Megger - Substation overview
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
5/105
5
170 product groups, 2600 products
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
6/105
6
MEGGER Insulation testers, fibre optic testingMULTI-AMP Circuit breaker test testsBIDDLE High voltage test sets
AVO Multimeters,Training, softwareDUCTER Ohm metersFOSTER Oil test setsSTATES Terminal blocks
METROSONICS Critical systems monitoringPROGRAMMA Relay/ Circuit Breaker/ Battery TestingPAX DIAGNOSTIC Transformer, Insulation Products
Megger Brand Names
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
7/105
7
IEC 61850 STANDARD IN SUBSTATION AUTOMATION
Main purpose of the standard is to achieve interoperability amongdifferent devices from different vendors within the same substation.
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
8/105
8
IEC 61850 STANDARD IN SUBSTATION AUTOMATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
9/105
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
10/105
10
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
11/105
11
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
12/105
12
THE POWER SUBSTATIONIn a substation there are Primary Equipments:
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
13/105
13
THE POWER SUBSTATION
The Primary equipments in the Substation need
to be controlled . The word CONTROL in a substation has nothing to do with ProcessControl , where the word CONTROL is usually associated to feedbacksystems :
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
14/105
14
THE POWER SUBSTATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
15/105
15
THE POWER SUBSTATIONBusbar change. Load is on Busbar 2
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
16/105
16
THE POWER SUBSTATIONBusbar change. Connecting Busbar 1 to Busbar 2
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
17/105
17
THE POWER SUBSTATIONBusbar change: Connecting the Feeders to Busbar 1
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
18/105
18
THE POWER SUBSTATIONBusbar change: Disconnecting feeders from Busbar 2
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
19/105
19
THE POWER SUBSTATIONBusbar change: Disconecting Busbar 2 from the system
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
20/105
20
THE POWER SUBSTATIONBusbar change. Busbar 1 in service
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
21/105
21
THE POWER SUBSTATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
22/105
22
THE POWER SUBSTATIONOne very simple interlocking:Earthing Switch and Disconnector
I can OPEN / CLOSE the Disconnector ONLY if the EarthingSwitch is OPEN.If the Earthing Switch is CLOSED I cannot operate theDisconnector.
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
23/105
23
THE POWER SUBSTATIONEARTHING SWITCH CLOSED
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
24/105
24
THE POWER SUBSTATIONEARTHING SWITCH OPEN
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
25/105
25
THE INTERLOCKING SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
26/105
26
A Local Action (open/close) may require:THE INTERLOCKING SYSTEM
Remote information (from different bays)Local information (from the same bay)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
27/105
27
OC G S S
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
28/105
28
THE INTERLOCKING SYSTEM
THE INTERLOCKING SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
29/105
29
THE INTERLOCKING SYSTEM
THE IEC 61850 INTERLOCKING SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
30/105
30
THE IEC 61850 INTERLOCKING SYSTEM
CONTROL / INTERLOCKING in an IEC 61850 substation
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
31/105
31
CONTROL / INTERLOCKING in an IEC 61850 substation
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
32/105
32
IEC 61850 Standard
THE POWER SUBSTATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
33/105
33
THE POWER SUBSTATIONIn a substation there are Primary Equipments..
THE POWER SUBSTATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
34/105
34
THE POWER SUBSTATION that must be protected.
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
35/105
THE PROTECTION RELAYS
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
36/105
36
THE PROTECTION RELAYS
THE PROTECTION RELAYS
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
37/105
37
THE PROTECTION RELAYS
The circuit breaker opens and interrupts the fault current. The relaysees no fault conditions anymore and it resets. Circuit breaker remains open, the fault has been cleared.
