Why Airflow Management

© Upsite Technologies, Inc.05/02/2023 2

Total Load

IT LoadPUE =

Mechanical plant + cooling fans: 35% of total load, 73% of non IT Load

2002 Uptime Institute Research

Bypass Airflow* 60%

Hot Spots 10%

Cooling Capacity 2.6x

2013 Upsite Technologies Research

Bypass Airflow* 48%

Hot Spots 20%

Cooling Capacity 3.9x

*More accurately, “Raised Floor Bypass Open Area” in today’s terminology.

The State of Airflow Management

© Upsite Technologies, Inc.05/02/2023 3

  Raised floor

area (sq ft)

# of running cooling units

Raised floor

bypass open

area (%)

Hot spots (%

of cabinets

)

Cold spots (%

of cabinets) (Data from 6 sites)

Proper perforated tile

placement (%)

Cooling Capacity Factor (CCF)

Averages 7,527 8 48% 20% 35% 77% 3.9Minimum 720 2 13% 0% 0% 7% 1.2Maximum 37,00

040 93% 86% 86% 100% 32.0

Recommended

n/a n/a <10% 0% 0% 100% 1.2Conclusion: Inefficient cooling configuration / airflow management is the problem; capacity is not the problem.

Research

© Upsite Technologies, Inc.05/02/2023 4

Large unsealed cable openings can release ¼ of a cooling units capacity.

Raised Floor Open Area

© Upsite Technologies, Inc.05/02/2023 5

Raised floor openings sealed with KoldLok brush grommets

Raised Floor Open Area

© Upsite Technologies, Inc.05/02/2023 6

IT Intake Air Temperatures are Paramount

© Upsite Technologies, Inc.05/02/2023 7

Airflow is invisible Cooling capacity is difficult to quantify Mixed messages in the market Vendor influence Lack of education

Why are Myths Prevalent

© Upsite Technologies, Inc.05/02/2023 8

• Money

• OpEx Savings• CapEx Savings

• Capacity• Cooling Capacity

• IT Reliability

• Green Initiatives• CO2 Reduction

A 4,000 Sq. Ft. data center could reduce its operating expense by $60,000 annually, simply by improving airflow management.

AFM Problems Are an Opportunity

© Upsite Technologies, Inc.05/02/2023 9

“Containment eliminates bypass airflow”

• Bypass airflow – any conditioned air that does not pass through IT equipment before returning to a cooling unit.

Myth #1

© Upsite Technologies, Inc.05/02/2023 10

Bypass Airflow Clarified

Typical existing conditions

© Upsite Technologies, Inc.© Upsite Technologies, Inc.05/02/2023 11

Bypass Airflow Clarified

After raised floor AFM improvements

© Upsite Technologies, Inc.© Upsite Technologies, Inc.05/02/2023 12

Bypass Airflow Clarified

With Containment

© Upsite Technologies, Inc.© Upsite Technologies, Inc.05/02/2023 13

Bypass Airflow Clarified

Optimized

© Upsite Technologies, Inc.© Upsite Technologies, Inc.05/02/2023 14

“Containment improves efficiency / reduces costs”

• Only true if reduction of hot spots reduce IT equipment fan speeds

• Creates the opportunity to improve efficiency and reduce costs

Myth #2

© Upsite Technologies, Inc.05/02/2023 15

Stranded Capacity of low temperature set pointsLiebert DX Model VH267W 20-Ton Cooling Unit

Environmental Condition

Total(kW)

Latent(kW)

Sensible(kW)

72°F, 45% Rh 67.0 0 67.070°F, 48% Rh 64.5 4.8 59.7Stranded 2.5 4.8 7.3Stranded (%) 4% 11%

Stranded Capacity

© Upsite Technologies, Inc.05/02/2023 16

Stranded Capacity from low temperature set pointsLiebert Chilled Water Model 600C CRAH Unit

Cooling capacity increase from 7°F return air increase

Environmental Condition

Total(kW)

Latent(kW)

Sensible(kW)

72°F, 45% Rh 98.0 0 98.065°F, 45% Rh 70.0 0 70.0Stranded 28.0 0 28.0Stranded (%) 40% 40%

Stranded Capacity

© Upsite Technologies, Inc.05/02/2023 17

“When containment is deployed, perforated-tile placement doesn’t matter”

•There can be too many perforated tiles or grates in a cold aisles

Myth #3

© Upsite Technologies, Inc.05/02/2023 18

Misplaced/Excessive Supply Tiles

© Upsite Technologies, Inc.05/02/2023 19

“Containment increases the return air temperature to cooling units”

•Thermostat controls return air temperature

•Same flow rate and heat load so same average delta T

Myth #4

© Upsite Technologies, Inc.05/02/2023 20

Bypass Airflow Revealed

© Upsite Technologies, Inc.05/02/2023 21

“Full containment is essential, partial containment doesn’t work.”

