENT OF PASSIVE FIRE PROTECTION SYSTEM FOR CAKERWALLA OFFSHORE - SHAPADU ENERGY & ENGINEERING SDN BHD
CARIGALI HESS February 1, 2011 Completed
378.
PROVISION OF FIELD JOINT COATING, SUPPLY AND INSTALLATION OF CANUSA GTS-PP WRAPID SLEEVE FOR CILIPADI PIPELINE PROJECT – TL OFFSHORE SDN BHD
SHELL January 17, 2011 Completed
379. REPAIR WORKS OF BLASTWALL AND FIREWALL FOR MODULE 3 KUMANG TOPSIDE - OFFSHORE WORKS
PETRONAS CARIGALI SDN BHD
December 13, 2010 Completed
380.
DESIGN, CONSTRUCT, SUPPLY AND DELIVERY OF NOISE ATTENUATORS AND EXPANSION SPOOLS FOR F13 PROCESSING MODULE GLYCOL REBOILER SKID AT E11P-B PLATFORM
SARAWAK SHELL BERHAD
November 24, 2010 Completed
381.
FABRICATION AND INSTALLATION OF THE MOORING PORCHES, CHAIN JACK GANTRIES AND ASSOCIATED PLATFORMS, AND INSTALLATION OF FAIRLEAD FOUNDATIONS FOR GUMUSUT KAKAP FPS HULL (36010863) AT MALAYSIA MARINE AND HEAVY ENGINEERING
SHELL / MISC November 12, 2010 Completed
382. SUBCONTRACT FOR STRUCTURAL WORKS FOR PROCESS PLATFORM FOR B -193 PROJECT AT SIME DARBY ENGINEERING
OIL AND NATURAL GAS CORPORATION
LTD (ONGC) October 22, 2010 Completed
383. DESIGN, FABRICATE AND SUPPLY FIRE RATED ROLLER SHUTTER FOR KINABALU NAG DEVELOPMENT PROJECT (KNPG-B) - MMHE
PETRONAS CARIGALI SDN BHD
October 21, 2010 Completed
384. SUPPLY AND DELIVERY OF SAFETY EQUIPMENTS FOR SAMARANG (PHASE 1 – ACCELERATED DRILLING) DEVELOPMENT PROJECT – KENCANA PETROLUEM
PETRONAS CARIGALI SDN BHD
October 6, 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
385. PROVISION OF BR-B REPLACEMENT – RISER PIPE, CLAMP AND I-TUBE – FIELD JOINT COATING
TALISMAN September 20, 2010 Completed
386. DESIGN, FABRICATE AND SUPPLY OF BLASTWALL FOR LIVING QUARTERS FOR JACKETS OF PM329 EAST PIATU DEVELOPMENT PROJECT – KENCANA HL
NEWFIELD September 17, 2010 Completed
387.
PROVISION OF PIPELINE FIELD JOINT COATING SERVICES AND INFILL MATERIALS FOR PETRONAS CARIGALI’S SKO PIPELINE PROJECT – TL OFFSHORE
PETRONAS CARIGALI SDN BHD
September 7, 2010 Completed
388. PROVISION OF FLOWLINE AND RISER FIELD JOINT COATING SERVICES FOR GUMUSUT KAKAP PROJECT – SAPURA ACERGY
SHELL August 6, 2010 Completed
389. UMBRELLA CONTRACTS FOR SALE OF SSB/SSPC SCRAP METAL (600865) SARAWAK SHELL
BERHAD August 3, 2010 Completed
390.
