UNIMIX - Vacuum processing units

Scale-up Basics

Rainer Liebig

Project Manager Sales EKATO SYSTEMS GmbH

EKATO SYSTEMS GmbH – Public 2

Ad

van

ced

Pro

cess

So

luti

on

s

Agenda

Vacuum Processing Plant UNIMIX – Features Design Aspects Parameters for Scale-up

Tip speed of PARAVISC Mixing time of PARAVISC Tip speed of Homogeniser BTO – Batch Turn Over

Summary

EKATO SYSTEMS GmbH – Public 3

Ad

van

ced

Pro

cess

So

luti

on

s

Vacuum Processing Plant EKATO UNIMIX

Features: Vacuum processing Heating/cooling Agitation with PARAVISC High Sheer Homogenizer S-Jet Raw material charging into

homogenizer Internal/external homogenisation

EKATO SYSTEMS GmbH – Public 4

Ad

van

ced

Pro

cess

So

luti

on

sInnovation for your process

Professional scale-up calculation of Newtonian and non-Newtonian fluids.

EKATO SYSTEMS GmbH – Public 5

Ad

van

ced

Pro

cess

So

luti

on

sScale-up calculation

EKATO SYSTEMS is unique with the possibility to calculate the scale-up parameters to maximize the quality and

quantity for our customer!

Important Design Aspects

Tip speed of Homogenizer – 27 m/s

Tip speed of PARAVISC agitator – 2.5 m/s

Vessel design: ratio H / Ø = 1 : 1

EKATO SYSTEMS GmbH – Public 6

Ad

van

ced

Pro

cess

So

luti

on

sScale up calculation - Parameters

Tip speed of PARAVISC agitator

Mixing time PARAVISC

Tip speed of Homogenizer

BTO’s (Batch Turn Over’s) at homogeniser

Product transfer in case of pre-phase vessels

Tip speedRotor (homogenisator)

Tip speed PARAVISC

EKATO SYSTEMS GmbH – Public 7

Ad

van

ced

Pro

cess

So

luti

on

s

Scale up calculation – Tip Speed PARAVISC

C = π * n/s * ddSRT25 = 0,284 m dSRC1000 = 0,976 m

nSRT25 = 120 rpm nSRC1000 = ? rpm

CSRT25 = 3,14* 120/60s * 0,284 = 1,78 m/sec

CSRC1000= 3,14 * X /60s * 0,401 = 1,78 m/secA

BX =2* 0,284 / 0,976 = 0,581 * 60 = 34,8 rpm

3,14 * 120/60s * 0,284 = 3,14 * X/60s * 0,976 = 34,8 rpm

EKATO SYSTEMS GmbH – Public 8

Ad

van

ced

Pro

cess

So

luti

on

s

Scale up calculation – Mixing Time PARAVISC

tSRC1000 = (nSRT25 * tSRT25) / nSRC1000

tSRT25 = 2 min tSRC1000 = ? min

nSRT25 = 120 rpm nSRC1000 = 34,8 rpm

tip speed = 1,78 m/s tip speed = 1,78 m/s

tSRT1000 = (120SRT25 * 2SRT25) / 34,8SRC1000 = 6:53 min

EKATO SYSTEMS GmbH – Public 9

Ad

van

ced

Pro

cess

So

luti

on

s

Scale up calculation – Tip Speed Homogeniser

C = π * n/s * ddSRT25 = 0,060 m dSRC1000 = 0,166 m

nSRT25 = 6000 rpm nSRC1000 = ? rpm

CSRT25 = 3,14 * 6000/60s * 0,060 = 18,8 m/sec

CSRC1000= 3,14 * x /60s * 0,166 = 18,8 m/secA

B 3,14 * 6000/60s* 0,060 = 3,14 * X/60s * 0,166 = 2164 rpm

EKATO SYSTEMS GmbH – Public 10

Ad

van

ced

Pro

cess

So

luti

on

sScale up calculation – BTO (Batch Turn Over) at Homogeniser

25 L

1000 L

S-jet 100

S-jet 1000

= 100 L/min H2O

= 1000 L/min H2O

100 / 25 * 2:00 = 8 BTO‘s

* = all with same tip speed of 18,8 m/sec

tSRT25 = 2:00 min = 8 BTO’s tSRC1000 = ? min = 8 BTO’s

1000/1000

* 8 BTO‘s = 8:00

EKATO SYSTEMS GmbH – Public 11

Ad

van

ced

Pro

cess

So

luti

on

sSummary

REMEMBER

In order to succeed in the scale-up calculation, the following information need to be established:

Tip speed of PARAVISC agitator

Mixing time PARAVISC

Tip speed of Homogenizer

BTO’s (Batch Turn Over’s) at homogeniser

Thank you for your attention!

Ad

van

ced

Pro

cess

So

luti

on

s

EKATO SYSTEMS GmbH – Public 12