Move from Traditional Change Management to Agile Methodology · change management to Agile...

Post on 28-Sep-2020

3 views 0 download

transcript

1

Move from Traditional Change Management to Agile Methodology

Session #139, February 13, 2019

Sherri Hess, MS-IS, BSN, RN-BC, FHIMSS Chief Nursing Informatics Officer, Banner Health

Jean Palazzetti, MSN, MBA, RN, Sr Dir Nursing Informatics, Banner Health

2

Sherri Hess, MS-IS, BSN, RN-BC, FHIMSS

Jean Palazzetti, MSN, MBA, RN, HCM

Has no real or apparent conflicts of interest to report.

Conflict of Interest

3

• Pre-Agile Landscape at Banner Health

• Why agile

• Agile principles

• How to implement agile

• Benefits of agile

• Data to support

• Retrospective

Agenda

4

• Explain the importance of moving from traditional change management to Agile methodology

• Explain how to implement a governance model to support an agile, rapid methodology

• Describe the importance of a data driven approach, using analytics to lead design

• Identify three principles in Agile methodology

• Describe three benefits of Agile methodology

Learning Objectives

5

Banner Health System

6

Dare To Dream

7

Polling Question

How long from request for an enhancement to implementation?

Responses

1. 0-3 months

2. 3-6 months

3. 6-9 months

4. 9-12 months

How many requests are in your backlog?

Responses

Under 100

100-300

300-600

Way too many to count

Are your end users satisfied with your enhancement process?

Responses

Delighted by the process

Saddened, needs improved

8

• Significant growth

• New venues of care delivery

• Essential Clinical Data Set

• Clinician satisfaction

• Patient Obsessed culture - Sofia

• Minimal data used to drive changes/enhancements

Landscape For Change

9

• Enhancement process long

• Unclear on decision making process

• Metrics unclear

• Large meetings – poor decision making

• Education was “one size fits all”

Why Agile?

10

Waterfall Change Management

– Converted large academic system

– Enhancement request was complex

– Large backlog of requests

– Adoption low

– Communication was challenging

– Rarely went back to measure success

Pre Agile

11

Which Landed Us Here

12

18,000 Nurses

Done

Done

13

Agile Principles

• Satisfy customer-early and continuous delivery

• Welcome change

• Individuals and interactions over processes and tools

• Working software over comprehensive documentation

• Customer collaboration over contract negotiation

• Respond to change over following plan

14

• Training

• Assemble the teams

• Start-DO SOMETHING

• Scrum meetings

• Grooming sessions

• Retrospectives

How To Implement

15

Benefits Of Agile

• Whole team & stakeholders (SMEs) at the table real time

• Simplicity

• Reflection & Fine Tuning

• Team size

• Work broken down into manageable units

• Focus on quality

• Frequent delivery

16

Capabilities Completed

Average:

• 23 Capabilities per Iteration

Total Counts:

• 362 Complete

• 17 Ready

• 86 In Progress

• 299 Backlog

1 2 2 2 3 2 3 2

79

5 48

12

1

1 11 2

2

1

6

1

2

11 5

108 5 5

12

6

8

9

10 15

24

1

1

4

3 2 2

2

33

3

1 1

2

6

1

2

61

6

5

1

6

6

31

1

2

31

4

3

2

5

84

10

9

7

7

7 8

7

3

0

5

10

15

20

25

30

35

40

45

Iteration01

Iteration02

Iteration03

Iteration04

Iteration05

Iteration06

Iteration07

Iteration08

Iteration09

Iteration10

Iteration11

Iteration12

Iteration13

Iteration14

Iteration15

Iteration16

Ambulatory Consumer/Portal Cross Venue Operations

Hospital Based Medicine Lab Meds Process

Procedural Specialty Medicine

Break/Fix

Only

17

Orders to Scheduling

Decreased the turn around time from procedure order to actual scheduling time by 36.4%

Equated to 2 days and 4 hour reduction

18

• Baseline

– 25.40% of the orders were scheduled within the first 24 hour of the order being placed

– 10.31% of orders were scheduled between 24-48 hours

– 35.71% of orders were scheduled within the first 48 hours

• Comparison

– 43.12% of the orders were scheduled within the first 24 hours of the order being placed

– 11.22% of orders were scheduled between 24-48 hours

– 54.34% of orders were scheduled within the first 48 hours

Increased the amount of orders scheduled within 48 hours by 52.2%

52.2%

Baseline: February 2018

Go Live: September 5, 2018

Comparison: October 2018

Excludes: Orders with a turn around time greater than 28 days

19

Prevented 534,532 mCDS alerts for all users6.4+ million projected prevented mCDS alerts over 12 months for all users

Data Source: Millennium

Baseline: 3/1/18 – 3/31/18

Comparison: 8/8/18 – 9/8/18

534,532 prevented mCDS

alerts over 1

month for all users

6.4+ million projected prevented

mCDS alerts over 12

months for all users

20

ED Physician Efficiency Metrics

Adjusted Time in EMR per patient reduced from 19 min 42 seconds to 11 min 59 secs. Total of nearly 8 minutes!

21

• Interdisciplinary team

• Triad approach

• Feedback Loop

• Dedicate resources

– Support

– Education

– IT

– Informatics

Aligning Support To The Work

22

Banner Comprehensive Approach

Agile Governance

ECD Clinically

Driven

Data

Utilization

Efficiency

Analysis

ECD/Model

Subjective

Survey

23

• What went well

– Hit the ground running

– Teams engaged and Leaders supportive

– Stakeholders on board

– Large amount of work done in a short amount of time

– Clinicians eager for optimization

Post Agile Retrospective

24

• Lessons Learned

– Not all pieces have to be done in one iteration

– Review usage and efficiency analytics before and after

– Take time to address poor adoption

– Put all projects in one place

– Don’t bombard one group with too many changes

– May be too agile

Retrospective, cont’d

26

• Are you ready to adopt agile and two-week sprints?

• Responses

• Bring it on!

• No way!

Polling Question

27

Sherri Hess MS-IS, BSN, RN-BC, FHIMSS

Chief Nursing Informatics Officer

602-747-7288 | Sherri.Hess@bannerhealth.com

Jean Palazzetti, MSN, MBA, RN, HCM

Sr Director Nursing Informatics

602-747-7538 | Jean.Palazzetti@bannerhealth.com

Questions