Post on 16-May-2018
transcript
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS 52
Client Name: Scotch College December 2011Project: Scotch Middle School Traff ic Assessment
DVC Scotch College TS (2) 24 Donald Veal Consultants
Overall, this review has not identified traffic issues which would prevent the Middle School development from proceeding. Several recommendations for improving traffic flow on Shenton Road beside the school have also been presented for consideration by the Town of Claremont.
Agenda Page 121
Site Plan - Existing 11
Site Plan - Proposed - Ground Floor 12
Site Plan - Proposed 3D view 13
Middle School
Proposed Floor Plan - Ground Floor 15
Proposed Floor Plan - Level 1 16
Proposed Elevations - West & South 17
Proposed Elevations - East & North 18
Library/Gallery
Proposed Floor Plan - Ground Floor 20
Proposed Floor Plan - Lower Level 21
Proposed Elevations - East & North 22
Proposed Elevations - West & South 23
Art Building
Proposed Floor Plan - Ground Floor 25
Proposed Floor Plan - Lower Level 26
Multipurpose & Pipes Room
Proposed Floor Plan - Ground Floor 28
Proposed Elevations 29
Underpass
Proposed Plan + section 31
Perspectives 33
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS 10
Architectural drawings
Agenda Page 133
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS 1:500 @ A3 / 1:250 @ A1
0m 4m 8m 20m
11
EXISTING ADMINto be demolished
EXISTING LIBRARY
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING RESIDENCE
EXISTING SCOTCH COLLEGE FACILITIES
EXISTING CLASSROOMSto be demolished
EXISTING CANTEEN
to be demolished EXISTING BUILDING
to be demolishedEXISTING
BUILDINGto be demolished
EXISTING CLASSROOMS+ ART (LOWER LEVEL)
SCOTCH COLLEGE SENIOR SCHOOL CAMPUS
stairs to senior oval
bus stop
EXISTING DROP OFF AREA
EXISTING JUNIOR
SCHOOL
EXISTING CLASS
ROOMS
HOUSEMASTER
RESIDENCE
EXISTING MULTIPURPOSE HALL
EXISTING PASSIVE RECREATION AREA
existing drop off area
RL17
RL17
RL17
RL15.50
RL16.63
RL15.50
RL16.50
RL16.00 RL17.00
existing footpath
existing carpark
S H
E N
T O
N
R O
A D
S A
U N
D E
R S
S
T R
E E
TEXISTING QUAD
site plan - existing
11Agenda Page 134
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASSsite plan proposed
1:500 @ A3 / 1:250 @ A1 12
LIBRARY
PROPOSED MIDDLE SCHOOL
FOOD TECHNOLOGY
ART
MULTI-PURPOSE LEARNING SPACES
PIPESROOM
SPORTSSTORE
GALLERY (LOWER LEVEL)
JUNIOR SCHOOL
CANTEEN (LOWER LEVEL)
SHEN
TON
RO
AD
SAU
ND
ERS
STRE
ET
PRIVATERESIDENCE
LOT 15SCOTH COLLEGE
HOUSE MASTER’SRESIDENCE
CLASS ROOMS
20.7msetback
24.9msetback
8.3m
setb
ack
6.1m
setb
ack
NEW UNDERPASS
MULTI-PURPOSE
HALL
DROP OFFZONE
0m 4m 8m 20m
Agenda Page 135
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS 13
PROPOSED MIDDLE SCHOOL BUILDING
FOOD TECHNOLOGY
SPORTS STORE + PIPES ROOM
PROPOSED LIBRARY
NEW LANDSCAPING
GALLERY ON LOWER LEVEL
MULTIPURPOSE ROOMS
ART ROOMS + CANTEEN ON LOWER LEVEL
site plan proposed 3D0m 4m 8m 20m
Agenda Page 136
COVERED WALKWAY
NEW LANDSCAPED AREA
NEW LANDSCAPINGREFER LANDSCAPE PLAN
S C O T C HMIDDLE SCHOOL& _ O V E R P A S S
FFL17.85
FFL15.50
RL15.50
RL15.50
RL 17.00
RL17.85
RL 16.00
RL 17.20
RL 15.50
RL 15.85
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASSMiddle School Building : floor plan ground floor
1:200 @ A3 / 1:100 @ A1
0m 2m 4m 10m
15
WAITING
ENTRY
RECEPTION
HEAD MS
MA ADMIN
PA
AMPHITHEATRE
LIFT
GLAYEAR 7
GLAYEAR 7 GLA
YEAR 7GLA
YEAR 7
GLAYEAR 7
GLAYEAR 7
GLAYEAR 7
GLAYEAR 7
GLAYEAR 6
GLAYEAR 6
GLAYEAR 6
GLAYEAR 6
OFFICE
SERVER ROOM
STUDENTENTRY
STUDENT ENTRY
LEARNING STREET
UAT
CLEANERS
STORE
INTERVIEWWCs
MS
MS
FS
Agenda Page 137
FFL 20.30
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS0m 2m 4m 10m
16Middle School Building : floor plan level 01
1:200 @ A3 / 1:100 @ A1
AS
AS STAFF
AS
AS STAFF
LIFT
STAFF COMMON
STAFF WORKVOID
VOID
VOID
BREAKOUT
BREAKOUT
PREP
GLAYEAR 8
GLAYEAR 8SCIENCE
MULTIPURPOSESCIENCE
MULTIPURPOSE
GLAYEAR 8
GLAYEAR 8
GLAYEAR 8
GLAYEAR 8
GLAYEAR 8 GLA
YEAR 8
INTERVIEW
MEETING
MEETING
UATSTORE
VOID TO ENTRY BELOW
LEARNING STREET
CLEANERS
WCs
MS FS
Agenda Page 138
west elevation + underpass
south elevation
SITE BOUNDARY
Decorative concrete panels to retaining
New underground connection to senior campus
Feature brickwork Matte finish profiled metal deck roofing
Face brickwork Aluminium vertical shading blades
Clerestory glazing and ventilation
Feature brickwork
Aluminium shading blades
Prefinished metal cladding
Translucent glass block
Ventilation louvers
Stone cladding
RL 17.85
FFL 20.30
eave RL 23.00
ridge RL 26.30
FFL 15.50
FFL 15.50
FFL 20.30
RL 23.00
RL 26.30
RL 17.85
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS 17Middle School Building : elevations west + south
1:200 @ A3 / 1:100 @ A1
natural ground level at boundary
natural ground level at Shenton RdRL 21.40
natural ground level at Shenton Rd RL 21.40
SHENTON ROAD
Agenda Page 139
Stone cladding Prefinished metal cladding
Ventilation louvers
Aluminium shading blades
Face brickwork Feature brickwork
Glazed entry
Stone claddingFeature brickwork Prefinished aluminium shading louvers
Matte finish profiled metal deck roofing
Face brickwork Prefinished aluminium shading louvers
Screening to westPainted steel columns
east elevation
north elevation
RL beyond16.85
FFL 20.30
eave RL 23.00
ridge RL 26.30
FFL 15.50
RL 16.85
FFL 15.50
FFL 20.30
RL 23.00
RL 26.30
Development Application PROPOSED SCOTCH MIDDLE
SCHOOL & UNDERPASS 18Middle School Building : elevations east + north
1:200 @ A3 / 1:100 @ A1
SITE BOUNDARY
SHENTON ROAD RL 18.00
Agenda Page 140