PROVISION OF THE SERVICE FOR DISPOSAL OF SURPLUS MATERIALS FOR PETRONAS GROUP OF COMPANIES FOR YEAR 2010-2013 (UMBRELLA CONTRACT)
PETROLIAM NASIONAL BERHAD
July 28, 2010 Completed
391. SUPPLY AND DELIVERY OF INSTRUMENT FIRE & GAS CABLES FOR MRU - BUNGA ORKID DEV. PROJECT FOR SDE
TALISMAN MALAYSIA LIMITED
July 23, 2010 Completed
392. PROVISION OF PIPELINE FIELD JOINT COATING AND INFILL MATERIAL FOR ST. JOSEPH PIPELINE INSTALLATION ON E3 – TL OFFSHORE
SABAH SHELL PETROLUEM CO. LTD
July 22, 2010 Completed
393. SUPPLY AND DELIVER OF INSTRUMENT CABLES & GLANDS FOR EMEMPI’S SELIGI AND SEMANGKUK PIPELINE REPLACEMENT PROJECT
RANHILL WORLEY PARSONS
June 29, 2010 Completed
394. STRUCTURAL WORK ~(5-TOPSIDES) - EPCIC OF (5) WELLHEAD PLATFORM FOR B-193 PROJECT – SDE
OIL AND NATURAL GAS CORP. LTD
(ONGC) June 12, 2010 Completed
395. SUPPLY OF ELECTRICAL FITTINGS AND ACCESSORIES FOR GUNTONG E AIR UTILITY SYSTEM UPGRADE PROJECT
RANHILL WORLEY PARSONS
May 27, 2010 Completed
396. SUPPLY OF CABLES FOR INTERGRATED PROCUREMENT AND CONSTRUCTION DEVELOPMENT PROJECT (PHASE 1)
SIME DARBY May 18, 2010 Completed
397. PROVISION OF FIELD JOINT COATING SERVICES FOR DEVIL’S CREEK DEVELOPMENT PROJECT
SAPURA ACERGY May 15, 2010 Completed
398. SUPPLY OF SERVI-WRAP ANTI-CORROSION MATERIALS SARAWAK SHELL May 13, 2010 Completed
399. SUPPLY OF INSTRUMENT CABLES & CABLE GLANDS FOR TAPIS PUMP FIRE AND GAS SYSTEM UPGRADE PROJECT - EMEPMI
RANHILL WORLEY PARSONS
May 4, 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
400. MASTER SERVICE AGREEMENT FOR PROVISION OF VSAT SYSTEM INCLUDING LAN/WAN – TL OFFSHORE SDN BHD
TL OFFSHORE May 1, 2010 Completed
401. SUPPLY, FABRICATE, INSTALL AND PRE-COMMISSION ONE UNIT OF GYM ROOM FOR BRE
TALISMAN MALAYSIA LIMITED
April 29, 2010 Completed
402. DESIGN, SUPPLY, APPLICATION AND INSTALLATION OF PASSIVE FIRE PROTECTION (PACKAGE NO.SF03) FOR GUMUSUT KAKAP SEMI-FPS PROJECT
MMHE April 21, 2010 Completed
403. APPLICATION OF FOAM INSULATION FOR CAMERON INTERNATIONAL (M) SYSTEM SDN BHD
CAMERON INTERNATIONAL (M)
SDN BHD April 10, 2010 Completed
404. FIELD JOINT COATING WORK AT TLO FOR 2010 MURPHY PIPELINE PROJECT MURPHY OIL CORP March 16, 2010 Completed
405. FIELD JOINT COATING WORK AT GLOBAL OFFSHORE MALAYSIA FOR 2010 PETRONAS PIPELINES PROJECT
PETRONAS CARIGALI
March 16, 2010 Completed
406. SUPPLY OF CABLES FOR F23R-A CILIPADI GAS FIELD DEVELOPMENT PROJECT PFCE March 15, 2010 Completed
407. PASSIVE FIRE PROTECTION FOR SARAWAK SHELL E-8 PLATFORM SARAWAK SHELL March 15, 2010 Completed
408. DISPOSAL & REMOVAL OF SCRAP MATERIALS FROM MMHE SARAWAK SHELL March 15, 2010 Completed
409. SALE OF USED/SCRAP MATERIALS AND EQUIPMENT MLNG March 10, 2010 Completed
410. THERMOCOUPLE CABLE FOR BUNGA ORCHID-A TALISMAN MALAYSIA
March 9, 2010 Completed
411. HEAT SHIELD PANELS FOR ABU FIELD PETRONAS CARIGALI
March 3, 2010 Completed
412. SUPPLY AND APPLICATION OF PFP FOR F23DR-A CILIPADI PROJECT AT RFSB FOR PFCE
SARAWAK SHELL BERHAD
February 28, 2010 Completed
413. J-LAY TOWER REFURBISHMENT PROJECT (STRUCTURAL WORKS) FOR SAPURA ACERGY
SHELL / MISC February 25, 2010 Completed
414. SUPPLY OF LIGHT WATER STATION PETRONAS CARIGALI
