AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page1–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplicationLargeFacilitiesRetro-commissioningGoals:☐Providefinancialincentivestosupportimplementationofno-andlow-costenergyefficiencyimprovements(0-1yearpayback)tosystemsinlargefacilities.☐Reducefacilityoperatingcostsbyoptimizingtheoperationofsystemsforlargefacilities.☐Providearoadmapofenergyefficiencyopportunitiesforcapitalimprovementprojects(1-10yearpayback)tobeimplementedviatheCustomInitiative.

Doesyourfacility/projectqualify?☐Atleast100,000squarefeetofair-conditionedspace☐ExistingEnergyManagementControlSystem(EMCS)thatmonitorsandcontrolsHVACsystems☐Facility must be at least five years old AND a miminum of 5 years since last major upgrade or Retro-Commissioning survey.☐Non-residentialfacility☐Electricprojects:electricdeliveryservicerateDS2,DS3,DS4,orDS6andEnergyEfficiencyProgramsChargeonAmerenIllinois electricbillfortheservicepointcorrespondingtotheelectricproject.DS1projectswillbeconsideredifthereisnootherOfferingin theResidentialorBusinessProgramabletoservetheDS1customer.☐Gasprojects:gasdeliveryservicerateGSD2,GDS3,GDS4,GDS5,orGDS7andEnergyEfficiencyProgramsChargeonAmerenIllinois gasbill.GDS1customerswillbeconsideredifthereisnootherOfferingintheResidentialorBusinessProgramabletoservethe GDS1customer.☐EstimatedprojectcompletiondateisbyDecember31,2019☐Finalapplicationpaperworkisduewithin30daysofprojectcompletionorbyDecember31,2019,whichevercomesfirst Incentives:

☐Themostcommonnocost/lowcostmeasuresimplementedthroughLargeFacilitiesRetro-Commissioning(LFRCx)include modificationstotheexistingenergymanagementcontrolsystemandtooptimizeHVACandlightingsystemoperations.☐ProgramincentivesareprovidedtodefrayaportionoftheRCxsurveycost.☐Programincentivesincludeasurveyincentiveandanimplementationincentive.☐Thesurveyincentiveis70%ofthesurveycost.☐Theimplementationincentiveof$0.02/kWhsavedand/or$0.30/thermsavedappliestoallimplementedandverifiedRCx measureswitha0-1yearpayback(savingscappedat25%ofthefacility’sannualusageunlessmeteredverificationprovided).☐InfacilitieswhereAmerenIllinoisprovidesonlyonefuelsource(gasorelectric),thesurveyincentivewillbereducedto40%of thesurveycost.

☐CustomersqualifyfortheRCxincentivebyimplementingsufficient0-1yearpaybackenergyefficiencymeasurestomeetthe minimumenergysavingsrequirementoutlinedinthepreapprovalletter.☐RecommendationsandsupportingdatafromtheRCxsurvey(“ImplementationPlan”)maybeusedtoprovidethebasisofaCustom Initiativeapplication.☐Electricincentivescappedat$500,000perproject.☐Gasincentivescappedat$100,000perproject.☐Pleasebeawarethatprojectsmayonlyreceiveincentivesforeligibleequipmentifitis(1)self-installedbyanemployeeofthe AmerenIllinoiscustomerlistedonthisapplication,or(2)installedbyanIllinoisCommerceCommission-approvedCertifiedInstaller. AfulllistofCertifiedInstallerscanbefoundathttps://www.icc.illinois.gov/utility/default.aspx?type=28.Participationinstructions:

• Pre-approvalisrequiredbeforetheRCxsurveyisinitiated(includinggeneratingpurchaseorders).• TherearefivephasesofeveryLFRCxproject:Screening,Application,Survey,Implementation,andVerification.• Eachphaseincludesasetofrequireddocumentationthatmustbesubmittedandreviewedbeforetheprojectcanmove

forwardtothenextphase.Onlythematerialsrequiredforeachphaseshouldbesubmitted.• Astheprojectmovestothenextphase,youareresponsibleforsubmittingtherequireddocumentationlistedforthat

phase.• Thephaserequirementsarelistedatthebeginningofeachsectionasachecklist.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page2–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplicationItisofcriticalimportancetonotifytheprogramofanyscopechangesbeingconsidered,asyourenergysavingsandincentivelevelmaybeaffected.Programrepresentativescanadviseyouastopossibleimpactsofthescopechangesandassistincollectingtheproperdocumentation.Supplementaldocumentation:☐LandlordConsentForm–requiredifAmerenIllinoiscustomerisatenant☐PaymentReleaseAuthorization–requirediftheincentiveistobepaidtoapartyotherthantheAmerenIllinoiscustomer☐LargeIncentiveRequestForm–requiredifthetotalrequestedincentiveisover$25,000(survey+implementationincentive)

Pleasecontactprogramrepresentativeswithquestions:IllinoisBusinessEE@ameren.comor1.866.800.0747.

WhoandWhatisaRetro-Commissioning(RCx)ServiceProvider(RSP)?WhatisaRetro-CommissioningServiceProvider(RSP)?• AnRSPisaconsultingfirmordesignbuildcontractorwithskillsandexperienceinRCx.• AnRSPisexperiencedinprovidingRCxauditstolargefacilitiescustomers.• AnRSPhasbeenselectedbytheAmerenIllinoisEnergyEfficiencyprogramtoassistinthedeliveryofthisprogramtoAmerenIllinoiscustomers.

HowdoesacustomerselecttheirRSP?• CustomersandRSPstypicallyhaveanongoingrelationshipandusethisprogramtoimplementnocost/lowcostenergyefficiencymeasuresanddevelopagameplanforfuturecapitalimprovements.

• CustomerswhodonothaveanongoingrelationshipwithanRSPcanworkwithEnergyEfficiencyprogramstafftoselectanRSPthatmeetstheirneeds.

• CustomerswhohaveanongoingrelationshipwithafirmtheywouldliketouseasanRSPcanworkwithEnergyEfficiencyprogramstafftoobtainapprovaltousetheirdesiredserviceprovider.

WhatcanacustomerexpectfromtheirRSP?• Appropriateskillsandexperiencetoperformaretro-commissioningauditforlargefacilities.• Solidunderstandingofthelargefacilitiesretro-commissioningprogramprocessandguidelines.• Provenexperienceinsuccessfullycompletingalargefacilitiesretro-commissioningprojectthroughtheAmerenIllinoisEnergyEfficiencyProgram.

