Post on 25-Apr-2020
transcript
1 Chairman
2 Member
3 Member
4 Member
5 Shri Y. B. Sontakke, Joint Director (WPC), Member
6 Sp. Invitee
7 Sp. Invitee
Maharashtra Pollution Control Board, Mumbai
Chairman of the committee welcomed the members of the committee and allowed proceeding of the meeting to start. The minutes of the 2nd (Booklet No. 4)
Consent Committee meeting of 2017-18 held on 23.04.2017 circulated under Board’s letter No. MPCB/AS (T)/TB/B-8745 dated 27.04.2017 were confirmed.
Shri V. M. Motghare, Joint Director (Air Pollution Control)
Maharashtra Pollution Control Board, Mumbai
The meeting thereafter deliberated on the agenda items placed before the committee and following decisions were taken.
MAHARASHTRA POLLUTION CONTROL BOARD
Minutes of 4th Consent Committee Meeting of 2017-2018 held on 01.08.2017 at 11:00 a.m. at 4th Floor Conference Hall, MPC Board, Kalpataru Point,
Sion (E), Mumbai 22. (Booklet No. 7, 8 & 9)
……….
The following members of the Consent Committee were present:
Shri. R. G. Pethe
Dr. P. Anbalagan, IAS, Member Secretary
Maharashtra Pollution Control Board, Mumbai
Retired WPAE, MPC Board
Shri Shri P. K. Mirashe, Assistant Secretary (Technical)
Maharashtra Pollution Control Board, Mumbai
Shri A. R. Supate, Principal Scientific Officer,
Shri N. N. Gurav, Reginal Officer (HQ),
Maharashtra Pollution Control Board, Mumbai
Maharashtra Pollution Control Board, Mumbai
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 1
Sr.
No.
Name of Industry Decision on grant
of consent
Consent granted
upto
Section Remarks/ Discussion (1)
Establish
1
Kingston Exotica (Sr. No. 85/1/85/2 &
92/1 Behind Kingston Serene, Near Tata
Inora Park,
Autade Handewadi, Pune)
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish for
construction of residential project on total plot area
of 20,950 sq. mtrs. & total construction BUA of
36,117.67 sq. mtrs., by imposing following
conditions:
(i) PP shall not take any effective steps prior to
obtaining Environment Clearance and submit Bank
Guarantee of Rs. 10 lakhs towards compliance of
same and consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install online monitoring system for
BOD, TSS and flow at the outlet of STP.
2
Maple Moshi Annex (Maple Group, 7th
Floor, City Square Building, Behind The
Pride Hotel,
Shivaji Nagar, Pune)
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish for
construction of residential cum commercial project
on total plot area of 24,000 sq. mtrs. & total
construction BUA of 49,985.35 sq. mtrs., as per EC
dtd. 27.06.2016, by imposing following conditions:
(i) PP shall not take any effective steps prior to
obtaining Environment Clearance and submit Bank
Guarantee of Rs. 10 lakhs towards compliance of
same and consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install online monitoring system for
BOD, TSS and flow at the outlet of STP.
3
VGS Realty Construction Pvt.Ltd.
(Omkar House), Off Eastern Express
Highway, Opp. SIon
Chunnabhatti Signal, Sion (E).)
Not Approved
Consent to
Establish
(Revalidation)
_____ RO(HQ)
It was decided to issue SCN for refusal of consent
to establish for revalidation, on following non-
compliances:
(i) PP has not replied to email dtd. 22.05.2017
regarding non submission of EC copy, area detail,
STP and MSW proposal and present status of
construction work.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 2
4
Ram India Shelters (Ram House, 712/13
Market yard Pune) S.NO.165 (P)
Phursungi Haveli Not Approved
Consent to
Establish
_____ RO(HQ)
It was decided to issue SCN for refusal of consent
to establish, on following non-compliances:
(i) PP has carried out construction work before
obtaining Environment Clearance from competent
authority and C to E from Board.
5
Bajajsons Limited (Plot No. 31,MIDC
Area ,Satpur ,Nashik.) Plot No.-31 MIDC,
SATPUR Nashik
Not Approved
Consent to
Establish
_____ APC
It was decided to issue final refusal of consent to
establish for expansion in existing project and
closure directions on following non compliances:
(i) Industry is not recycling the effluent in existing
plant as per consent conditions.
(ii) Land is not developed for disposal of treated
effluent.
(iii) As TDS content in treated effluent is high and
effluent is used for gardening within premises which
is polluting ground water table.
6
Golden Dreams TechnoPark Pvt.Ltd.,
(Plot No.:- F-4/1, F-4/1 (PT) MIDC Area,
Chikalthana,
Aurangabad)Not Approved
Consent to
Establish
(Revalidation)
_____ RO(HQ)
It was decided to issue SCN for refusal of consent
to establish for revalidation, on following non-
compliances:
(i) PP has not submitted not submitted Area details
along with building layout, local body
permission/NOC, STP & OWC proposal, CA
certificate in proper format, status of Environment
Clearance.
7
Mumbai Waste Management Limited,
(Plot No. P - 32, MIDC , Taloja , Tal :
Panvel, Dist.
