2012 Санкт-Петербург 2

High Level Group for Strategic Developments in Business Architecture in Statistics

• Created by the CES bureau in 2010

• 10 heads of national and international statistical organizations

• Strategic vision endorsed by CES in 2011

2011 Санкт-Петербург 3

High Level Group Vision:

We have to re-invent our products and processes and adapt to a changed world

Vision in brief

Innovate the products and services– Address the global dimension– Use the potential of the data explosion– Take position in the information value chain– Adapt our products to a changing society

2012 Санкт-Петербург 4

27 foldgrowth in the next9 years

Vision in brief

Industrialize the processes– Free up resources, reduce diversity– Standardize, save money– Minimize labor, ease the burden– Collaborate, combine forces

2012 Санкт-Петербург 5

Common Generic lndustrialised Statistics

GSBPM GSIM

Methods Technology

Business Concepts Information Concepts

Statistical HowTo Production HowTo

conc

eptu

alpr

actic

al

Common Generic lndustrialised Statistics

GSBPM GSIM

Methods Technology

Business Concepts Information Concepts

Statistical HowTo Production HowTo

conc

eptu

alpr

actic

al

SINCE THEN:

2012 Санкт-Петербург 6

Since Then:

Workshops with expert group leadersNov 2011; we need GSIM

New Members joined HLG-BASMexico, Republic of Korea

GSIM Sprints (Slovenia, Korea)Version 0.8 created in virtual project

2012 Санкт-Петербург 7

Acquisition Program

Methodology

Statistical Program

Information Request

Dissemination Program

Statistical Project

Data Resource

Population Units

Concept

Variable

Classification

Value Domain

ProviderProvision Agreement

Statistical ProductsData Set

Data Structure

Unit DataStructure

Cube Structure

Record Structures

Process Step Execution

Process Step Design

Process Method

Separation of Statistical, Acquisition, and Dissemination programs, with central role for Methodology

Balanced support for all data acquisition channels

Balanced support for multiple dissemination channels

Shared Data Resource, maintained corporately, for use by all statistical programs

Basic infrastructure for critical base elements

Mapping of processes to support managed operations

All structures and relationships described in metadata to support automated processes

Statistical projects access shared data

Provision for formalisation of arrangements for data acquisition and dissemination

Process management for all areas of activity

Methodology applies to processes in all areas

Process Step Definition

Process Control

Rule

ProductionActivity

ConceptualInformation

GSIM sprint

GSIM V1.0 will enable

• Common, agreed terminology– So we can share and reduce the burden…

• Moving away from subject oriented production– Industrial, not artisanal

• Support for broad-based data capture– Enable use of surveys, administrative data, the data explosion

• Support for all dissemination channels• Consistent with existing standards and

approaches– GSBPM, CORE, ISO 11179, Neuchâtel, DDI, SDMX

GSIM sprint

THEN, JUNE 2012STRATEGY ENDORSED

2012 Санкт-Петербург 10

Strategy: HOW

Improve processes to free up resourcesMake products and services easier to produceUse the potential of the data explosionPrepare for organizational changes as consequence of these goals

2012 Санкт-Петербург 11

Strategy: Next Steps

Completing the GSIM Workshop in November On our (long) list:

Create modular interoperable statistical platformNew methodologies for Big DataList of candidate projects to be key priorityInventory of existing projects, create communityConvergence of standardization initiatives

2012 Санкт-Петербург 12

Strategy: Governance

CES initiated, but is reaching outHLG-BAS oversees execution of the strategy

Directly in the CES-subordinate groupsBy (written) consent in the other groups

Yearly list of key priorities assigned to appropriate expert groups

Annual workshop with all relevant groups

2012 Санкт-Петербург 13

NOW, 2012 AND BEYONDHEADING FOR CHANGE

2012 Санкт-Петербург 14

Communicating our vision

Simple: no techno jargonActions speak louder than words

Vivid: use metaphors and examplesRepeatable: to be spread and shared

By anyone to anyone

Invitational: engage in dialogTwo way communication is better than one wayCommunicate and lead

2012 Санкт-Петербург 15

Gettting the work done

November; Geneva workshop>20 expert groups, aligning

Key priorities determined for HLG-BAS1 or 2 projects, like GSIM

2012 Санкт-Петербург 16

Thank You