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
38/105
38
THE PROTECTION SYSTEM
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
39/105
39
THE PROTECTION SYSTEM
Radial Feeders: No communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
40/105
40
THE PROTECTION SYSTEM
Radial Feeders: No communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
41/105
41
THE PROTECTION SYSTEM
Radial Feeders: No communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
42/105
42
THE PROTECTION SYSTEM
Radial Feeders: No communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
43/105
43
THE PROTECTION SYSTEM
Radial Feeders: Communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
44/105
44
THE PROTECTION SYSTEM
Radial Feeders: Communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
45/105
45
THE PROTECTION SYSTEM
Radial Feeders: Communication
THE PROTECTION SYSTEM
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
46/105
46
THE PROTECTION SYSTEM
Radial Feeders: Communication
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
47/105
GOOSE communication for PROTECTION and CONTROL
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
48/105
48
GOOSE = Generic Object Oriented S ystem Event.Is an unacknowledged multicast message that is repeated with a certainstrategy allowing the supervision of the Horizontal Communication.
GOOSE communication for PROTECTION and CONTROL
GOOSE or Contact (Conventional) ?
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
49/105
49
GOOSE or Contact (Conventional) ?
GOOSE or Contact (Conventional) ?
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
50/105
50
GOOS o Co tact (Co ve t o a ) ?
GOOSE or Contact (Conventional) ?
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
51/105
51
( )
GOOSE or Contact (Conventional) ?
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
52/105
52
( )
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
53/105
53
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
54/105
BEFORE standardisation : REPORTING TO SCADA / RTU
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
55/105
55
Proprietary communication protocols were / are still available.Handling correctly all protocols was and is still a challenge
BEFORE: PROTOCOL CONVERTERS / IMPLEMENTATIONS
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
56/105
56
IEC 61850 APPLICATION: REPORTING TO SCADA / RTU
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
57/105
57
IEDs from different vendors can exchange and use information over acommon communications media. No need to have protocol converters.Reporting: Vertical Communication .
IEC 61850 APPLICATION: SCADA/RTU COMMUNICATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
58/105
58
The communication between SCADA / RTU and the IEDsis defined in the IEC 61850 standard (MMS / FTP).
Data exchanged can be:
Control (operating primary objects) Log Reporting of events Disturbance Files Upload
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
59/105
59
IEC 61850: NETWORK TOPOLOGY
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
60/105
60
The data traffic runs on Ethernet, 100 Mbit/s.
This means that in the IEC 61850 substation there are Ethernet switches.
Protection and Control signals aredependent on the correctfunctionality of the communicationsystem, which has in the Ethernetswitches one of its most importantfactors.
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
61/105
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
62/105
62
IEC 61850: The SCL language
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
63/105
63
IEDs and Substations are described through XML files.The IEC 61850 language used in the XML files is calledSCL language.
SCL: Substation Configuration Language.
IEC 61850: The SCL language (IED Modelling)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
64/105
64
IEC 61850: The SCL language (IED modelling)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
65/105
65
Bay A Bay Unit (IED)
PTRC (Trip, Operate)
IEC 61850: The SCL language (IED modelling)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
66/105
66
Bay Unit (IED)
PTRC (Trip, Operate)
SCLBay A
IEC 61850: The SCL language (IED modelling)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
67/105
67
Bay Unit (IED)
PTRC (Trip, Operate)
SCLBay A
IEC 61850: The SCL language (IED modelling)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
68/105
68
Bay Unit (IED)
PTRC (Trip, Operate)SCL
Bay A
IEC 61850: The SCL language (IED modelling)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
69/105
69
SCLSCLIt is possible to structurethe Logical Nodes, andgroup them under differentLogical Devices.The rules of this structureare described in the XMLfile.
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
70/105
IEC 61850: Different SCL files
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
71/105
71
Depending on the information they carry, there are different types of SCL files:
ICD (IED Capability Description)
CID (Configured IED Description)SCD (Substation Configuration Description)
SSD (System Specification Description)
IID (Instantiated IED Description)SED (System Exchange Description)
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
72/105
72
IEC 61850: Engineering Process
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
73/105
73
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
74/105
IEC 61850: Engineering Process
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
75/105
75
There are software tools that can extract engineering information from theSCD file and represent them in a comfortable way to the user:
IEC 61850: Engineering Process
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
76/105
76
REPORTING Vertical Communication
All the IEC 61850 devices (IEDs) describe themselves withhelp of the SCL language.
SCL information from all IEDs are integrated into theIEC 61850 Engineering Tool.
