TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

I-90 ALLSTON INTERCHANGE

A MULTIMODAL TRANSPORTATION PROJECT

TASK FORCE MEETING #2MAY 21, 2014 – HONAN LIBRARY, ALLSTON

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

MassDOT Priorities

2

Improve Safety, Access & Connections for All ModesInterchan

geCambridg

e StTransit Neighborh

ood• Replace Viaduct• Realign I-90• Implement

AET• Context

Sensitive Design

• Redesign C-bridge St• Revitalize C-

bridge St• Reconfigure

Local Roadway Connections• Context

Sensitive Design

• Support S. Station Expansion, C-Rail, DMU, etc.• Context

Sensitive Design

• Avoid/minimize ROW/property displacements• Minimize

local impacts during construction• Context

Sensitive Design

The Bottom

LineUse available financial resources within timeframe

allotted

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Taskforce Priorities

3

Improve Safety, Access & Connections for All ModesInterchan

geCambridg

e StTransit Neighborh

ood• Realign I-90• Minimize

interchange presence • Safe

connections to C-bridge St.• Increase

permeability across interchange• Context

Sensitive Design

• Safe connections to interchange• Less

interchange impact to C-bridge St.• Reconfigure

Local Roadway Connections• Improve safety• Context

Sensitive Design

• Connections between C-bridge St. & W. Station• Context

Sensitive Design

• Minimize local impacts during construction• Avoid new cut-

thru traffic• Reconnect

Allston• Foster local

business • Context

Sensitive DesignThe

Bottom Line

Improve safety, respect the neighborhood, reconnect Allston to itself & the Charles

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Shared Priorities Improve safety for all modes:

walking, cycling, driving, transitRealign I-90Context sensitive design or:

Lessen impact of interchangeAvoid inducing cut-through traffic with

new configurationReconnect sections of Allston to each

other and the RiverProtect the neighborhood during

constructionA more vibrant Cambridge Street that

serves all modesAccessibility to transit at future West

Station

4

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Traffic Analysis Area

5

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Existing Highway Volumes

6

70,000

DAILY

55,000

56,000 73,000

75,000

72,000

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Existing Ramp Volumes

7

15,000

DAILY

19,00016,000

16,000U-TURN = 1,000

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1 ,500

5,600

Existing Highway & Ramp Volumes – AM Peak

8

7,100

I-90 EB OFF

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,300

4,100

Existing Highway & Ramp Volumes – AM Peak

9

5,400

I-90 WB OFF

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,1004,100

Existing Highway & Ramp Volumes – AM Peak

10

5,200

I-90 WB ON

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,8005,600

Existing Highway & Ramp Volumes – AM Peak

11

7,400

I-90 EB ON

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,300

3,900

Existing Highway & Ramp Volumes – PM Peak

12

5,200

I-90 EB OFF

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,400

4,500

Existing Highway & Ramp Volumes – PM Peak

13

5,900

I-90 WB OFF

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,5004,500

Existing Highway & Ramp Volumes – PM Peak

14

6,000

I-90 WB ON

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

1,6003,900

Existing Highway & Ramp Volumes – PM Peak

15

5,500

I-90 EB ON

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

70%

30%

Existing Ramp Distribution – AM Peak

16

EB OFF

1,500

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

30%

70%

Existing Ramp Distribution – AM Peak

17

WB OFF

1,300

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

30%70%

Existing Ramp Distribution – AM Peak

18

FROM CAMBRIDGE

ST

1,300

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

45%55%

Existing Ramp Distribution – AM Peak

19

FROM S.F.

ROAD1,300

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

60%

40%

Existing Ramp Distribution – PM Peak

20

EB OFF

1,300

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

35%

65%

Existing Ramp Distribution – PM Peak

21

WB OFF

1,400

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

25%75%

Existing Ramp Distribution – PM Peak

22

FROM CAMBRIDGE

ST

1,100

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

40%

60%

Existing Ramp Distribution – PM Peak

23

FROM S.F.

