MOLALLA RIVER SCHOOL DISTRICT FACILITIES DEPARTMENT SUMMER 2015 DEFERRED MAINTENANCE.

Post on 18-Jan-2016

217 views 0 download

Tags:

transcript

MOLALLA RIVER SCHOOL DISTRICTFACILITIES DEPARTMENT

SUMMER 2015 DEFERRED

MAINTENANCE

MOLALLA HIGH SCHOOL HVAC REPAIRS 2015

• REPLACED BELTS ON A/C UNIT 3• REPAIRED GYM UNIT COMPRESSOR• REPAIRED COOLING TOWER PUMP• REPAIRED GIRLS LOCKER ROOM UNIT ECONOMIZER• REPLACED VARIABLE SPEED DRIVE IN A/C UNIT 1• REPLACED BELTS ON A/C UNITS 1 AND 2• REPLACED SHAFT ON A/C UNIT 2• REPLACED SUPPLY MOTOR FOR RTU 8• REPLACED RETURN MOTOR, BEARINGS, AND SHAFT FOR

RTU 2• REPLACED COMPRESSOR ON DRY SYSTEM IN CANOPY

AREA• REPAIRED PUMP ON RTU 8

HIGH SCHOOL NEW STEAM OVEN AND FILTER SYSTEM

HIGH SCHOOL OLD BOOSTER HEATER AND NEW BOOSTER HEATER

NEW LED FIXTURES FOR STAFF/ATHLETIC PARKING LOT AT HS

MOLALLA ELEMENTARY CARPET

HALLWAY AND LIBRARY

POD AND HALLWAY

MES PAVING UPPER PARKING LOT AND WALKWAYS

SEALED BUS LANE AT MES

MIDDLE SCHOOL EIGHTH GRADE WING EXTERIOR BLINDS FOR TEMP. CONTROL

MIDDLE SCHOOL BOYS LOCKER ROOM PAINTING

MIDDLE SCHOOL GIRLS LOCKER ROOM BEFORE

AND AFTER

NEW SIDEWALK AT MULINO-AROUND THE FRONT TO THE WEST ENTRANCE

MULINO DRAINAGE WORK PREP

MULINO DRAINAGE WORK AFTER

RURAL DELL HALLWAYS PAINTING

NEW SINKS AND FAUCETS AT RURAL DELL

RURAL DELL LOCKER ROOM REMODEL FOR SUPPORTED ED CLASSROOM

ROOFING AT RURAL DELL

RURAL DELL AND CLARKES NEW PRESSURE TANKS

CLARKES BOILER TRANSFORMER BEFORE AND AFTER REPLACEMENT

NEW PHONE SYSTEM HANDSETS

MAIN SERVER AT DISTRICT OFFICE AND INTERCOM SPEAKER

FOOTBALL FIELD HOMECOMING 2015