IEC 61850: Engineering Process
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
77/105
77
The SCADA system isalso IEC 61850compliant, and it can readthe SCD filesunderstanding how thesubstation looks like,which IEDs are presentand which informationthey send to the SCADAsystem .
SCADA / RTU Vertical Communication
IEC 61850: Engineering Process
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
78/105
78
GOOSE Horizontal Communication
In the SCL file there is written which IED talks to which IED.
The standard messages among IEDs in the same substation are calledGOOSE messages (Generic Object Oriented Substation Event).GOOSE messages can contain protection application information (TRIP,Block etc.) .
IEC 61850: Engineering Process
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
79/105
79
The IEC 61850 Engineering Tool
One IEC 61850 Engineering Tool is in principle a software that handlesSCL files.
The initial SCL files are provided by the IED vendor software tools, and theyare called ICD files (IED Capability Description).
The ICD files are imported in the IEC 61850 Engineering TOOL andGOOSE Reporting information are added for each IED, creating the socalled SCD file (Substation Configuration Description).
The SCD file is then exported from the Engineering Tool. IED vendor toolswill import that file and will download in the IEDs the IEC 61850 informationthat are written in the SCD files.
IEC 61850:E i i P
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
80/105
80
Engineering Process
IEC 61850: Engineering Tools
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
81/105
81
Documentation
The SCD file describes thesubstation in IEC 61850 language(SCL).The IEC 61850 tool is able toelaborate such information and toshow it in human readable format,like a PDF file.
IEC 61850: Engineering Tools
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
82/105
82
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
83/105
83
PROCESS BUS
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
84/105
84
Sampled Values(SV)9-2
Merging Units(MU)
IEC 61850-9-2NCIT
PROCESSBUS
FULLY IEC 61850 SUBSTATION
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
85/105
85
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
86/105
Replacement of BO cards
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
87/105
87
GOOSE OUT
Replacement of BI cards
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
88/105
88
GOOSE OUT
GOOSE IN
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
89/105
89
GOOSE OUT
GOOSE IN
THE IEC 61850-8-1 IED
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
90/105
90
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
Replacement of analog cards + A/D conversion
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
91/105
91
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
SAMPLED VALUES (SV)
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
92/105
92
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
SAMPLED VALUES
THE FULLY IEC 61850 COMPLIANT IED
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
93/105
93
GOOSE IN GOOSE OUT
IEC 61850-8-1 Station Bus
SAMPLED VALUES
IEC 61850-9-2Process Bus
WHERE ARE THE SAMPLED VALUES COMING FROM?E
S
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
94/105
94
S A M P L E D V A L U E
Merging Units
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
95/105
95
Merging Units
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
96/105
96
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
97/105
97
IEC 61850 Standard
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
98/105
98
IEC 61850: TESTING
H d t t ll f thi ?
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
99/105
99
How do we test all of this?
How do we test the Network Topology (Switches)?
How do we test the Vertical Communication to SCADA?(IEC 61850-8-1, MMS, Reporting)
How do we test Interlockings?(IEC 61850-8-1 GOOSE)
How do we test Protection Schemes?(IEC 61850-8-1 GOOSE and IEC 61850-9-2 SV)
IEC 61850: TESTING
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
100/105
100
Information about IEC 61850KTH: Kungliga Tekniska Hgskolan
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
101/105
101
g g g
University courses on IEC 61850for SA (Substation Automation)
Information about IEC 61850Tissues (Technical Issues) database
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
102/105
102
( )
www.tissues.iec61850.comIEC 61850 standard is a dynamic standard !. You must follow it!
IEC 61850 Blog www.blog.iec61850.comInformation about IEC 61850
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
103/105
103
g
Information on new IEC 61850documents
Information on IEC 61850 events
Information on new instruments andtechniques on the IEC 61850
g
Competent and fast up to date blog on IEC 61850
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
104/105
Megger http://www.megger.comInformation om IEC 61850
7/27/2019 KTH == IEC 61850 for Substation Automation 2013-04-12
105/105
gg p ggIEC 61850 test equipment, tools and litterature