Metso AutomationFor reliable and user-friendly
energy production
February 2014 Matti Miinalainen
Content
1. Metso Group overview
2. Metso Automation in short
3. Metso DNA for reliable energy production
4. Metso’s solution for Turbine Automation
5. Selected references – Power industry
Metso DNA –for reliable and user-friendly
energy productionPower production applications
Highlights of Metso DNA features
© Metso
COGENERATION Flexibility, steam network management, high availability
Specialized expertise in the power industry
HYDRO POWEREfficiency, availability, river optimization
PYROLYSISEnvironmentally efficiency, high availability,
WASTE-TO-ENERGYMaximizing waste disposal, emission management, environmentally efficiency
FLUIDIZED BED BOILERSFlexible multi fuel combustion, combustion optimization with corrosion management
COAL FIREDHigh availability, emission minimization, combustion optimization, flexible usage
SOLAR POWEREfficiency, availability, optimizing lifecycle maintenance costs
GASIFICATIONHigh cycle efficiency, high availability
COMBINED CYCLEHigh availability, emission minimizing, flexibility
22
© Metso
Product portfolioEnergy Demand ForecastingEnergy Trading and PurchasingProduction Optimization
Metso DNA Energy Management
Metso DNA Plant Operation Monitoring Metso DNA Boiler Performance MonitoringMetso DNA Steam Turbine Performance MonitoringMetso DNA Boiler Sootblowing ManagerMetso DNA Boiler Life MonitoringMetso DNA LCP Emission Monitoring
Plant Management Applications
Metso DNA Historian Calculation EnvironmentMetso DNA Report
Reporting & Analyzing Tools
Metso DNA HistorianMetso DNA Operate – Alarms & Events ServerApplication databases (SQL Server)
Information Services (Databases)
Metso DNA Fuel Power Compensator Metso DNA FBB Combustion Manager Metso DNA Steam Turbine ControllerMetso DNA Steam Network ManagerMetso DNA Training Simulator
Advanced Control Applications
User InteractionAutomated ProcessSecured Lifecycle
Metso DNA
01
© Metso
One system for all automation in power generationMetso DNA
02
© Metso
Metso DNA redundancyRedundant hard disks and backup tape device
• Backup Power Supply for- control node cabinets and rack I/O’s• Optional power backup for- control room devices and servers
Back-up(BU)
Redundant process controller
Redundant hard disk
• Redundant Field Bus• Redundant I/O power supply per rack
Redundant PLCinterface
Profibus DPdevices
PCSPCS GTW-LIS GTW-LISPCS
Redundant control room bus and process busRedundant control room bus and process bus
Information Server Operator InterfaceEngineering Server Alarm Processing
• Redundant power supplies and Interface controller
•Redundant M120 I/O units
Availability up to
99,98%03
© Metso
Servo outputs• 3 analog output channels
• Output range -100…+100 mA
• Settable range min and max
• Settable dither
- Frequency 50…500 Hz
- Amplitude 0…10 mA
• Field loop diagnostics
AIT4L Inputs• 4 LVDT input channels
• Input update interval 1 ms
• Settable measurement filter
• 16 bit A/D converter
ACN MR - powerful Metso DNA controller5ms control cycles now possible
Technology• Intel Atom processor
• Industry spec components
• 5 Ethernet ports
• installed in I/O-group
• Controller redundancy
Performance• Down to 5 ms control cycles
• 2 I/O-groups with < 20 ms
cycles
• More I/O-groups via Ethernet
DI for Valve shut down• 1 digital input channel
• Field voltage supply 24 VDC
• Current limit 40 mA
• Shut down function attachable
to each AO channel individually
• Reaction time 2 ms
• Power load unbalance runback
AIT4CInputs• 4 input channels 0/4-20 mA
• Input update interval 1 ms
• Settable measurement filter
• 16 bit A/D converter
Isolation• Field to system 1500 VAC
• Between channels 500 VAC
ACN MR Servo output unit AOI3S Valve position input
04
© Metso
Metso DNA OperateOperation tools for efficient problem solving
• Efficient alarm analysis with 1 ms Sequence of Events (SOE)
• Replay history from any picture, “time machine”
• Drag and drop trend analysis• Dynamic function and
interlocking descriptions for machine and process
• Integrated diary entries for trends and loops
Start History mode
Select displayed moment and replay
History mode indication
Feeling of control
05
© Metso
Multilingual Metso DNA Control Panel
• Used language can be selected per operator station • There can be several languages to choose from (these needs to be agreed
already on the sales phase)
06
© Metso
• Boiler HP feed pumps• Circulation water pumps• Exhaust air fans• Fresh air fans• Primary air fans• Secondary air fans• District heating pumps• Coal / peat mill feed air fans• Booster pumps
• Relative shaft vibrations (x-y)• x/y positions (GAP voltage)• Absolute bearing vibrations (x-y-z)• Axial positions (z)• Differential expansions• Absolute expansions• Shaft eccentricity• Tachometer• Process parameters
Typical condition monitoring measurementsBoiler and Turbine-Generator
Turbine generator(gas, steam or hydro)
Process specific auxiliary equipment, e.g.
