SAN ANTONIO WATER SYSTEM MULTIPLE SEWERSHED PACKAGE 7A | ADDENDUM 2 1 of 5
MULTIPLE SEWERSHED PACKAGE 7A Solicitation Number: CO–00217 SAWS Sewer Job No.: 17–4559
ADDENDUM 2 July 19, 2019
To Bidder of Record: This addendum, applicable to work referenced above, is an amendment to the bidding documents and as such will be a part of and included in the Contract Documents. Acknowledge receipt of this addendum by entering the Addendum number and issue date on the space provided in submitted copies of the proposal.
MODIFICATIONS TO SPECIFICATIONS
1. The estimated cost for this project has changed to $5,600,0000, which is also now reflected on SAWS website at the following: https://apps.saws.org/Business_Center/Contractsol/Drill.cfm?id=3551&View=Yes
2. Insert attached Right of Entry Agreement with Bexar County into Appendix B.
3. Insert attached Right of Entry Agreement with Roland T. Cantu into Appendix B.
4. Remove and replace the Special Conditions in entirety with the revised version attached to this Addendum. Section SC2.5 has been added for access and work requirements within Bexar County Property (Pletz Park). Section SC2.6 has been added for access and work requirements within the Roland Cantu Property (Texoma Project Site).
MODIFICATIONS TO PLANS
1. Plan sheet 23 – Replace sheet dated 6/27/19 with attached sheet dated 7/17/19. 2. Plan sheet 28 – Replace sheet dated 6/27/19 with attached sheet dated 7/17/19. 3. Plan sheet 29 – Replace sheet dated 6/27/19 with attached sheet dated 7/17/19.
SAN ANTONIO WATER SYSTEM MULTIPLE SEWERSHED PACKAGE 7A | ADDENDUM 2 2 of 5
RESPONSES TO QUESTIONS
1. Is it the intention of SAWS for the contractor reinstate all laterals by remote (if necessary) and
then excavate to make a new Inserta Tee connection to the CIPP?
Answer: Yes, laterals that are specified to be replaced are to be reinstated by remote device temporarily after CIPP lining and then permanent connection to be made by open cut with Inserta‐Tees. See Special Provisions to Technical Specifications, Section M. Revisions to Standard Specification Item No. 1109 Sanitary Sewer Lateral Stub Outs or Reconnections. 2. Will gasket cutting/removal or light root removal be a paid task as an obstruction removal by
remote?
Answer: No, gasket removal and fine root removal will not be paid for separately. See Special Provisions to Technical Specifications, Sections L. Revision to Standard Specification Item No. 1103 Point Repairs and Obstruction Removals. 3. If heavy roots (those having a detrimental effect on the finished CIPP) must be removed, then
will the “obstruction removal by remote device” item apply?
Answer: Yes, per Special Provisions to Technical Specifications, Sections L. Revision to Standard Specification Item No. 1103 Point Repairs and Obstruction Removals, roots balls and other roots not identified as fine roots will be paid for under obstruction removal item. 4. Is the Concrete Riprap item intended to be used for all “stabilized construction entrances” task?
If no, then where is the Riprap to be used?
Answer: No, Concrete Riprap item is not to be used for stabilized construction entrances. Concrete riprap replacement will be necessary for reconstruction of MH No. 56302 and 47994 at the Industrial Center Site. 5. Will the “Flexible Base Compacted 6” Install and Removed” pay item apply to all areas
designated on the plans as “Flexible Base Access Path”? Will the same pay item apply if required for an Asphalt Base prior be paving?
Answer: “Flexible Base Compacted in Place (6”) ‐ Install and Remove” item is intended for areas outside of existing pavement where contractor may need to install (and remove) a temporary road to access areas where work is to be performed. This item is not to be used for repairs to existing roadways/pavements; separate pay items for roadway/pavement repairs are included in the bid documents. 6. Can trees that do not have a Level 2B designation be removed or trimmed, if necessary, at the
contractor’s expense without consequence?
SAN ANTONIO WATER SYSTEM MULTIPLE SEWERSHED PACKAGE 7A | ADDENDUM 2 3 of 5
Answer: Contractor will need to coordinate, schedule meeting and obtain approval for any tree removals or trimming with the City of San Antonio Arborist prior to removal or trimming of any trees in accordance with the tree permit and submit approval to SAWS. 7. Will the Hydromulch item apply when needed for access path restoration?
Answer: Yes, access path areas outside of existing pavement are to be restored with topsoil and hydromulch as necessary. 8. Is the 8” water main relocation pay item to be used for the Riddle St. water main relocation?
