Kanban In Action

Post on 18-Sep-2014

2 views 0 download

Tags:

description

These are the slides for my Kanban In Action presentation. This particular version was given as part of my "I'm telling you for the last time"-series (see http://www.marcusoft.net/2013/11/ImTellingYou.html). The presentation was recorded and can be found here: http://www.youtube.com/watch?v=ufCa1VlItLA Be sure to check out mine and Joakim Sundens book on Kanban (http://bit.ly/theKanbanBook)

transcript

Kanban in Action

http://blog.huddle.net/wp-content/uploads/2009/08/team-building-exercises-improving-teamwork.jpg

kanban

http://www.youtube.com/aptitudsthlm

Bandung

What is Lean? 3 min version

From http://www.thisislean.com/ !

Niclas Modig, Per Åhlund

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

This is Lean

Res

ourc

e!ef

ficie

ncy

Flow!efficiency

This is Lean

Little’s Law

Work-in-Process Avg Completion

Rate

Cycle Time =

Little’s Law

12 things at the same time

1 month =12 / month

Little’s Law

6 things at the same time

12 / month0.5 month =

Little’s Law

24 things at the same time

2 months =12 / month

In Software Development

Specifications Waiting To Be Implemented

Non-Integrated Code

http://lh5.ggpht.com/_8SjZZf9L_xM/Sh28HfTKSdI/AAAAAAAAAmc/LAGQYPi3sYI/DSCF8047.JPG

Code Not Yet In Production

http://to55er.files.wordpress.com/2010/01/bumpy_road.jpg

Deployment

http://1000awesomethings.files.wordpress.com/2009/10/smooth-road.jpg

http://to55er.files.wordpress.com/2010/01/bumpy_road.jpg

Deployment

http://1000awesomethings.files.wordpress.com/2009/10/smooth-road.jpg

http://www.practicalgrace.org/daily/wp-content/uploads/2009/01/exhausted-runner.jpg

Limit work in process

Smaller Units Of Work

Limit Work To Capacity

Less Rework

Less Waiting

Remove Impediments

Exploit and Elevate Bottlenecks

Cross-Functional Teams

Film-time!

Kanban

Source: http://www.kanban101.com/

Why Should I Use Kanban?

Kanban in practice

Queues as leading indicators

Inspect and adapt

“What should I do now?”

Work Item Types

What’s on the card?

Managing defects

Daily standup

Metrics

Story Points

Real Data

Disneyland wait times

Start tomorrow!

Start tomorrow!• Stop starting, start finishing

Start tomorrow!• Stop starting, start finishing

• Visualise and study the workflow

Start tomorrow!• Stop starting, start finishing

• Visualise and study the workflow

• Limit WIP and improve lead times

Start tomorrow!• Stop starting, start finishing

• Visualise and study the workflow

• Limit WIP and improve lead times

• Monitor flow and use leading indicators such as queue utilisation and bottlenecks

Start tomorrow!• Stop starting, start finishing

• Visualise and study the workflow

• Limit WIP and improve lead times

• Monitor flow and use leading indicators such as queue utilisation and bottlenecks

• Use metrics to improve

Start tomorrow!• Stop starting, start finishing

• Visualise and study the workflow

• Limit WIP and improve lead times

• Monitor flow and use leading indicators such as queue utilisation and bottlenecks

• Use metrics to improve

• Learn more onhttp://www.limitedwipsociety.org/

www.marcusoft.net @marcusoftnet

marcus.hammarberg@aptitud.se

www.marcusoft.net @marcusoftnet

marcus.hammarberg@aptitud.se

Recording of this talk http://www.youtube.com/

aptitudsthlm