07
© Metso
Fully integrated vibration monitoring
• ACN I/O solution- ACN M120 series I/O group with AIV8V
units for fast dynamic measurements- Max. 128 channels per I/O group- 8 measurements per I/O card => card
amount depends on monitoring points
• Vibration monitoring processing unit - ACN CS and ACN RT- A separate or shared with controls
• Application- Measurement, calculations, alarm limits- User Interface elements- History trending if TEA or IA databases are
part of the controls package
Vibration levels are on alarm or warning level
08
© Metso
Fuel Power Compensator (FPC)
• Compensates variations in:- fuel quality (dry/wet fuel, multiple fuels)- fuel amount (unmeasured variable)
• Improves combustion by supporting fuel flow controller and making corrections based on calculated fuel power
• Calculates fuel power in two different ways:- flue gas oxygen method (dynamic situations)- steam balance method (steady-state situations)
• Stabilizes:- boiler production- fuel consumption (minimizes usage)- combustion variables
• Recommended with Combustion Optimizer
09
© Metso
Proven benefits with Advanced Control Applications
Nox before
100 200 300 400 500 600 7000
50
100
150
200
250
100 200 300 400 500 600 7000
200
400
600
800
1000CO before
100 200 300 400 500 600 7000
200
400
600
800
1000
Optimization On
CO after
100 200 300 400 500 600 7000
2
4
6
8
10O2 before
100 200 300 400 500 600 7000
2
4
6
8
10
Optimization On
O2 after
Nox after
100 200 300 400 500 600 7000
50
100
150
200
250
Optimization On
10
© Metso
Latest in Metso DNA to boost yourpower generation
Turbine controls
Pulverized coal fired combustion optimization
Condition monitoring
Sootblowing optimization
11
© Metso
Staying competitive in the electricity market
$12 million savings resulted in reduction of 7% limestone usage over the operating range
Metso played a significant role in helping Grant Town avoid considerable cost of installing a post combustion flue gas treatment system, and met our expectations of efficient, low cost operation.
Steve Friend Plant ManagerAmerican Bituminous
12
Turbine AutomationCustomer specific approach
with deep knowledge of Steam Network controls
© Metso
Metso DNA Turbine Controller
• System- Common solution for the balance
of the plant, boiler and the turbine- Special fast io-cards for 5ms cycle
time
• Turbine controller- All required controls and
sequences- Better integration of boiler and the
turbine controls in demanding industrial applications
- Simulator for FAT and training
• Industrial customers- Advanced combustion controls- Model predictive steam network
control
14
© Metso
Metso DNA steam turbine automation
• Coordination of turbine and boiler island• Redundancy at all levels• Turbine Controller
- Speed control with automatic start-up- Auxiliary devices- Primary and secondary control- Simulator for FAT and training - Complex industrial pressure controls
• Turbine protection- Over speed protection - Hima / DNA modules - Machine protection
• Machine Monitoring- Performance monitoring calculations- Thermal stress calculations- Vibration diagnostics
15
© Metso
Steam Network knowhow in CHPsSteam Turbine essential part of the steam network
16
Integrated machine monitoring
Metso DNA Machine Monitoring- ACN MR - server- M120 - cards
17 © Metso
© Metso
• Extensive experience - Industrial turbines and large utility sized turbines- With overall control strategies for power boilers, steam
network management and frequency support applications
- Both retrofits of old installations as well as new turbine deliveries.
• Experienced with the following steam turbines: Doosan-Skoda, LMZ, HangZhou, Zamech, KWU, Lang (Alstom), Bergman-Borgman, ASEA Stahl, Siemens, ABB, Lang, BHEL, AEG, Triveni.