• Doors alone can produce significant benefits• Sealing rack openings can make an impact• A few baffles can eliminate isolated hot spots

Myth #5

© Upsite Technologies, Inc.05/02/2023 22

Full containment didn’t solve intake air temperature problems

Hot and cold spots are still present

Myth #5

© Upsite Technologies, Inc.05/02/2023 23

Rack AFM is crucial to any aisle level solution

Myth #5

© Upsite Technologies, Inc.05/02/2023 24

Rack AFM is crucial to any aisle level solution

Myth #5

© Upsite Technologies, Inc.05/02/2023 25

No Containment

© Upsite Technologies, Inc.05/02/2023 26

Baffles and Doors

© Upsite Technologies, Inc.05/02/2023 27

Modular Containment

Modular Containment

Cold Aisle Application

Hot Aisle Application

© Upsite Technologies, Inc.05/02/2023 28

Modular Containment

Angled Rack Top Baffles (Cold Aisle)

Adjustable Rack Gap Panel

Vertical Rack Top Baffles (Hot Aisle)

Modular Containment

© Upsite Technologies, Inc.05/02/2023 29

Identify Your Opportunity

© Upsite Technologies, Inc.05/02/2023 30

There are two types of computer rooms

1. Those without IT equipment intake air temperature problems

• Improving AFM enables them to be more efficient

2. Those with IT equipment intake air temperature problems

• Improving AFM solves intake air temperature problems (hot

spots and cold spots) and enables them to be more efficient

• More efficient results in: lower OPEX, deferred CAPEX,

increased cooling capacity

A metric Upsite Technologies developed to estimate the utilization of computer room cooling infrastructure.

CCF is a ratio of the total rated cooling capacity to estimated heat load.

The Cooling Capacity Factor (CCF)

© Upsite Technologies, Inc.05/02/2023 31

Convert the total rated (stated) cooling capacity to kW, divide by 110% of the IT critical load (kW)

7 – 30 ton cooling units (210 tons) UPS load 235 kW

Total rated cooling capacity (210 tons x 3.52) = 739 kW

110% of the IT critical load (235 x 1.1) = 259 kW

CCF = 2.8 (739/259) Running cooling capacity is 280% of the load

CCF: How It’s Calculated

© Upsite Technologies, Inc.05/02/2023 32

CCFTons x 3.52 = kWcCooling unit capacityRated capacity at standard conditions (75 deg F, 45%Rh)Capacity goes up with increase in return temperatureCapacity goes down with decrease in return temperature

At 80% fan speed80% airflow volumeOnly 50% of fan energy

Identify Your Opportunity

© Upsite Technologies, Inc.05/02/2023 33

Relationship BetweenFlow rate : Delta T : Heat load

CFM =

q = amount of heat transferredCp = specific heat of airΔT = temperature rise of air across the heat source W = mass flow

CFM = cubic feet per minute of airflow through the server3.16 = factor for density of air at sea level in relation to F⁰ΔT = temperature rise of air through the server in F⁰

q = Cp x W x ΔT

3.16 x W Delta T

Heat Transfer Equation

© Upsite Technologies, Inc.05/02/2023 34

Relationship BetweenFlow rate : Delta T : Heat load

“Blade” servers at 35 F ⁰ ΔT consume 90 CFM / kW

“Pizza box” servers at 20 F ⁰ ΔT consume 158 CFM / kW

UPS load (kW) x CFM/kW = Total IT CFM

Typical IT Cooling Airflow Rates

© Upsite Technologies, Inc.05/02/2023 35

Key Airflow Management Metrics

AFM Metrics

IT Equipment Intake Air Temperature Cooling Capacity Factor (CCF) Raised Floor Open area Supply Tile Placement (perforated tiles and grates) Blanking Panel Utilization Bypass Airflow

A holistic approach An iterative process ‘Check in’ at the room level

after making any AFM improvements

Watch video at:upsite.com/resources/airflow-management/

Upsite’s 4 R’s of Airflow Management™

© Upsite Technologies, Inc.05/02/2023 37

05/02/2023 © Upsite Technologies, Inc. 38

June 15: How IT Decisions Impact Facilities: The Importance of Mutual UnderstandingPresented by Ian Seaton and Lars Strong, P.E.

June 22: The 4 Delta T’s of Airflow ManagementPresented by Lars Strong, P.E.

Register at upsite.com/airflow-management-awareness-month

Upcoming Webinar Schedule

Thank you!

@UpsiteTech

blog.upsite.com

On LinkedIn

Lars Strong, P.E.Senior Engineer, Upsite Technologieslstrong@upsite.com

Follow Upsite for the latest news and information on data center AFM.