February 5, 2010 Completed
415. BLASTING AND PAINTING FOR JLT STRUCTURE SERVICES FOR GUMUSUT AT SAPURA ACERGY
SHELL/ MISC January 28 2010 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
416. SUPPLY OF HEATSHIELDS TO CILIPADI PROJECT AT RFSB FOR PFCE SARAWAK SHELL December 28 2009 Completed
417. DISPOSAL OF EXXON MOBIL OBSOLETE, PROJECT SURPLUS, AND USED MATERIALS
EMEMPI December 8, 2009 Completed
418. S-LAY FIELD JOINT COATING CONTRACT FOR GUMUSUT PIPELINE AT SAPURA ACERGY
SHELL / MISC November 26, 2009 Completed
419. SUPPLY AND APPLICATION OF PFP FOR TANGGA BARAT CPP TOPSIDE @ MMHE
PETRONAS CARIGALI
November 3, 2009 Completed
420. DISPOSAL OF TML SLOW MOVING AND OBSOLETE GOODS AT KSB (SCRAP METAL)
TALISMAN October 30, 2009 Completed
421. SUPPLY OF BLASTWALL FOR F23 (CILIPADI) AT RAMUNIA YARD @ PFCE SARAWAK SHELL October 21, 2009 Completed
422. SUPPLY OF BLASTWALL TO J.R MCDERMOTT FOR THE KIPPER TUNA PROJECT ESSO AUSTRALIA August 25, 2009 Completed
423. SUPPLY OF INSTRUMENT, FIRE & GAS, ELECTRICAL AND TELECOM CABLES TO PFCE AT RAMUNIA FABRICATION YARD FOR 23 TOPSIDE PROJECT
SARAWAK SHELL August 24, 2009 Completed
424. SUPPLY OF AIMS RFP MUDMAT SYSTEM FOR NEWFIELD’S WEST BELUMUT WELLHEAD JACKET AT KENCANA HL
NEWFIELD July 31, 2009 Completed
425. SUPPLY OF CHEMICALS – TRIETHYLENE GLYCOL – 99.9%, 235 KGS DRUM UNDER PRICE AGREEMENT WITH PETRONAS CARIGALI
PETRONAS CARIGALI
July 15, 2009 Completed
426.
ELECTRICAL AND INSTRUMENTATION FABRICATION & HOST TIE & HOOK-UP COMMISSIONING OF GUA FLAREBOOM REPLACEMENT AT BOUSTEAD PENANG SHIPYARD S/B
EXXON MOBIL June 22, 2009 Completed
427. FABRICATION OF INSTRUMENT GAS SKID FOR KUMANG PROJECT AT SDE PETRONAS CARIGALI
June 15, 2009 Completed
428. FIELD JOINT COATING WORK AT TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI
June 8, 2009 Completed
429. SUPPLY OF SERVIWRAP TO TLO FOR 2009 PETRONAS PIPELINE PROJECT PETRONAS CARIGALI
May 15 , 2009 Completed
430. FIELD JOINT COATING WORK AT TLO FOR BEKOK-DULANG PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
April 17, 2009 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
431. FIELD JOINT COATING WORK AT TLO FOR WEST LUTONG PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
March 6, 2009 Completed
432. FIELD JOINT COATING WORK AT TLO FOR BETTY BAKAU PROJECT FOR PETRONAS PIPELINE PROJECT
PETRONAS CARIGALI
February 12, 2009
Completed
433. PASSIVE FIRE PROTECTION FOR B11 LQ & HELIDECK AT BDEWC, SARAWAK SARAWAK SHELL
BERHAD February 11, 2009 Completed
434. PASSIVE FIRE PROTECTION FOR PC-4 RISER AT BD11 DR-A PLATFORM FOR MMHE
PETRONAS CARIGALI
January 19, 2009 Completed
435. SUPPLY OF ELECTRICAL AND INSTRUMENTATION CABLES FOR F23 VLAP COMPRESSION AT SDE
SARAWAK SHELL BERHAD
January 5, 2009 Completed
436. MARK AND CUT STEEL STRUCTURAL WORKS FOR MCR-A PROJECT AT MMHE MMHE JV WITH
TECHNIP January 2, 2009 Completed
437. FABRICATION OF STRUCTURAL WORKS FOR EAST MODULE TOPSIDES OF GUMUSUT KAPAP AT MMHE
SHELL AND MISC December 31, 2008 Completed
438. E & I AND PIPING WORK AT MMHE FOR TANGGA BARAT CPP TOPSIDES PETRONAS CARIGALI
December 24, 2008 Completed