Answer: Yes, the water main relocation required for Riddle Street will be paid for under the following items: Item 818 – 8” PVC Water Main (0’‐6’ depth) Item 828 – 8” Gate Valve Item 836 – Pipe Fittings (All Sizes and Types) Item 840 – 8” Water Tie‐In Item 841 – Hydrostatic Testing Item 844 – 2” Blowoff, Temporary Item 3000 – Removal, Transportation, and Handling Asbestos Cement Pipe
Please note that Item 530.1 Barricades, Signs and Traffic Handling – Riddle Street, and Item 550 Trench Excavation Safety Protection will also apply to the water main relocation work.
See sheet C‐22 of plans for water main relocation details. 9. Can the driveway pay item be used for restoring a driveway that must be cut to route bypass?
Answer: All driveway restoration due to bypass are considered subsidiary to the bypass and will not be paid for separately. 10. The total value of the CIPP items will not surpass the 40% self‐perform threshold. Other support
components on CIPP projects, such as Clean/TV, Obstruction Removal, Point Repairs and Bypass Pumping are routinely performed by subcontractors, including paving, when required. Will SAWS waive the 40% self‐perform on this CIPP project which would then permit truly qualified CIPP installers to bid as Prime, if the wish to do so?
Answer: No, this requirement is not waived. 11. The wording on the Statement of Bidder’s Experience should be changed to allow the qualified
Bidder or it’s qualified Subcontractor to install the CIPP as is worded on the Statement of Experience for the Bypass provider. A qualified CIPP installer (Subcontractor or Prime) that has always been approved by SAWS on past CIPP projects, all diameters, should not be discriminated against or arbitrarily excluded from participating just because they’re not a Prime bidder. Furthermore, the current wording prevents a truly qualified CIPP installer from teaming with a truly qualified Prime civil construction contractor that does not happen to install CIPP in house. The current wording is biased to a select few contractors.
SAN ANTONIO WATER SYSTEM MULTIPLE SEWERSHED PACKAGE 7A | ADDENDUM 2 4 of 5
Answer: As this project consists solely of sewer rehabilitation by CIPP for larger diameter pipes, the experience requirements shall not be changed. 12. If a 24” MH ring/cover needs to be replaced, then can it be replaced with a new ring/cover that
is the same size?
Answer: Yes, 24” MH ring and covers can be replaced with same size ring and cover unless manhole reconstruction is specified. For manholes to be reconstructed the ring and cover shall be upgraded to a 30‐inch opening per SAWS standard specification 855 Reconstruction of Existing Manholes. 13. Onslow Site: Why is MH 31243 being designated for Reconstruction?
Answer: MH 31243 is being designated for reconstruction because of the condition of the manhole and for potential liner insertion point. 14. On the Texoma site, is it SAWS intent to temporarily or permanently “plug” the 24” cross pipe?
Answer: The intent is to temporarily plug the 24‐inch cross pipe on the Texoma site. The plug shall be removed after construction is complete. 15. On the Texoma site, can the 48” be diverted at any time into the parallel 66”?
Answer: The parallel 66‐inch main does not have excess capacity so flows cannot be diverted into the parallel 66‐inch main. 16. On Industrial Center, can MH 937839 be used as a suction MH and then reconstructed instead of
installing a Doghouse MH?
Answer: The Contractor will be required to submit a sealed Bypass Pumping Plan in accordance with the requirements in specification 864‐S2 Bypass Pumping (Large Diameter Sanitary Sewers). In that Bypass Pumping Plan, the Contractor can propose an alternate suction point which may include MH 937839. Please not that MH 937839 is shallow. 17. Will the Owner/Engineer please provide the budget for this project?
Answer: See Item 1 under “Modifications to Specifications” above. 18. Will the Owner/Engineer please provide any previous itemized bid tabulations for projects of
similar scope?
Answer: Itemized bid tabulations for previous similar projects are available on the SAWS Business Center website. 19. Will the Owner/Engineer please provide a copy of the current plan holders list?
Answer: The current plan holder’s list is readily available on this project’s solicitation website.
7/18/2019
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-1
SC1.0 - SCOPE OF WORK
The San Antonio Water System is soliciting bids for the purpose of retaining a Contractor to perform the rehabilitation of existing sanitary sewer pipelines using cured-in-place pipe (CIPP) construction method, to include replacement or reconnection of associated existing sanitary sewer services and replacement or rehabilitation of existing manholes.
