MOBILE DISTRICTDREDGING PROGRAM
MOBILE DISTRICTDREDGING PROGRAM
NAD/SAD REGIONAL DREDGING
MEETING/WEDA
NAD/SAD REGIONAL DREDGING
MEETING/WEDA US Army Corps of Engineers Mobile District
US Army Corps of Engineers Mobile District
Hopper PipelineBucket Existing Contract FY 08 Updated Sep 2007
Mobile Bay/Bar(Rental) Hopper Manson - Glenn E. POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment Hurricane Contingency Solicitation POC - George Rush 251-694-3715
Panama City Beach Nourishment TBD(Unit Price) Hopper 500,000 CY POC - John Crane 251-690-3257
Mobile Harbor Extensions1200/2100 Bucket Bid Opening Jan 08 POC - Tim Caldwell 251-690-3583(Unit Price)Gulfport HarborImprovements Bucket/Hopper Bid Opening 8 April POC - John Crane 251-690-3257(Unit Price) 5.4McyMobile River
Bucket/Pipeline Bid Opening TBD POC - George Rush 251-694-3715(Unit Price) 800KcyPascagoula Harbor Improvements Bucket/Hopper Bid Opening 17 June POC - John Crane 251-690-3257
8.0McyPascagoula Sound/Horn Island WeeksPass/Gulfport Pipeline Ellefson POC - Kelly McElhenney 251-694-3722(Unit Price) Pasc Gulfport Pasc TheodoreBWT/GIWW/Ala River Mike Hooks (Rental) Pipeline E. Stroud POC - Roger Gerth 251-694-3708
Ala River GIWW BiloxiHarrison County Beaches(Unit Price) Pipeline 800KCY
Gulf Sand and Gravel POC - Tim Caldwell 251-690-3583BWT/Alabama River(Rental) Pipeline Bid Opening TBD POC - Roger Gerth 251-694-3708
Tenn-Tom/GIWW(Rental) Pipeline Bid Opening TBD POC - Kelly McElhenney 251-694-3722
ProjectMAYMARJANContractor & Dredge SEP SEPJULJUN AUG
Schedule For FY-08 Dredging Work for Mobile DistrictSouth Atlantic Division
SAM Dredging Program
DEC FEBOCT NOV APR
Hopper PipelineBucket Existing Contract FY 08 Updated Sep 2007
Mobile Bay/Bar(Rental) Hopper Manson - Glenn E. POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment Hurricane Contingency Solicitation POC - George Rush 251-694-3715
Panama City Beach Nourishment TBD(Unit Price) Hopper 500,000 CY POC - John Crane 251-690-3257
Mobile Harbor Extensions1200/2100 Bucket Bid Opening Jan 08 POC - Tim Caldwell 251-690-3583(Unit Price)Gulfport HarborImprovements Bucket/Hopper Bid Opening 8 April POC - John Crane 251-690-3257(Unit Price) 5.4McyMobile River
Bucket/Pipeline Bid Opening TBD POC - George Rush 251-694-3715(Unit Price) 800KcyPascagoula Harbor Improvements Bucket/Hopper Bid Opening 17 June POC - John Crane 251-690-3257
8.0McyPascagoula Sound/Horn Island WeeksPass/Gulfport Pipeline Ellefson POC - Kelly McElhenney 251-694-3722(Unit Price) Pasc Gulfport Pasc TheodoreBWT/GIWW/Ala River Mike Hooks (Rental) Pipeline E. Stroud POC - Roger Gerth 251-694-3708
Ala River GIWW BiloxiHarrison County Beaches(Unit Price) Pipeline 800KCY
Gulf Sand and Gravel POC - Tim Caldwell 251-690-3583BWT/Alabama River(Rental) Pipeline Bid Opening TBD POC - Roger Gerth 251-694-3708
Tenn-Tom/GIWW(Rental) Pipeline Bid Opening TBD POC - Kelly McElhenney 251-694-3722
JUN AUG
Schedule For FY-08 Dredging Work for Mobile DistrictSouth Atlantic Division
SAM Dredging Program
DEC FEBOCT NOV APRProject
MAY OCTMARJANContractor & Dredge SEP SEPJUL
Type of Work: Beach Nourishment
Length:1 Mile
Quantity: 500 Kcy
Distance to Borrow Area: 20 Miles
Type of Equipment: Hopper
Small Business Set Aside: No
Schedule: Mid FY08
Type of Work: Beach Nourishment
Length:1 Mile
Quantity: 500 Kcy
Distance to Borrow Area: 20 Miles
Type of Equipment: Hopper
Small Business Set Aside: No
Schedule: Mid FY08
