Kee Safety Export Projects

Post on 16-Apr-2017

410 views 0 download

transcript

Sample of Kee Safety Export

Projects

PROJECTS

Kee Guard - Free Standing Rail

Project: MASDAR City Location: Abu Dhabi, UAE Year: 2010 Contractor: Al Ahmadiah Hip Hing Supplied: 1km Kee Guard handrails

Kee Guard - Free Standing Rail

Project: Al Zeina, Raha Beach Location: Abu Dhabi, UAE Year: 2010 / 2011 Contractor: Laing O’Rourke Supplied: 3.1km Kee Guard handrails

Kee Guard - Free Standing Rail

Project: ICLDC Diabetes Centre Tawam Hospital Location: Al Ain, UAE Year: 2011 Contractor: Brookfield Multiplex Supplied: 200m Kee Guard handrails

Kee Guard - Free Standing Rail

Project: Morgan Stanley Childrens Hospital Location: Harlem, New York Year: 2015 Supplied: KeeGuard

Kee Guard - Free Standing Rail

Project: Kellogs HQ Dublin Location: Dublin, Ireland Year: January 2016 Supplied: KeeGuard

Kee Gate - Fall Protection

Project: Kellogs HQ Dublin Location: Dublin, Ireland Year: January 2016 Supplied: Kee Gate

Kee Gate – Fall Protection

Contractor: Semco Maritime Location: Denmark Year: 2015 Supplied: 18 No. Self – Closing Safety Gates Info: Gates used to secure access to specific platforms used to transport wind turbine propeller / blades via road

Kee Line – Fall Protection

Project: Al Zeina, Raha Beach Location: Abu Dhabi, UAE Year: 2010 / 2011 Contractor: Laing O’Rourke Supplied: 6.4km Kee Line systems

Kee Line – Fall Protection

Project: Allahamah STP Location: Al Ain, UAE Year: 2012 Sub-Contractor: Kee Safety LLC Supplied: Kee Line system

Kee Line – Fall Protection

Project: Al Wathba STP Location: Abu Dhabi, UAE Year: 2012 Sub-Contractor: Kee Safety LLC Supplied: 2 x Kee Line systems

Kee Line – Fall Protection

Project: Sheraton Park Hotel Qatar Location: Doha - Qatar Year: 2015 Supplied: Kee Line

Kee Line layout has been designed in fall restraint due to the low ground clearance

and close proximity to the edge of the roof.

1m restraint lanyards supplied.

Project information

Two additional S5 clamps were added to the start and end baseplates to achieve a Factor of Safety of 3 as required by the consultant.

The roof slope is 11º

Project information

Kee Line – Fall Protection

Customer: Faurecia Location: Germany Year: 2015 Supplied: 5 No. KeeLine Systems

Kee Line – Fall Protection

Customer: MRT Malaysia Location: Kuala Lumpur, Malaysia Year: 2015 Supplied: Kee Line- 2 Lines of 120m

Info: Powder coated to match roof surface finish

Kee Walk – Fall Protection

Customer: Faurecia Location: Germany Year: 2015 Supplied: 2 No. KeeWalk Systems

Kee Walk – Fall Protection

Project: Vasilikos Power Station Location: Cyprus Year: 2012 Contractor: Iacovou Group Supplied: 776m Kee Line systems 264m Kee Line Overhead 406m Kee Walk

Kee Walk – Fall Protection

Project: Alte Oper Location: Frankfurt am

Main Year: 2014 Supplied: 23 Meters Kee Walk

Kee Walk – Fall Protection

Project: Ballymena Health Centre Location: Co Antrim, Northern Ireland Year: 20145 Supplied: Kee Walk & Access Ladders

Initial Access Design

Kee Walk® Design

Kee Walk® EN 516:2006 Compliant

Safe, Anti-slip, Level Walkway

Kee Walk & Kee Guard TopFix – Fall

Protection

Project: Keppel Merlimau Cogen II Location: Singapore Year: 2012 Contractor: Alstom Supplied: 350m Kee Guard TopFix 350m Kee Walk

Kee Guard Premium– Fall Protection

Project: REC Solar Module Location: Singapore Year: 2014 Supplied: 274m Kee Guard systems

Kee Dome– Fall Protection

Project: Alcoa Location: France Year: 2013 Contractor: Kee Safety Supplied: 40 pcs Kee Dome