Raigad) Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish for
plastic recycling unit, by imposing following
conditions:
(i) Industry shall not take any effective steps prior to
obtaining amended environment clearance and
submit Bank Guarantee of Rs. 10 lakh towards
compliance of same and consent conditions.
(ii) Industry shall obtain registration under plastic
waste management rules 2016.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 3
8
Crystal Garden (S. No 134/3 &4 (C),
Pashan,) 134/3 & 4 (C) Pashan Haveli,
Pune
Approved
Consent to
Establish
(Revalidation)
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish for
revalidation of construction of residential cum
commercial project on total plot area of 27500.66
sq. mtrs. & total construction BUA of 13592.699 sq.
mtrs., subject to submission of EC copy, by
imposing following conditions:
(i) PP shall submit Bank Guarantee of Rs. 10 lakhs
towards compliance consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install online monitoring system for
BOD, TSS and flow at the outlet of STP.
9
SHALIMAR NUTRIENTS PRIVATE
LIMITED (Survey No.246/1,246/2, 247/A,
247/B/1,247/B/2,249,250) SONKHAMB
TALUKA:KATOL
KATOL
Not Approved
Consent to
Establish
_____ WPC
It was decided to issue refusal of consent to
establish and closure directions on following non
compliances:
(i) Exceeding the JVS reports continually for
existing industry.
(ii) Non submission of reply to SCN.
10
Terrapolis Asset Pvt. Ltd.,Proposed
SRA Project “Terrapolis Atrius” on plot
bearing C.T.S No.
509, 510, 510/1to 8 Village Nahur
(1501,LODHA
SUPREMUS,S.B.MARG,LOWER
PAREL,MUMBAI)Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish for
construction of residential SRA project on total plot
area of 4,221 sq. mtrs. & total construction BUA of
36,260.35 sq. mtrs., as per EC dtd. 28.01.2016, by
imposing following conditions:
(i) PP shall not take any effective steps prior to
obtaining Environment Clearance and submit Bank
Guarantee of Rs. 5 lakhs towards compliance of
same and consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install online monitoring system for
BOD, TSS and flow at the outlet of STP.
11
JVS Comatsco Industries Private
Limited Gat No- 106/2,107/2,107/3 Village-
Moh SinnarApproved
Consent to
Establish
Expansion
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion, by imposing following non compliances:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards O & m of pollution control system and
consent conditions.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 4
12
Ramsons Industries Ltd. (A-301, Neeti
Gaurav, Central Bazar Road,
Ramdaspeth, Nagpur.) Kh.No.
151/1,152/1, Mouza Bazargaon, Amravati
Road Kalmeshwar
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish, by
imposing following conditions:
(i) Industry shall not take any effective steps prior to
obtaining Environment Clearance and submit Bank
Guarantee of Rs. 5 lakh towards compliance of
same and consent conditions.
13
MENON ALKOP ( DIVISION OF MENON
BEARINGS LTD.) C-1, Five star MIDC
Kagal-
Hatkanangale
Approved
Consent to
Establish
Expansion
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
(ii) Industry shall upgrade there ETP before
applying for consent to operate.
14
PHOENIX MECANO INDIA PVT. LTD.,
GAT NO. 388,389 PIRANGUT
INDUSTRIAL ESTATE, BHARE MULSHI
Approved
Consent to
Establish
Expansion
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
15
Suncity Corporation, CTS Nos.
574/C,574/17 to 54,Village-
Kanjur,Bhandup, Mumbai
Not Approved
Consent to
Establish
_____ RO(HQ)
It was decided to issue final refusal of consent to
Establish and stop work, on following non
compliances:
(i) As PP has applied for the consent to establish
after High Court order dtd. 26th & 29th Feb 2016.
16
Salasar Alloy & Steel Industries Private
Limited, Plot No. E-9, MIDC Butibori,
Hingna Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion of existing unit for additional products
Galvanized Wire (by electroplating activity 3450
MT/M), by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
17
SIYARAM SILK MILLS LIMITED,
Plot No. T-9, Addl. Amravati Nadgoan
Peth Industrial Area
(Textile Park)
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
WPC
It was decided to grant consent to establish for
manufacturing of Denim Yarn, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
18
Ebco Pvt.Ltd.,
SURVEY NO.53, HISSA NO.7/3 & 7/4,
GAURAI PADA, VASAI (E), DIST -
PALGHARApproved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion for increase in production quantity, water
consumption and effluent, subject to verification of
JVS of existing unit, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 5
19
ALKOPLUS PRODUCERS PVT.
LIMITED., Plot No - 3, Additional MIDC,
Latur.
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
WPC
It was decided to grant consent to establish for
installation of Thermic fluid heater, by imposing
following conditions:
(i) Industry shall not take any steps prior to
obtaining Environment Clearance and submit Bank
Guarantee of Rs. 5 lakh towards compliance of
same and consent conditions.
(ii) Industry shall take prior permission from
Regional Officer, Aurangabad before restarting of
production.