WhoarethecurrentRSPs?• TheRSPlistisupdatedannually-thecurrentlistofapprovedRSPsisavailableathttp://www.AmerenIllinoisSavings.com/portals/0/business/forms/2018-Large-Facilities-RSP-List.pdf.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page3–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

CustomerandProjectInformationTable1-AmerenIllinoisCustomerandProjectInformation

CustomerNameonAmerenIllinoisAccount

SignedW-9formisrequireddocumentationClickhereforablankW-9form

AmerenIllinoisElectricAccountNumber:

AmerenIllinoisNaturalGasAccountNumber:

MailingAddress(checkmailedto) City State Zip

ContactName Title

E-mailAddress Phone(XXX)XXX-XXXX Ext. Fax(XXX)XXX-XXXX

SecondaryContactName(ifapplicable) Phone(XXX)XXX-XXXX E-mailAddress

PhysicalInstallationAddress(ifdifferentthanabove)

InstallationAddress City State Zip

Checkone:OwnerTenant(Iftenant,pleasecompletetheLandlordConsentForm)

Name(s)oftheperson(s)whoreferredyoutotheAmerenIllinoisEnergyEfficiencyProgramforthisproject:NameofAmerenIllinoisorEnergyEfficiencyEmployee NameofReferringContractororProgramAlly

ProjectInstallationInformation☐Self-installedbyanemployeeoftheAmeren

Illinoiscustomerlistedonthisapplication☐InstalledbyIllinoisCommerceCommission-registeredCertifiedInstaller(Name,asregisteredwithICC:_________________________________________________)

Retro-commissioningServiceProvider(RSP)Information

CompanyName ContactName Title

MailingAddress City State Zip

E-mailAddress Phone(XXX)XXX-XXXX Ext Fax(XXX)XXX-XXXX

Facility/ProjectDescriptionFacilityType(checkone):University/SchoolOfficeHospitalMedicalOfficeBuilding(outpatientservices)SkilledNursingFacilityOther(Pleasespecify):

ProjectDescription:(checkallthatapply):EnergyManagementControlSystemLightingControlSystemHVACBuildingEnvelopePumpingSystemsOther(pleasespecify):

FacilitySize(squarefeet): • Mustbeatleast100,000sq.ft.toqualifyfortheincentives• Mayincludeaggregatesquarefootagefrommultiplefacilitiesononecampus• Mayincludemultiplespacetypes(offices,classrooms,medical,industrial,etc.)

NewerversionspostedtotheAmerenIllinoisEnergyEfficiencyProgramwebsitesupersedeallpreviousversions.Therevisionnumberislistedinthefooterofeachpage.Theversionoftheapplicationthatwasavailableatthetimeyousubmittedyourpre-approvalapplicationwillapply.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page4–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

ScreeningPhase

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page5–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

ScreeningPhaseCompletingthisportionoftheapplicationisthefirststepinapplyingforincentivemoneyforyourLargeFacilitiesRCxproject.Tobegintheprocess,theRSPandAmerenIllinoiscustomermustcompleteandsubmittheitemslistedinthischecklist.

ScreeningToolGuidelines• TheLargeFacilitiesRCxScreeningToolisdesignedtoassessandpre-qualifystrongcandidatesforparticipationinthe

LargeFacilitiesRCxOffering.• ThisscreeningtoolisdesignedtominimizetheatriskinvestmentofengineeringmanhoursbytheRSPinassemblingthe

necessaryinformationfortheincentiveapplication.• BasedontheresultsoftheScreeningTool,projectsthatdonotqualifyforparticipationintheLargeFacilitiesRCx

OfferingwillnotproceedanyfurtherwiththeRCxapplicationprocess.SuchprojectswillbeprovidedwithrecommendationsfromanEnergyEfficiencyrepresentativeregardingotherprojectsthatmayqualifyforincentives.

• BasedontheresultsoftheScreeningTool,projectsthatdoqualifyforparticipationintheLargeFacilitiesRCxOfferingwillreceiveapre-qualificationletterandanincentivestipendtodefraycostsofpreparingtheapplicationphase.Suchprojectswillthenproceedwiththesubmittalofalargefacilitiesretro-commissioningincentiveapplication.

ScreeningTool

Facilityage(forpredominantbuilding)(years)

Equipmentage

BoilerPlant (years)

ChillerPlant (years)

AHUs (years)

EMCS (years)

Facilitymaintenancesupport(checkone)

Limited

Average

Aggressive

Limited–insufficientmaintenancestaff,noequipmentserviceagreements,nopreventativemaintenanceprogram

Average–adequatemaintenancestaff,developingequipmentserviceagreements,developingpreventativemaintenanceprogram

Aggressive–robustmaintenancestaff,equipmentserviceagreementsinplace,activepreventativemaintenanceprogram

Customer/RSPrelationship(checkone)

NewCustomer Newcustomer–Noprojectstodate

DevelopingRelationship DevelopingRelationship–someprojects,1-2yearrelationship

StrongRelationship StrongRelationship–manyprojects,long-termrelationship

ScreeningPhaseChecklistCustomerandProjectInformation(Table1)ScreeningTooliscompleteCustomersignature(AcknowledgementandSignatureBlock)StipendPaymentRelease(optional)

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page6–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

Customermotivation/Commitmentlevel(checkone)Low-level

Mid-level

High-level

Customerisnotfullycommittedtotheretro-commissioningproject,internalapprovalprocesshasnotbeeninitiated.Customeriscommittedtotheretro-commissioningproject,internalapprovaldiscussionsareinprogress.Customeriscommittedtotheretro-commissioningproject,hasinternalapproval,andexpectstoimplementcustomprojectsuponcompletionofretro-commissioning.

Also,checkhereifyourfacilityhasacorporateenergypolicyand/orseparateinvestmentstructureforenergy-efficiencyprojects.

Also,checkhereifyourprojecthasreceivedboardapproval(contingentonAmerenIllinoisfunding).

Retro-CommissioningOpportunities(0-1yearpayback)ListuptofiveEnergyConservationMeasures(ECMs)thatrepresentpotentialopportunitiesforthisfacility.ECM#1ECM#2ECM#3ECM#4ECM#5

CustomOpportunities(1-10yearpayback)ListuptofiveEnergyConservationMeasures(ECMs)thatrepresentpotentialopportunitiesforthisfacility.ECM#1

ECM#2

ECM#3

ECM#4

ECM#5

EstimatedAnnualEnergyUsage

Electric kWh • ProvideanorderofmagnitudeestimateoftheannualenergyusageforthisfacilityinkWhandtherms.

• Providebackup/supportinginformationifavailable.Gas therms

EstimatedAnnualEnergySavings(retro-commissioningmeasuresonly)

Electric kWh

• ProvideanestimateoftheannualenergysavingsexpectedfromtheRCxmeasuresforthisfacility.

