IBM Maximo Scheduler 7.5.1
Including Graphical Assignment
Maximo Scheduler Overview
Functions:Creating SchedulesScheduling work in a Gantt Chart View Resource Planning Resource Assignments
Graphical Assignments
Preliminary Steps
Create a Calendar
Associate the Calendar to a Labor record
Setup the Work Order
Creating a Schedule
Managing Work in Gantt View
Activity Table
Activity Chart
Schedule Compliance
Dragging Work in Gantt View
Dragging Groups of Tasks
Constraints and Alerts
Resource Table
When specific craft
is highlighted,
Maximo can indicate
which work orders
utilize that craft
Resource Chart
If the top row for Crafts is selected, all craft requirements will display. Shift availability does not display for multiple crafts.
If one specific craft is selected, the resource requirement and availability is displayed.
Multiple crafts can be selected by holding the Ctrl key and selecting the crafts.
Schedule Costs - High Level Costs
Schedule Costs – Itemized Breakdown
Schedule Costs – Cost Comparison
Other Resource Availability
Group Work by Work Property
Work Cost
Schedule compliance
PM Forecast Gantt View
PM Reforecast from Gantt View
Precedent Constraints
Graphical Assignment Manager
Graphical Assignment Manager
Check Assignments in Work Order Tracking