International Cooperation Team
Technology Policy & Strategy Department
Korea Hydro & Nuclear Power Co.(KHNP)
Managing the supply chain:
Challenges and Overcoming in Korean
nuclear industry
TM on Topical Issues in the Development of Nuclear Power Infrastructure
4-7 February 2014, Vienna, Austria
Operation
Construction
Planning
23 Units
5 Units
6 Units
20,716MW
6,600MW
8,400MW
Operation : 6 units
Operation : 6 units
Construction : 2 units
Planning : 2 units
Operation : 5 units
Construction : 1 units
Operation : 6 units
Construction : 2 units
Planning : 4 units
Seoul
Hanbit NPP
Kori NPP
Wolsong NPP
Hanul NPP
2
: 5th & 6th New site Samcheok
Yeongdeok
Status of NPPs in Korea
(28.2%)
(28.0%)
(23.8%)
20,716MW
(39.0%) (24.7%)
(27.0%)
138,784GWh
Coal
Gas (8.5%) Oil
(11.4%) Others
Coal Gas
(5.8%) Oil
(3.5%) Others
Others: Hydroelectric, Renewable, etc. Others: Hydroelectric, Renewable, etc.
Source : KEPCO(Dec.2013)
Nuclear power is used as a base load
5
Electricity Mix
31
Kori 1,2,3,4 / Shin-Kori 1,2 Hanbit 1,2,3,4,5,6
Wolsung 1,2,3,4 / Shin-Wolsung 1 Hanul 1,2,3,4,5,6
6
Operating Plants
Construction Planning
UAE May 2017 May 2018 May 2019 May 2020
APR1400
Apr. 2017 Apr. 2018 Jun. 2021 Jun. 2022 Shin-Hanul
Shin-Wolsong
Aug. 2014 Sep. 2014 Dec. 2019 Dec. 2020 Dec. 2023 Dec. 2024
APR1400 APR1400 APR+
Shin-Kori
KOREA
Shin-Kori 3 Shin-Kori 4 Shin-Kori 6 Shin-Kori 5 Shin-Kori 7
Shin-Hanul 3 Shin-Hanul 4 Shin-Hanul 1 Shin-Hanul 2
OPR1000
Shin-Wolsong 2
Jul. 2014
UAE 1 UAE 2 UAE 3 UAE 4
Shin-Kori 8
APR1400 APR1400 APR1400
APR1400
APR1400 APR1400 APR1400
APR+ APR1400
APR1400
4
7
Construction Plan
National Networking for NPPs
Nuclear R&D Institute
R&D of Nuclear technology
Development of new technology
Government & KHNP
Nuclear policy and promotion
Planning of nuclear Power
Enactment of Nuclear Power
Regulatory Authority
Licensing & inspecting NPP
Regulatory guide
Industries
Construction, design & A/E
Manufacturing of component
and equipment
Manufacturing of nuclear fuel
Utilities
Operation and maintenance
Construction management
Fundamental for industries
Society & Associations
• Korea Nuclear Society(KNS)
• Korea Atomic Industrial Forum(KAIF)
• Korea Nuclear Energy Promotion Agency
Universities
Education in Nuclear Engineering
Education in Science & Engineering
B.S., M.S., Phd of Nuclear Engineering
KHNP NSSC
Start-Up
KEPCO E&C
NSSS T/G FUEL BOP
DOOSAN DOOSAN KNF DOMESTIC &
FOREIGN CONSTRUCTORS KHNP
A/E Equipment
Supply Construction
NSSC: Nuclear Safety and Security Commission
KEPCO E&C : KEPCO Engineering & Construction
DOOSAN : DOOSAN Heavy Industries Co.
KNF : Korea Nuclear Fuel Co.
CONSTRUCTORS : HYUNDAI, DAEWOO, SAMSUNG,
DOOSAN, DAELIM, etc.
Organization for Project Management
Fukushima Accident
Safety Culture Issue
Counterfeit Certificates
Corruption Scandals
Challenges in the Nuclear Industry
Safety Culture Issue
Cover-up of SBO at Kori #1
Event
Station Blackout for 12 minutes in a cold shutdown in Feb. 2012
Not to report the loss of power and classify an emergency
Safety Culture Breach
Decision by the station manager not to report and instead to delete record of the event
Prevention measures
24 Hours Monitoring System by the regulatory body
Reinforcement of safety culture and reporting system
IAEA’s Expert Mission to review the SBO
Safety culture advisory service by foreign third party
CGID Issue
In November 2012, KHNP confirmed that some suppliers had supplied items
by falsifying the foreign dedication entities' quality certificates for Commercial
Grade Items Dedication(CGID), such as fuse, relay, diode, etc.