• ThisestimatemaybeexpressedinkWhandthermsorasa%oftheexistingannualenergyusage.Ifpresentingasa%,pleaseprovidethefacility'sexistingannualenergyusageinkWhand/ortherms.

• Providebackup/supportinginformationifavailable.Gas therms

EstimatedSurveyCost

$• Reviewtheprogramoverviewtabtoensureagoodworkingknowledgeofthe

programrequirements.• ProvideanestimateoftheRSP’ssurveycostforthisproject.

RequestedSurveyStipend

$

• Provideanestimateofthecosttomeettheapplicationphaserequirements.(Itisestimatedthiswilltypicallyinclude1-2weeksofeffortandrepresent5-10%ofthetotalsurveycost.)(cappedat$15,000fordual-fuelcustomersand$7,500forsingle-fuelcustomers)

EstimatedCompletionDate(mm/dd/yyyy)

• Completionofthesurveyandthe0-1yearpaybackprojects.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page7–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

AmerenIllinoisCustomerAcknowledgementandSignature–ScreeningIcertifythatallInformationprovidediscorrecttothebestofmyknowledge,andIgivetheCompany’spermissiontosharemyrecordswiththeIllinoisCommerceCommission,oritscontractors,whoplantoevaluatemyenergyusage.Additionally,IwillallowreasonableaccesstomypropertytoverifytheinstallationandperformanceoftheEnergyEfficiencyMeasuresthatareeligibleforincentivesunderthePrograms.

Bycheckingthisboxandsigningbelow,IcertifythatIhaveread,understoodandagreetotheTermsandConditionsattheendofthisform(p.22).IunderstandandagreethattheTermsandConditions(p.22)applytoallphasesofthisproject.Applicationswillnotbeacceptedas“complete”unlessthisboxischecked.

PrintName:__________________________________________________Title:__________________________________________

Signature:____________________________________________________Date(mm/dd/yyyy):_____________________________ElectronicsignaturesallowedandacceptedbytheBusinessProgram.Typingyournameaboveconstitutesavalidelectronicsignature.

StipendPaymentRelease

Stipendcheckpayableto:CompleteandsubmitthefollowinginformationonlyiftheincentivepaymentistobepaidtoanentityotherthantheAmerenIllinoiscustomerofrecord,listedinTable1ofthisapplication.

CompanyName

SignedW-9formisrequireddocumentation:ClickhereforablankW-9form

MailingAddress City State Zip

ContactName Title

E-mailAddress Phone Ext. Fax

IamauthorizingthepaymentoftheincentiveassociatedwiththeLargeFacilitiesRetro-CommissioningStipendto:

AmerenIllinoisCustomer(nosignaturerequired)

RSPorotherentity:IunderstandandagreethatIwillnotbereceivingthestipendincentivepaymentfromAmerenIllinois.IalsounderstandandagreethatmyreleaseofpaymenttoathirdpartydoesnotexemptmefromtheprogramrequirementsandTermsandConditions(p.22)specifiedattheendofthisapplication.

AmerenIllinoisCustomerName(Company)_____________________________________________________________________

PrintName:___________________________________________________Title:________________________________________

Signature:____________________________________________________Date(mm\dd\yyyy):____________________________ElectronicsignaturesarenotacceptedinthissignatureblockifthepaymentisgoingtoanentityotherthantheAmerenIllinoisCustomer.TheAmerenIllinoisCustomermustsignthissection,byhand,andsubmittotheprogram.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page8–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

ApplicationPhase

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page9–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

ApplicationPhaseCompletingthisportionoftheapplicationisthesecondstepinapplyingforincentivemoneyforyourLargeFacilitiesRCxproject.Tobegintheprocess,completeandsubmittheitemslistedinthischecklist.

RSPSurveyProposalRequirements(Includeassupplementaldocumentationtotheincentiveapplication):• ProvidedonRSP’sletterhead• Includesurveyscope,cost,andterms

EnergySavingCalculations(Includeassupplementaldocumentationtotheincentiveapplication):• ProvidebasiccalculationstosupportthesavingsestimateinTable2band2c• Outlinethecontributionofeachexpectedenergysavingmeasure• Provideanestimateoftheexistingannualenergyusageforthefacility(kWhandtherms)

WalkthroughSurveyReportRequirements(Includeassupplementaldocumentationtotheincentiveapplication):• Conductanon-sitevisittoconfirmtheexistingconditions • IncludeanequipmentlistfortheexistingHVACandcentralplantsystems• Noteanyunusualconditionsorchallengesassociatedwiththisfacility • Identifyanyrisksassociatedwiththesurvey,implementation,orverificationphasesoftheproject(inaccessibleareas,plantshutdown

requiredtoimplementmeasures,etc)BuildingComparisonScores(Includeassupplementaldocumentationtotheincentiveapplication):

• PleaseprovideEnergyUtilizationIndex(EUI):www.energystar.gov/ia/business/tools_resources/new_bldg_design/2003_CBECSPerformanceTargetsTable.pdf

• PleaseprovideENERGYSTAR®benchmarkscore.ThisscoreisestablishedthroughtheuseoftheENERGYSTARPortfolioManagertool.www.energystar.gov/index.cfm?c=evaluate_performance.bus_portfoliomanager

ApplicationPhaseChecklistScreeningToolsubmittedandapprovedSurveyScopeandSavingsEstimates(Tables2a,2b,&2c)Customersignature(AcknowledgementandSignatureBlock)RSPSurveyProposalEnergySavingCalculationsWalkthroughSurveyReportBuildingComparisonScoresLIRFforrequestsover$25,000(survey+implementationincentive)

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page10–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplicationTable2a-SURVEYSCOPE(ExistingEquipment)

SurveyScopeCheckallthatapply

EnergyManagementControlSystemLightingControlSystemHVACBuildingEnvelopePumpingSystemsHeatingSystemsBoilerPlantOther(Pleasespecifybelow)

Pro-FormaEstimates

Energysavingsmeasures(listofmeasureswith0-1yearpayback)

Energysavingsmeasures(listofmeasureswith1-10yearpayback)

SurveyCost($)SurveyIncentive–70%ofsurveycost($)

[40%ifgas-orelectric-only]

Table2b-SURVEYESTIMATEFORELECTRICMEASURES(ExistingEquipment)

EnterkWhSaved Incentivizedat2cents/kWh= $

A EstimatedAnnualkWhSavings (0-1yearpaybackmeasuresonly,fortheentiresystem) (kWh)

B YourElectricRate(moneyspentonelectricityforayear)dividedby(kWh

usedinayear)Cents/kWh

C EstimatedSavings AxB $

D EstimatedImplementationCost (The0-1yearpaybackmeasuresonly) $

E SimplePayback D÷C (years)

