Local Division of the Unified Patent Court · 2 picture & 3D buildings: Google Earth . o Local...

Post on 22-Jul-2020

0 views 0 download

transcript

Local Division of the Unified Patent Court

16th Preparatory Committee meeting May, 26th 2016

Dr. Thomas Linke

Local Division of the Unified Patent Court

Location

2 picture & 3D buildings: Google Earth

o Local Division courtroom, registry and offices will be located in the prestigious

Civil Justice building, home of Hamburg’s Local Court and Regional Court

o Right at the so-called “Justizforum” where some of the most important courts of

Hamburg are located (Higher Regional Court, civil & criminal courts)

o Easily accessible:

o By subway – 5 minutes from Hamburg Central Station

o By taxi – 20 minutes from Hamburg Airport

o By car – car park right beside the building

o 10 minute walk to famous Jungfernstieg & Mönckebergstrasse – shopping

o 5 minute walk to Reeperbahn – entertainment

o 10 minute walk to river Elbe, “Landungsbrücken” and Hamburg port

Local Division of the Unified Patent Court

Central location

3

o Ensemble of three grand court buildings

o Civil Justice building

o Higher Regional Court building

o Criminal Justice building

o Dating back to the turn of the 19th century

o Workplace for about 400 judges

o Deciding about 70,000 civil law cases

and 16,000 criminal law cases per year

Local Division of the Unified Patent Court

“Justizforum”

4 picture & 3D buildings: Google Earth

Local Division of the Unified Patent Court

Civil Justice building, floor plan

5 drawing / picture: Garcia Hansonis architektur

Local Division of the Unified Patent Court

Civil Justice building, floor plan

6 sketch: Garcia Hansonis architektur

Floor plan of courtroom and consulting room

Local Division of the Unified Patent Court

7 drawings: Garcia Hansonis architektur

Courtroom (before renovation)

Local Division of the Unified Patent Court

8 picture: Michaela Opfer

Floor plan of offices and registry

Local Division of the Unified Patent Court

9 drawing: Garcia Hansonis architektur

Registry and office

Local Division of the Unified Patent Court

10 sketches: Garcia Hansonis architektur

o Renovation and construction work started in 2015 - on schedule

o Restauration of the courtroom is expected to be finished within the next few

days

o Preliminary workings for the registry and the offices are on schedule

o Final workings are expected to be finished in September 2016

Local Division of the Unified Patent Court

Timeline

11

More news:

project lead: Michaela Opfer

Tel.: +49 40 42843 – 3381

E-Mail: lokalkammer@justiz.hamburg.de

Please visit the website of the local division:

www.hamburg.de/justizbehoerde/lokalkammer-hamburg/

Local Division of the Unified Patent Court

Thank you for your attention

12