A project location is a group of pipeline segments as defined in the project plans. There are eight (8) project locations, Industrial Center, Salado Creek Greenway (Pletz Park), F Street, Onslow Drive, Baity Court, E. Houston Street (Willow Springs Golf Course), Riddle Street, Texoma Drive. All quantities are estimated in the proposal, and it is the intent of the proposal and quantities to establish a fixed unit price for various line items to be paid to the Contractor by SAWS during the term of the contract. No change in the unit price will be made, regardless of the actual quantity of the item of work performed during the term of the contract. Some of the work involved in the project may require but is not limited to relocation, installation, replacement, or removal of existing potable water mains, sidewalks, driveways, concrete curbs, wheelchair ramps, topsoil, sodding, concrete steps, signs, and concrete or asphalt replacement.
SC2.0 - PROJECT REQUIREMENTS
Contractor shall submit with their bids a baseline project schedule identifying the order in which the project locations will be completed.
Additional SAWS projects may be ongoing within the vicinity of the Project locations of Baity Court and Onslow Drive. In addition SAWS is pursuing acquisition of Right of Entry (ROE) for construction for the Salem Radio Property located at the Industrial Center project location. These Project locations may be required to be completed after all other Project locations have been completed and accepted by SAWS.
Contractor shall submit a completion report to SAWS when construction is completed. The completion report shall include but not be limited to the following:
Pre and post MPEG-1 format and written to CD/DVD video and video logs. Any test and/or submittals specified in this contract documents such as
density tests, structural properties, etc. that are required.
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-2
SC2.1 - PERFORMANCE TIME
A project location is a group of pipeline segments as defined in the project plans. The table below shows the project locations as identified in the design plans, contract documents, easement(s) and ROE agreements. The Contractor shall submit and maintain throughout construction, a detailed construction baseline schedule showing sequence of work, to clearly identify the project location construction activities.
Location
No. (1) Project Location Scope Segment(s)/
COMPKEYS Permit(s) Special Coordination
1 Texoma Drive CIPP Rehab
993426 CoSA Tree CoSA Arborist
2 Salado Creek Greenway (Pletz
Park)
CIPP Rehab
998968 CoSA Tree Permit CoSA Arborist, CoSA Parks, Bexar County
Parks 3 F Street CIPP
Rehab 1060707 1060359 1060360
CoSA ROW, CoSA Tree CoSA Arborist, CoSA ROW, Gates Elementary,
San Antonio ISD Transportation and Routes
Depts. 4 1Onslow Drive CIPP
Rehab 989028 CoSA ROW, CoSA Tree CoSA Arborist, CoSA
ROW, CoSA Parks 5 1Baity Court CIPP
Rehab 984467 983913 995101
CoSA ROW, CoSA Tree CoSA Arborist, CoSA ROW
6 E. Houston Street (Willow Springs
Golf Course)
CIPP Rehab
999068 CoSA ROW, CoSA Tree CoSA Arborist, CoSA ROW, CoSA Parks,
Alamo City Golf Course (through Willow Springs
Golf Course) 7 Riddle Street CIPP
Rehab 984208 CoSA ROW, CoSA Tree CoSA Arborist, CoSA
ROW 8 2Industrial Center CIPP
Rehab 998888 998889 2383529 1005665 996531
CoSA Tree, CoSA Floodplain Development
CoSA Arborist, Follow ROE information (Salem
Radio Properties)
Notes: 1 Project location may have other SAWS projects occurring within the vicinity. Contractor to coordinate with SAWS and
incorporate into baseline schedule accordingly. 2 Project location that has outstanding Right of Entry for Construction. Contractor may need to start this project location
last and incorporate into baseline schedule accordingly.
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-3
The Contractor shall not work on more than two (2) project locations concurrently without written approval from SAWS Inspections. Contractor shall not commence any work until applicable permits are obtained. Copies of these permits shall be kept on site at all times, readily available. Contractor shall always abide by the permitting entities’ requirements. Contractor shall provide at least 14 day written advance notice to SAWS prior to commencing activities at a different project location.
Final completion of the project, all project locations, shall be achieved in 365 calendar days from the Notice to Proceed issuance date.
Project substantial completion can be achieved when the SAWS Inspector and Engineer confirm all the sanitary sewer pipeline and manhole work (replacement, installation, rehabilitation, reconstruction, etc.) has been completed, tested and the sewer system has been accepted for service. The Contractor shall address all Substantial Completion walkthrough punch-list items. As part of the Final Completion the Contractor shall submit final redlines drawings to the Engineer within 30 days of Substantial Completion date.
SAWS reserve the right to limit the number of active locations if the contractor fails to restore the project sites.
Final completion shall be achieved when the SAWS Inspector, Engineer, and other pertaining entities confirm punch-list items have been completed and permit(s) can be closed.
