Block IIA/IIR IIIA • Increased accuracy (0.63-m spec) • Increased EC power (-151.5 dBW) IIIB • Assured availability • Real-time communications IIIC • Navigation integrity • High-power spot beam
IIR-M: IIA/IIR capabilities plus • 2nd civil signal on L2 (L2C) • Earth coverage M-code on L1 & L2 • L5 Demonstration • Flex power upgrade to defeat low-level enemy
jamming
IIF: IIR-M capability plus • 3rd civil signal on L5
• Basic GPS provides initial navigation capabilities
• Std service (16-24-m SEP) – Single frequency (L1) – C/A code navigation
• Precise service (16-m SEP) – Two frequencies (L1 & L2) – P-code navigation
Block IIR-M/IIF Block IIIA/IIIB/IIIC Increasing System Capabilities—Increasing Defense/Civil Benefit
IIR-M IIIA IIIC
M J J A S O N D J F M A M J J A S O N D 1Q 2Q 3Q 4Q 2008 2009 Mo/Qtr CY GFY FY2008 FY2009
1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 1Q 2Q 3Q 4Q 2010 2011 2012 2013 2014 2015 2016 FY2010 FY2011 FY2012 FY2012 FY2014 FY2015 FY2016 GPSIIIA
Master Schedule
Rev 9: 30 APR 09 (IMS status 24 Apr)
Program Milestones Ph3 13 Jun 28 Aug Ph2 Ph1
IBR SEIT SSIS Antenna Space Vehicle Software
Bus
ATP PDR CDR SV01 SV02 18 - 21 May 11 Oct 16 May 15 May
Inter - Segment System & SV Arch Definition Complete Sys of Sys Dev &
Demo Compl PSICA Approval Complete
Antenna CDR SV01 TT&C
Delivered Govt Prov HD GFE Avail
SW Preliminary Complete
Bus PDR Bus Realtime
SIM Del
Intra - Segment Demo Complete Intra - Seg Sys & SV Arch
Definition Complete GPSIIIA FCA Comp
31 Jan SV TRR 2 Mar
PMPCB Approval Compl GPSIIIA
PCA Comp
HPE HP
PDR EDM - 1 NNSA NDS PL Del (GFE) Receive NDS
EGSE1 (GFE)
NCE/GD 1 st Comm PL Deliv Comm
CDR
NPE/ITT AI&T Launch Ops
Antenna PDR SV01 Crosslink
Complete SV01 Earth Deck Del SV01 Earth
Deck Del 8 May
GNST Avail PL Qual
Comp Assy Qual Comp Nav PL Del
Assy Bx STE Comp
Detail SW Dsgn Comp SW SIM
FQT Comp Sys SW Perf Test Comp Sys SW
Interfaces Demo SCAMPIs Comp
Bus CDR Comp Bus Elt Sub - Tier TRR Del
RIU 2&3 Del
2.0 SW OBC
FQT Comp Bus MRR
Comp NCE TRR Comm
PDR
Dlvr GSS To CCAFS
Nav Payload PDR Nav Payload
CDR MDU FQT Completed Nav Payload
Delivery AI&T Planning
Updated AI&T GSE PDRs Complete AI&T
CDR GPF Ready SV TRR
Comp GNST to CCAFS SV01 Envr Comp
SV01 AI&T Complete SV02 AI&T
Complete Launch Vehicle
Adapter Analysis PDR LV Adapter Final Design CDR
Launch Adaptor MRR HW ILS Act Comp (Sim, FLT, GSE) Launch Ops
Established SV02 Handover To Launch Ops
SV01 Handover to Ops
EDM RIU
24 Mar
13 Jan 17 Apr
9 Apr 30 Jun
17 Sep SV01 Launch Confid TRR
FSW AI&T 2.0
0.98
.98
0.99 0.99 0.99
0.98
1.00
SPI 15 May
HP CDR
1 Apr
10 Oct
8 Apr
27 Mar
21 Apr
18 Mar
Primary Critical Path Secondary Critical Path Tertiary Critical Path
.97
0.92
.97 0.92
Receive NDS EGSE1 (GFE)
17 Apr
ILRS Recommended Standard for Laser Retroreflectors on GNSS
GPS 35/36
ETS VIII (JAXA)
Courtesy of John LaBrecque
Airborne platform navigation must be highly precise and requires high-rate GPS data
representation of actual fault ruptures recorded and preserved in unprecedented detail
Terrestrial Laser Scanner is versatile - can scan at
ranges of 200 m
representation of 3D surfaces is extraordinarily detailed; 42 million pts. at Echo Cliffs PBR
Conclusions:
Opportunities Posed by Advances in Geodesy
- GPS (L2C, L5, L1C) / GNSS - ‘new and improved’ signals may offer signficant changes - high-rate and overlap with seismology - real-time, e.g. co-seismic displacements; EEW & tsunami (e.g., Chile) - zipper arrays; co-located GPS and strong-motion instruments
- InSAR
- LiDAR - geodetic imaging - open data formats - software development - artifact removal
- Image Differencing (e.g., COSI-Corr)