439. PASSIVE FIRE PROTECTION FOR B-11 TOPSIDES AT BROOKE DOCK YARD SARAWAK SHELL
BERHAD December 19, 2008 Completed
440. SUPPLY OF KOBE ELECTRODES FOR F23-RA TOPSIDES AT RFSB SARAWAK SHELL
BERHAD December 19, 2008 Completed
441. INSTRUMENTATION & FGS & TELECON JUNCTION BOX – DULANG B AT KENCANA HL
PETRONAS CARIGALI
November 4, 2008 Completed
442. SUPPLY OF TOTE TANKS PETRONAS CARIGALI
October 29, 2008 Completed
443. SUPPLY OF FIRE RATED WINDOWS FOR KUMANG AND TANGGA BARAT AT SDE PETRONAS CARIGALI
October 21, 2008 Completed
444. SUPPLY OF INSTRUMENT CABLES FOR FPSO RUBY AT MMHE MISC October 15, 2008 Completed
445. STRUCTURAL FABRICATION WORK FOR TANGGA BARAT AT MMHE PETRONAS CARIGALI
October 13, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
446. SUPPLY AND INSTALL KUMANG BLASTWALL/ FIREWALL COMPLETE SYSTEM INCLUDING PFP AT SDE TO MEET FIRE RATINGS
PETRONAS CARIGALI
October 10, 2008 Completed
447. SUPPLY OF ELECTRICAL AND INSTRUMENTATION (E&I) CABLES FOR KUMANG AND TANGGA BARAT AT SDE
PETRONAS CARIGALI
September 27, 2008 Completed
448. PIPING FABRICATION WORK FOR B11 KA TOPSIDE @ MMHE SARAWAK SHELL
BERHAD September 16, 2008 Completed
449. SUPPLY OF PERSONNEL TRANSFER BASKET AND CABLE GLAND / FITTINGS TO MURPHY OIL
MURPHY SARAWAK OIL CO. LTD
September 15, 2008 Completed
450. FIELD JOINT COATING WORK FOR CPOC PIPELINES AT TLO PETRONAS CARIGALI
September 10, 2008 Completed
451. PASSIVE FIRE PROTECTION FOR PLUTO PROJECT @ RFSB WOODSIDE ENERGY August 15, 2008 Completed
452. FIELD JOINT COATING WORK AT TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT
SARAWAK SHELL BERHAD
August 1, 2008 Completed
453. SUPPLY OF CANUSA HSS TO TLO FOR SCDR-A / E11K-A 12” & 14” PIPELINE PROJECT
SARAWAK SHELL BERHAD
July 22, 2008 Completed
454. SUPPLY OF DOUBLE SKIN HEAT SHIELDS FOR B11 KA PROJECT AT MMHE SARAWAK SHELL
BERHAD June 30, 2008 Completed
455. PASSIVE FIRE PROTECTION OF ANDP-D AT RFSB PETRONAS CARIGALI
June 30, 2008 Completed
456. SUPPLY OF SERVIWRAP FOR CPOC PIPELINE TO TLO PETRONAS CARIGALI
June 26, 2008 Completed
457. E&I, PIPING, MECHANICAL & STRUCTURAL FABRICATION FOR KUMANG CLUSTER DEVELOPMENT / TANGGA BARAT PROJECT @ SDE
PETRONAS CARIGALI
June 11, 2008 Completed
458. DESIGN, SUPPLY, FABRICATION AND INSTALL NEW FIRE AND BLASWALL FOR BR-A
TALISMAN MALAYSIA LIMITED
May 23, 2008 Completed
459. PASSIVE FIRE PROTECTION OF GOPA-GOPB AT KHL MURPHY SARAWAK
OIL CO. LTD May 8, 2008 Completed
460. SUPPLY AND DELIVERY OF CONCRETE MATRESSES, SLEEPERS, LIFTING FRAME FOR 24” ANDR-A/TCOT PIPELINE FOR TLO
PETRONAS CARIGALI
April 30, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
461. ELECTRICAL AND INSTRUMENTATION FABRICATION WORK AT RFSB ON ANGSI –D PLATFORM
PETRONAS CARIGALI
April 24, 2008 Completed
462. PFP for F23 AND F6 AT BROOKE DOCKYARD, KUCHING, SARAWAK SARAWAK SHELL
BERHAD April 11, 2008 Completed
463. SUPPLY OF POWER & INSTRUMENTATION CABLES MURPHY SARAWAK
OIL CO. LTD April 10, 2008 Completed
464. SUPPLY OF HEATSHIELDS TO CLOUGH FOR MONTARA PROJECT IN THAILAND CLOUGH (THAILAND)
CO. LTD April 10, 2008 Completed
465. FIELD JOINT COATING SERVICES FOR TALISMAN PIPELINE INSTALLATION TALIMAN MALAYSIA
LIMITED April 10, 2008 Completed
