Managing Leachate SeepsBelow Final Cover

Ali Khatami, Ph.D., P.E.SCS Engineers

S C S E N G I N E E R S

Leachate Seeps

• Many reasons for leachate seeps

• Operator manages leachate seeps while slope unclosed

• Various means and methods for management of leachate seeps

• Full closure and leachate seeps

• Partial closure and leachate seep

2

S C S E N G I N E E R S

Leachate Seeps Below Geomembrane

S C S E N G I N E E R S

Leachate Toe Drain System

(LTDS)

3

S C S E N G I N E E R S

Location of LTDS

S C S E N G I N E E R S

Leachate at Toe of Slope

4

S C S E N G I N E E R S

Leachate Pool at Perimeter Berm

S C S E N G I N E E R S

Removing Leachate by Vac Truck

5

S C S E N G I N E E R S

Vac Truck

S C S E N G I N E E R S

Exposing Anchor Trench

6

S C S E N G I N E E R S

Excavating Overfill

S C S E N G I N E E R S

Excavating Overfill

7

S C S E N G I N E E R S

Grading Slope

S C S E N G I N E E R S

Graded Slope

8

S C S E N G I N E E R S

Graded Slope

S C S E N G I N E E R S

Graded Slope

9

S C S E N G I N E E R S

LTDS Geocomposite Deployment

S C S E N G I N E E R S

LTDS Geocomposite

10

S C S E N G I N E E R S

LTDS Geocomposite

S C S E N G I N E E R S

Anchor Trench Excavation

11

S C S E N G I N E E R S

Anchor Trench for LTDS Geocomposite

S C S E N G I N E E R S

Bottom of LTDS Geocomposite

12

S C S E N G I N E E R S

Extension of LTDS Geocomposite

S C S E N G I N E E R S

Extended LTDS Geocomposite on Slope

13

S C S E N G I N E E R S

Anchor at High End of Seep

S C S E N G I N E E R S

Connection Points to Cleanouts

14

S C S E N G I N E E R S

Connection Point to Sump Riser

S C S E N G I N E E R S

Connection Point to Sump Riser

15

S C S E N G I N E E R S

Deployment of LTDS Geotextile

S C S E N G I N E E R S

LTDS Pipe Placement

16

S C S E N G I N E E R S

Vertical Pipe

S C S E N G I N E E R S

LTDS Pipe Placement

17

S C S E N G I N E E R S

Vertical Pipe

S C S E N G I N E E R S

LTDS Pipe Connection to Cleanout Pipe

18

S C S E N G I N E E R S

Connection of LTDS Pipe to Sump Riser

S C S E N G I N E E R S

Connection of LTDS Pipe to Sump Riser

19

S C S E N G I N E E R S

Connection of LTDS Pipe to Sump Riser

S C S E N G I N E E R S

LTDS Gravel Placement

20

S C S E N G I N E E R S

Forming Gravel around LTDS Pipe

S C S E N G I N E E R S

LTDS Gravel Placement

21

S C S E N G I N E E R S

LTDS Gravel Placement

S C S E N G I N E E R S

Gravel at End of LTDS Pipe

22

S C S E N G I N E E R S

Closing LTDS Burrito

S C S E N G I N E E R S

Placement of Soil Above LTDS Burrito

23

S C S E N G I N E E R S

Soil Above LTDS Burrito

S C S E N G I N E E R S

LTDS at Completion

24

S C S E N G I N E E R S

LTDS Pipe at Cell Construction Time

S C S E N G I N E E R S

LTDS Drain Pipes

25

S C S E N G I N E E R S

LTDS Drain Pipe into Leachate Sump

S C S E N G I N E E R S

LTDS Drain Pipe into Leachate Sump

26

S C S E N G I N E E R S

LTDS Drain Pipe into Leachate Sump

S C S E N G I N E E R S

Sump and LTDS Drain Pipe

27

S C S E N G I N E E R S

LTDS Drain Pipe at Leachate Sump

S C S E N G I N E E R S

LTDS Drain Pipe into Leachate Corridor

28

S C S E N G I N E E R S

Closed Burrito

S C S E N G I N E E R S

Cover Geomembrane Welded toBottom Geomembrane

29

S C S E N G I N E E R S

Cover Geomembrane Welded toBottom Geomembrane

S C S E N G I N E E R S

Granular Bentonite Over Extrusion Weld

30

S C S E N G I N E E R S

Granular Bentonite Over Extrusion Weld

S C S E N G I N E E R S

GCL Strip Over Granular Bentonite

31

S C S E N G I N E E R S

GCL Strip Over Granular Bentonite

S C S E N G I N E E R S

GCL Strip Over Granular Bentonite

32

S C S E N G I N E E R S

GCL Strip Over Granular Bentonite

S C S E N G I N E E R S

Cover Soil Placement

33

S C S E N G I N E E R S

Slope Final Condition

S C S E N G I N E E R S

Slope Final Condition

34

S C S E N G I N E E R S

Benefits of LTDS

• Collects and removes leachate below final cover geomembrane

• Eliminates ponding of leachate below final cover geomembrane at toe of slope

• Provides gas collection at toe of slope

• Connects to leachate collection sump, sump riser, or cleanouts

• Addresses aggressive leachate seeps on slope

S C S E N G I N E E R S

Construction Recommendations

• Construct LTDS and drain pipes at time of cell development

• Set LTDS pipe invert below top of berm

• Leave no sand between LTDS geocomposite and LTDS geotextile

• Construct vertical pipes for future connection to gas system

• Do not use sacrificial geomembrane over LTDS, use geotextile to allow infiltration