SC2.2 - PERMITS:
SAWS has obtained Utility Installation Request/ROW permits from TxDOT in accordance with the project contract documents. Note that permits expire on by the 90th calendar day from date of issuance and may be amended by SAWS for one additional 90-day period (180 calendar days total). Contractor shall provide written notification to SAWS at least 48 working days before the permit expires. If a permit extends beyond the 180 calendar days or expires prior to Contractor notifying of renewal request, the permit must be resubmitted to TxDOT by SAWS. TxDOT has up to 30 calendar days for review. Contractor shall provide notification to SAWS 45 calendar days prior to desired start date for new permits or expiration of permit that has already been amended so that SAWS may resubmit the permit request to TxDOT. Contractor shall bear delays in construction time and costs incurred for not providing the required advance notice to SAWS prior to the permit expiring. Delays resulting in liquidated damage fees shall also be borne by the Contractor.
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-4
SAWS has also obtained all applicable Floodplain Development Permit(s) and CoSA Tree Permit(s) from City of San Antonio. Contractor is responsible for all other required permits per the General Conditions. This includes applying and paying CoSA street cut and TxDOT driveway cuts permits.
SC2.3 - ACCESS:
Access to project locations are defined in the design plans, contract documents, ROE exhibits. The Contractor shall carefully review these documents and shall closely coordinate with landowners and their tenants. The Contractor shall bear full responsibility for all actions, damages or impacts of their actions, whether intentionally or not, in or around the project location(s), including correcting said actions at their sole expense. Contractor shall refer to ROEs for additional requirements. Contractor is required to coordinate with the Willow Springs Golf Course for activities taking place at the E. Houston Street project site.
SAWS is pursuing acquisition of Right of Entry (ROE) for construction for the Salem Radio Property (see attached ROE Exhibit), for use by Contractor, reference parcel ID# 500288. This ROE agreement may not be available for the Contractor until after construction Notice to Proceed (NTP) has been given. Contractor shall plan accordingly and include this project site last within Contractor’s baseline schedule.
SC2.4 - CONSTRUCTION ACCESS AND STAGING AREA:
The Contractor shall stake the edges of the Right-of-Entry area(s) (both sides) and easement (s) as indicated in the drawings. Right of Entries for Construction have been obtained by SAWS for several properties within this project. Contractor shall comply with all requirements of each Right of Entry for Construction Agreement and consider schedule limitations that may be specific to certain sites and/or properties. See executed Right of Entry Agreements in the Appendix of these project documents. Contractor shall schedule their work for each site/property accordingly to complete the overall project within the Contract Time.
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-5
SC2.5 – WORK AND ACCESS WITHIN BEXAR COUNTY PROPERTY:
The Contractor shall be aware and abide by the following special conditions for work and access within Bexar County Property (Pletz Park):
1. There shall be no equipment or material staging in the Park at any time;
2. No road closures will be granted;
3. Cables and wood guard bollards keeping vehicles from the trail can be removed temporarily during construction activities but must be replaced every day before the contractor leaves for the workday;
4. The Park will be closed during heavy rains;
5. If after hours or nighttime work is necessary (as approved by SAWS), the Contractor must ensure that the Park gate remains closed at all times after 6:00 p.m.;
6. From November to March, the park gate will close daily at 6:00 p.m. and from April to October, the Park gate will close at 8:00 p.m.;
SC2.6 – WORK AND ACCESS WITHIN ROLAND AND MARY CANTU PROPERTY:
The Contractor shall be aware and abide by the following special conditions for work and access within the Roland and Mary Cantu Property (Texoma Project Site):
1. The construction contractor shall provide notice by phone to the Owner, Mr. Roland Cantu, (210) 260-5960, at least 48 hours in advance of accessing the easement and work area on the Roland Cantu property for construction, site assessments, by-pass pumping operations, and access by ingress/egress.
2. During construction of the Multiple Sewershed Package 7A Project, the construction contractor will coordinate with the property owner via phone at (210) 260-5960, to keep the property owner apprised of the general level of construction activity in the vicinity of the SAWS easement and to address concerns of the property owner that may arise.
3. Following completion of Multiple Sewershed Package 7A Project activities on the property, the contractor shall restore any damaged property, including but not limited to the paved driveway/access road and roadside vegetation, to a condition equal or better than the existing or make good such injury or damage in a manner acceptable to SAWS and property owner (with no separate payment for this work).
4. During construction, by-pass pumping operations, site assessments, ingress/egress, and anytime SAWS representatives or contractor accesses or leaves the property, gates must be closed at all times, including closing and locking gates immediately after each passage.