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page11–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

Table2c-SURVEYESTIMATEFORGASMEASURES(ExistingEquipment)

EnterThermsSaved Incentivizedat30cents/therm=$

A EstimatedAnnualThermSavings (0-1yearpaybackmeasuresonly,fortheentiresystem) (Therms)

B YourGasRate(moneyspentongasforayear)dividedby(therms

usedinayear)(Centspertherm)

C EstimatedSavings AxB $

D EstimatedImplementationCost (The0-1yearpaybackmeasuresonly) $

E SimplePayback D÷C (years)

AmerenIllinoisCustomerAcknowledgementandSignature–Application

EstimatedSurveyCompletionDate(mm/dd/yyyy)__________________________________________________________________

Estimatedimplementationcompletiondate(mm/dd/yyyy)__________________________________________________________

Estimateverificationsurveycompletiondate(mm/dd/yyyy)_________________________________________________________

Bysigningbelow,IcertifythatallInformationprovidediscorrecttothebestofmyknowledge.Thereissupportfromfacilitymanagementtoinvestintheimplementationofenergysavingmeasuresidentifiedintheretro-commissioningsurvey(minimuminvestmentcostlistedinRowDofTable2band2c)

PrintName:__________________________________________________Title:___________________________________________

Signature:____________________________________________________Date(mm/dd/yyyy):______________________________Electronicsignaturesarenotacceptedinthissignatureblock.TheAmerenIllinoisCustomermustsignthissection,byhand,andsubmittotheprogram.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page12–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

SurveyPhase

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page13–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

SurveyPhaseCompletingthisphaseisthirdstepinapplyingforincentivemoneyforyourLargeFacilitiesRCxproject.Tobegintheprocess,completeandsubmittheitemslistedinthischecklist.

SurveyPhaseGuidelines• Surveyphasemustbeinitiatedwithin30daysofpre-approvalletterorincentivesmaybeatrisk.• ImplementationPlanmustbesubmittedtocustomerandEnergyEfficiencyrepresentativeatleastoneweekpriortopresentation

meeting.• ImplementationPlanPresentationMeetingmustbeheldandmustincludecustomer,LargeFacilitiesRSP,andEnergyEfficiency

representativeorincentivesmaybeatrisk.Withoutthismeeting,theimplementationincentivewillnotbeprovided.• ProgramCommitmentFormmustbesignedandcompletedwithinoneweekofImplementationPlanPresentationMeeting.• RepairsmaybeinitiatedpriortosubmittalofImplementationPlanifnecessarytomaintainprojectschedule.

ImplementationPlanPresentationMeetingGuidelines:• Thismeetingmaybeconductedatthecustomer’sfacility,viaconferencecall,orviawebinar.• MeetingparticipantsmustincludeRSP,customer,andEnergyEfficiencyrepresentative.• RSPtoreviewretro-commissioningsurveyfindingsincluding:

o 0-1yearpaybackmeasurestobeimplementedunderRCxInitiative.o 1-10yearpaybackmeasureswhichmaybeimplementedunderCustomInitiative.

• Customertoaddressthefollowingissues:o Comments/questionsonRetro-CommissioningImplementationPlan.o Reviewofenergyefficiencymeasurescustomerplanstoimplementtomeetminimumenergysavingsrequirement.o Updatedscheduleforimplementationphase.

• EnergyEfficiencyrepresentativetoaddressthefollowingissues:o Comments/questionsonRetro-CommissioningImplementationPlan.o Reviewofprogramrequirementsforimplementationandverificationphases.o Requestforcompletedprogramcommitmentformasafollowuptothismeeting.

Ifyouhavequestionsorareuncertainhowtoproceed,pleasecontactprogramrepresentativesviaemail:IllinoisBusinessEE@ameren.comorat1.866.800.0747.

Surveyphasechecklist

Writtenconfirmationofestimatedsurveycompletiondate(sentviae-mailtotheprogram,providedbyRSP)CopyofP.O.toRSPdocumentinginitiationofthesurveyphaseElectronicsubmittalofImplementationPlanImplementationPlanPresentationMeetingCompletedTable3-SurveyChecklistCompletedReport,perTable4-ImplementationPlanReportOutlineCompletedTable5-ProgramCommitmentForm

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page14–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

Table3–LargeFacilitiesRetro-CommissioningSurveyChecklistThisisachecklistofsomepotentialenergysavingsopportunitiesforconsiderationinlargefacilities.Pleaseusethisasastartingpoint–donotlimityoursurveytothesecheckpoints.

SystemsthatsimultaneouslyheatandcoolInoperableeconomizersPumpswiththrottleddischargesHVACequipmentsetpointsandruntimeschedulesthatdonotcorrelatewithactualbuildinguseLightingcontrolschedulesthatdonotcorrelateImproperbuildingpressurizationShortcyclingofequipmentVariablefrequencydrivesthatoperateatunnecessarilyhighorconstantspeedsOccupancysensorsandphotocellswhicharenotcalibratedorarenotfunctioningasintendedOfficeequipmentwithpowermanagementfeaturesdisabledAirinfiltrationthroughwindows,doors,walls,androofHVACSystemswhichhavenotbeenrecentlytested,adjusted,andbalancedLackofcleaningofairsideheattransfersurfacesandfilters(filterreplacementenergysavingscannotbeclaimedtowardsprojectenergysavingsrequirements)Roomthermostats,ductthermostats,humidistats,andtemperaturesensorsrequiringcalibrationInoperableormalfunctioningdampersandvalvecontrolsChilled-watersystemsnotutilizingautomatedchilled-waterresetChilled-watersystemsrequiringchillertubecleaningandimprovewatertreatmentImprovedboilercontrolsSteamtrapmaintenanceOzonelaundrysystems(lessenhotwaterusage)LowflowshowerheadsandfaucetaeratorsHeatrecoverychillersHeatrecoveryheatexchangersInstallhigh-efficiencyboilersorretrofitboilerburnersInstalleconomizersInstallinsulationarounddomestichotwatertanks,steamandhotwaterdistributionlines,condensatereturnlines,deaeratortanks,andboilerfeedwaterstoragetanksRepairorupgradetheheatinginsulationsurfacesofboilersAdjustboilerblowdownratesRetrofitnaturalgasfryers,griddles,hot-foodholdingcabinets,ovens,andsteamcookerswithmoreefficientmodels

Table4–ImplementationPlanOutlineNOTE:ThisoutlineisintendedasaguidelinefortheImplementationPlanreportandmaybemodifiedbasedonthescopeofRCxSurveyforeachproject.