• OEM certification by LMZ (steam turbine)• OEM certification by Doosan-Skoda (steam turbine)
Metso DNA steam turbine automation Selected references
18
© Metso
Structure of the Turbine Control and Protection
Stop valve ControlValves
n > MAX
RotatingSpeed Measurement3 channel(Protech 203
Turbine protection(3-Channel)
Status data
SynchronizingDevice
Speed controller•Island operation•Disturbance reserve•Load shut-off •Manual output control
Turbine controller•Turbine run-up•Load control•Back-pressure control•Steam extraction controls•Limiting controls•Parameters for island operation
Turbine protection•Diagnostics•Testing
Logic•Control mode•Disturbance monitoring•Protection•Limits of generator switch•Island operation
4...20 mA
G
Monitoring•Speed•Position•Watch-dog
Island operation activiated
Generator’s breaker closed
I/O-LEVEL
Other measurements
Local Operator Interface
2 x 3 measurement
1 x 3
X 2
X 1 EH
4...20 mA
G-
X 2
Red.
Process Control StationBus Interface to Main System
X 2Test
Control hydraulics
EH
4...20 mA
G-
X 2
Red.
X 1 X 1 EH
4...20 mA
G-
X 2
Red.
X 1 EH
4...20 mA
G-
X 2
Red.
Valve coordinator
ESD
ESD
19
© Metso
Jaquet FT3000 overspeed SIL3 and Hima turbine protection SIL3 +24 VDC
2/3 - votedhydraulic trip block
K 4
K 5
K 6
Speed puls/mA(TCS)
K 1
K 2
K 3
Speed puls/mA (TCS)
Speed sensor AOverspeed test A 110%
Overspeed 110%
Sensor failure A(TPS)
Speed puls/mA (TCS)Speed sensor BOverspeed test B 110%
Overspeed 110%
Sensor failure B (TPS)Speed sensor COverspeed test C 110% Overspeed 110%
Sensor failure C (TPS)
Criteria ACriteria BCriteria CCriteria D
Criteria NN …
19
20 © Metso
© Metso
Unified automation system provides many benefits
Kari EnwallAutomation-related electrical engineeringFortum NaantaliFinland
If the systems were from different suppliers, some of the features would definitely be lost at some point.”
Fluidized Bed BoilersOTSC PC Boilers
Combined Cycle Power PlantsTurbine Controllers
Waste-to-Energy Plants
Selected Power References
© Metso
Worldwide references
PowerCombined Heat & PowerWaste to EnergyFlue gas desulfurizationHydro
TransmissionRefinery & ProcessCombined CycleSolarWave Surge
23
© Metso
Automating the world’s largest FBB plants
Alholmens240MW –World’s largest multifuel boiler
Nacogdoches 100MW – Largest biomass boiler in US
Lagisza 460MW – World’s largest FBB – OT CFB
Sha Lang Tan 300MW –China’s largest FBB
Neyveli Lignite 250MW – India’s largest FBB
© Metso
Selected references in CFB Plants
0
200
400
600
800
1000
1200
0 5 10 15 20 25
Capacity MWth
Tornio
Kauttua
RovaniemiEC TychyToppila I
Rauma Pori
KokkolaToppila II
KaukasEesti Balti Alholmen
Ostroleka
Langerbrugge
Lagisza
Jing Hai x2
Keljonlahti
Bold = Foster Wheeler references
© Metso Date Author Title
• Worlds largest super-critical CFBC Boiler
• 460 MWe
• Foster Wheeler
• July 2009 start-up
• Total Plant Controls
• > 20,000 I/O’s
PKE Elektrownia Lagisza S.A. Poland
26
© Metso
Metso Power & Automation together
Hel
me
Laun
kaln
eH
AM
Cog
enM
artin
ska
Sav
onlin
naK
erav
an L
VA
S T
artu