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-6
SC3.0 - SPECIFICATIONS
All work performed shall be in accordance with the Contract Documents and the current San Antonio Water System Specifications for Water and Sanitary Sewer Construction, these Special Conditions, the current Texas Department of Transportation Standard Specification for Construction of Highways, Streets, and Bridges, the current City of San Antonio Standard Specifications for Public Work Construction, City of San Antonio Utility Excavation Criterial Manual, or specifications and requirements of any other governing jurisdiction that may apply.
SC4.0 - CONSENT DECREE NOTICE PROVISION
The San Antonio Water System (“SAWS”), the United States of America and the State of Texas have entered into a Consent Decree in Civil Action No. 5:13-cv-00666- DAE, United States of America and State of Texas v. San Antonio Water System, in the United States District Court for the Western District of Texas, San Antonio Division (the “Consent Decree”). A copy of the Consent Decree is available at http://www.saws.org/Infrastructure/EPA/download.cfm
Work performed pursuant to this contract is work that SAWS is required to perform pursuant to the terms of the Consent Decree. In the event of any conflict between the terms and provisions of this Consent Decree Notice Provision and any other terms and provisions of this Contract or the Contract Documents, the terms and provisions of this Consent Decree Notice Provision shall prevail.
A. Retention of documents.
Contractor shall retain and preserve all non-identical copies of all documents, reports, research, analytical or other data, records or other information of any kind or character (including documents, records, or other information in electronic form including, but not limited to e-mails) in its or its sub-contractors’ or agents’ possession or control, or that come into its or its sub- contractors’ or agents’ possession or control, and that relate in any manner to this contract, or the performance of any work described
in this contract (the “Information”). This retention requirement shall apply regardless of any contrary corporate or institutional policy or procedure or legal requirement. Contractor, Contractor’s sub-contractors and agents shall retain and shall not destroy any of the Information until such time as Contractor has received written approval from the General Counsel of SAWS that the Information or any part of the Information may be destroyed. Contractor shall, within 30 days after receipt of a written request by SAWS, deliver the Information to SAWS. Contractor
Multiple Sewershed Package 7A Addendum No. 2
Special Conditions
SC-7
shall instruct and require its agents and sub-contractors performing any part of the work described in this contract to comply with the requirements of this paragraph.
B. Notification of events that may cause delay.
If any event occurs that may delay performance by Contractor, or Contractor’s agents or sub-contractors of any work or obligation of any kind under this contract, Contractor shall provide notice in accordance with the Notice Provisions of this contract to SAWS within two (2) business days of the date Contractor or Contractor’s agents or sub-contractors first knew that the event might cause a delay. Contractor shall provide a written explanation and description of the reasons for the delay, the anticipated duration of the delay, all actions taken or to be taken to prevent or minimize the delay, and a schedule for implementation of any measures to be taken to prevent or mitigate the delay or the effect of the delay. TIME IS OF THE ESSENCE in the performance of the requirements of this paragraph and of any work to be performed by the Contractor in this contract.
C. Liability for stipulated penalties.
The Consent Decree provides that the United States of America, the United States Environmental Protection Agency and the State of Texas may assess stipulated penalties against SAWS upon the occurrence of certain events. To the extent that Contractor or Contractor’s agents or sub-contractors cause or contribute to, in whole or in part, the assessment of any stipulated penalty against SAWS, Contractor agrees that it shall pay to SAWS the full amount of any stipulated penalty assessed against and paid by SAWS that is caused or contributed to in whole or in part by any action, failure to act, or failure to act within the time required by any provision of this contract. Contractor shall also pay to SAWS all costs, attorney fees, expert witness fees and all other fees and expenses incurred by SAWS in connection with the assessment or payment of any such stipulated penalties, or in contesting the assessment or payment of any such stipulated penalties. In addition to any and all other remedies to which SAWS may be entitled at law or in equity, Contractor expressly authorizes SAWS to withhold all amounts assessed and paid as stipulated penalties, and all associated costs, fees, or expenses from any amount unpaid to Contractor under the terms of this contract, or from any retainage provided in the contract.
