Mobinil Power Roadmap

Post on 24-Mar-2016

91 views 0 download

Tags:

description

Mobinil Power Roadmap . restricted - Technology - N D 2011. The Egyptian Company for Mobile Services (Mobinil) Mar 15 th , 2011. Agenda. 1. Green Power . 2. Energy Saving. 3. Carbon Credit & LEED Building . Green Power. Current Solar Project GSMA assessment pure solar site - PowerPoint PPT Presentation

transcript

1The Egyptian Company for Mobile Services (Mobinil) - Restricted

Mobinil Power Roadmap

The Egyptian Company for Mobile Services (Mobinil)Mar 15th, 2011

2The Egyptian Company for Mobile Services (Mobinil) - Restricted

Agenda

Green Power 1

Energy Saving2

3 Carbon Credit & LEED Building

3The Egyptian Company for Mobile Services (Mobinil) - Restricted

Green Power

1. Current Solar Project

2. GSMA assessment pure solar site

3. Hybrid sites

4The Egyptian Company for Mobile Services (Mobinil) - Restricted

Objective• To study opportunities to transfer network sites in off grid areas

powered by diesel generator to renewable green power (Solar System)

Why?• Noticeable reduction in solar system prices, that will leads to achieve better

ROI & payback period• Fuel trend price is unpredictable, we do expect Sharpe increase in the coming

5 years reference to the below trend

175% increase Y03 to Y10 one liter =0.2$

Y03 Y05 Y07 Y09 Y10 Y11 Y150

0.20.40.60.8

11.21.41.61.8

Fuel Price L/EGP

5The Egyptian Company for Mobile Services (Mobinil) - Restricted

Solar Map for the achieved sites (100)

6The Egyptian Company for Mobile Services (Mobinil) - Restricted

Green Power

1. Current Solar Project

2. GSMA assessment pure solar site

3. Hybrid sites

7The Egyptian Company for Mobile Services (Mobinil) - Restricted

GSMA assessment • In progress:

– 40 road sites planned to be launched during 2011

• Future extensions:• 150 sites have been initially identified as being most suitable for the use of

renewable energy• These 98 sites consume a total of 2,189,214 Litres of fuel per year at a current

cost of $634,845 and is likely to increase significantly in the coming years– 98 sites Ready potential for solar power deployment– Releasing 145 genset– Net savings of 12.6 M$ after 10 years– Accordingly reducing carbon footprint (7,250 Ton)– Payback for these 98 sites is as below:

Site power watt No. of sites Payback500 13 1.7

600 4 2.7

700 47 2.9

800 15 3.7

900 19 4

8The Egyptian Company for Mobile Services (Mobinil) - Restricted

Solar Design – 20 Years Model-900W

9The Egyptian Company for Mobile Services (Mobinil) - Restricted

Solar Design – 20 Years Model-900W

10The Egyptian Company for Mobile Services (Mobinil) - Restricted

Potential solar sites

Priority 1 Sites

Priority 2 Sites Priority 3 Sites

11The Egyptian Company for Mobile Services (Mobinil) - Restricted

Green Power

1. Current Solar Project

2. GSMA assessment pure solar site

3. Hybrid (wind + batteries) sites

12The Egyptian Company for Mobile Services (Mobinil) - Restricted

13The Egyptian Company for Mobile Services (Mobinil) - Restricted

Wind + Batteries trial candidates

• payback is 2.7 years for 750 watt site

14The Egyptian Company for Mobile Services (Mobinil) - Restricted

Agenda

Green Power 1

Energy Saving2

3 Carbon Credit & LEED Building

15The Egyptian Company for Mobile Services (Mobinil) - Restricted

1. Objective & Methodology

2. Saving opportunities3. Cooling solutions trials4. New technology/products

Energy Saving

16The Egyptian Company for Mobile Services (Mobinil) - Restricted

Overview on Telecom site Energy Consumption

BSS60%

A/Cs40%

% Energy Consumption in BTS Site

40% of the site consumption will be almost eliminated if A/Cs are replaced with an alternative cooling solution.

17The Egyptian Company for Mobile Services (Mobinil) - Restricted

Objectives:

• Reducing Energy OPEX by using energy efficient solutions.• Moving towards Green solutions.• Smart energy management.

Methodology:• Tackling new and innovative solutions to reduce the energy consumption (applying on the highest sources of consumption first).• Taking advantage of the BSS Swap to modify the power design to be more efficient.

18The Egyptian Company for Mobile Services (Mobinil) - Restricted

1. Objective & Methodology

2. Saving opportunities

3. Cooling solutions trials4. New technology/products

Energy Saving

19The Egyptian Company for Mobile Services (Mobinil) - Restricted

Saving Opportunities Box (Cooling):

Cooling Solutions

Shelter

Traditional A/Cs

1- Downgrade A/Cs (after BSS

Swap)2- Daikin A/C

Saving solutions

3- Raising site temp, setting

4- Free Cooling

Outdoor

Outdoor Enclosure with

indoor BTS

5- Replace A/Cs with HEX or ventilation

Outdoor BTS

20The Egyptian Company for Mobile Services (Mobinil) - Restricted

Cooling Solutions Savings Vs. existing:

I-Traditional A/Cs:

1- Downgrading A/Cs after the BSS Swap:

• A/Cs can be downgraded to 2 HP instead of 3HP due to lower equipment dissipation.