466. FIELD JOINT COATING FOR PETRONAS CARIGALI 2008 PIPELINE INSTALLATION AT TLO FOR 5 PIPELINES
PETRONAS CARIGALI
April 10, 2008 Completed
467. SUPPLY AND APPLICATION OF WET AND CASTING PFP FOR TALISMAN RISERSAND ESDVS
TALIMAN MALAYSIA LIMITED
April 8, 2008 Completed
468. SUPPLY OF FIRE RATED DOORS TO MMHE PETRONAS CARIGALI
April 5, 2008 Completed
469. SUPPLY OF RADIANT HEATSHIELD, LOUVERS AND MISC ITEMS FOR PC 4 @ MMHE
PETRONAS CARIGALI
March 31, 2008 Completed
470. FIELD JOINT COATING FOR KEA- TIA @ PBJV
PETRONAS CARIGALI
March 7, 2008 Completed
471. SUPPLY OF ELECTRICAL OPERATED MONORAIL TROLLEY HOIST, 5 MT – MMHE
MMHE March 7, 2008 Completed
472. SUPPLY OF MANUAL OPERATED GANTRY CRANE TO MMHE MMHE March 7, 2008 Completed
473. ENGINEERING, DESIGN, FABRICATION AND INSTALLATION OF SHELTER CABIN FOR PC4 AT MMHE
PETRONAS CARIGALI
February 28, 2008 Completed
474. SUPPLY OF LINE PIPES SMLS API TYPE OF VARIOUS SIZES TO MMHE PETRONAS CARIGALI
January 17, 2008 Completed
475. SUPPLY OF FIRE RATED DOORS TO TURKMENISTAN GAS DEVELOPMENT PROJECT
MITCO JAPAN SDN BHD
January 11, 2008 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
476. PASSIVE FIRE PROTECTION FOR BUNGA ORKID @ SDE TALISMAN
MALAYSIA LIMITED January 3, 2008 Completed
477. FABRICATION OF GUMUSUT-KAKAP SEMISUBMERSIBLE HULL (PACKAGE 2) SHELL AND MISC December 5, 2007 Completed
478. STRUCTURAL FABRICATION FOR CPOC PROJECT AT MMHE PETRONAS CARGALI
SDN BHD November 30, 2007 Completed
479. SUPPLY OF FIRE RATED WINDOWS FOR BUNGA ORKID PROJECT AT SDE TALISMAN
MALAYSIA LIMITED October 23, 2007 Completed
480. SUPPLY OF TOTE TANKS TO EMEPMI EXXON MOBIL September 30, 2007 Completed
481. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E& I AND BLASTING/ PAINTING FOR PC 4 TOPSIDE WORK @ MMHE
PETRONAS CARGALI SDN BHD
July 26, 2007 Completed
482. FIELD JOINT COATINGS FOR VASAI EAST DEVELOPMENT PROJECT AT RAMUNIA FABRICATORS SDN BHD
OIL & NATURAL GAS CORPORATION,
INDIA August 27, 2007 Completed
483. SUPPLY & APPLICATION OF PASSIVE FIRE PROTECTION -TALISMAN NORTHERN FIELD
TALISMAN MALAYSIA LIMITED
August 23, 2007
Completed
484. FIELD JOINT COATINGS FOR JERNEH PIPELINES AT TLO EXXONMOBIL August 8, 2007 Completed
485. FABRICATE BEAM HAUNCH, CROSS OVER SPOOL FOR HIGH PRESSURE MUD LINE AND CRANE BEAM
SAAG DRILLING & WELL SERVICES SDN
BHD August 7, 2007 Completed
486. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR BELUMUT AT RAMUNIA FABRICATORS SDN BHD
PETRONAS CARIGALI SDN BHD
August 5, 2007 Completed
487. FIELD JOINT COATINGS FOR SEMARANG PIPELINES AT TLO PETRONAS CARGALI
SDN BHD July 28, 2007
Completed
488. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR INTRALINE RESOURCES
TALISMAN MALAYSIA LIMITED
July 16, 2007 Completed
489. FIELD JOINT COATINGS FOR ANDR-A PIPELINES AT TLO PETRONAS
CARIGALI SDN BHD June 25, 2007
Completed
490. FIELD JOINT COATINGS FOR 18 “ GUE PIPELINE AT TLO EXXONMOBIL June 20, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
491. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SUMANDAK TOPSIDES
PETRONAS CARIGALI
June 13, 2007 Completed
492. SUPPLY OF SPARES FOR CLOSURE DOOR TO MMHE SARAWAK SHELL
