8/26/2020
1
North Pleasant Valley DesalterSalinity Management Pipeline Connection
aaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
August 26, 2020
Desalter Site and Pipelines
DesalterSiteChurch
Brine Line (SMP)
Connection
1
2
8/26/2020
2
Desalter Site Looking East
Upland Rd.
SMP Discharge Connection
• Calleguas MWD Agreement for Construction and Use of SMP Discharge Connection
• CMWD design, construct, own and operate - City pays all costs
• Initial preliminary estimate for design and construction - $500,000
• Total deposits to CMWD to date for design and construction - $603,843
• Additional deposit required for construction - $313,440
Total estimated cost incl. 20% contingency $917,283Prior council authorizations $623,843Additional authorization required $293,440
3
4
8/26/2020
3
Calleguas MWD SMP Discharge Connection
Desalter Site – August 25, 2020
5
6