- END -
30 & E IRR PT OF TR E
NCB 12117 BLK LOT TR
2901 E LOOP 410
PROPERTIES INC
SALEM RADIO
ESM'T)
(VARI WIDTH DRAINAGE
SUBDIVISION), LOT 901
NCB 12117 (SCAR
E LOOP 410
SCAR INC
30" S
A
30" S
A
30" S
A30" S
A
30" S
A
30" S
A
30" S
A
30" S
A
30" S
A
30" SA
30" SA
30" SA
30" SA
30" SA
30" SA
30" SA
DESIGNED BY:
PROJECT NO.:
DATE:
OF
NO. REVISIONDATE BY
DRAWN BY:
CHECKED BY:
COPYRIGHT:
SHEET TITLE
1 2 3 4 5 6
D
E
SCALE:
02196053.0000
SHEET
C
B
A
ARCADIS U.S., INC.
FIRM REGISTRATION NUMBER: F-533
WATER SYSTEM
SAN ANTONIO
10001 Reunion PlaceSuite 404San Antonio, Texas 78216P - 210.491.2391 F - 512.338.1784
TBPE Firm #6535 www.kfriese.com
LEGEND
AS SHOWN
92
0 50' 100'
HORIZONTAL SCALE
CONCEPUTAL BYPASS LINE
PROPERTY LINE
SANITARY SEWER MANHOLE
EXIST SANITARY SEWER
PROP SANITARY SEWER
JOB NO. 17-4559
PACKAGE 7A PROJECT
MULTIPLE SEWERSHED
FEBRUARY 2019
100% SUBMITTAL
07/17/19
109721
CHRISTOPHER BOENTGES
23
INDUSTRIAL CENTER
998889, 988888
1005665, 2383529,
SEGMENT 996531,
PLAN 2 OF 2
BYPASS PUMPING
BP-02
APPARENT ROW
SE
E S
HE
ET 2
2 O
F 9
2M
AT
CH LIN
E A
7/16/2019 ADDENDUM # 2 CB
BEITEL CREEK
IH LOOP 410 WBFR
MH ID# 413396
MH ID# 45779
MH ID# 59911
100-YEAR FLOODPLAINVOL. 5491, PG 912SEWER EASEMENT 25' SANITARY
VOL. 5491, PG 917EASEMENT (0.430 ACRES) 25' SANITARY SEWER
PLAT VOL. 7700, PG 56EASEMENT AS SHOWN IN 25' SANITARY SEWER
VOL. 7700, PGS 55-5620' ACCESS EASEMENT
MH ID# 937839
+INV ELEV = 706.40' +TOP ELEV = 725.00'
DOGHOUSE SUCTION MH (NSPI)PROP 5' DIA WATERTIGHT
EASEMENT VOL. 7700, PG 5616' SANITARY SEWER
PLAN PER SPECIFICATION 864-S1 AND 864-S2.PHASING SHOWN IS CONCEPUTAL. CONTRACTOR IS RESPONSIBLE FOR PREPARING BYPASS PUMPING MAINTAIN TRAFFIC THROUGH INTERSECTIONS AND ACCESS TO DRIVEWAYS. BYPASS ROUTE AND PORTIONS OF BYPASS PIPING WILL REQUIRE ROAD RAMPS OR NEED TO BE BURIED IN ORDER TO 3.
OF CONSTRUCTION. CONTRACTOR MUST FIELD VERIFY ALL DEPTHS, DISTANCES, PIPE SIZES, AND GRADES BEFORE START 2.
NOTIFICATION OF THE PIPE INSTALLATION. C. NOTIFICATION OF BYPASS PUMPING SETUP OPERATIONS. B. NOTIFICATION OF PRE-TELEVISION INSPECTION. A.
ANY OF THE FOLLOWING ACTIVITES TAKE PLACE:CONTRACTOR MUST NOTIFY AND/OR CONTACT SAWS INSPECTION AT 210-233-3500 48 HOURS BEFORE 1.
GENERAL SEWER NOTES:
2
2
IRRG 370 FT OF 5 NCB 10575 BLK LOT E 3635 BELGIUM LN
CITY OF SAN ANTONIO
IRRG 439.45 FT OF 5
NCB 10575 BLK LOT N
1411 PICARDIE DR
BEXAR COUNTY
14" S
A
14" S
A
14" S
A
14" S
A
14" S
A
14" S
A
36" SA
36" SA
30" SA
30" SA
36" SA 36" SA 36" SA 36" SA
36" SA 36" SA 36" SA 36" SA
36" SA 36" SA 36" SA
36" SA 36" SA
48" S
A
48" S
A
48" S
A
48" S
A
42" S
A
42" S
A
42" S
A42" S
A
36" S
A
36" S
A
78" S
A
78" S
A
DESIGNED BY:
PROJECT NO.:
DATE:
OF
NO. REVISIONDATE BY
DRAWN BY:
CHECKED BY:
COPYRIGHT:
SHEET TITLE
1 2 3 4 5 6
D
E
SCALE:
02196053.0000
SHEET
C
B
A
ARCADIS U.S., INC.