BERHAD June 6, 2007
Completed
493. FIELD JOINT COATINGS FOR BETTY– BORONIA 18” P/L SARAWAK SHELL
BERHAD June 1, 2007 Completed
494. ENGINEERING, PROC, CONSTRUCTION & COMMISSIONING OF FIRE PROTECTION SYSTEM
PETRONAS DAGANGAN BERHAD
May 28, 2007 Completed
495. FIELD JOINT COATING FOR TAPM-3 CAA NORTHEN FIELD DEVELOPMENT TALISMAN
MALAYSIA LIMITED May 22, 2007
Completed
496. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR SCDR-A TOPSIDES
SARAWAK SHELL BERHAD
May 4, 2007 Completed
497. SUPPLY OF SAFETY EQUIPMENT AND LIFE RAFT TO MDFT FOR KIKEH PROJECT M.D.F.T (KIKEH) LTD May 2, 2007
Completed
498. FIELD JOINT COATINGS FOR ALL SUMANDAK PIPELINES AND SUPPLY OF SERVIWRAP TO TL OFFSHORE
PETRONAS CARIGALI
(PETRONAS CARIGALI)
April 6, 2007 Completed
499. 2007-2009 OFFSHORE FACILITIES TRANSPORT AND INSTALLATION OF FIELD JOINT COATINGS FOR MCDERMOTT
SARAWAK SHELL BERHAD
March 27, 2007 Completed
500. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR PETRONAS CARIGALI’S BELUMUT PROJECT AT RFSB
PETRONAS CARIGALI
(PETRONAS CARIGALI)
March 19, 2007 Completed
501. SUPPLY AND APPLICATION OF PASSIVE FIRE PROTECTION FOR ANGEL GAS TOPSIDE PROJECT AT MMHE
WOODSIDE ENERGY March 15, 2007 Completed
502. FIELD JOINT COATING OF 10” BAP-AA TO BADP-G PIPELINE FOR TL OFFSHORE
PETRONAS CARIGALI
(PETRONAS CARIGALI)
March 1, 2007 Completed
503. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF BLASTWALL FOR SHELL’S SCDR-A AT MMHE
SARAWAK SHELL March 1, 2007 Completed
504. FABRICATION, INSTALLATION, TESTING AND PRE-COMMISSIONING OF PIPINGAND MECHANICAL WORKS FOR SCDR-A TOPSIDES AT MMHE
SARAWAK SHELL February 14, 2007 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
505. DESIGN, ENGINEERING AND FABRICATION OF END CLOSURE FOR SHELL’S SCDR-A PROJECT AT MMHE
SARAWAK SHELL February 6, 2007 Completed
506. ENGINEERING, DESIGN & FABRICATION OF PFP CASTINGS FOR METERING RUN - BR-B PLATFORM OFFSHORE
TALISMAN MALAYSIA LIMITED
January 29, 2007 Completed
507. FABRICATE GUMUSUT-KAKAP SEMI-SUBMERSIBLE HULL SHELL January 25, 2007 Completed
508. MULTI DISCIPLINE WORKS (STRUCTURE, PIPING, E&I AND BLASTING/PAINTING FOR F6 REJUVENATION WORKS
SARAWAK SHELL January 23, 2007
Completed
509. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR MAARI FIELD DEVELOPMENT AT KENCANA HL ENGINEERING
CLOUGH PROJECT INTERNATIONAL PTY
LTD, AUSTRALIA January 17, 2007 Completed
510. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR ANGEL GAS PROJECT AT MMHE
WOODSIDE ENERGY LTD, AUSTRALIA
January 15, 2007 Completed
511. SUPPLY OF ANTI-SKID BRE STAIRWAYS TALISMAN
MALAYSIA LIMITED January 4, 2007 Completed
512. DESIGN, ENGINEERING, FABRICATION AND SUPPLY OF HEATSHIELDS FOR SCDR-A PROJECT AT MMHE
SARAWAK SHELL December 27, 2006 Completed
513. SUPPLY OF INSTR. CABLE CONNECTING BRA AND BRE PAGA SYSTEM TALISMAN
MALAYSIA LIMITED November 15, 2006 Completed
514. FIELD JOINT COATING FOR PBJV GROUP SDN BHD FOR WEST LUTONG PROJECT
PETRONAS CARIGALI
November 11, 2006 Completed
515. CONTRACT FOR CIVIL WORKS PACKAGE FOR KUANTAN – KERTEH RAILWAY PROJEC, INCL. VEHICULAR, DRAINAGE & UTILITY BOX CULVERTS
PERCON BABENA JOINT VENTURE
October 15, 2006 Completed