• 30% saving in A/C cons., i.e.: 12% in total site cons.

2- DAIKIN A/Cs:

• Trial has been conducted • 50% saving in A/C cons., i.e.: 20 % in total site cons.• Almost no starting current, more efficient , uses eco-friendly Ferion.

21The Egyptian Company for Mobile Services (Mobinil) - Restricted

Cooling Solutions Savings Vs. existing:

II-Saving Solutions:

3- Raising shelter temperature to 32 C:

• A trial has been conducted (batteries inside NSN cabinet).• 62% saving in A/C cons., i.e.: 25 % in total site cons.

4- Free Cooling Solution:

• A trial will be conducted.• Can be used with high temp setting (with battery cooler) or low setting (without

battery cooler).• 80% expected saving in A/C cons., i.e.: 32 % in total site cons.

22The Egyptian Company for Mobile Services (Mobinil) - Restricted

Cooling Solutions Savings Vs. existing:

III-Outdoor Solutions:

5- Outdoor Enclosures:

• The A/C on the enclosure to be replaced with HEX or ventilation system.• 80% expected saving in A/C cons., i.e.: 32 % in total site cons.• Can be used on new enclosures or to replace for old enclosure doors

23The Egyptian Company for Mobile Services (Mobinil) - Restricted

1. Objective & Methodology

2. Saving opportunities

3. Cooling solutions trials

4. New technology/products

Energy Saving

24The Egyptian Company for Mobile Services (Mobinil) - Restricted

Ventilation system trial (Shram-Dahab 4)• Due to stock limitation of OD BTS for solar project

• Indoor BTS installed in outdoor enclosure after the following preparation:-

Disconnect A/CReplace existing DC fans (2 X 8Watt) with

higher power (air flow) (2 X 60Watt)

•Trial started during June 2010

•Results was as follow:- no high temperature was received during June Measurement duration July 1st till July 13th Max. high Temp. was 46Cº Min. high temp was 31CºConclusion: indoor BTs can safely operate up to 45Cº with ventilation system (same concept of MBO & CBO with HEX)

25The Egyptian Company for Mobile Services (Mobinil) - Restricted

NSN- Site star cabinet trial• Actual specifications for the site-star cabinet (battery cooling cabinet)

• Reduction in energy consumption

• Cabinet application:

1. Using the site star as the battery cabinet instead of the existing battery enclosures which will consume 160 W instead of 940W (less CAPEX/OPEX)

2. Using the site star cabinet in sites with high electricity fees, such as Telecom Egypt (TE) sites. Below, the expected savings (OPEX) from the application of the site star in Telecom Egypt sites.

Ambient Temp. °C Inside temp. °C Max. ΔT obtained Cabinet consumption (W)

Actual measurements 38.89 23.89 15 158

NSN's presented figures 35 20 15 4055 20 35 158

Case Energy consumed in 18 days (kVAh)Trial site (NSN’s solution) 1457 Dummy site (Existing condition 2 A/Cs working) 1978Percent decrease 26.5%

26The Egyptian Company for Mobile Services (Mobinil) - Restricted

1. Objective & Methodology

2. Saving opportunities

3. Cooling solutions trials

4. New technology/products

Energy Saving

27The Egyptian Company for Mobile Services (Mobinil) - Restricted

Smart Site Monitoring

Problem Definition:

• Only 4 alarm records are currently available in Mobinil OMC (Power , Rectifier, High temp, Fire alarm) which leads to the following issues.

Trouble shooting & Diagnosing problems:• The alarms are not sufficient to diagnose the problems and define adequate

solution.• Power logging should be performed manually on site.

Data base & Planning problems:• There is no data base for the power (equipment or history).• Data base is collected via the L1 maintenance subcontractors are usually not

updated or accurate.

28The Egyptian Company for Mobile Services (Mobinil) - Restricted

Smart Site Monitoring

“If you can’t measure it, you can’t manage it.”

Objectives:

• Provide easy and fast tool to trouble shoot power problems and enhance NUR.

• Build a data base for sites equipment & measurements and hence:

Diagnose the root cause of the problem & solve it (ex: stabilizers, cyclic batteries, generator, enhance battery backup.

Optimize the power designs based on actual readings. Explore opportunities for green solutions.

29The Egyptian Company for Mobile Services (Mobinil) - Restricted

Smart Site MonitoringMethodology:

• Installing monitoring system to collect power & environmental data from each site.

• Data will be sent via GPRS (USB modem) to a centralized server.• The available data will be used for analysis and network enhancement.Progress:• Free trial will be conducted with NSN.• 30 Solar sites will be installed with Alcatel monitoring systems.

