Case Study: KFC Maintenance

Brief: Ci Parnters has become the preffered supplier to KFC in the Western Capefor all types of maintenance logs.This includes replacing of LED’s, replacement of signage components damaged byvandalism or weather and repairing old wiring and lighting. Upgrading of shopsignage is also within our scope of work.

KFC CeresReplacement of old cladding. Replaced flat logo with 3D illuminated letters

KFC HermanusReplacement of old, vandalised toilet signs to new spec ACM panel signage.

AfterBefore

Before After

KFC PaarlReplacement of PVC print that was vandalised

AfterBefore

KFC PicketburgReplacement of faulty LED’s and power supply.

Before After