Panama City BeachPanama City Beach
Panama City Beach
Hopper PipelineBucket Existing Contract FY 08 Updated Sep 2007
Mobile Bay/Bar(Rental) Hopper Manson - Glenn E. POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment Hurricane Contingency Solicitation POC - George Rush 251-694-3715
Panama City Beach Nourishment TBD(Unit Price) Hopper 500,000 CY POC - John Crane 251-690-3257
Mobile Harbor Extensions1200/2100 Bucket Bid Opening Jan 08 POC - Tim Caldwell 251-690-3583(Unit Price)Gulfport HarborImprovements Bucket/Hopper Bid Opening 8 April POC - John Crane 251-690-3257(Unit Price) 5.4McyMobile River
Bucket/Pipeline Bid Opening TBD POC - George Rush 251-694-3715(Unit Price) 800KcyPascagoula Harbor Improvements Bucket/Hopper Bid Opening 17 June POC - John Crane 251-690-3257
8.0McyPascagoula Sound/Horn Island WeeksPass/Gulfport Pipeline Ellefson POC - Kelly McElhenney 251-694-3722(Unit Price) Pasc Gulfport Pasc TheodoreBWT/GIWW/Ala River Mike Hooks (Rental) Pipeline E. Stroud POC - Roger Gerth 251-694-3708
Ala River GIWW BiloxiHarrison County Beaches(Unit Price) Pipeline 800KCY
Gulf Sand and Gravel POC - Tim Caldwell 251-690-3583BWT/Alabama River(Rental) Pipeline Bid Opening TBD POC - Roger Gerth 251-694-3708
Tenn-Tom/GIWW(Rental) Pipeline Bid Opening TBD POC - Kelly McElhenney 251-694-3722
JUN AUG
Schedule For FY-08 Dredging Work for Mobile DistrictSouth Atlantic Division
SAM Dredging Program
DEC FEBOCT NOV APRProject
MAY OCTMARJANContractor & Dredge SEP SEPJUL
Mobile Harbor Extension
Mobile Harbor Extension 2100/1200
Type of Work: New WorkDepth: 45’Width: 500’Length: 3300’Quantity: 300 KcyType of Material: Sand/Clay Placement Area: Ocean D/ADistance to Placement Area: 40 MilesType of Equipment: Bucket/HopperSet Aside: YesSchedule: Bid Opening January 2008
Hopper PipelineBucket Existing Contract FY 08 Updated Sep 2007
Mobile Bay/Bar(Rental) Hopper Manson - Glenn E. POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment Hurricane Contingency Solicitation POC - George Rush 251-694-3715
Panama City Beach Nourishment TBD(Unit Price) Hopper 500,000 CY POC - John Crane 251-690-3257
Mobile Harbor Extensions1200/2100 Bucket Bid Opening Jan 08 POC - Tim Caldwell 251-690-3583(Unit Price)Gulfport HarborImprovements Bucket/Hopper Bid Opening 8 April POC - John Crane 251-690-3257(Unit Price) 5.4McyMobile River
Bucket/Pipeline Bid Opening TBD POC - George Rush 251-694-3715(Unit Price) 800KcyPascagoula Harbor Improvements Bucket/Hopper Bid Opening 17 June POC - John Crane 251-690-3257
8.0McyPascagoula Sound/Horn Island WeeksPass/Gulfport Pipeline Ellefson POC - Kelly McElhenney 251-694-3722(Unit Price) Pasc Gulfport Pasc TheodoreBWT/GIWW/Ala River Mike Hooks (Rental) Pipeline E. Stroud POC - Roger Gerth 251-694-3708
Ala River GIWW BiloxiHarrison County Beaches(Unit Price) Pipeline 800KCY
Gulf Sand and Gravel POC - Tim Caldwell 251-690-3583BWT/Alabama River(Rental) Pipeline Bid Opening TBD POC - Roger Gerth 251-694-3708
Tenn-Tom/GIWW(Rental) Pipeline Bid Opening TBD POC - Kelly McElhenney 251-694-3722
JUN AUG
Schedule For FY-08 Dredging Work for Mobile DistrictSouth Atlantic Division
SAM Dredging Program
DEC FEBOCT NOV APRProject
MAY OCTMARJANContractor & Dredge SEP SEPJUL
Type of Work: New WorkDepth: 36’Width: Widen from 220 to 300’Length: 20+ MilesQuantity: 5.4 McyType of Material: Hard Sand and Clay Placement Area: New Ocean D/ADistance to Placement Area: 30 MilesType of Equipment: Bucket/HopperSmall Business Set Aside: NoLast Dredged: 2007Schedule: Bid Opening April 2008