20
Garg Inox Ltd.,
G-4, RANJANGAON INDUSTRIAL AREA
MIDC TALUKA SHIRUR
Approved
Consent to
Establish
Expansion
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion for replacing existing process of wire
annealing with sand bath by lead bath, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
21
AVIANS INNOVATIONS TECHNOLOGY
PVT LTD.,
C-22/6 CHAKAN INDL. AREA, MIDC, PH-
II, VILLAGE:- BHAMBOLI, KHEDApproved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for the
proposed manufacturing activity of (1)
Rolling shutter Qty-150 Nos/m. (2) Gates Qty-15
No/M (3) Dock levelers Qty-75 No/M. with
painting & powder coating activity, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
22
Paradise Superstructures, Sai World
Empire, S. No. 93/1, 93/2+4, 93/3, 94/1,
64/2, 94/3A, 94/3B,94/4, 102/1A, 102/1B,
102/3, 102/4, 102/5A/2, 102/5B, 102/5K,
103/1A, 103/1B, 103/2A, 103/2B, 103/3
Villlage Rohinjan, Tal. Panvel, Dist.
Raigad
Not Approved
Consent to
Establish
_____ RO(HQ)
It was decided to issue final refusal of consent to
Establish and stop work, on following non
compliances:
(i) PP has started construction work without
obtaining Environment Clearance from competent
authority and consent to establish from Board.
23
HBS View Pvt. Ltd., HBS VIEW 360, C.S.
No.12/738, Plot no. 14 of Malabar Hill
Division, Tardeo
Main Road, 'D' ward, MumbaiNot Approved
Consent to
Establish
_____ RO(HQ)
It was decided to issue final refusal of consent to
Establish and stop work, on following non
compliances:
(i) As PP has applied for the consent to establish
after High Court order dtd. 26th & 29th Feb 2016
stating that all the projects application / proposals
submitted after 1st March 2016 shall be restricted.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 6
24
Raychem RPG PVT LIMITED (1/62,
M.G.Road, Opp Bharat petrol pump,
Sativali Village)
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was to grant consent to establish for expansion
i.e. Medium Voltage Covered conductor – 50 sq mm
– 3000 Mtrs/Medium Voltage Conductor 70 sq mm -
96000 Mtrs/M, Medium Voltage Covered Conductor-
99 sq mm-11000 Mtrs/M, Medium Voltage Covered
Conductor- 120 sq mm- 11000 Mtrs/M., by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
25
IRAA Clothing Pvt.Ltd., B-7/3,
M.I.D.C.,Tarapur Boisar
Not Approved
Consent to
Establish
Expansion
_____ WPC
It was decided to issue SCN for refusal of consent
to establish expansion on following non-
compliances:
(i) Industry has not submitted supporting
document regarding name change. Latest JVS
results, environment statement details, proposed
water budget and fuel consumption.
(ii) Industry has failed to submit compliance report
for conditional restart direction.
26
KIRLOSKAR PNEUMATIC CO LTD.,
(SASAWAD INDUSTRIAL ESTATE) 606
SASWAD PURANDAR
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for Shot
Blasting activity, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
27
ANSHUL SPECIALITY MOLECULES
PRIVATE LIMITED (108-110, MIDC)
PLOT NO. 108,109,110 DHATAV MIDC ,
VILLAGE ROTH (B) ROHAApproved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
AS(T)
It was decided to grant consent to establish for
expansion for repacking of chemicals, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
(ii) Industry shall install online monitoring system.
28
Anant Dudh Pvt. Ltd. (At Post - Kikvi, Tal -
Bhor, Dist - Pune.) Gat No. 263 Kikvi Bhor
Not Approved
Consent to
Establish
_____ WPC
It was decided to issue SCN for refusal of consent
to establish for industry type R-47 Milk
processing and dairy products (Integrated project),
on following non-compliances:
(i) As per MoEF direction u/s 5 of EPA 1986 dtd.
13/11/2013 Village Kikvi Tal. Bhor, Dist. Pune
falls under ESA of Western Ghats identified by
HLWG. The Red category of Industries in
CPCB/SPCB list are prohibited to Establish,
Expansion of projects/activities.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 7
29
INDIAN OIL CORPORATION LIMITED
(LPG BOTTLING PLANT) (AT-POST:
BHOSE,, Chakan
Shikrapur Road, SH-55)
Approved
Consent to
Establish
(Expansion)
Commissioning of
the unit or 5 yrs
whichever is earlier
AS(T)
It was decided to grant consent to establish
expansion for Statutory Testing & Painting activity,
by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
30
Shree Sai Construction, S. No. 73, H.
No. A & B, village Achole, near dubey
medical collage,
Nalasopara €
Approved
Consent to
Establish
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish for
construction of residential project on total plot area
of 17,930 sq. mtrs. & total construction BUA of
31,257.85 sq. mtrs., as per EC dtd. 09.05.2017,
subject to submission of EC copy, by imposing
following conditions:
(i) PP shall submit Bank Guarantee of Rs. 5 lakhs
towards compliance of consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install online monitoring system for
BOD, TSS and flow at the outlet of STP.