30The Egyptian Company for Mobile Services (Mobinil) - Restricted

Fuel Cell

Why Fuel Cells?

• Green Solution (fueled by methanol).• Produces DC current (-48 volt).• Can replace backup generator, rectifier and batteries.• 250 Liter tank can operate a 5 KW site (24TRX,3G) for

2 days.

Application:

• Can replace the generators installed in hazard areas.

Action:

• Technical & commercial feasibility should be studied.

31The Egyptian Company for Mobile Services (Mobinil) - Restricted

Smart GeneratorGenerator, controller & batteries in one skid

32The Egyptian Company for Mobile Services (Mobinil) - Restricted

High efficiency Rectifiers

• Rectifiers efficiency is currently around 92%.

• New generations efficiency is around 97%.

• This will save 5% of the BSS power, i.e. 3% in total site cons.

33The Egyptian Company for Mobile Services (Mobinil) - Restricted

Agenda

Green Power 1

Energy Saving2

Carbon Credit & LEED Building 3

34The Egyptian Company for Mobile Services (Mobinil) - Restricted

Carbon Credit Transactions

Clean Development Mechanism “CDM” is simply one of the flexible mechanisms defined in the Kyoto Protocol, that allows transaction of carbon credits (CERs and VERs)* between developed and developing countries.

CERs: Certified Emission ReductionsVERs: Verified Emission Reductions

35The Egyptian Company for Mobile Services (Mobinil) - Restricted

• Mobinil engaged in a CDM project at which Ernst & Young will be providing advisory services for potential Green House Gases “GHGs” abatement projects.

• The current GHGs abatement projects includes:– Energy consumption reduction projects– Alternative Energy projects

36The Egyptian Company for Mobile Services (Mobinil) - Restricted

• BTSs/BSCs related:– Grid power replacing generators– Deployment of outdoor sites instead of

indoor– Fuel cells instead of standby generators– Hybrid solutions for less fuel

consumption– Solar power systems for repeaters and

BTS sites– Swapping BTS sites into Single RAN (2G

& 3G)– Cooling solutions instead of A/Cs with

much less power consumption– Monitoring system for energy

management through the network– Sharing sites with other operators to use

only one source of energy• Ex: 27 KVA genset for 2 sites

instead of 1 for each

• MSCs/Data centers:– IP/MPLS swap– Swapping to soft switches– Transcoders swapping after SingleRAN

implementation– IN swap

• Facilities:– Video Conferencing– Turning off A/Cs and fade lighting after

7:00 pm

Mobinil phase 1 potential projects

This will contribute positively in the green projects investments and will make investment in renewable and alternative energy solutions more attractive for Mobinil.

37The Egyptian Company for Mobile Services (Mobinil) - Restricted

Mobinil always in the LEED

An overview about Leadership in Energy and Environmental Design

38The Egyptian Company for Mobile Services (Mobinil) - Restricted

An internationally recognized set of standards aiming to maximize energy efficiency in any building.

A certificate - that a building was designed and built using these performance improving standards.

What is LEED?...

LEED is flexible enough to apply to all buildings... Commercial and residential. …

Works through the building lifecycle… from design to construction to operations and maintenance… even repairs and restoration.

It’s more of a design approach that sets the tone for what will come later on..

39The Egyptian Company for Mobile Services (Mobinil) - Restricted

What does LEED measure?

1. Energy Savings.. Power consumption, insulation, lighting systems, IT and Data Center designs

2. Water Efficiency…

3. Carbon Emissions… Air-conditioning systems, cooling medium, type and source of power.

4. Indoor environmental quality… Daylight, ventilation, space, ambient temperatures, sound levels

5. Use of resources… Waste management system, nature of building materials

40The Egyptian Company for Mobile Services (Mobinil) - Restricted

LEED Benefits

Substantial savings in operational costs.

Possibility to ‘cash-in’ on reduced carbon emissions

Happier employees, better morale…higher productivity

Better social image

More real estate value. LEED buildings are known to be assessed at higher prices.

41The Egyptian Company for Mobile Services (Mobinil) - Restricted

About Mobinil’s new LEED building… General information Map snapshot Layout and ground floor plan

42The Egyptian Company for Mobile Services (Mobinil) - Restricted

General information Complex Name: Pyramids Heights. Located along Cairo – Alexandria

desert road. 22KM from October City

Lessor: Samcrete Development. Lessee: The Egyptian Company For Mobile Services [Mobinil]

Building B[1]: Basement. Ground. First. Second and Third floors. Total lease area of 1250 ... Distributed over 5 floors:

…. To be used as offices and open work space. Plus an area of 2500M2

basement to be used as a storage and public services for the building.

Expected capacity: 1550 seats

12500 M2

43The Egyptian Company for Mobile Services (Mobinil) - Restricted

Geographical snapshot

44The Egyptian Company for Mobile Services (Mobinil) - Restricted

Layouts. Plans

Typical floor plan

Building layout

45The Egyptian Company for Mobile Services (Mobinil) - Restricted

Thank You