Kee I-Bolt

Project: Le Meridien Hotel Al Aqa Beach Location: Fujairah, UAE Year: 2010 / 2011 Client: Meridien Group Supplied: 31 Ringanka I-Bolts

Kee Lite – Aluminium Handrails

Project: Al Wathba Sewage Treatment Plant Location: Abu Dhabi, UAE Year: 2010 / 2011 Contractor: Six Construct Supplied: 5.9km handrails Staircase railings Access Gates

Kee Lite – Aluminium Handrails

Project: Allahamah Sewage Treatment Plant Location: Al Ain, UAE Year: 2010 / 2011 Contractor: Six Construct Supplied: 4.1km handrails Staircase railings Access Gates

Kee Lite – Aluminium Handrails

Project: Dibba STP Location: Sharjah, UAE Year: 2009 / 2010 Sub-Contractor: Corodex Supplied: 300m handrails Staircase railings Access Gates

Kee Lite – Aluminium Handrails

Project: Fujairah Sewage Treatment Plant Location: Fujairah, UAE Year: 2009 Contractor: Passavant Roediger Supplied: 1km handrails Staircase railings

Kee Lite – Aluminium Handrails

Project: Ras Abu Fontas A1 Desalination Plant Location: Doha, Qatar Year: 2010 Contractor: Fisia Italimpianti Supplied: 200m handrails Staircase railings

Kee Lite – Aluminium Handrails

Project: PGA Arena Stadium Location: Poland Year: June 2011 Contractor: BS Aspio Supplied: 1500 Meters KeeLite Powder Coated

Kee Klamp – Galvanised Handrails

Project: Jumeirah Palm Water Cooling Plant Location: Dubai, UAE Year: 2009 Contractor: Shinryo, Japan Supplied: 500m handrails Staircase railings

Kee Klamp – Galvanised Handrails

Project: UK Ministry of Defence Location: Musanah, Oman Year: 2010 / 2011 Contractor: Douglas OHI Supplied: 600m handrails 5 Staircases

Kee Klamp – Galvanised Handrails

Project: GTC177 Location: Doha, Qatar Year: 2010 / 2011 Contractor: Qatar Building Company Supplied: Handrails Staircase Handrails Chamber Covers

Kee Klamp – Galvanised Handrails

Project: Pump House Location: Doha, Qatar Year: 2010 Client: Kahramma Supplied: Handrails Staircase Handrails

Kee Klamp – Window Displays

Project: Window Displays Location: Singapore Year: 2015 Client: Vision Display Supplied: Kee Klamp

Kee Klamp – Bespoke Access Platforms

Project: Michelin Location: Paris, France Year: 2014 Client: Factory Supplied: Bespoke Access Platforms

Transnet - South Africa

Mobile Access Platforms

Transnet - South Africa

Mobile Access Platforms

Reading Busses - UK

Mobile Access Platforms

Reading Busses - UK

Mobile Access Platforms

Volkeswagen - UK

3 Day turnaround

Mobile Access Platforms

Tegral - Ireland

Mobile Access Platforms

Mercedes - Germany

Before

After

Static Access Platforms

Southfields College - UK

Static Access Platforms

Kee Klamp – Bespoke Step-Overs

Project: Asquith House Apartment Development Location: Leeds, UK Year: 2015 Client: phd1 Construction Supplied: Bespoke Step-Overs

Beam Clamp – Safe Connections

Project: Arenco Tower Sheikh Zayed Road Location: Dubai, UAE Year: 2009 Client: Private Supplied: Beamclamp Connections for Cradle workers & Cladding Hoist

Beam Clamp – Safe Connections

Project: BeamClamp Location: Russia Year: 2015 Client: Private Supplied: Beamclamp Connections

Box Bolt – Blind Steelwork Fixing

Project: Al Zeina, Raha Beach Location: Abu Dhabi, UAE Year: 2011 Contractor: Laing O’Rourke Supplied: 1,000+ Box Bolts for Cladding fixing

Kee Safety Export

Cradley Business Park

Overend Road

Cradley Heath, B64 7DW, UK

Tel: +44 (0) 1384 632 398

Fax: +44 (0) 1384 632 399

E-mail: exportenquiries@keesafety.com

Website: www.keesafety.co.uk

Contact: Leonie Powell/ E-Mail: lpowell@keesafety.com