31
NAMCO INDUSTRIES PVT. LTD.,
HORALE, PO WAOSHIApproved
Consent to
Establish
(Expansion)
Commissioning of
the unit or 5 yrs
whichever is earlier
APC
It was decided to grant consent to establish for
expansion for manufacturing of Stainless Steel
Slabs, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
Operate
1
NITCO LTD., SHRIGAON-POYAND,
ALIBAUG, RAIGAD, MAHARASHTRA) Approved
Consent to
Operate
31.07.2018 APC
It was decided to grant consent to operate for
Captive Power Plant having capacity 4.5 MW, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
2
STAR CIRCLIPS AND ENGINEERING
LIMITED, K-44 -44/1 FIVE STAR MIDC
AREA BUTIBORI)
Approved
Consent to
Operate
31.01.2021 APC
It was decided to grant consent to operate for
installation of electric Heater, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
3
MANGALORE MINERALS PVT. LTD.,
(GAT NO 48 (PART), A/p JADAWVADI,
BEHIND TALEGAON
MIDC, TAL- MAVAL)
Approved
Consent to
1st Operate
31.07.2018 APC
It was decided to grant 1st consent to operate in
principally for Reclaim silica sand Qty-8000 MT/M &
Resin Coated sand Qty-2000 MT/M., by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 8
4
Kalika Steel Alloys Pvt Ltd., Plot No. C-
7, 8 & C-9, Add. MIDC, Jalna Approved
Renewal of
Consent to
Operate
31.05.2019 APC
It was decided to grant renewal of consent to
operate for manufacturing MS Ingots & Billets 800
MT/Day and TMT Retrolled Bars 800 MT/Day.,by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance consent conditions and O
& M of pollution control systems.
5
SUDITI INDUSTRIES LTD., C-253/254
MIDC, TTC INDUSTRIAL AREA, PAWNE
VILLAGE, TURBHE,
NAVI MUMBAI
Not Approved
Consent to
Operate for
Amendment
_____ WPC
It was decided to issue SCN for refusal of consent
to operate for Amendment, on following non
compliances:
(i) Industry has not to installed SCADA system, as
unit generate effluent quantity more than 100 CMD,
the instructions of same had given as per decision
of CEPI review meeting.
(ii) Industry have not switch fuel for boiler from coal
to PNG,
(iii) Industry has not submitted Bank guarantees as
per previous consent
(iv) Industry has not submitted CA certificate
showing investment for multiple unit in the board
prescribed format.
(v) Not submitted document reg. change in name
“Suditi enterprises to Suditi Industry Ltd”
6
ITC Ltd (Food Division), Plot No. D-1,
MIDC Ranjangaon, Tal:- Shirur, Dist:-
Pune 412220
Approved
1st Consent to
Operate and
amalgamation
with existing
Renewal of
Consent to
Operate
28.02.2019 WPC
It was decided to grant 1st Consent to Operate and
amalgamation with existing Renewal of Consent to
Operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance of consent conditions and
O & M of pollution control systems.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 9
7
Hotel Atmantan Lodging and Boarding
122/1, NORTH MAIN ROAD, KOREGAON
PARK, PUNE
Approved
Renewal of
Consent to
Operate for
Expansion
31.05.2022 WPC
It was decided to grant renewal of consent to
operate with expansion for hotel activity for
additional 36 Nos. of Room, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance of consent conditions and
O & M of pollution control systems.
(ii) PP shall install online monitoring system within 4
months.
Consent shall be issued after obtaining requisite
consent fee.
8
Anuraj Sugars Ltd., Yawat At-Post Yawat
, Tal. Daund , Dist. Pune
Approved
Renewal of
Consent to
Operate
31.07.2018 WPC
It was decided to grant renewal of consent to
operate for sugar manufacturing unit, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs. 5
lakh towards compliance of consent conditions and
O & M of pollution control systems.
(ii) PP shall install online monitoring system within 4
months.
(iii) Industry shall not to use 32 TPH Boiler until
provision of Wet Scrubber as APC.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 10
9
The Janta Co-Op. Dairy Society. Ltd.,
CTSNo1838,1840,1883,1885,1886,1968–
1971,2039–2044,2100–2103,2157,2158,2
221,2222,2294,2295,SNo133(2a)
CTS No. 1838, 1840, 1883, 1885, 1886,
1968 – 1971, 2039 – 2044, 2100 – 2103,
2157, 2158, 2221, 2222,
Bhayander Approved
Consent to
1st Operate
(Part)
31.05.2018 RO(HQ)
It was decided to grant consent to 1st operate
(Part), for residential project on total plot area of for
residential project on total plot area of 21,496 sq.
mtrs. & total BUA construction of 78,913.10 sq.
mtrs. out of 90,507.85 sq. mtrs., subject to
verification report from SRO about online monitoring
system, by imposing following conditions:
(i) PP shall submit Bank Guarantee of Rs. 10 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be granted after: (1) Submission of
Certificate from Architect regarding BUA completed
for which they have applied for 1st Consent to
Operate. (2) After installation of online monitoring
system for the parameters Flow, BOD, and TSS at
STP outlet and verification of the same from
SRO/RO.
10
Om Sai Construction, Sai Mannat Plot
No. 1, 1A, 1-B/1, 1-B/2, 1-B/3, 1-B/6,
Sector 34A, Kharghar, Navi Mumbai
Approved
Consent to
1st Operate
(Part)
31.05.2018 RO(HQ)
It was decided to grant consent to 1st operate
(Part), for residential project on total plot area of for
residential project on total plot area of 3,759.55 sq.
mtrs. & total BUA construction of 48,539.45 sq.
mtrs. out of 51,112.044 sq. mtrs. (As per EC dtd.