516. STRUCTURAL STEEL FABRICATION FOR SUMANDAK SELATAN TOPSIDES AND HOST
PETRONAS CARIGALI
September 27, 2006 Completed
517. FJ COATING FOR TLO PETRONAS
CARIGALI AND SHELL
August 10, 2006 Completed
518. PIPING WORKS FOR KIKEH FPSO AT MMHE MURPHY OIL August 2, 2006 Completed
519. SUPPLY OF HEATSHIELDS FOR F13W PROJECT AT RAMUNIA FABRICATORS SARAWAK SHELL June 15, 2006 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
520. SUPPLY OF END CLOSURE DOORS- F13W AT RFSB SARAWAK SHELL June 09, 2006 Completed
521. PASSIVE FIRE PROTECTION FOR KIKEH DTU TOPSIDES MURPHY OIL
May 3, 2006 Completed
522. FIELD JOINT COATINGS AT BARMADA MCDERMOTT TALISMAN
MALAYSIA LIMITED March 14, 2006 Completed
523. FIELD JOINT COATINGS FOR BARMADA MCDERMOTT S/B EXXON MOBIL March 14, 2006 Completed
524. PASSIVE FIRE PROTECTION FOR ARTHIT PFP AT Mc DERMOTT YARD IN BATAM INDONESIA
PTTEP and KBR February 27, 2006 Completed
525. PIPING WORKS FABRICATION FOR MURPHY KIKEH PROJECT @ MMHE MURPHY OIL January 14, 2006 Completed
526. ELECTRICAL AND INSTRUMENTATION FOR MODEC RJS-409 MODULE FABRICATION @ SDE
PETROBRAS December 1, 2005 Completed
527. PIPELINE FIELD JOINT COATING FOR BARAM (MCOT) 16” AND 10” PETRONAS
CARIGALI – TLO November 30, 2005 Completed
528. STRUCTURAL FABRICATION FOR MODEC RJS-409 ESPADARTE MODULE FABRICATION @ SDE
PETROBRAS November 1, 2005 Completed
529. SPECIAL STRUCTURAL SPECIAL FABRICATION FOR MURPHY KIKEH PROJECT MURPHY OIL September 9, 2005 Completed
530. SUPPLY AND INSTALL OF FIRESEAL FOR AMENAM KPONO PROJECT TOTAL ELF September 9, 2005 Completed
531. ARCHITECTURAL FITTINGS FOR CLIFF HEAD A PLATFORM AT HL ENGINEERING ROC OIL, AUSTRALIA August 6, 2005 Completed
532. PFP FOR SHELL E11 –PB SARAWAK SHELL August 3 2005 Completed
533. SUPPLY OF BARUNIA PROTECTIVE RELAYS PETRONAS
CARIGALI SDN BHD August 3, 2005 Completed
534. MAJOR STRUCTURAL FABRICATION FOR MURPHY KIKEH DTU SPAR HULL MURPHY OIL May 3, 2005 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
535. PFP FOR BARAM TOPSIDE AT BDEWC PETRONAS
CARIGALI SDN BHD April 2005 Completed
536. DESIGN, ENGINEERING AND FABRICATION OF BARAM HEATSHIELD AT BDEWC PETRONAS
CARIGALI SDN BHD April 2005 Completed
537. BLASTING AND PAINTING WORKS AT SSE FOR GUE EXXONMOBIL March 2005 Completed
538. DESIGN, ENGINEERING AND FABRICATION OF E11 P-B BLASTWALL AT MSE SARAWAK SHELL
BERHAD March 2005 Completed
539. PFP FOR SHELL’S E8-DR-A AT RAMUNIA FABRICATORS SARAWAK SHELL
BERHAD March 2005 Completed
540. PFP FOR SHELL’S F13 SARAWAK SHELL February 2005 Completed
541. PFP FOR BR-E JACKET AND TRIPOD PROJECT AT MSE TALISMAN ENERGY February 2005 Completed
542. PFP FOR BR-E CO2 REMOVAL PROJECT AT SSE TALISMAN ENERGY February 2005 Completed
543. PFP FOR GUNTONG E PROJECT AT SIME SEMBCORP ENGINEERING EXXONMOBIL
EXPLORATION & PRODUCTION INC
January 2005 Completed
544. DESIGN, ENGINEERING AND FABRICATION OF SCKA & SF 13 HEATSHIELDS SARAWAK SHELL
BERHAD October 2004 Completed
545. DESIGN, ENGINEERING AND FABRICATION OF GUNTONG- E BLASTWALL EXXONMOBIL
EXPLORATION & PRODUCTION INC
July 2004 Completed
546. STRUCTURAL STEEL FABRICATION & WELDING AT MSE FOR MOAB TALISMAN ENERGY July 22, 2004 Completed