ExecutiveSummaryFacilityProfileSummaryofFacilityEligibilityrequirements,includingconditionedversusnon-conditionedsquarefootageEUIandENERGYSTARBenchmarkScoresandSupportingInformationEnergyManagementControlSystemDrawingsandSequenceofOperationsLightingControlSystemDrawingsandSequenceofOperationsHVACandLightingDrawings(asapplicabletoprojectscope)Air-HandlingUnits(AHUs)designflow,powerrequirements,andcontroltypesFacilityPerformanceBaselinesDiagnosisofOperatingandComfortProblemsIdentificationofComponentFailuresandEquipmentPerformanceDegradationRecommendationandPrioritizationofSpecificMaintenanceMeasures,ControlChanges,BalancingChangesandEquipmentImprovementsCapitalImprovementMeasuresandRecommendationsDocumentationofrecommendedchangesinoperatingprocedures(postimplementation)Documentationofenergysavingsandcomfortimprovements(postinstallation)RecommendationsforongoingtrackingofthefacilityenergyandcomfortbalanceSavingsCalculations

Electronicsubmittalofsurveydata(powerandpressurereadings)ElectronicsubmittalofsavingscalculationsorsimulationinputsandassumedperformancecurvesSavingsfromnon-automatedadjustmentsshouldnotbeclaimed(e.g.routinechilledwaterresetadjustmentsbyfacilityengineer)Motorefficienciesshouldbebasedonmotornameplate(orNEMApremiumefficiencyifnameplatenotaccessible)Pumpandfanloadfactorsshouldbemeasuredwherepractical.Ifnotmeasured,then65%shouldbeused.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page15–RetroCommissioningLargeFacilitiesApp2019Rev01

LargeFacilitiesRetro-CommissioningApplication

Table5–ProgramCommitmentFormAmerenIllinoisCustomerNameandContactInformation

Company MailingAddress ContactPerson EmailAddress

CompanyPhone CompanyFax ContactPhone ContactCell

Retro-CommissioningServiceProvider(RSP)NameandContactInformationCompany MailingAddress ContactPerson EmailAddress

CompanyPhone CompanyFax ContactPhone ContactCell

Retro-CommissioningSurveyRecommendationsThefollowingsurveyrecommendationswillbeimplementedbythecustomertomeettheminimumsavingsrequirements:(PleasebrieflylistthemeasurestobeimplementedhereandattachacopyoftheRSP’sRCxImplementationPlandescribingthesemeasuresindetail.)

SavingsandIncentiveInformation

A $ RSPSurveyCost

B $ AmerenIllinoisSurveyIncentive(foundinthepre-approvalletter)

C $ AmerenIllinoisElectricImplementationIncentive2centsperkWhsaved

D $ AmerenIllinoisGasImplementationIncentive30centsperthermsaved

E kWh MinimumAnnualSavingsRequirement(foundinthepre-approvalletter)

F kWh PlannedkWhsavingsofthe0-1yearmeasurestobeimplemented

G Cents/kWh Yourelectricrate

H $ Estimatedannualelectricalsavings(FxG)

I Therms MinimumAnnualGasSavingsRequirement(foundinthepre-approvalletter)

J Therms Plannedthermsavingsofthe0-1yearmeasurestobeimplemented

K Cents/Therm Yourgasrate

L $ Estimatedannualgassavings(JxK)

M $ Estimatedcostofplannedmeasures(excludessurveycost;laborcanbeviaRSP,othercontractor,orin-house)

N Years Paybackofplannedmeasures(M÷(H+L))(Mustbelessthan1year)

ProgramCommitmentTermsandConditions• MinimumannualsavingsrequirementmustbemetviatheimplementationofmeasureslistedonthisformonorbeforeDecember31,2019,the

programyeardeadline.• Failuretoproceedwiththeimplementationofthelistedmeasuresand/orfailuretomeettheprogramyeardeadlinemayresultintheforfeitof

incentives.• ConfirmationofmeasuresimplementationviathesubmittalofaverificationreportbytheRetro-CommissioningServiceProviderisrequiredduring

theVerificationPhase.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page16–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

AmerenIllinoisCustomerAcknowledgementandSignature–CommitmentIhavereviewedtheRetro-CommissioningImplementationPlanwiththeRetro-commissioningServiceProviderandwithanEnergyEfficiencyprogramrepresentative.Iampreparedtoimplementtheenergysavingsmeasuresinordertomeettheminimumannualenergysavingsrequirementsandtheprogramyeardeadlineasdescribedinthisapplication.Furthermore,Iunderstandthatanoutsidecontractormayrequestpermissiontoverifythattheprojectwascompletedasstatedintheapplication,andIwillagreetothisinspection.

Bycheckingthisboxandsigningbelow,IcertifythatIhaveread,understoodandagreetotheTermsandConditionsintheparagraphabove.Applicationswillnotbeacceptedas“complete”unlessthisboxischecked.

PrintName:_____________________________________________Title:________________________________________

Signature:___________________________________Date(mm/dd/yyyy):______________________________________ElectronicsignaturesallowedandacceptedbytheBusinessProgram.Typingyournameaboveconstitutesavalidelectronicsignature.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page17–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

ImplementationPhase

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page18–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

ImplementationPhaseCompletingtheImplementationPhaseisthefourthstepinapplyingforincentivemoneyforyourLargeFacilitiesRCxproject.Tobegintheprocess,completeandsubmittheitemslistedinthischecklist.

ImplementationPhaseGuidelines• Implementationofretro-commissioningmeasuresmaybeaccomplishedbyinhouseresources,localcontractor,yourRSPora

combinationoftheseresources.• Implementationphasemustbeinitiatedwithin30daysafterthesurveypresentationmeetingtoavoidputtingtheprojectincentives

atrisk.• Measuresthatrequireascheduledplantshutdownareanexceptiontothe30daydeadline.

Pleasesendallreportsviae-mailtotheprogramviaemail:IllinoisBusinessProjects@ameren.com.Pleasebesuretoincludeyourprojectnumberinthesubjectlineoftheemail.

ImplementationPhaseChecklist

Providenotificationbye-mailtotheRSPandEnergyEfficiencyrepresentativethattheimplementationphasehasstarted.Provideanupdatebye-mailtotheRSPandEnergyEfficiencyrepresentativestatingtheestimatedcompletiondatefortheimplementationphase.Providenotificationbye-mailtotheRSPandEnergyEfficiencyrepresentativethattheimplementationphaseiscomplete.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page19–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

VerificationPhase

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page20–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

VerificationPhaseCompletingthisphaseisthefifthstepinapplyingforincentivemoneyforyourLargeFacilitiesRCxproject.Tobegintheprocess,completeandsubmittheitemslistedinthischecklist.