ROAD1,800

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Existing Local Roadway Volumes – AM Peak

24

300400

300325

800

1,400800

1,200

550

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Existing Local Roadway Volumes – PM Peak

25

450400

425450

1,200

1,4001,200

1,300

500

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Local Roadway Bicycle Volumes – AM (PM) Peak

26

1 (2)1 (4)

1 (7)3 (3)

1 (1)

4 (3)

2 (4)

2 (2)

1 (1)

2 (2)

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Local Roadway Pedestrian Volumes – AM (PM) Peak

27

20 (10)25 (15)

6 (7)

20 (40)15 (15)

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – AM Peak Hour Volumes

28

55

TOTAL VOLUME2,455

1,200430

1,250

330

440

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – PM Peak Hour Volumes

29

45

TOTAL VOLUME3,260

1,000740

1,530

675

800

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – Traffic Signal Phasing

30

1.I-90 Off Ramps

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – Traffic Signal Phasing

31

1.I-90 Off Ramps2.Cambridge Street

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – Traffic Signal Phasing

32

1.I-90 Off Ramps2.Cambridge Street3.Hotel Exit

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – Traffic Signal Phasing

33

1.I-90 Off Ramps

2.Cambridge Street

3.Hotel Exit4.S.F. Road WB

Off Ramp

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Cambridge St/S.F. Rd – PM Peak Hour Volumes

34

1.I-90 Off Ramps

2.Cambridge Street

3.Hotel Exit4.S.F. Road WB

Off Ramp 5.S.F. Road EB

Frontage Road

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Interchange Concept Development – Traffic Considerations• Simplify the Cambridge

Street/Soldiers Field Road intersection

• Provide system that disperses rather than concentrates traffic flows

• Reduce traffic on Cambridge Street by providing multiple connection points

• Determine need for 2-lane ramps vs. 1-lane ramps

35

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

36

Operational(During

Construction)

Operational(Final

Configuration)

Physical Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

37

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)

Physical Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

38

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

39

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical•Limited distance between River and BU property

Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Existing Section Near Buick Street

40

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

41

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections

Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Preliminary Section Near Malvern Street

42

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

43

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way

Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

44

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90

Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Schematic Connector Location Limit

45

No Connections from Cambridge St over I-90 are Possible

750’

Proposed I-90Rail Yard

and Commuter Rail

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Schematic Connector Profile

46

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

47

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90•Potential subsurface contamination

Regulatory

Fiscal/Schedul

e

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

48

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical Regulatory•Historic

impacts Section 106•Parkland impacts Section 4(f)•Stormwater treatment

Fiscal/Schedul

e•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90•Potential subsurface contamination

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project/Site Constraints

49

Operational(During

Construction)•Maintain all local connections•Maintain 8 lanes of travel on I-90•Maintain all rail service

Operational(Final

Configuration)•Rail yard location south of I-90•Future Commuter Rail Station location• I-90 design

speed of 65 mph•On/off ramps lengths sufficient for acceleration/ deceleration and queuing

Physical Regulatory•Historic

impacts Section 106•Parkland impacts Section 4(f)•Stormwater treatment

Fiscal/Schedul

e•Funds identified from Capital Improvement Plan (CIP) FY14-FY18 (approx $160M)•Schedule linked to AET coming on-line 2016

•Limited distance between River and BU property•Clearance over rail yard –possible connections•Right-of-way•Length required for street connections from Cambridge St over I-90•Potential subsurface contamination

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Preliminary Interchange Concept Design

50

GROUP 1Suburban Type• One

intersection for on-ramps

• One intersection for off-ramps

GROUP 2Suburban Type• One

intersection for EB on-ramps & WB off-ramps

• One intersection for WB on-ramps & EB off-ramps

GROUP 3Urban Type

• Split diamond configuration

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 1A

51

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 1B

52

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 1C

53

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 1D

54

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 2A

55

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 2B

56

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 3A

57

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 3B

58

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 3C

59

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 3D

60

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 3E

61

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Option 3F

62

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Parcel Ownership Map

63

TASK FORCE MEETING #2 – 5/21/14 – HONAN LIBRARY, ALLSTON

Project Locus

64