14.03.2014), subject to verification report from SRO
about installation of STP, OWC and online
monitoring system, by imposing following
conditions:
(i) PP shall submit Bank Guarantee of Rs. 20 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be granted after: (1) Submission of
Certificate from Architect regarding BUA completed
for which they have applied for 1st Consent to
Operate. (2) After installation of online monitoring
system for the parameters Flow, BOD, and TSS at
STP outlet and verification of the same from
SRO/RO.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 11
11
NAMCO INDUSTRIES PVT. LTD.,
(HORALE, PO WAOSHI) 140,144 AT
HORALE, WAWOSHI VILLAGE
KHALAPUR
Approved
Consent to 1st
operate
(Expansion) with
Amalgamation
with existing
Renewal of
consent to
operate
30.09.2022 APC
It was decided to grant consent to 1st operate for
expansion with amalgamation with existing Renewal
of consent to operate, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs, 5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
12
Sylvanus Properties Ltd., Plot no 44/1,
45/5, 45/7, 45/8 to 42 at Village Savroli
and 25/10 at
Dahivali Taluka Khalapur District Raigad
Not Approved
Consent to 1st
Operate
(Part)
_____ RO(HQ)
It was decided to issue SCN for refusal of consent
to 1st operate (part), on following non-compliance:
(i) PP has not amended consent to establish for
total BUA-1,35,315 sq.m as per EC.
(ii) PP has not provided OWC and also not
submitted architect certificate.
13
Shagun Relaty, Plot No. 204, Sector-23
,Ulwe Panvel
Approved
Consent to
1st Operate
31.05.2018 RO(HQ)
It was decided to grant consent to 1st operate, for
residential project on total plot area of for residential
project on total plot area of 6,898.90 sq. mtrs. &
total BUA construction of 29,499.211 sq. mtrs. (As
per EC dtd. 05.09.2014), subject to verification
report from SRO about installation of OWC and
online monitoring system, by imposing following
conditions:
(i) PP shall submit Bank Guarantee of Rs. 20 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be granted after: (1) Submission of
Certificate from Architect regarding BUA completed
for which they have applied for 1st Consent to
Operate. (2) After installation of online monitoring
system for the parameters Flow, BOD, and TSS at
STP outlet and verification of the same from
SRO/RO.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 12
14
Shree Saptashree Builders &
Developers Pvt. Ltd, Near ACC Colony,
Opp. Dnyansadhana Vidya
Mandir, Mental Hospital, Road, Thane (W)
Approved
Consent to
1st Operate
31.05.2018 RO(HQ)
It was decided to grant consent to 1st operate, for
residential project on total plot area of for residential
project on total plot area of 13,890.64 sq. mtrs. &
total BUA construction of 36,360.56 sq. mtrs. (As
per EC dtd. 05.09.2014), subject to verification
report from SRO about installation of online
monitoring system, by imposing following
conditions:
(i) PP shall submit Bank Guarantee of Rs. 10 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be granted after: (1) Submission of
Certificate from Architect regarding BUA completed
for which they have applied for 1st Consent to
Operate. (2) After installation of online monitoring
system for the parameters Flow, BOD, and TSS at
STP outlet and verification of the same from
SRO/RO.
15
Geomatrix Developers LLP, Plot No.
29,Sector 25 ,Kamothe, Panvel, Dist
Raigad Kamothe Panvel
Approved
Consent to
1st Operate31.05.2018 RO(HQ)
It was decided to grant consent to 1st operate, for
residential project on total plot area of for residential
project on total plot area of 14,599.650 sq. mtrs. &
total BUA construction of 49,828.24sq. mtrs. (As
per C to E), subject to verification report from SRO
about installation of STP, OWC and online
monitoring system, by imposing following
conditions:
(i) PP shall submit Bank Guarantee of Rs. 20 lakh
towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be granted after: (1) Submission of
Certificate from Architect regarding BUA completed
for which they have applied for 1st Consent to
Operate. (2) After installation of online monitoring
system for the parameters Flow, BOD, and TSS at
STP outlet and verification of the same from
SRO/RO.
PP shall submit the application for C to E& C to O
for remaining BUA as per amended EC.
Renewal
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 13
1
Super Auto India Ltd., Gat No - 308,
Nanekarwadi, Chakan, Taluka - Khed,
Pune - 410501, Maharashtra
Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue final refusal of renewal of
consent to operate on following non-compliances:
(i) Industry has increased the C.I. by Rs.11.82 Crs
without obtaining consent to establish from the
Board.
(ii) Industry is not operating ETP regularly and
discharging untreated effluent outside factory.
(iii) Industry has not provided scrubber to the
chrome plating section.
(iv) Industry has stored H.W. in open space and not
sending it to CHWTSDF.
(v) Industry has not reply to SCN issued on
27.3.2017.
2
Balkrishna Synthetics Limited, Plot No.