Sw
ieci
eU
PM
Sho
tton
UP
M C
hape
lleK
alm
ar E
nerg
iW
roch
law
Rau
man
Voi
ma
Cel
biD
alki
a Fa
ctur
eLa
nger
brug
geE
neco
Del
fzijl
Övi
k E
nerg
iE
dend
erry
Kuo
pion
Ene
rgia
RW
E T
ullis
Rus
sel
Ost
role
kaP
orin
Pro
sess
iS
czce
cin
PG
EK
ymin
voi
ma
Gai
nesv
ille
Nac
ogdo
ches
Cik
aran
g 1
Cik
aran
g 2
Alh
olm
en
0
100
200
300
400
500
600
MWth
27
© Metso
Selected references in BFB plants
0
50
100
150
200
250
300
0 5 10 15 20 25 30 35 40
Cap
acity
Units
Capacity MWth
28
© Metso
PowerCogenerationWaste-to-EnergyFlue gas desulfurization
Beijing,Liulihe Cement CogenBeijing, Sanhe
Jiangxi, GuixiJiangxi, Fengcheng I&IIJiangxi, Fengyi
Shanxi, Shentou INeimenggu, JinghaiNeimengtu, Dengkou
Hebei, ZhangjiakouHebei, Qinghuangdao
Guizhou, JinshaGuiZhou, QianbeiGuizhou, Yaxi
Sichuan, Yibin
Yunnan, QujingYunnan, Kunming 1&2Yunnan, Xiaolongtan 1&2Yunnan, Xuanwei V,VI, VIIYunnan, Xunjiansi
Jiangxi, Jiujiang Chemical
Henan,Xinxiang GuchengHenan, Xingxiang BaoshanHenan, Xingyang
Hubei, Xiangfan
Chongqing 1,2,3
Hunan, Lianyuan
Liaoning, Dalian Chemical
Shandong, Lunan Cement Cogen Zhangqiu
Jiangsu, Xutang I&IIJiangsu, Pengcheng I&IIJiangsu, Yizheng ChemicalMeishan Iron&SteelJiangsu, Xiaguan
Shanghai, WaigaoqiaoShanghai, Minhang
Zhejiang, Qianqing
Anhui, TianjiaanAnhui TonglingAnhui, AnqingAnhui, Ma’anshan
Guangzhou, Nansha CCPP
References - China
© Metso
Huadian Jurong Power Plant, China
• 2 x 1000 MWe Ultra-supercritical coal fired TPP
• Start-up: 2013
• Total BTG Controls
• 27,360 I/O’s
• Delivered by Metso SAC JV:- Main control system,- Furnace safety surpervision system- Data acquisition system - Steam turbine digital electro-hydarulic control system (DEH)- FGD plant control system and SCR controls
© Metso
Fengcheng Power Plant, China
• 2 X 700 MW OTSC
• Start-up: January 2007
• Shanghai Electric Co., China
• Total BTG Controls
• 23,300 I/O’s
31
© Metso
Maanshan Power Plant, China
• 2 X 660 MW OTSC
• Dec 2008 start-up
• Harbin Power Engineering, China
• Total BTG Controls
• 24,200 I/O’s
32
NTPC RIHAND STGII 2x500 MWKOTA - 6 1x195 MWNTPC SIPAT 2x500 MWTAU DEVILAL PANIPAT 7 & 8 2x250 MWSGTPS BIRSINGHPUR 1x500 MWNTPC KAHALGAON 1x500 MWKPCL BELLARY 1x500 MWDVC MEJIA 1x210 MWNTPC VINDHYACHAL STGII 2x500 MWAPGENCO RAYALASEEMA 2x210 MWMS EB PARLI 1x250 MWCS EB KORBA EAST 2x250 MWKAHALGAON STGII 2x500 MWPARAS #1 1x250 MWMEJIA 5&6 2x250 MWCHANDRAPURA 2x250 MWSANTALDIH 1x250 MWJINDAL RAIGARH 4x250 MWAMARKANTAK V 1x210 MWBAKRESWAR 4&5 2x210 MWUKAI 1&2 2x120 MWTANDA (R&M) 3x110 MWTENUGHAT (R&M) 1x210 MW
MAHAGENCO BHUSAWAL 2X500 MWNTPC SIMHADRI II 2X500 MWOP JINDAL STPP 4X600 MW
NTPC UNCHAHAR 1x210 MWBALCO RENUSAGAR #9 1x67 MWGEB KUTCH LIGNITE 1x75 MWPARICHHA 1 & 2 2x210 MWNTPC RAMAGUNDAM 1x500 MWMAHAGENCO KHAPERKHEDA 1x500 MWANPARA 4 & 5 2x500 MWPIPAVAV TPP 2X600 MWPRAYAGRAJ STPP 3X660 MWGIRAL 1x125 MWLEHRA MOHABAT 2x250 MW
THERMAL POWER PLANTS
112233445566778899
101011111212131314141515161617171818191920202121222223232424
11
1010
1212
1111
44
3399 88
22
55
77
66
13132121
2020
1818
1616
1414