547. BLASTWALL REINSTAMENT TO H60 RATING – PFP TALISMAN ENERGY July 5, 2004 Completed
548. SUPPLY OF VESSELS UNDER MASTER SPOPT CHARTER PARTY FCF653 EXXONMOBIL
EXPLORATION & PRODUCTION INC
June 26, 2004 Completed
549. PASSIVE FIRE PROTECTION SUPPLY AND APPLY FOR AMENAM PROJECT AT SSE TOTAL ELF FINA @
NIGERIA June 2004 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
550. SUPPLY OF PRODUCTION & TEG CHEMICALS - 3 YEARS SARAWAK SHELL/
PETRONAS CARIGALI / NIPPON
June 23, 2004 Completed
551. CASTINGS FOR BUNGA RAYA-A PLATFORM TALISMAN ENERGY March 3, 2004 Completed
552. PFP FOR YOHO PROJECT PROTECTION EXXON MOBIL
NIGERIA March 2004 Completed
553. CASTINGS FOR SDV on BUNGA RAYA-A TALISMAN ENERGY December 2003 Completed
554. PFP FOR SERAI PROJECT SARAWAK SHELL September 2003 Completed
555. PFP FOR JINTAN PROJECT PROTECTION SARAWAK SHELL
BERHAD July 2003 Completed
556. INFIELD JOINT COATING FOR NIPPON STEEL (NSC) PETRONAS CARIGALI
May 8, 2003 Completed
557. YOHO PLATFORM ELECTRODE EXXON MOBIL
NIGERIA February 2003 Completed
558. BUNGA RAYA 24” Riser PFP PETRONAS
CARIGALI/TALISMAN February 2003 Completed
559. SHELL M3 BLASTWALL SARAWAK SHELL January 11, 2003 Completed
560. HELANG’s RISER / SDV/ FLANGE / VALVE PFP CASTING NIPPON OIL
EXPLORATION January 2003 Completed
561. MLNG SPHERE PFP MLNG SDN BHD December 2002 Completed
562. LUNDIN RISER / SDV PFP TALISMAN December 2002 Completed
563. HALFDAN HEATSHIELDS ENGINEERING DESIGN SEMBCORP ENGRG
SINGAPORE September 6, 2002 Completed
564. SHELL M1 BLASTWALL ENGINEERING DESIGN SARAWAK SHELL
BERHAD September 2002 Completed
JURUNATURE SDN. BHD. - COMPANY CURRENT TRACK RECORD
NO WORK DESCRIPTION OWNER COMMENCEMENT
DATE CURRENT STATUS
Nov 18, 2019 - (Track Record Updated)
565. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP NIPPON OIL
(HELANG) AT MSE July 15, 2002 Completed
566. MODIFICATION & INSTALL ELECTRICAL WORK FOR SWITCHGEARS (KNDP-A) SARAWAK SHELL
BERHAD November 18, 2001 Completed
567. PASSIVE FIRE PROTECTION FOR MLNG3 SLUGCATCHER PETRONAS CARIGALI
October 29, 2001 Completed
568. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP MALAYSIA LNG
SDN BHD October 20, 2001 Completed
569. PASSIVE FIRE PROTECTION USING LEIGH’S PAINTS PFP PETRONAS CARIGALI
October 15, 2001 Completed
570. SUPPLY/ INSTALL E & I SWITCHGEAR SARAWAK SHELL
BERHAD August 20, 2001 Completed
571. INSULATION CONTRACT WITH PETRA RESOURCES ESSO PRODUCTION
MALAYSIA INC. July 6, 2001 Completed
572. SUPPLY OF ELECTRODES DOTANAH ENGRG &
CONSTRUCTORS July 2, 2001 Completed
573. ELECTRODE SUPPLY FOR NIPPON OIL (HELANG) MALAYSIA
SHIPYARD (MSE) June 15, 2001 Completed
574. ELECTRODE SUPPLY FOR PETRONAS CARIGALI (ANGSI-A) SIME SEMBCORP
ENGINEERING June 15, 2001 Completed
575. ELECTRODE SUPPLY FOR ESSO (SATELIT) AND LARUT MSE February 2001 Completed
576. SUPPLY OF ELECTRODES FOR ESSO (LARUT-A) SIME SEMBCORP
ENGINEERING July 6, 2000 Completed
577. SUPPLY OF ELECTRODES PETRONAS FERTILIZER
TENDER Completed
578. SUPPLY OF CONSUMABLES FOR PETRONAS PETRONAS
AMMONIA SDN BHD TENDER Completed
579. SUPPLY OF CONSUMABLES FOR PETRONAS CARIGALI PETRONAS CARIGALI
TENDER Completed