H-3/1, MIDC A ROAD, Tarapur Palghar
Approved
Renewal of
Consent to
Operate
31.01.2022 WPC
It was decided to grant renewal of consent to
operate with Nil effluent and subject to verification
of online monitoring system, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
3
Transrail Lighting Limited, B 1/1 MIDC,
Deoli, Dist - Wardha
Approved
Renewal of
Consent to
Operate
31.05.2018 APC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
(ii) Industry shall install ARP within 6 months period
and submit Bank Guarantee of Rs. 5 lakh towards
compliance of same.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 14
4
Kirloskar oil Engines Ltd., A11/1, MIDC,
Ambad, Nashik
Approved
Renewal of
Consent to
Operate
28.02.2021 APC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
5
WEBER HYDRAULIC INDIA PVT. LTD.,
PLOT NO. 3, GAT NO. 822 TO 833, 834
(P), 836 (P), 848,
849 (P), VILLAGE - SHIRWAL, TALUKA -
KHANDALA, DIST - SATARA 412801
Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue final refusal of renewal of
consent to operate on following non-compliances:
(i) Industry has not submitted BG as per previous
consent condition.
(ii) Industry is not in operation since Aug-2016.
(iii) Industry has not reply to SCN issued on
25.05.2017.
6
WESTERN COALFIELDS LIMITED,
A SUBSIDARY OF COAL INDIA (A
GOVT. OF INDIA
UNDERTAKING) (O/o of the Sub Area
Manager,Silewara UG mine,Silewara Sub
Area,WCLNagpur
Area)
Approved
Plain Renewal of
Consent to
Operate
31.03.2019 APC
It was decided to grant plain renewal of consent to
operate for Under Ground Mine, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
7
Gimatex Industries Pvt. Ltd.,
7 km. milestone, NH-7, Vill. Wani,
Hingaghat, Dist. Wardha
Approved
Plain Renewal of
Consent to
Operate
31.07.2018 WPC
It was decided to grant plain renewal of consent to
operate forYarn-1325 MT/M,Grey cloth-320 MT/M &
Soft waste-164 MT/M, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 15
8
Polyplastic Industries (India) Pvt.Ltd., B-
30/2,MIDC, Industrial
Area,Ranjangaon,Tal-Shirur,
Dist.- PuneApproved
Renewal of
Consent to
Operate
(with increase in
CI)
31.07.2018 APC
It was decided to grant renewal of consent to
operate with increase in CI from 42.15 to 60.05
Crores and without increase in production quantity,
by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
9
Shree Bhimeshwari Ispat Pvt Ltd.,
J 17 Additional MIDC Satara
Approved
Renewal of
Consent to
Operate
30.06.2018 APC
It was decided to grant renewal of consent to
operate without increase in production quantity, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
10
SUPER CRAFT FOUNDRY,
UNIT 02 plot no D76 Miraj MIDC Miraj.
Dist Sangli Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue SCN for refusal of renewal
of consent to operate on following non-
compliances:
(i) Industry has CI of Rs. 13.27 Crs. and now unit
has applied forrenewal mentioning CI as Rs. 25.77
Crs. i.e. unit has increased CI by Rs. 12.50 Crs.
11
The Automotive Research Association
of India (ARAI) Survey No. 102, Vetal Hill,
Off Paud Road,
Kothrud, Pune
Not Approved
Renewal of
Consent to
Operate
_____ APC
It was noted that already SCN was issued to the
said industry on 25.05.2017 and they have replied
to it on 12.06.2017 & 15.06.2017.
As CI of the industry is Rs. 423.8462 Crs. It was
decided to refer case to CAC Desk.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 16
12
KSPG Automotive India Pvt. Ltd., Plot
No.A-1, Additional Supa Parner Industrial
Park, Village-Waghunde Budruk,
Taluka:Parner, Dist:Ahmednagar. Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to revoke the consent for the unit
located at Plot No. A-3, as industry has shifted their
activities from Plot No. A-3 to A-1.
Industry shall take soil sample for the plot no. A-3
and submit results to Board.
Bank Guarantee of Rs. 5 lakh to be returned after
compliance of conditions regarding hazardous
waste disposed of at MEPL, Pune and results of
soil sample.
13
Cummins Generator Technologies India
Private Limited, C-33, MIDC,
AhmednagarApproved
Renewal of
Consent to
Operate
30.06.2018 APC
It was decided to grant renewal of consent to
operate without increase in production quantity, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
14
Siyaram Silk Mills Limited, Plot No. G-
1/1, MIDC, Tarapur-Boisar, Tal. & Dist.
PalgharApproved
Renewal of
Consent to
Operate
(Amendment for
change in
quantity of
polyester yarn
dyeing and cotton
yarn dyeing)
31.05.2021 WPC
It was decided to grant renewal of consent to
operate amendment for change in quantity of
polyester yarn dyeing and cotton yarn dyeing
without increase in production quantity and without
change in effluent quantity, by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 17
15
SUPREME AUTOSHELL INDIA PVT.
LTD., Plot No.21 & 30,MIDC, Satpur,
Nashik
Approved
Renewal of
Consent to
Operate
30.09.2018 APC
It was decided to grant renewal of consent to
operate for additional activity of electroplating and
production with increase in CI in principally, subject
to installation of APCS to electroplating section, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
16
HINDUSTAN PETROLEUM
CORPORATION LTD., CHANDRAPUR
LPG PLANT, PLOT NO. B-32
& 33, GHUGHUS MIDC ROAD,
CHANDRAPUR
Approved
Renewal of
Consent to
Operate
31.12.2018 AS(T)
It was decided to grant renewal of consent to
operate with increase in CI., by imposing following
conditions:
(i) Forfeit Bank Guarantee of Rs. 1 lakh towards
installation of paint booth without C to E from
Board.
