Mechanical Systems - From Design to Verification, part 2

Post on 05-Dec-2014

625 views 2 download

description

Presentation by Chris Conway at the workshop Balancing Moisture, Ventilation, and Energy Efficiency in Arlington, VA on December 11, 2013.

transcript

Mechanical Systems

From Design to Verification

December 11th, 2013

Verification (to prove something is true or correct)

• Definition of a Hole: • a : an opening through something : perforation

<have a hole in my duct> • b : an area where something is missing : gap:

as (1) : a serious discrepancy : flaw, weakness <some holes in your logic regarding your ventilation strategy>

Find Hole – Fix Hole (or verify no Hole)

You don’t have to be good at math… Common Sense is your best friend

Change is hard I know, I know…

Buildings are just like our bodies… Intentional and Purposeful holes

Blower Door

• Measure airtightness level of building/unit envelopes • Fancy tape measure

for air leakage • Test (when?)

• Typically, at Final • Before drywall is hung

in certain scenarios • Code Compliance

aka Hole Hunter

EarthCraft Virginia

Duct Blaster

• Diagnose and demonstrate leakage problems

• Estimate efficiency loss • Test (when?)

• Before drywall is hung • Final inspection

• Code Compliance

Test airtightness of forced air duct systems

EarthCraft Virginia

Duct Tape! (Don’t use on ducts)

Mastic!

EarthCraft Virginia

Flow Capture Device

• Used to accurately measure air flow in all residential applications

• Positive • Duct Supplies

• Negative • Duct Return • Bath Exhaust • Ventilation

EarthCraft Virginia

Unit / Bedroom Pressures

Main body of the unit is negatively pressurized

Bedrooms are positively pressurized

Pressures must be in balance

EarthCraft Virginia