VerificationPhaseGuidelines:• ProjectverificationwillbeconductedbytheRSPusingTable6.• Everyprojectisrequiredtohaveapost-installinspectionconductedbyEnergyEfficiencystaff.• Theintentoftheverificationsurveyistoconductaspotcheckoftheenergy-efficiencymeasuresagreedtointheprogramcommitment

formtoverifythatthosemeasureshavebeenimplemented.

Ifyouareconsideringchangestoyourscopeofwork,itisimperativethatyoucontacttheEnergyEfficiencystaff.Programrepresentativeswillprovideinformationonhowthesechangeswillimpactyoursavings/incentiveandthenecessarystepsrequiredtorequestincentivechanges.

Table6–VerificationSurveyForm–tobecompletedbytheRSP(mayincludemultiplecopiesofthissheetifnecessary)CustomerCompanyName:

RSPCompanyName:

Project#(fromyourpre-approvalletter):Completeasectionbelowforeachsurveyconducted.Theoptionsfor“SurveyType”include:

HeatingSystemsEMCS

HVACBoilerPlant

BuildingEnvelopeOther(lightingcontrols,etc.)

Survey1

TypeofSurvey:

DescriptionofMeasure: DescriptionofSurveyApproach:

DiscrepanciesNoted:Y/NandComments: SatisfactoryImplementation:Y/NandComments:

Date:(mm/dd/yyyy)

Survey2

TypeofSurvey:

DescriptionofMeasure: DescriptionofSurveyApproach:

DiscrepanciesNoted:Y/NandComments: SatisfactoryImplementation:Y/NandComments:

Date:(mm/dd/yyyy)

Survey3

TypeofSurvey:

DescriptionofMeasure: DescriptionofSurveyApproach:

DiscrepanciesNoted:Y/NandComments: SatisfactoryImplementation:Y/NandComments:

Date:(mm/dd/yyyy)

VerificationPhaseChecklistThecustomershallnotifytheRSPandEnergyEfficiencyrepresentativethattheimplementationphasehasbeencompletedandthattheverificationsurveycanbeconducted.TheRSPshallscheduleandconducttheverificationsurveyusingTable6.Attheconclusionoftheverificationsurvey,theRSPshallsubmittheverificationformtoAmerenIllinoiswithacopytothecustomer(Table6).Thisformwillrepresentthefinaldocumentationfortheproject.Inadditiontothecompletedverificationform,includeacopyofallinvoicesthatrelatetotheproject.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page21–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplication

Survey4

TypeofSurvey:DescriptionofMeasure: DescriptionofSurveyApproach:

DiscrepanciesNoted:Y/NandComments: SatisfactoryImplementation:Y/NandComments:

Date:(mm/dd/yyyy)

Survey5

TypeofSurvey:DescriptionofMeasure: DescriptionofSurveyApproach:

DiscrepanciesNoted:Y/NandComments: SatisfactoryImplementation:Y/NandComments:

Date:(mm/dd/yyyy)

AmerenIllinoisCustomerandRSPAcknowledgementandSignature-Verification

Icertifythatallinformationprovidediscorrecttothebestofmyknowledge.

Bycheckingthisboxandsigningbelow,IconfirmthattheupgradeshavebeencompletedatthefacilitylocationasspecifiedintheVerificationSurveyForm(Table6).Applicationswillnotbeacceptedas“complete”unlessthisboxischecked.

CompanyName(AmerenIllinoisCustomer):_________________________________________________________________

ProjectNumber(FromPre-ApprovalLetter):_________________________________________________________________

ProjectCompletionDate:(mm/dd/yyyy)___________________________________________________________________Completionisdefinedasallmeasurescompletedandequipmentinstalledandoperational.

AmerenIllinoisCustomerSignature

PrintName:________________________________________________________________Title:____________________________________

Signature:_______________________________________________________Date:(mm/dd/yyyy)________________________________

RSPSignature

PrintName:______________________________________________________Title:______________________________________________

Signature:_______________________________________________________Date:(mm/dd/yyyy)________________________________

Electronicsignaturesarenotacceptedinthissignatureblock.TheAmerenIllinoisCustomerandRSPmustsignthissection,byhand,andsubmittotheprogram.

AmerenIllinoisEnergyEfficiencyProgram Submitapplicationsto:IllinoisBusinessProjects@ameren.com300LibertyStreet,5thFloor,Peoria,IL61602 Sendquestionsto:IllinoisBusinessEE@ameren.comTollFree:1.866.800.0747Fax:1.309.677.7950AmerenIllinoisSavings.com/business Page22–RetroCommissioningLargeFacilitiesApp2019Rev02