1717 2424
2323
1515
19192222
25252626272728282929303031313232333334343535
2525
2626
2727
2828 292930303131
3232
3333
3434
353544
6655
77 33
8811
22
11
22
33
44
99
1010
1111
1212
1313
KUTTALAM CCPP 101 MWDHUVARAN CCPP 107 MWGMR KAKINADA 230 MWGMR VASAVI CCPP 4X50 MWBHUSHAN CCPP 1x60 MWBHADRACHALAM1x21MWDHOLPUR CCPP 330 MWBHILAI STEEL 1x15 MWBHUSHAN 60 MWRAICHUR (R&M)
COMBINED CYCLE POWER PLANTS112233445566778899
1010
55
66
77
88
99
1010
Metso Automationin India
11
44
6655
33
131399
88
77
1414
221212
1010
1111
99
ADITYA CEMENT 1x23 MWRIL, HAZIRA 40 MWTISCO JOJOBERA 1x120 MWHINDUSTAN ZINC LTD. 2x77 MWRAIGARH 55 MWHINDALCO 1x35 & 1x6 MWITC BHADRACHALAN 1x18.5 MWBHUSHAN LTD. 1x77 & 1x30.75 MWMONET ISPAT 1x80 MW NALCO ANGUL 2X120 MWGNFC 2x25 MWTISCO JAMSHEDPUR 1x30 MWSPB ERODE 21 MW
112233445566778899
1010111112121313
CAPTIVE POWER PLANT
NHPC PARBATI HEP 4x200 MWKPCL ALMATTI HEP 5x55 & 1x15 MWNEEPCO TURIAL HEP 2x30 MWMPEB MADHIKEDA HEP 2x20 MWTHDC KOTESHWAR HEP 4x100 MWMANERI BHALI HEP 4x76 MWROLEP HEP 2x18 MWMUKERION HEP 2x9 MWKOLDAM HEP 4x200 MWSEWA 3x40 MWCHIPLIMA HEP 1x25 MWMADHIKHEDA HEP 1x20 MWKAMENG HEP 4x150 MW
1122
445566778899
HYDRO POWER PLANTS
1010111112121313
33
363637373838
3737
38383636
© Metso
© Metso
OP Jindal Super Thermal Power Plant, India
• 4 x 250 MW
• BHEL
• Sept 2008 start-up
• Total BTG Controls
• ~ 50,000 I/O’s
34
© Metso
National Thermal Power Corporation, Ramagundam Unit 7, India• First “Unified Automation Solution”
in India
• BHEL 1 x 500 MW
• Start-up: August 2004
• Total BTG Controls
• ~ 21,000 I/O’s
35
Selected automation references: Hydro Power Plants
Location Country Capacity Start upYear
MWeDjerdap- 1 HPP Serbia 5 x 201MW 2013Irganayskaya HPP Russia 2 x 205 MW 2012Baksan HPP Russia 3 x 8,3MW 2012Ilarion HPP Greece 2x70MW, +5MW 2012Nho Que 3 Vietnam 2x55 MW 2012Anjalankoski Finland 14,5 MW 2012Anjalankoski Finland 3x4,5 MW 2012Peniche Portugal 300kW 2011Vuokskij kaskad Russia 8x27MW 2011Tuyen Quang Vietnam 3X114 2008Se San 3A Vietnam 2X55 2006Chukka HEP India 4x85 2006ROLEP 1 & 2 India 2x18.5 2005Koteshwar 1 to 4 India 4x100 2005Maneribhali 1 to 4 India 4x76 2004Turial 1 & 2 India 2x30 2004Almatti Units 1 to 6 India 5 X 55, 1 X 15 2004Madhikheda 1 & 2 India 2x20 2004Almatti Units 1 to 6 India 5 X 55 1 X 15 2004Bihai Taiwan 1x62.5 2003Parbati India 4x200 2003Can Don Vietnam 2 x 38.8 2003Kyröskoski Finland 15 1997Anjalankoski Finland 1994Kyröskoski Finland 5x 1992Tammerkoski Finland 2x 4,3 1992
36 © Metso
© Metso Title/Author
DATE
SIME LAEM CHABANG POWER CO. LTD,LAEM CHABANG, THAILAND2008
• Electrical output 60 MWe, process steam 45 t/h• Fuel: natural gas• Combined cycle
Selected automation references: Combined Cycle Power Plants
SEMBCORB UTILITIES,TEESSIDE, UNITED KINGDOM2008
• Electrical output 40 MWe• Fuel: natural gas• Gas turbine & HRSG
2010 ENERJI SABANDIRMA, TURKEY
• Electrical power 900 MWe • Fuel: natural gas• Combined cycle (2xGT+2xHRSG+1xST)
FORTUM POWER AND HEAT, SUOMENOJA, ESPOO, FINLAND2008
• Electrical output 234 MWe, District heat 214 MW • Fuel: natural gas• Combined cycle