(ii) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
(iii) PP shall submit Board Resolution from plant
head, towards installation of paint booth without
obtaining consent to establish from the MPC Board
thus violated the provisions of Environmental Laws
and in future, they will not do such violations and
BG of Rs. 2 lakh towards submission of Board
resolution by 31.08.2017.
Consent shall be issued after obtaining requisite
consent fee.
17
Deepak Nitrite Ltd., PLOT NO. K-9 & K-
10,MIDC TALOJA,DISTRICT-RAIGAD
Approved
Renewal of
Consent to
Operate
28.02.2018 AS(T)
It was decided to grant renewal of consent to
operate without increase in production quantity, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 18
18
TG Terminals Private Limited, Village
Veshvi, Post Dighode, Tal. Uran, Dist.
RaigadApproved
Renewal of
Consent to
Operate
(with change of
name)
31.03.2022 RO(HQ)
It was decided to grant renewal of consent to
operate for CFS activity with change of name from
M/s. Forbes & Company Ltd to M/s TG Terminals
Pvt. Ltd., by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
19
Anand Teknow Aids Engineering India
Ltd., Plot no A-18, 5 star MIDC Loni
Deokar Village
Pune- Solapur Road Tal- Indapur Dist-
Pune-413312Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue SCN for refusal of renewal
of consent to operate, on following non-
compliances:
(i) Industry has increased in capital investment from
Rs. 8.10 Crs. To 39.61 Crs. (total increase in C.I.
31.51 Crs) without obtaining permission from Board.
(ii) Industry has failed to reply to the SRO vide letter
dated 29.03.2017 asked industry to submit
clarification on this increase in C.I.
20
Bajaj Electricals Ltd., Plot No. B-7, MIDC
Ranjangaon, Village Dhoksangvi, Tal:-
Shirur, Dist:-Pune 412209Approved
Renewal of
Consent to
Operate
31.03.2022 APC
It was decided to grant renewal of consent to
operate without increase in production quantity, by
imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 19
21
Kider India Pvt. Ltd., Gat No. 584/2,
Koregaon Bhima, Tal:- Shirur, Dist:- Pune
412216 Shirur
Approved
Renewal of
Consent to
Operate
(with increase in
CI)
28.02.2020 APC
It was decided to grant renewal of consent to
operate with increase in C.I., by imposing following
conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
(ii) PP shall submit Board Resolution from plant
head, towards starting constructed of new shed
without obtaining consent to establish from the
MPC Board thus violated the provisions of
Environmental Laws and in future, they will not do
such violations and BG of Rs. 2 lakh towards
submission of Board resolution by 31.08.2017.
Consent shall be issued after obtaining requisite
consent fee.
22
SASTI UG MINE, WCL BALLARPUR
AREA Sasti UG Mine, Ballarpur Area,
WCL, PO: Sasti
Approved
Renewal of
Consent to
Operate
31.03.2020 APC
It was decided to grant plain renewal of consent to
operate for Under Ground Mine, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
(ii) SRO to do monthly sampling.
Consent shall be issued after obtaining requisite
consent fee.
23
Ghonsa Opencast Mine Office of the Sub
Area Manager, Ghonsa-Kumbharkhani,
Po.- Rasa, Tal.-
Wani, Distt. - Yavatmal, Maharashtra
Not Approved
Renewal of
Consent to
Operate
______ APC
It was decided to defer the case and put up in next
CC after obtaining EC copy and SCN status.
24
BHARAT PETROLEUM CORPORATION
LIMITED, BORKHEDI DEPOT Village
Borkhedi (C.Rly),
off NH-07Approved
Renewal of
Consent to
Operate
31.05.2022 AS(T)
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 20
25
SRI AMBIKA SOLVEX LIMITED,
VILLAGE - VANI RAMBHAPUR,
AMARAVATI ROAD, AKOLA
Approved
Renewal of
Consent to
Operate
31.05.2018 WPC
It was decided to grant renewal of consent to
operate in principally, subject to submission of
CGWA NOC and Bank Guarantee, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
(ii) Industry shall take prior permission from
Regional Officer, Amaravati before restarting of
production.
Consent shall be issued after obtaining requisite
consent fee.
26
DTL Ancillaries Ltd, Gat No.373,
Kharabwadi, Near WMDC Industrial Area,
Kharabwadi, Chakan, Tq. Khed, Approved
Renewal of
Consent to
Operate
31.03.2022 APC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
27
WESTERN COALFIELDS LIMITED
Durgapur Rayatwari Colliery Ballarshah
Road, Chandrapur Area
Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue final refusal of renewal of
consent to operate and closure direction, on
following non-compliances:
(i) PP has not replied to SCN issued on 07.06.2017
as non-compliance reported by SRO, Chandrapur.
28
The Indian Card Clothing Co Ltd., Next
to Hindustan Antibiotics Ltd., Mumbai
Pune Highway,Pimpri
Approved
Renewal of
Consent to
Operate
30.04.2019 APC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
(ii) Industry shall upgrade ETP and STP within 6
months period and submit Bank Guarantee of Rs.