LargeFacilitiesRetro-CommissioningApplicationTermsandConditions1. DEFINITIONS:Inadditiontotermsdefinedelsewhereherein,whenanyoneofthefollowingtermsisusedintheseTermsandConditions,whereinthefirstletteriswrittenwithacapitalletter,thenthattermshallhavethefollowingdefinition.Wordsimportingpersonsincludecorporation,andwordsimportingonlythesingularincludethepluralandviceversawhenthecontextrequires.a)“AmerenIllinois”shallmeanAmerenIllinoisCompanyd/b/aAmerenIllinois.b)“Application”shallmeantheCustomercompleteddocumentusedtoapplyforcashincentives,programTermsandConditions,andanyotherappropriateapplication-specificdocumentation.c)“ApplicationGuide”shallmeanthedownloadablefile(PDFformat)thatincludes:directionsforcompletingtheApplication,Customereligibilitycriteria,andanyotherappropriatedocumentation.d)“Customer”shallmeananEligibleCustomerwhohassubmittedanApplicationforincentivemoneyusingtheirAmerenIllinoisaccountnumber.TheCustomershallbecomeapartytotheagreementuponacceptanceofCustomer’sApplicationbyAmerenIllinois.e)“CustomInitiative”shallmeanthoseprojectsassociatedwithincentivesthatarenotStandardorStreetlightingInitiatives,includingbutnotlimitedto:Custom,NewConstructionLighting,andFeasibilityStudy.See1.k)belowforalistofStandardInitiativeApplications.f)“EEM”shallmeanenergyefficiencymeasures.g)“EligibleCustomers”shallmeannon-residentialelectricand/orgasCustomersofAmerenIllinois.EachapplicationhasdifferenteligibilityrequirementsforDeliveryServicerates(DS#forelectric,GDS#forgas)tobeeligibleforthatprogram.Refertothespecificprogramapplicationstodetermineifyourbusinessiseligibleforthatapplication.TheAmerenIllinoisincentivepaymentsareawardedonlytoEligibleCustomersforequipmentthatisownedbythemandinstalledintheAmerenIllinoisserviceareaatthelocationthatcorrespondswiththeAmerenIllinoisaccountnumberlistedintheApplication.AllEligibleCustomersareultimatelyresponsibleforcompliancewiththeseTermsandConditions.h)“Facility”shallmeanasinglepremisethat,ingeneral,consistsofacontiguoustractoflandseparatedbynothingmorethanastreet,alley,orrailroadright-of-way,whereallbuildingsand/orenergy-consumingdevicesareownedbyasingleCustomer.i)“NewConstruction”shallincludeconstructionofnewbuildings,change-of-useofexistingbuildingsorland,additionstoexistingbuildings,orwhentwoormorebuildingsystemsarerenovated,suchasshellandheating,heatingandlighting,etc.j)“Pre-approval”shallmeanwrittennotificationtoCustomerofamaximumpre-approvedincentiveamountthroughaPre-approvalletter,whichAmerenIllinoisissuesafterreviewoftheCustomer’sApplication.k)“QualifyingEnergyEfficiencyMeasures(EEMs)”shallmeaneither(i)standardgasorelectricEEMs(i.e.,measuresfoundonanyoftheStandardInitiativeapplications:Lighting,VFD,HVAC,SpecialtyEquipment,SteamTrap,andLeakSurveyandRepair);or(ii)measureseligibleundertheCustomInitiativeapprovedbyAmerenIllinois;or(iii)measuresfoundintheStreetlightingorRetro-commissioningInitativeasidentifiedinofficialprogrammaterialsfoundontheAmerenIllinoisEnergyEfficiencywebsite.Technologiesthatpurporttosaveenergythroughreductionofvoltage,demand,orpowerconditioningarenotQualifyingEEMs.EEMsthatdisplaceelectricalenergyuseornaturalgastoanotherfuel(i.e.,fuelswitchingproposals)arenotQualifyingEEMs.Otherthangeothermalprojects,renewableenergyprojects(solar,windpower,etc.)arealsonoteligibleforincentivesunderthisprogram.Unlessexplicitlypre-approved,EEMsmustbenewandcoveredbywarranties.NaturalGas(gas)incentivesdonotincludepropaneorbutanemeasures.l)“StandardInitiative”shallmeanthoseprojectsassociatedwithStandardgasorelectricEEMs.StandardInitiativeincludesthefollowing:Lighting(notNewConstructionLighting),VFD,HVAC,SpecialtyEquipment,SteamTrapand/orLeakSurveyandRepair.SeetheAmerenIllinoisEnergyEfficiencywebsiteforapplications(AmerenIllinoisSavings.com).2. OWNERSHIPOFCAPACITYAND/ORENVIRONMENTALCREDITS:a)EEMspurchasedandinstalledinpartthroughincentivesprovidedbythisprogramarethepropertyoftheCustomer,subjecttoanylimitationscontainedwithintheseTermsandConditions.b)Notwithstandingtheabove,unlessotherwiserequestedinwritingbytheCustomerpriortoinstallationoftheEEMs,AmerenIllinoisholdssolerightstoanysystemcapacitycreditsandenvironmentalcreditsthatmaybeassociatedwithEEMsforwhichincentivesfromAmerenIllinoiswerereceived,andAmerenIllinoiscandisposeofthesecreditsinanymannerauthorizedbylaworregulation.c)InnoeventshallactivityassociatedwithanyenergyorenvironmentalcreditsnotedinSection2(b)resultininterferencewiththeCustomer’ssolediscretiontooperateEEMsasapprovedinhis/herincentiveaward.3.PRE-APPROVALForallApplications,AmerenIllinoisisnotobligatedtoawardanyincentivepaymentunlessPre-approvalisgranted.Further,AmerenIllinoiswillnotpayincentivesforanyEEMsorderedoranypurchaseordergeneratedpriortothedateofthePre-approvalletter,UNLESS,therequestedincentiveislessthan$10,000onanyStandardInitiativeApplication(see1.jabove).Pre-approvalreservesincentivefundsforaperioduptotheEstimatedCompletionDateprovidedinthePre-approvalletter.AftertheEstimatedCompletionDate,AmerenIllinoismayrevokethePre-approvalletterandassociatedincentivefunds.CustomerisresponsibleforensuringapplicationisaccurateandequipmentmeetseligibilityrequirementsinordertoreceivethePre-approvalincentivepayment.4.POST-INSTALLATIONVERIFICATION:AmerenIllinoisisnotobligatedtomakeanyincentivepaymentuntilithasperformedasatisfactorypost-installationverification.ThisprovisionmaybewaivedatthesolediscretionofAmerenIllinois.5. INCENTIVEPAYMENTAMOUNTS:a) Incentivecaps(perprogramyearforafacility)aredefinedasfollows:

i) Standard,Custom,andRetro-Commissioningapplications:Electricincentivesarecappedat$500,000perproject.Gasincentivesarecappedat$100,000perproject.ii) IncentivesawardedundertheStaffingGrantwillbepro-ratedbasedupontheenergysavingsachievedcomparedtotheacceptedsavingsinthestaffinggrantpre-approvalletter,uptothepre-approvedstaffinggrantincentiveamount.SeetheStaffingGrantApplicationforfurthercriteria.

iii) NewConstructionLightingincentivesarecappedat$100,000.iv) FeasibilityStudy–themaximumincentivepaymentforasingleFeasibilityStudyiscappedat$20,000.SeetheFeasibilityStudyapplicationforfurtherdetails.v) LeakSurveyandRepair–thecappedincentiveis$20,000foracompressedairLeakSurveyandRepairproject.SeetheLeaksSurveyandRepairapplicationforfurthercriteria.vi) Metering&Monitoring–themaximumtotalincentivepaymentforMetering&Monitoringis$22,000.SeetheMetering&Monitoringapplicationforfurtherdetails.

b)AmerenIllinoisreservestherighttoadjustand/ornegotiatetheincentiveamount,baseduponitsindependentassessmentofappropriatesavingsorcostestimates.c) OnceanincentiveApplicationispre-approved,AmerenIllinoiswillpaynomorethanthepre-approvedincentiveamount.d) AmerenIllinoisreservestherighttocapincentivesat$10,000forStandardprojectsthatdidnotobtainpre-approval.e)IncentivesforStandardorNewConstructionapplicationswillbecappedattheprojectcost,whichincludesmaterialcostandexternallaborcost(Internallaborisnotconsideredintheprojectcost).SteamTrapSurveysareeligibleforincentiveswheninternallaborisusedpertheguidelinesoftheSteamTrapapplication.