KOJUHOVO HETAINH POWER PLANT, MOSCOW, RUSSIA2011
• Electrical output 170 MWe• Fuel: natural gas• Gas turbine & HRSG
OMV SAMSUN ELEKTRIK URETIM SAN. VE TIC. A.S, TURKEY2012
• Electrical output 880 MWe• Fuel: natural gas• Combined Cycle
AGE ENERJI,DENIZLI, TURKEY2013
• Electrical output 205 MWe• Fuel: natural gas• Combined Cycle
37
© Metso
Experience with the technology providersGas turbine manufactures
• Gas turbine control system connected to Metso DNA through link- Monitoring and operation through Metso DNA operator interface- Start-up and shutdown sequences in Metso DNA- MW setpoints for the GT´s from the main load controller or AGC in Metso DNA in
pre-selected control mode- Typical link protocols: GE´s Mark II-VI GSM, Modbus TCP/IP, Profibus DP, OPC
• Gas turbine control system done with Metso DNA
GT manufactures
GT manufactures
GEABB AlstomAnsaldo
BHELEGTFiatHanjung
MitsubishiPGRolls-RoyceSiemens
ThomanssenTuma TurbomachWestinghouse
GEAEG
AlstomFiat
PR&GECSiemens
38
© Metso
ST manufactures
• Steam turbine control system connected to Metso DNA through link- Monitoring and operation through Metso DNA operator interface- Start-up and shutdown sequences in Metso DNA- Typical link protocols: Modbus TCP/IP, Profibus DP, OPC,Mauell PLC interface,
GE´s Mark II-VI GSM, Siemens S7 SAPI Ethernet TCP/IP
• Steam turbine control system done with Metso DNA
Experience with the technology providersSteam turbine manufactures
ST manufactures
Skoda LMZHangZhouZamech
KWULang (Alstom) Bergman-BorsigASEA Stahl
SiemensABBBHELAEG
LMZAlstomPrvni Brnenska StrojirnaSiemens
ABB GEAnsaldoFranco Tosi
BHEL Blohm+VossEkolFuji
KWU Lang MAN Mitsubishi
NEI ParsonSiemensSkodaSTT Thermodyn
Urals Turbine WorksZamech
39
© Metso
Experience with the technology providersHeat recovery steam generator manufactures
• HRSG automated with Metso DNA
HRSG manufacturesAdatoSES TlmaceRafakoPodolsk
Ahlstrom Babcock&BorsigCMI BelgiumAlstom
Stork Energy KvaernerIdrotermiciStandard Fasel
Schelde BredaFoster Wheeler Senior thermalOschatz
Mech. de la Pena VogtZurnDeltak
SGPTampella PowerMetsoNooter/Eriksen
40
41 © Metso
© Metso
ReferencesEurope
Finland• Westenergy Oy Ab, Vaasa
Sweden•Åmotfors Energi Ab
Estonia• Eesti Energi AS, TallinnUK
• Ineos Runcorn, Manchester phase 1• Ineos Runcorn, Manchester phase 2
• MES Environmental, Dudley• MES Environmental, Wolverhampton
• Waste Recycling Group, Lincolnshire • Veolia Environmental Services, Staffordshire
• Cory Environmental, Riverside London• Veolia Environmental Services, Newhaven
• Sita, Cleveland 4&5• Dundee Energy Recycling, Dundee
• RWE Markinch, Glenrothers• London Waste, London
Austria• A.S.A., Zistersdorf• AVE Wels II • AVE Wels I• AVE Lenzing
Italy•Trattamento Rifiuti Metropolitani, Turin• Veolia, Piacenza• Veolia, Energonut
Hitachi Zosen Inova (former Von Roll Inova)Keppel SeghersCNIM Metso PowerOther Technology or Automation Replacement
Projects in execution are mentioned in bold/italic
Norway• BIR Avallsenergi, Bergen
42
© Metso