FIRM REGISTRATION NUMBER: F-533
WATER SYSTEM
SAN ANTONIO
10001 Reunion PlaceSuite 404San Antonio, Texas 78216P - 210.491.2391 F - 512.338.1784
TBPE Firm #6535 www.kfriese.com
LEGEND
AS SHOWN
92
0 50' 100'
HORIZONTAL SCALE
CONCEPUTAL BYPASS LINE
PROPERTY LINE
SANITARY SEWER MANHOLE
EXIST SANITARY SEWER
PROP SANITARY SEWER
JOB NO. 17-4559
PACKAGE 7A PROJECT
MULTIPLE SEWERSHED
FEBRUARY 2019
100% SUBMITTAL
07/17/19
109721
CHRISTOPHER BOENTGES
28
GREENWAY
SALADO CREEK
SEGMENT 998968
PLAN 1 OF 2
BYPASS PUMPING
NCB 10583 BLK LOT F
1415 CREEKVIEW DR
VAN DYKE
ANNE R & RICHARD A
13.43 AC
NCB 10583 BLK LOT J
1375 CREEKVIEW DR
DOUGLAS M JONES
295.2 FT OF 5 OR P-101
IRR 329.28 FT OF E IRR
NCB 10575 BLK LOT NW
BEXAR COUNTY
AC TOTAL AC 13.296
7.712 AC & P-2A 5.584
IRR 152.53 FT OF TR-9
NCB 10574 BLK LOT NE
BEXAR COUNTY
NCB 14386 BLK 2 LOT 14
BLVD
3807 WILLOWWOOD
REGINA WILLIAMS
NCB 14386 BLK 2 LOT 13
BLVD
3811 WILLOWWOOD
RUTH E MCCLEDON
NCB 14386 BLK 2 LOT 12
BLVD
3814 WILLOWWOOD
RICHARDSON
ERNESTINE B
NCB 14386 BLK 2 LOT 11
BLVD
3810 WILLOWWOOD
JACKSON
HARVEY G & ADA
BP-03
SE
E S
HE
ET 2
9 O
F 9
2M
AT
CH LIN
E A
7/17/2019 ADDENDUM # 2 CB
PLETZ COUNTY PARK ENTRANCE ROAD
TR
AIL
WA
Y
CO
SA P
AR
KS
PLETZ COUNTY PARK ENTRANCE ROAD
SALA
DO C
REEK
SALADO CREEK
100-YEAR FLOODPLAIN
MH ID# 48937
MH ID# 48938VOL. 4119, PG 455EASEMENT10' SANITARY SEWER
VOL. 2857, PG 143EASEMENT25' SANITARY SEWER
(ABANDONED)EXISTING 14" SIPHON
MH ID# 479618
PLAN PER SPECIFICATION 864-S1 AND 864-S2.PHASING SHOWN IS CONCEPUTAL. CONTRACTOR IS RESPONSIBLE FOR PREPARING BYPASS PUMPING MAINTAIN TRAFFIC THROUGH INTERSECTIONS AND ACCESS TO DRIVEWAYS. BYPASS ROUTE AND PORTIONS OF BYPASS PIPING WILL REQUIRE ROAD RAMPS OR NEED TO BE BURIED IN ORDER TO 3.
OF CONSTRUCTION. CONTRACTOR MUST FIELD VERIFY ALL DEPTHS, DISTANCES, PIPE SIZES, AND GRADES BEFORE START 2.
NOTIFICATION OF THE PIPE INSTALLATION. C. NOTIFICATION OF BYPASS PUMPING SETUP OPERATIONS. B. NOTIFICATION OF PRE-TELEVISION INSPECTION. A.
ANY OF THE FOLLOWING ACTIVITES TAKE PLACE:CONTRACTOR MUST NOTIFY AND/OR CONTACT SAWS INSPECTION AT 210-233-3500 48 HOURS BEFORE 1.
GENERAL SEWER NOTES:
2
MH ID# 48949
MH ID# 547657
SHEET)NOTE 1, THIS (REFER TO MH ID# 49293
2
2
+INV ELEV = 616.3 +TOP ELEV = 633.5
SUCTION MH (NSPI)NEW 5' DIA WATERTIGHT
REQUIREMENTSFOR COSA PARKS TRAIL (NSPI), SEE SHEET G-05 ACROSS COSA TRAIL TRENCH BYPASS PIPING
NCB 10575 BLK LOT 8C
3835 BELGIUM LN
CITY OF SAN ANTONIO
36" SA
36" SA
36" SA
48" S
A
48" S
A
48" S
A
48" S
A
42" S
A42" S
A36" S
A
42" S
A
42" S
A
36" S
A
78" SA
78" SA
78" SA
DESIGNED BY:
PROJECT NO.:
DATE:
OF
NO. REVISIONDATE BY
DRAWN BY:
CHECKED BY:
COPYRIGHT:
SHEET TITLE
1 2 3 4 5 6
D
E
SCALE:
02196053.0000
SHEET
C
B
A
ARCADIS U.S., INC.