6. MONITORINGANDEVALUATIONFOLLOW-UPVISITS:CustomergrantsAmerenIllinoisandanyofitsagents,therighttomakefollow-upvisits,inspectionsorsurveysoftheCustomer’sfacilityduringthe36monthsfollowingthecompletiondateoftheprojectatatimeconvenienttotheCustomer.IfAmerenIllinoisdiscoversthattheEEMswerenotactuallyandproperlyinstalledorweresubsequentlydisconnectedwithin36monthsafterinstallation,AmerenIllinoisshallbeentitledtomoneydamagesequaltothetotalamountofincentivepaymentsmadeplusinterest.7. CHANGESIN/CANCELLATIONOFTHEPROGRAM:a)AmerenIllinoismaychangetheprogramrequirements,incentives,ortheseTerms&Conditionsatanytimewithoutnotice,includingsuspendingacceptanceofApplications,denialofApplicationsalreadyreceived,orterminatingtheprogram.b)Intheeventofprogramchange,ApplicationsthathavebeengrantedPre-approvalwillbeprocessedtocompletionundertheTerms&ConditionsineffectatthetimeofPre-approvalbyAmerenIllinois.c)CashincentivesundertheAmerenIllinoisprogramsareofferedonafirst-come,first-servedbasisandaresubjecttoprojectandCustomereligibility,andtheavailabilityoffunds.8. LIMITATIONOFLIABILITYANDINDEMNIFICATION:a)AMERENILLINOIS’TOTALLIABILITYTOCUSTOMERUNDERTHESETERMSANDCONDITIONS,ORANYOTHERREQUIREMENTOFCUSTOMER’SAPPLICATIONORCONDITIONOFINCENTIVEAWARDSHALLBELIMITEDTOPAYINGTHEINCENTIVEPAYMENTSSPECIFIEDINTHEAPPLICATIONORPRE-APPROVALLETTERS.AMERENILLINOIS,ITSPARENT,AFFILIATESANDSUBSIDIARIES,ANDTHEIRDIRECTORS,OFFICERS,EMPLOYEES,ORAGENTSSHALLNOTBELIABLETOTHECUSTOMERORFORANYDAMAGESINTORT(INCLUDINGNEGLIGENCE)CAUSEDBYANYACTIVITIESASSOCIATEDWITHTHISAPPLICATION;LOSSOFPROFITSORREVENUE;LOSSOFUSEOFCUSTOMER'SPROPERTY,EQUIPMENTORPOWERSYSTEM;INCREASEDCOSTSOFANYKIND,INCLUDINGBUTNOTLIMITEDTOCAPITALCOST,FUELCOSTANDCOSTOFPURCHASEDORREPLACEMENTPOWER;ORANYSPECIAL,INDIRECT,CONSEQUENTIALORINCIDENTALDAMAGESWHATSOEVER.BYPARTICIPATINGINTHEAMERENILLINOISPROGRAM,CUSTOMERAGREESTOWAIVEANYCLAIMS,EXCEPTASPROVIDEDINTHISARTICLE8.a)ABOVE,ANDFULLYRELEASESAMERENILLINOISFROMANYOTHERDAMAGES,OFANYKINDARISINGOUTOFORRELATEDTOCUSTOMER’SAPPLICATION.b)TheCustomershalldefend,protect,indemnify,andholdharmlessAmerenIllinois,itsparent,affiliateandsubsidiaries,andtheirrepresentativedirectors,officers,employees,andagentsfromandagainstallliabilities,losses,claims,damages,judgments,penalties,costsandexpenses(including,withoutlimitation,attorney’sfeesandexpenses)withrespecttoalldemands,claims,suits,causesofaction,and/orjudgmentsforinjuries,includingdeath,toanyperson,ofthirdparties,andforpropertydamageincurredbyorassessedagainstAmerenIllinoisarisingoutoforrelatingtoCustomer’sApplication.9. NOWARRANTIES:AmerenIllinoisdoesnotguaranteetheenergysavingsanditsparent,affiliates,employees,andagentsdonotmakeanyrepresentationsorwarrantiesofanykindregardingtheresultstobeachievedbytheEEMsortheadequacyorsafetyofsuchmeasures.AmerenIllinoisanditsparent,affiliates,employees,andagentsdonotendorse,guarantee,orwarrantanyparticularmanufacturer,contractororproduct,anditprovidesnowarranties,expressedorimplied,includinganyimpliedwarrantyofmerchantabilityorimpliedwarrantyoffitnessforanyproductorservices.AmerenIllinoishasnoobligationsregardinganddoesnotendorseorguaranteeanyclaims,promises,work,orequipmentmadeperformedorfurnishedbyanycontractorsorequipmentvendorsthatsellorinstallEEMs.10. CUSTOMERSHALLPAYALLTAXES:IncentivepaymentsreceivedbytheCustomeroranyThirdPartyPayeeunderthisAgreementmaybetaxablebythefederal,state,andlocalgovernment.TheCustomerisresponsiblefordeclaringandpayingallsuchtaxes,regardlessofwhoreceivestheincentive.a)Exceptasexpresslyprovidedherein,ifeitherAmerenIllinoisortheCustomerdesirestomodifytheseTermsandConditions,themodificationmustbeinwritingandsignedbyanauthorizedrepresentativeofthepartyagainstwhichenforcementofthemodificationissought.11. REMOVALOFEQUIPMENT:TheCustomeragrees,asaconditionofparticipationintheprogram,toremoveanddisposeofanyequipmentbeingreplacedbytheEEMsinaccordancewithallapplicablelaws,rules,andregulations.TheCustomerfurtheragreesnottoreinstallanyofreplacedequipmentanywhereinIllinois,ortransferittoanyotherpartyforinstallationinIllinois.12. CHOICEOFLAWANDDISPUTES.a)THESETERMSANDCONDITIONS,ORANYOTHERREQUIREMENTOFTHEAPPLICATIONGUIDEORCONDITIONOFINCENTIVEAWARDWILLBEGOVERNEDINALLRESPECTSBYTHELAWS,STATUTES,ANDREGULATIONSOFTHESTATEOFILLINOIS.AMERENILLINOISANDCUSTOMERHEREBYIRREVOCABLYANDUNCONDITIONALLYWAIVEANYRIGHTEITHERSUCHPARTYMAYHAVETOATRIALBYJURYORTOINITIATEORBECOMEAPARTYTOANYCLASSACTIONCLAIMSINRESPECTOFANYACTION,SUITORPROCEEDINGDIRECTLYORINDIRECTLYARISINGOUTOFORRELATINGTOTHISPROJECT.b)CustomeragreesthatanydisputearisingoutoforrelatedtheworkmanshiporperformanceofanEEMortheadequacyorsafetyorsuchmeasureshallberesolvedsolelybetweentheCustomerandeithertheEEMcontractororequipmentprovider(Rev14)