10 lakh towards compliance of same.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 21
29
Beekalene Fabrics Pvt Ltd., Plot No.C-
1/1, MIDC, TTC Indl Area, Village -
Pawane, Thane Belapur Road
Not Approved
Renewal of
Consent to
Operate
_____ WPC
It was decided to issue SCN for refusal of renewal
of consent and stop work, on following non-
compliances:
(i) Industry has not submitted Board
resolution as they have increased CI by 22.21 Cr
without prior permission from MPC Board.
(ii) JVS analysis report dated 16.12.2015 parameter
BOD & COD are not achieving consented
standards.
(iii) industry has not submitted Bank Guarantee as
per previous consent conditions.
30
Ultra Engineers (Unit IV) Sector No 10,
Plot No 58 ,PCNTDA, Bhosari, Pune.Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue SCN for refusal of renewal
of consent and stop work, on following non-
compliances:
(i) Industry has increase in capital investment. from
Rs. 39.95 Crs to Rs. 42.37 Crs. And also increase
production quantity without permission from the
Board.
31
METALYST FORGINGS LTD., Gat No.
251, Chakan - Talegaon Road,
Kharabwadi, Chakan
Not Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue SCN for refusal of renewal
of consent and stop work, on following non-
compliances:
(i) industry has not provided adequate APC system.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 22
32
INDIAN OIL CORPORATION LIMITED
(LPG BOTTLING PLANT) AT-POST:
BHOSE,, Chakan
Shikrapur Road, SH-55
Approved
1st Consent to
Operate and
amalgamation
with existing
Renewal of
Consent to
Operate
30.09.2020 AS(T)
It was decided to grant 1st consent to operate &
amalgamation with existing consent, by imposing
following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
33
PHOENIX MECANO INDIA PVT. LTD.,
GAT NO. 388,389 PIRANGUT
INDUSTRIAL ESTATE, BHARE MULSHINot Approved
Renewal of
Consent to
Operate
_____ APC
It was decided to issue SCN for refusal of renewal
of consent to operate, on following non-
compliances:
(i) Industry increased from Rs. 29.92 Crs to Rs.
51.97 Crs without obtaining permission from the
Board.
34
Govind Milk & Milk Products Pvt.Ltd.
(Ganeshsheri,Pandharpur Road,Kolki)
93/1,93/2,94/1,95 Ganeshsheri, Kolki
PhaltanApproved
Renewal of
Consent to
Operate
30.04.2019 WPC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
35
Allana Cold Storage Ltd., D-38,MIDC
Industrial Area,TTC,Thane Belapur
Road,Turbhe,Navi
MumbaiApproved
Renewal of
Consent to
Operate
31.05.2021 WPC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
36
REAL DAIRY INDUSTRIES PVT LTD., F
22 KATPHAL ROAD MIDC BARAMATI
BARAMATI Approved
Renewal of
Consent to
Operate
30.05.2020 WPC
It was decided to grant renewal of consent to
operate, by imposing following conditions:
(i) Industry shall submit Bank Guarantee of Rs.5
lakh towards O & M of pollution control systems and
compliance of consent conditions.
Consent shall be issued after obtaining requisite
consent fee.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 23
37
Asmeeta Infratech Limited, Plot no. 1
Addl. Kalyan Bhiwandi Indistrial Area
Bhiwandi
Approved
Consent to
Establish
(Revalidation)
Commissioning of
the unit or 5 yrs
whichever is earlier
RO(HQ)
It was decided to grant consent to establish
revalidation for construction for Textile Park project
on total plot area of 2,42,814 sq. mtrs. & total
construction BUA of 2,18,532.60 sq. mtrs., by
imposing following conditions:
(i) PP shall not carry out further remaining work
after expiry of EC i.e. 27/09/2018 and submit Bank
Guarantee of Rs. 20 lakhs towards compliance of
same and consent conditions.
(ii) PP shall submit an affidavit in Board’s
prescribed format within 15 days regarding the
compliance of conditions of EC and C to E.
(iii) PP shall install online monitoring system for
BOD, TSS and flow at the outlet of STP.
The meeting concluded with a vote of thanks to the Chair.
Note: As decision taken in CAC meeting held on 03.11.2015, regarding granting consent for maximum validity i.e. 5 years for Red category, Orange - 6
years Hence all above industry consent to renewal shall be granted for 5 years after obtaining requisite consent fee, excluding Sugar industries.
As per the circular issued by the Board vide no.MPCB/AS(T)/TB/B-5087 dated 03.12.2015.
1] All consent shall be issued by prescribing condition of new hazardous waste rule dated 04.04.2016 for compliance of Hazardous Waste and other wastes
(Management & Transboundary Movement), Rules 2016.
2] As per new BMW rule PSO to submit the compliance report for all the HCE for STP / ETP.
3] It was decided to issue directions to textile, chemical and other pollution potential industry having effluent quantity of 25 CMD to install online monitoring for
parameter - flow, pH, BOD, COD & SS with camera to asses station and maintain probe in non-performing CEPT area i.e. PRIA, Roha, Taloja Tarapur &
Lote.
Booklet No. 7, 8 9/2017-18 Minutes of 4th CC meeting of 2017-18 dtd. 01.08.2017 24