Counterfeit Quality Certificates
Counterfeit Quality Certificates
CGID Issue
KHNP shut down Hanbit #5, 6 to replace the components
with the forged quality certificates
NSSC formed the government-civilian joint investigation team
which investigated falsification of certificates of the items supplied to KHNP
Comprehensive inspections expanded to all Q-class QVD(Quality
Verification Document) of the items supplied to KHNP over the past 10 years
for all of the Korean NPPs while investigating certificates for CGID
All parts with falsified certificates were replaced and NSSC gave permission
for the restart of the NPPs after safety check in January 2013
CGID Issue
KHNP
① Purchase Order
④ Delivery
KHNP
Supplier Dedication
Entity
② Request for
Dedication
③ Notification
of Result Forged
Counterfeit Quality Certificates
EQ Issue
In May 2013, It was found that the falsification of equipment qualification(EQ)
certificates of control cables supplied to Shin-Kori #1, 2, 3 ,4
and Shin-Wolsong #1, 2
Safety function verification in severe environment such as LOCA, Fire,
Melting accident, etc.
Test results in the EQ were falsified by local certified testing institutes.
KHNP immediately shut down affected NPPs to replace related parts
NSSC’s investigation was expanded to all NPPs’ certificates for EQ
The component with falsified certificates were replaced or retested.
NSSC permit restart of the plants in January 2014
Counterfeit Quality Certificates
Counterfeit Quality Certificates
EQ Issue
KHNP
Supplier
① Purchase Order
Testing
Institutes
② Request for
Qualification
③ Notification
of Result
KHNP
Forged
Verification
Agency
⑤ Approval
of Result
④ Request for
Verification
⑥ Delivery
Tolerated
Testing
Institutes
Scope Counterfeit Items
CGID • Forged Quality Certificate
• buzzer, diode, transformer
• power supplier, switch, fuse
• relay, rectifier, magnetic contactor
• pressure gauge, blower
QVD
• Reuse of past Certificates
• Issue of Fraudulent Certificates
• Changing Test Results
• pully, fan, motor
• pump, bushing, nut, bolt
• heater, tool set
• sleeve, actuator
• filter, valve disk
EQ
• Changing Test Results
• Changing Test Condition (Boric
Solution → Normal water)
• Changing Test Report of Laboratory by
Supplier
• control switch module
• control rod position transmitter
• radiation monitoring sensor
• AHU
• 600V control cable
• fuel tank
Counterfeit Quality Certificates
The investigation began after a tip-off from a citizen in September 2011
Prosecutor's Office launched investigation on corruption related
to nuclear power plant items
Vendor, test institute, verification agency, and KHNP has been implicated
The main cause was the disadvantage when the supply was delayed
Prosecutor's Office and NSSC collaborated in reviewing the safety
of nuclear power plants and confirmed that there was no item directly
related to safety
As a result of the investigation, 97 persons were prosecuted on a charge of
corruption
Corruption Scandals in supply chain
Strengthening quality control system
Establishment of a procedure for monitoring quality control by a third party
Reinforcement of legal liability of quality accreditation organizations
Introduction of NPP equipment certification management institution, etc.
Improving procurement system
Strengthening Independence of procurement department in KHNP
Enhancement of bidding system transparency
Organizing a committee to improve NPP procurement, etc.
Eradicating corrupt relationship
Prohibiting the re-employment of retirees in nuclear related companies
Hiring outside personnel in KHNP, etc.
① Strengthening quality control, ② Improving procurement system
③ Eradicating corrupt relationships in supply chain
Prevention measures
Not to be overconfident and complacency
Excellent performance of NPP operation for long period of time
Export of a NPP at the first time in Korea’s nuclear history
To be transparent and open in quality and procurement activities
Nuclear industry is easy to be closed due to the nature
To encourage anonymous reporting
The counterfeits and scandals was revealed by an anonymous tip-off
To cooperate with international agencies, WANO, IAEA and foreign companies
IAEA Expert Mission, WANO Corporate Review, Third party inspection
lessons learned
• Safety culture
• Equipment Reliability
• Engineering Competency
• Organization
• Personnel management
• Corporate culture
• Quality control
• Procurement system
• Corruption prevention
Innovation Integral System Safety First Policy
Public Trust Restoration & High Performance
Strategy to overcome