Project Scope of Work 1

(E) Football Field

(E) 10th Street

(E)

5th

Str

eet

Increment #2

“Baseball Field”

Increment #1

“Parking Lot”

Increment #3

“Field House”

Laney College

Athletic Field

&

Field House Project

Nawar Al Juburi

LEED® Green Associate Assistant Construction Manager/Field Engineer

Cordoba Corporation

Presented by:

Northern California Regional Office

500 12th Street, Suite 330

Oakland, CA 94607

2

Background & Priority 3

Laney College

Campus

Interstate Highway

880 South (To Oakland

International Airport)

Peralta Community

College District Office

Eagles

Football Field

Lake Merritt

STRATEGIC PROJECT LOCATION

Interstate Highway 880

North(To Downtown

San Francisco )

Lake Merritt BART

Station

Laney College

Athletic Filed & Field

House

Project Team / Cordoba’s Role 4

Owner

(PERALTA COMMUNITY COLLEGE DISTRICT)

Construction Management

(CORDOBA CORPORATION )

Design-Build Entity

(GILBANE BUILDING COMPANY )

Architect of Record

(GOULD EVANS BAUM THORNLEY, INC.)

Project Scope of Work 5

(E) Football Field

(E) 10th Street

(E)

5th

Str

eet

Increment #2

“Baseball Field”

Increment #1

“Parking Lot”

Increment #3

“Field House”

Inc. # 1: New Solar-Powered Parking Lot Structure 6

Inc. # 2: New Baseball Field 7

Inc. #3 Athletic Field House 8

First Floor- 12,000 sq.ft. 9

Second Floor- 5,500 sq.ft. 10

Final Project Cost 11

2% Owner Request

1.50% Unforeseen Conditions

1%E & O

This cost included five (5) Approved Change Orders

$18 Million

Project Highlights 12

Completed November 2011

Design-Build

LEED® Gold Certified

$1.9 million Photovoltaic Collection

System

Minimum of 340,000 kilowatt hours per

year

100% of the peak energy demand of

the Field House

75% of the annual power consumption

This translates into $350k in savings

within the first 5 years of the building's

use