FIRM REGISTRATION NUMBER: F-533
WATER SYSTEM
SAN ANTONIO
10001 Reunion PlaceSuite 404San Antonio, Texas 78216P - 210.491.2391 F - 512.338.1784
TBPE Firm #6535 www.kfriese.com
LEGEND
AS SHOWN
92
0 50' 100'
HORIZONTAL SCALE
CONCEPUTAL BYPASS LINE
PROPERTY LINE
SANITARY SEWER MANHOLE
EXIST SANITARY SEWER
PROP SANITARY SEWER
JOB NO. 17-4559
PACKAGE 7A PROJECT
MULTIPLE SEWERSHED
FEBRUARY 2019
100% SUBMITTAL
07/17/19
109721
CHRISTOPHER BOENTGES
GREENWAY
SALADO CREEK
SEGMENT 998968
PLAN 2 OF 2
BYPASS PUMPING
29
NCB 10575 BLK LOT 8C
3835 BELGIUM LN
CITY OF SAN ANTONIO
NCB 10575 BLK LOT 8C
3835 BELGIUM LN
CITY OF SAN ANTONIO
& 2 & EIRR PT OF 3
EXC PT OF N 5FT STRIP
NCB 10579 BLK LOT 1
1027 CREEKVIEW DR
CAROL SUE CALBERG
527.22 FT OF 3
IRR 217 FT OF 3 IRR
NCB 10579 BLK LOT S
CREEKVIEW DR
INVESTMENTS INC
DECISIVE CAPITAL
NCB 12202 BLK LOT TR A
1223 CREEKVIEW
JJBREIT LLC
NCB 10575 BLK LOT 8C
3835 BELGIUM LN
CITY OF SAN ANTONIO
BP-04
SE
E S
HE
ET 2
8 O
F 9
2M
AT
CH LIN
E A
7/17/2019 ADDENDUM # 2 CB
COSA TRAIL
PLETZ COUNTY PARK ENTRANCE ROAD
COSA
PARKS T
RAI
LWAY
SALADO
CREEK
100-YEAR FLOODPLAIN
MH ID# 479646
VOL. 6127, PG 912EASEMENT50' SANITARY SEWER
VOL. 4119, PG 455EASEMENT10' SANITARY SEWER
VOL. 2857, PG 143EASEMENT25' SANITARY SEWER
INV ELEV = 613.89' TOP ELEV = 625.25'MH ID# 4796458' DIA DISCHARGE
INV ELEV = 615.09'TOP ELEV = 627.51'ID# 4796505' DIA SUCTION MH
MH ID# 479651
ID # 479621STRUCTURE
ID # 479644STRUCTURE
PLAN PER SPECIFICATION 864-S1 AND 864-S2.PHASING SHOWN IS CONCEPUTAL. CONTRACTOR IS RESPONSIBLE FOR PREPARING BYPASS PUMPING MAINTAIN TRAFFIC THROUGH INTERSECTIONS AND ACCESS TO DRIVEWAYS. BYPASS ROUTE AND PORTIONS OF BYPASS PIPING WILL REQUIRE ROAD RAMPS OR NEED TO BE BURIED IN ORDER TO 3.
OF CONSTRUCTION. CONTRACTOR MUST FIELD VERIFY ALL DEPTHS, DISTANCES, PIPE SIZES, AND GRADES BEFORE START 2.
NOTIFICATION OF THE PIPE INSTALLATION. C. NOTIFICATION OF BYPASS PUMPING SETUP OPERATIONS. B. NOTIFICATION OF PRE-TELEVISION INSPECTION. A.
ANY OF THE FOLLOWING ACTIVITES TAKE PLACE:CONTRACTOR MUST NOTIFY AND/OR CONTACT SAWS INSPECTION AT 210-233-3500 48 HOURS BEFORE 1.
GENERAL SEWER NOTES:
2
2
2
REQUIREMENTS FOR COSA PARKS TRAIL (NSPI), SEE SHEET G-05 ACROSS COSA TRAIL TRENCH BYPASS PIPING