Type of Work: New WorkDepth: 36’Width: Widen from 220 to 300’Length: 20+ MilesQuantity: 5.4 McyType of Material: Hard Sand and Clay Placement Area: New Ocean D/ADistance to Placement Area: 30 MilesType of Equipment: Bucket/HopperSmall Business Set Aside: NoLast Dredged: 2007Schedule: Bid Opening April 2008
Gulfport Harbor Widening
Gulfport Harbor Widening
Hopper PipelineBucket Existing Contract FY 08 Updated Sep 2007
Mobile Bay/Bar(Rental) Hopper Manson - Glenn E. POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment POC - George Rush 251-694-3715
Mobile Bay/Bar(Rental) Hopper Bid Opening by Amendment Hurricane Contingency Solicitation POC - George Rush 251-694-3715
Panama City Beach Nourishment TBD(Unit Price) Hopper 500,000 CY POC - John Crane 251-690-3257
Mobile Harbor Extensions1200/2100 Bucket Bid Opening Jan 08 POC - Tim Caldwell 251-690-3583(Unit Price)Gulfport HarborImprovements Bucket/Hopper Bid Opening 8 April POC - John Crane 251-690-3257(Unit Price) 5.4McyMobile River
Bucket/Pipeline Bid Opening TBD POC - George Rush 251-694-3715(Unit Price) 800KcyPascagoula Harbor Improvements Bucket/Hopper Bid Opening 17 June POC - John Crane 251-690-3257
8.0McyPascagoula Sound/Horn Island WeeksPass/Gulfport Pipeline Ellefson POC - Kelly McElhenney 251-694-3722(Unit Price) Pasc Gulfport Pasc TheodoreBWT/GIWW/Ala River Mike Hooks (Rental) Pipeline E. Stroud POC - Roger Gerth 251-694-3708
Ala River GIWW BiloxiHarrison County Beaches(Unit Price) Pipeline 800KCY
Gulf Sand and Gravel POC - Tim Caldwell 251-690-3583BWT/Alabama River(Rental) Pipeline Bid Opening TBD POC - Roger Gerth 251-694-3708
Tenn-Tom/GIWW(Rental) Pipeline Bid Opening TBD POC - Kelly McElhenney 251-694-3722
JUN AUG
Schedule For FY-08 Dredging Work for Mobile DistrictSouth Atlantic Division
SAM Dredging Program
DEC FEBOCT NOV APRProject
MAY OCTMARJANContractor & Dredge SEP SEPJUL
Type of Work: New WorkDepth: Deepen Upper Sound from 38’ to 42’Width: Bar Channel widen from 350 to 550’ Length: 11 MilesQuantity: 8 McyType of Material: Sands and ClayPlacement Area: Ocean D/ADistance to Placement Area: 20 milesType of Equipment: Bucket/hopperSmall Business Set Aside: NoSchedule: Bid Opening – June 2008
Type of Work: New WorkDepth: Deepen Upper Sound from 38’ to 42’Width: Bar Channel widen from 350 to 550’ Length: 11 MilesQuantity: 8 McyType of Material: Sands and ClayPlacement Area: Ocean D/ADistance to Placement Area: 20 milesType of Equipment: Bucket/hopperSmall Business Set Aside: NoSchedule: Bid Opening – June 2008
Pascagoula HarborDeepening
Pascagoula HarborDeepening
Hopper PipelineBucket Existing Contract FY 08 Updated Sep 2007
MsCIPHancock County Streams Small bucket/truck haul POC - Steve Hrabovsky 251-694-3717
Service Disable VetMsCIP
Gautier Streams Small bucket/truck haul POC - Steve Hrabovsky 251-694-3717Service Disable VetMsCIP
Upper Bayou Casotte Small bucket/truck haul POC - Tom Smith 251-690-3270Service Disable VetMsCIP
Bayou Caddy Containment Small bucket/barge POC - Steve Hrabovsky 251-694-37178AFuel Dock
Penscola Navy Small pipeline POC - John Crane 251-690-3257
Fuel DockHurlburt Field AFB Small pipeline POC - Leo Cain 251-690-3440 FY09 or later
Fuel DockEglin AFB Small pipeline POC - Leo Cain 251-690-3440
Fuel DockTyndall AFB Small pipeline POC - Leo Cain 251-690-3440 FY09 or later
Fuel DockGulfport Small pipeline POC - Leo Cain 251-690-3440 FY09 or later
Fuel DockBelle Chase Small pipeline POC - Leo Cain 251-690-3440 FY09 or later
Pascagoula Marsh -Dredge Mid-size dredge and Material Disposal Site Geotubes to construct POC - John Crane 251-690-3257
425 Acre Site
Schedule For FY-08 Dredging Work for Mobile DistrictSouth Atlantic Division
AUG SEP OCTProject
APR MAY JUN JUL
MsCIP and Work for Others
Contractor & Dredge SEP OCT NOV DEC JAN FEB MAR
Figure 1. Project Location
Hancock County Streams – Hancock Hancock County Streams – Hancock County MarinaCounty Marina
Hancock Hancock County County Streams Streams
Cowan Cowan BayouBayou
Gautier Streams – 5 Gautier Streams – 5 channelschannels
Bayou Caddy Marsh Restoration Project
Containment Structure
New Marsh Bayou Caddy
Figure 3. Rendering of proposed plan for Bayou Caddy by Ron Dawkins
Bayou Caddy ContainmentBayou Caddy Containment
Updated SEPT-2007
FY09 FY10 FY11 FY12
Panama City Beach(Unit Price) Hopper 500K Beach Carillon/Pinnacle Point POC - John Crane 251-690-3257
Pensacola Navy Pipeline OceanUnit Price Hopper 4.5M - 8.0M Beach POC - John Crane 251-690-3257
LittoralMobile Harbor Turning Basin Bucket 3.2M Ocean POC - Tim Caldwell 251-690-3583
Pipeline UplandWalton County, FloridaBeaches Hopper 2M Beach POC - Elaine Baxter 251-690-3411
Pipeline
1st Qtr 2nd Qtr 3rd Qtr 4th Qtr3rd Qtr 4th Qtr1st Qtr3rd QtrDredge Quantity 3rd Qtr1st Qtr 2nd Qtr
Mobile District New Work Dredge ScheduleSouth Atlantic Division
2nd Qtr 4th QtrDisposal
Area1st Qtr 2nd Qtr 4th Qtr
Project
Type of Work: Beach Nourishment
Length:1 Mile
Quantity: 500 Kcy
Distance to Borrow Area: 20 Miles
Type of Equipment: Hopper
Small Business Set Aside: No
Schedule: Mid FY09
Type of Work: Beach Nourishment
Length:1 Mile
Quantity: 500 Kcy
Distance to Borrow Area: 20 Miles
Type of Equipment: Hopper
Small Business Set Aside: No
Schedule: Mid FY09
Panama CityBeachCarillon/Pinnacle
Port
Panama CityBeachCarillon/Pinnacle
Port
Carillon/Pinnacle Port
Type of Work: MaintenanceDepth: 44’Width: 500’ - 800’Length: 5 MilesQuantity: 4.5 - 8.0 McyType of Material: Silts and SandsPlacement Area: Ocean D/A, Beach and Littoral ZoneDistance to Placement Area: VariesType of Equipment: Hopper/PipelineSmall Business Set Aside: NoLast Dredged: 1990Schedule: January 2009
Type of Work: MaintenanceDepth: 44’Width: 500’ - 800’Length: 5 MilesQuantity: 4.5 - 8.0 McyType of Material: Silts and SandsPlacement Area: Ocean D/A, Beach and Littoral ZoneDistance to Placement Area: VariesType of Equipment: Hopper/PipelineSmall Business Set Aside: NoLast Dredged: 1990Schedule: January 2009
PensacolaNavy Channel
PensacolaNavy Channel
Mobile Harbor
Turning Basin
Mobile Harbor
Turning Basin
Type of Work: New WorkDepth: 45’Quantity: 3.2 McyType of Material: Sand, Silt and ClayPlacement Area: Upland/GaillardDistance to Placement Area: 13 MilesType of Equipment: Bucket /PipelineSmall Business Set Aside: NoSchedule: mid – FY09
Type of Work: New WorkDepth: 45’Quantity: 3.2 McyType of Material: Sand, Silt and ClayPlacement Area: Upland/GaillardDistance to Placement Area: 13 MilesType of Equipment: Bucket /PipelineSmall Business Set Aside: NoSchedule: mid – FY09
Mobile Harbor Extension
Gulf of Mexico
Walton County, Florida
Walton County
Post-Ivan 2004May 2003Dune Lakes
Walton County, Florida - BeachesWalton County, Florida - Beaches
Type of Work: Beach RenourishmentQuantity: 2 McyLength: 26 MilesType of Equipment: Hopper/PipelineSmall Business Set Aside: NoSchedule: Late FY 09